Home > Land Rover > Automobile > Land Rover Range Rover 2002my On Workshop Procedures Lm 6th Edition Nas Rover Manual

Land Rover Range Rover 2002my On Workshop Procedures Lm 6th Edition Nas Rover Manual

    Download as PDF Print this page Share this page

    Have a look at the manual Land Rover Range Rover 2002my On Workshop Procedures Lm 6th Edition Nas Rover Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 364 Land Rover manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.

    Page
    of 938
    							ENGINE - V8
    12-2-108 OVERHAUL
    5.Remove 2 bolts securing 2 brackets to upper 
    timing gear cover and remove brackets.
    6.Remove 6 bolts securing timing gear cover to 
    cylinder head and remove timing gear cover.
    7.Discard timing gear cover gasket.
    NOTE: Do not carry out further dismantling if 
    component is removed for access only.
    8.Remove bolt securing CMP sensor and remove 
    sensor.
    9.Discard O ring.
    Inspect
    1.Clean CMP sensor and mating face.
    Reassembly
    1.Fit new O ring to CMP sensor.
    2.Fit CMP sensor, fit bolt and tighten to 10 Nm (7 
    lbf.ft).
    3.Clean timing gear cover and mating face, clean 
    dowels and dowel holes.
    4.Remove bolt securing CMP sensor and remove 
    sensor.
    5.Apply sealant STC 50550 to areas illustrated.
    6.Fit RH lower bolt to timing gear cover and 
    position cover to cylinder head.
    NOTE: It is not possible to fit the RH lower bolt 
    after fitting the LH upper timing gear cover.
    7.Fit remaining 5 bolts and hand tighten 6 bolts 
    securing timing cover. 
    						
    							ENGINE - V8
    OVERHAUL 12-2-109
    8.Fit LRT-12-225/2 to LH camshaft cover.
    9.Fit camshaft cover and tool, fit 4 bolts and 
    tighten to 10 Nm (7 lbf.ft).
    10.Tighten bolts securing timing gear cover to 15 
    Nm (11 lbf.ft).
    11.Position 2 brackets to timing gear cover, fit bolts 
    and tighten.
    12.Remove 4 bolts securing camshaft cover, 
    remove camshaft cover and LRT-12-225/2.
    13. RH upper timing gear cover: Fit new sealing 
    washer, fit timing chain tensioner and tighten 
    plug securing chain tensioner to 40 Nm (30 
    lbf.ft).
    14. RH upper timing gear cover: Clean RH VCC 
    solenoid seal and mating faces.
    15. RH upper timing gear cover: Lubricate inner 
    mating face of VCC solenoid seal.
    16. RH upper timing gear cover: Fit VCC 
    solenoid seal, fit bolts and tighten.Refit
    1.Fit 2 new O rings to SAI pipe and position SAI 
    pipe to engine. Fit 3 bolts and tighten 3 bolts 
    securing SAI pipe to 10 Nm 7 (lbf.ft).
    2.Fit LH VCC solenoid valve.
     
     +  Engine - V8, OVERHAUL, Variable 
    camshaft unit - variable camshaft control 
    (VCC).
    3.Fit LH camshaft cover.
     
     +  Engine - V8, OVERHAUL, Gasket - 
    covers - camshaft. 
    						
    							ENGINE - V8
    12-2-110 OVERHAUL
    Cover - timing gear - lower 
    $% 12.65.43.01
    Remove
    1.Remove timing gear upper covers.
     
     +  Engine - V8, OVERHAUL, Cover - 
    timing gear - upper.
    2.Remove crankshaft front oil seal.
     
     +  Engine - V8, OVERHAUL, Oil seal - 
    crankshaft - front.
    3.Remove 2 bolts securing ancillary drive belt 
    tensioner to lower timing gear cover.
    4.Remove dust cap from ancillary drive belt 
    tensioner idler pulley and remove Torx bolt 
    securing ancillary drive belt tensioner idler 
    pulley.
    5.Remove ancillary drive belt tensioner 
    assembly.
    6.Remove 2 bolts securing A/C compressor drive 
    belt tensioner.
    7.Remove remaining bolt securing A/C 
    compressor drive belt tensioner and remove 
    tensioner.8.Remove nut and disconnect battery cable from 
    alternator.
    9.Release battery cable from lower timing gear 
    cover.
    10.Remove 6 alternator securing bolts and 
    alternator harness securing clip.
    11.Release and remove alternator from engine 
    timing cover.
    12.Discard alternator O ring. 
    						
    							ENGINE - V8
    OVERHAUL 12-2-111
    13.Remove 2 Allen bolts and 1 nut securing PAS 
    pump and move aside.
    14.Remove 6 bolts securing coolant pump
    15.Support coolant rail pipes and remove coolant 
    pump, remove and discard coolant pump O 
    rings.
    Disassembly
    1.Remove 6 bolts securing lower timing gear 
    cover to upper sump.2.Remove 15 bolts securing lower timing gear 
    cover to cylinder block.
    NOTE: Note position of all bolts as they are 
    different lengths:
    lA = M8 x 75 mm
    lB = M6 x 40 mm
    lC = M6 x 85 mm
    lD = M6 x 80 mm
    lE = M8 x 90 mm,
    lF = M6 x 60 mm. 
    3.Remove lower timing gear cover.
    4.Discard 3 lower timing gear cover gaskets.
    Inspect
    1.Clean timing gear cover and mating faces, 
    clean dowels and dowel holes. 
    						
    							ENGINE - V8
    12-2-112 OVERHAUL
    Reassembly
    1.Apply sealant STC 50550 to areas illustrated.
    2.Fit 3 new lower timing gear cover gaskets.
    3.Fit lower timing gear cover.
    4.Fit 15 bolts securing lower timing gear cover to 
    cylinder block and initially tighten to 5 Nm (4 
    lbf.ft).
    5.Tighten 6 mm bolts securing lower timing gear 
    cover to 10 Nm (7 lbf.ft) and 8 mm bolts 
    securing lower timing gear cover to 22 Nm (16 
    lbf.ft).
    CAUTION: Check torque of all bolts once 
    they have been tightened down. 
    6.Fit 6 bolts securing lower timing gear cover to 
    upper oil sump and tighten to 12 Nm (9 lbf.ft).
    Refit
    1.Lubricate new O rings and fit to sealing 
    grooves in coolant pump.
    2.Clean coolant pump housing and mating faces.
    3.Fit new gasket to coolant pump, fit pump to 
    engine and secure with bolts tighten bolts to 10 
    Nm (7 lbf.ft). 
    4.Position PAS pump to mounting, fit Allen bolts 
    and securing nut. Tighten Allen bolts to 10 Nm 
    (7 lbf.ft) and securing nut to 25 Nm (18 lbf.ft).
    5.Clean alternator and engine timing gear cover 
    mating face.
    6.Lubricate and fit new O ring to alternator.
    7.Fit alternator and tighten securing bolts.
    8.Secure battery cable to lower timing gear 
    cover.
    9.Connect battery lead to alternator and tighten 
    nut securing battery lead to alternator to 13 Nm 
    (10 lbf.ft).
    10.Position A/C compressor drive belt tensioner 
    and secure with bolt but do not tighten at this 
    stage.
    11.Fit 2 bolts securing A/C compressor drive belt 
    tensioner to upper sump but do not tighten at 
    this stage.12.Fit ancillary dive belt tensioner assembly, fit 
    Torx bolt securing ancillary drive belt tensioner 
    idler pulley and tighten Torx bolt.
    13.Fit dust cap to ancillary drive belt tensioner idler 
    pulley.
    14.Fit 2 bolts securing ancillary drive belt tensioner 
    to timing gear cover but do not tighten at this 
    stage.
    15.Fit crankshaft front oil seal.
     
     +  Engine - V8, OVERHAUL, Oil seal - 
    crankshaft - front.
    16.Fit timing gear upper covers.
     
     +  Engine - V8, OVERHAUL, Cover - 
    timing gear - upper. 
    						
    							ENGINE - V8
    OVERHAUL 12-2-113
    Timing chain & guides 
    $% 12.65.49.01
    Remove
    1.Remove LH VCC unit.
     
     +  Engine - V8, OVERHAUL, Variable 
    camshaft unit - variable camshaft control 
    (VCC).
    2.Remove lower timing gear cover.
     
     +  Engine - V8, OVERHAUL, Cover - 
    timing gear - lower.
    Disassembly
    1.Remove timing chain.
    2.Remove bolt securing LH timing chain guide.
    3.Release clip securing LH timing chain guide 
    and remove guide.4.Remove Torx bolt securing RH timing chain 
    tensioner guide.
    5.Remove tensioner guide and discard O ring.
    6.Remove 5 Torx bolts securing timing chain 
    centre guide.
    7.Remove centre guide and discard O ring, seal 
    and restrictor.
    Inspect
    1.Clean timing chain gears.
    2.Check timing chain gears for excessive wear.
    M12 7989 
    						
    							ENGINE - V8
    12-2-114 OVERHAUL
    Reassembly
    1.Fit and lubricate new restrictor, seal and O ring 
    to centre timing chain guide.
    2.Position centre timing chain guide and secure 
    with Torx bolts, tighten to 10 Nm (7 lbf.ft). 
    3.Fit and lubricate O ring to RH timing chain 
    tensioner guide.
    4.Fit RH timing chain tensioner guide and secure 
    with Torx bolt tighten to 45 Nm (33 lbf.ft).
    5.Fit LH timing chain guide and secure retaining 
    clip.
    6.Fit bolt to secure LH timing chain guide and 
    tighten to 10 Nm (7 lbf.ft). 
    7.Lubricate timing chain with clean engine oil.
    8.Fit timing chain to crankshaft sprocket and RH 
    VCC unit.
    NOTE: The timing chain may be fitted in any 
    position to the crankshaft sprocket and RH 
    VCC unit sprocket.
    9.Secure timing chain to LH cylinder head until 
    LH VCC unit is fitted.
    Refit
    1.Fit lower timing gear cover.
     
     +  Engine - V8, OVERHAUL, Cover - 
    timing gear - lower.
    2.Fit LH VCC unit.
     
     +  Engine - V8, OVERHAUL, Variable 
    camshaft unit - variable camshaft control 
    (VCC).
    Pipe(s) - water pump to coolant manifold 
    $% 26.31.25.01
    Remove
    1.Remove induction manifold.
     
     +  Engine - V8, OVERHAUL, Gasket(s) 
    - induction manifold.
    Disassembly
    1.Remove 6 bolts securing coolant manifold to 
    cylinder heads.
    2.Remove coolant manifold.
    3.Remove and discard coolant manifold gaskets.
    4.Remove 2 coolant pipes from coolant pump.
    5.Discard O rings.
    Inspect
    1.Clean gasket mating faces.
    2.Clean O ring grooves and ends of coolant 
    pipes. 
    						
    							ENGINE - V8
    OVERHAUL 12-2-115
    Reassembly
    1.Lubricate new O rings with rubber grease and 
    fit to grooves in coolant pump and coolant 
    manifold.
    2.Fit coolant pipes to the coolant pump.
    3.Position new gaskets and coolant manifold to 
    cylinder heads, fit bolts and tighten to 10 Nm (7 
    lbf.ft).
    Refit
    1.Fit induction manifold.
     
     +  Engine - V8, OVERHAUL, Gasket(s) 
    - induction manifold.
    Gasket(s) - induction manifold 
    $% 30.15.08.01
    Disassembly
    1.Remove nut securing positive terminal to 
    bracket on inlet manifold and release terminal 
    from bracket.
    2.Disconnect vacuum hose from secondary air 
    injection (SAI) control valve.
    CAUTION: Always fit plugs to open 
    connections to prevent contamination.
    M30 1164 
    						
    							ENGINE - V8
    12-2-116 OVERHAUL
    3.Disconnect SAI vacuum hose from inlet 
    manifold end cover, note fitted position and 
    remove reservoir and vacuum switch from inlet 
    manifold.
    CAUTION: Always fit plugs to open 
    connections to prevent contamination.
    4.Remove 2 bolts securing engine breather 
    separator to bracket on inlet manifold and move 
    the separator aside.
    5.Loosen clip and disconnect engine breather 
    hose from inlet manifold end cover.
    CAUTION: Always fit plugs to open 
    connections to prevent contamination.
    6.Loosen clip and disconnect engine breather 
    hose from LH camshaft cover.
    CAUTION: Always fit plugs to open 
    connections to prevent contamination.7.Disconnect purge control valve hose from inlet 
    manifold.
    CAUTION: Always fit plugs to open 
    connections to prevent contamination.
    8.Remove 10 nuts securing induction manifold to 
    cylinder heads and remove 10 spacers.
    9.Raise inlet manifold for access to manifold 
    drain hose.
    M30 1165
    M30 1166 
    						
    							ENGINE - V8
    OVERHAUL 12-2-117
    10.Release clip and disconnect drain hose from 
    inlet manifold. Discard clip.
    CAUTION: Always fit plugs to open 
    connections to prevent contamination.
    11.Remove induction manifold and discard 4 
    gaskets.
    Reassembly
    1.Fit new gaskets to inlet manifold.
    2.Position inlet manifold, connect drain hose and 
    secure the hose with a new clip.
    3.Fit inlet manifold to studs, fit spacers and 
    tighten nuts evenly and progressively to 15 Nm 
    (11 lbf.ft).
    4.Connect purge control valve hose to inlet 
    manifold.
    5.Connect engine breather hoses and tighten 
    hose clips.
    6.Position engine breather separator to bracket 
    and tighten bolts to 6 Nm (4.4 lbf.ft).
    7.Position SAI vacuum switch and reservoir to 
    inlet manifold, connect hose to inlet manifold 
    end cover.
    8.Connect vacuum hose to SAI control valve.
    9.Fit positive terminal to bracket on inlet manifold 
    and tighten nut to 10 Nm (7 lbf.ft). 
    						
    All Land Rover manuals Comments (0)

    Related Manuals for Land Rover Range Rover 2002my On Workshop Procedures Lm 6th Edition Nas Rover Manual