Home > Land Rover > Automobile > Land Rover Range Rover 2002my On Workshop Procedures Lm 6th Edition Nas Rover Manual

Land Rover Range Rover 2002my On Workshop Procedures Lm 6th Edition Nas Rover Manual

    Download as PDF Print this page Share this page

    Have a look at the manual Land Rover Range Rover 2002my On Workshop Procedures Lm 6th Edition Nas Rover Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 364 Land Rover manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.

    Page
    of 938
    							MAINTENANCE
    10-18 PROCEDURES
    Exhaust system
    Check
    1.Check for signs of exhaust system leaks, 
    damage and security.
    Underbody
    Check
    1.Check all visible areas for corrosion.
    Body
    Check
    1.Check all visible areas (excluding body 
    cavities) for corrosion.
    Steering rod ball joints and dust covers
    Check
    1.Check condition of ball joints and dust covers 
    and security of fixings.
    M01 0303 
    						
    							MAINTENANCE
    PROCEDURES 10-19
    Road/roller test
    WARNING: Roller test must be restricted to 3 
    mph (5 km/h). If 2 wheel rolling road is to be used, 
    disconnect propeller shaft from the transfer box 
    output shaft driving the axle which is NOT on the 
    rolling road.
    Testing
    1.Check for correct operation of starter switch, 
    ensure engine starts correctly; leave the engine 
    running.
    2.With vehicle stationary, turn steering from lock 
    to lock. Check for smooth operation and ensure 
    there is no undue noise from power steering 
    pump or drive belt.
    3. Check all vehicle systems for correct 
    operation.
    4.Check for unusual engine, gearbox and 
    suspension noises.
    5.Check braking system operation.
    6.Check for smooth gear engagement.
    7.Check engine performance.
    8.Check operation of all instruments and warning 
    devices where practicable.
    9.Where possible, check for correct operation of 
    hill descent control (HDC) mechanism. This 
    should not be carried out if excessive journey 
    time is required.
    10.After road/roller test, carry out a final inspection 
    of vehicle, with vehicle on a ramp.
    11.Check all fluid levels and top-up if necessary.
    12. 2 wheel rolling road: Ensure propeller shaft is 
    connected on completion of test.  
    						
    							MAINTENANCE
    10-20 PROCEDURES 
    						
    							ENGINE - V8
    ADJUSTMENTS 12-2-1
    Engine  - V 8 ADJUST ME NTS
    Engine oil pressure check 
    $% 12.90.09.01 
    Before disconnecting the battery, ensure all text and 
    cautions in the battery disconnection section are 
    observed. 
     
     +  GENERAL INFORMATION, Electrical 
    Precautions.
    Check
    1.Disconnect battery earth lead.
    2.Remove oil pressure switch.
     
     +  Engine - V8, REPAIRS, Switch - oil 
    pressure.
    3.Fit LRT-12-052/10 to oil filter housing and fit 
    LRT-12-052C to LRT-12-052/10, tighten 
    unions.
    4.Check engine oil level, top-up if necessary.
    5.Connect battery earth lead.
    6.Start and run engine until normal operating 
    temperature is reached.
    7.Note oil pressure readings with the engine 
    running at idle and at 3500 rev/min. 
     
     +  GENERAL DATA, Engine - V8.
    8.Switch off engine.
    9.Disconnect battery earth lead.
    10.Remove LRT-12-052C.
    11.Remove LRT-12-052/10.
    12.Clean oil spillage.
    13.Fit oil pressure switch.
     
     +  Engine - V8, REPAIRS, Switch - oil 
    pressure.
    14.Check engine oil level, top-up if necessary.
    15.Connect battery earth lead. 
    						
    							ENGINE - V8
    12-2-2 ADJUSTMENTS 
    						
    							ENGINE - V8
    REPAIRS 12-2-3
    REPAIRS
    Pulley - crankshaft 
    $% 12.21.01 
    Before disconnecting the battery, ensure all text and 
    cautions in the battery disconnection section are 
    observed. 
     
     +  GENERAL INFORMATION, Electrical 
    Precautions.
    Remove
    1.Position vehicle on lift.
    2.Disconnect battery earth lead.
    3.Remove ancillary drive belt
     
     +  CHARGING AND STARTING, 
    REPAIRS, Ancillary drive belt - V8.
    4.Remove viscous fan.
     
     +  COOLING SYSTEM - V8, REPAIRS, 
    Coupling unit - viscous fan.
    5.Remove compressor drive belt.
     
     +  AIR CONDITIONING, REPAIRS, 
    Drive belt - compressor - V8.
    6.Remove 8 bolts securing crankshaft pulley to 
    hub assembly.
    7.Remove crankshaft pulley.
    Refit
    1.Position crankshaft pulley to hub assembly, fit 
    to locating dowel.
    2.Fit 8 new bolts securing crankshaft pulley to 
    hub assembly and tighten to 22 Nm (16 lbf.ft).
    3.Fit compressor drive belt.
     
     +  AIR CONDITIONING, REPAIRS, 
    Drive belt - compressor - V8.
    4.Fit  viscous fan.
     
     +  COOLING SYSTEM - V8, REPAIRS, 
    Coupling unit - viscous fan.
    5.Fit ancillary drive belt.
     
     +  CHARGING AND STARTING, 
    REPAIRS, Ancillary drive belt - V8.
    6.Connect battery earth lead.
    Oil seal - crankshaft - front 
    $% 12.21.14 
    Before disconnecting the battery, ensure all text and 
    cautions in the battery disconnection section are 
    observed. 
     
     +  GENERAL INFORMATION, Electrical 
    Precautions.
    Remove
    1.Position vehicle on lift.
    2.Disconnect battery earth lead.
    3.Remove crankshaft pulley.
     
     +  Engine - V8, REPAIRS, Pulley - 
    crankshaft.
    4.Fit LRT-12-229 to crankshaft pulley hub.
    5.Position LRT-12-229 to rest on sub frame and 
    remove crankshaft pulley bolt.
    6.Remove LRT-12-229 from crankshaft pulley 
    hub.
    7.Remove crankshaft pulley hub.
    M12 7662
    LRT-12-229 
    						
    							ENGINE - V8
    12-2-4 REPAIRS
    8.Fit LRT-12-230/1 and LRT-12-230/2 to 
    crankshaft seal and remove crankshaft oil seal.
    9.Discard oil seal.
    Refit
    1.Clean seal mating faces.
    2.Fit new crankshaft oil seal to front cover using 
    LRT-12-231.
    NOTE: Front crankshaft oil seal should be fitted 
    flush to front timing cover.
    3.Remove LRT-12-231.
    4.Clean crankshaft pulley hub and mating faces, 
    fit crankshaft pulley hub to crankshaft.
    5.Fit new bolt to crankshaft, lock crankshaft using 
    LRT-12-229 and initially tighten crankshaft bolt 
    to 100 Nm (74 lbf.ft). Using an angle torque 
    gauge tighten in the following sequence. Stage 
    1; 60°. Stage 2; 60°. Stage 3; 30°.
    6.Remove LRT-12-229 from crankshaft pulley 
    hub.
    7.Fit crankshaft pulley.
     
     +  Engine - V8, REPAIRS, Pulley - 
    crankshaft.
    8.Connect battery earth lead.
    Oil seal - crankshaft - rear 
    $% 12.21.20 
    Before disconnecting the battery, ensure all text and 
    cautions in the battery disconnection section are 
    observed. 
     
     +  GENERAL INFORMATION, Electrical 
    Precautions.
    Remove
    1.Position vehicle on lift.
    2.Disconnect battery earth lead.
    3.Drain engine oil.
     
     +  MAINTENANCE, PROCEDURES, 
    Engine oil and filter - V8 engine.
    4.Remove torque converter drive plate.
     
     +  Engine - V8, REPAIRS, Torque 
    converter drive plate.
    5.Remove 6 Torx bolts and 6 bolts securing 
    crankshaft rear oil seal housing to cylinder 
    block.
    6.Remove crankshaft rear oil seal housing.
    7.Discard gasket from crankshaft rear oil seal 
    housing.
    8.Remove crankshaft rear oil seal from housing.
    Refit
    1.Clean crankshaft rear oil seal housing, locating 
    dowels and mating faces on cylinder block and 
    crankshaft oil seal running surface.
    M12 7587
    LRT-12-231 
    						
    							ENGINE - V8
    REPAIRS 12-2-5
    2.Fit LRT-12-217 and LRT-12-179 to new 
    crankshaft rear oil seal and fit new seal to 
    housing.
    3.Check for correct fitment of dowels in cylinder 
    block.
    4.Fit new gasket to crankshaft rear oil seal 
    housing.
    5.Apply sealant , Part No. STC 50550 to upper oil 
    sump gasket contact point.6.Fit LRT-12-218 to crankshaft. Apply a thin coat 
    of oil to inner lip of crankshaft rear oil seal, fit 
    seal and housing over LRT-12-218, fit onto 
    dowels and remove tool.
    7.Fit new washers to 6 Torx bolts, fit 6 Torx bolts 
    and 6 bolts securing crankshaft oil seal housing 
    to cylinder block and tighten to 12 Nm (9 lbf.ft).
    8.Fit torque converter drive plate.
     
     +  Engine - V8, REPAIRS, Torque 
    converter drive plate.
    9.Fill engine with oil.
     
     +  MAINTENANCE, PROCEDURES, 
    Engine oil and filter - V8 engine.
    10.Connect battery earth lead. 
    						
    							ENGINE - V8
    12-2-6 REPAIRS
    Gasket - cylinder head - LH 
    $% 12.29.02 
    Before disconnecting the battery, ensure all text and 
    cautions in the battery disconnection section are 
    observed. 
     
     +  GENERAL INFORMATION, Electrical 
    Precautions.
    Remove
    1.Position vehicle on lift.
    2.Disconnect battery earth lead.
    3.Drain cooling system.
     
     +  COOLING SYSTEM - V8, 
    ADJUSTMENTS, Coolant - drain, flush & 
    refill.
    4.Drain engine oil and remove oil filter.
     
     +  MAINTENANCE, PROCEDURES, 
    Engine oil and filter - V8 engine.
    5.Remove LH exhaust manifold.
     
     +  MANIFOLD AND EXHAUST SYSTEM 
    - V8, REPAIRS, Gasket(s) - exhaust manifold 
    - LH.
    6.Remove coolant pump to coolant manifold 
    pipes.
     
     +  COOLING SYSTEM - V8, REPAIRS, 
    Pipe(s) - coolant pump to coolant manifold.
    7.Remove LH VCC unit.
     
     +  Engine - V8, REPAIRS, Variable 
    camshaft unit - variable camshaft control 
    (VCC) - LH.
    8.Remove LRT-12-227 from timing tool access 
    hole.9.Rotate engine crankshaft pulley anti-clockwise 
    to align the 45° before TDC timing mark.
    NOTE: Raise timing chain and hold under 
    tension while turning crankshaft pulley.
    10.Remove LRT-12-223/6, LRT-12-223/5, LRT-
    12-223/3 and LRT-12-223/4 from LH cylinder 
    head camshafts.
    11.Remove bolt securing LH timing chain guide 
    rail to LH cylinder head. 
    						
    							ENGINE - V8
    REPAIRS 12-2-7
    12.Working in the sequence shown, progressively 
    loosen 10 cylinder head bolts.
    13.Discard 10 cylinder head bolts and remove 10 
    cylinder head bolt washers.
    14.With assistance, remove cylinder head 
    assembly.
    15.Discard cylinder head gasket.
    16.Discard O ring from cylinder block.Refit
    1.Clean mating faces of cylinder head and 
    cylinder block, dowels and dowel holes. If 
    necessary remove all traces of sealing 
    compound with hard wood scraper. Ensure 
    remnants do not remain in oil ways cooling 
    ducts or bolt holes.
    CAUTION: Make sure no oil or coolant is left 
    in the cylinder head bolt holes as damage to 
    the cylinder block may occur when 
    tightening the cylinder head bolts.
    2.Using a straight edge and feeler gauges, check 
    cylinder head for distortion along lines in 
    illustration. 
     
     +  GENERAL DATA, Engine - V8.
    3.Fit new O ring to cylinder block.
    4.Apply sealant, Part No. STC 50550 to areas 
    illustrated.
    5.Fit new cylinder head gasket to locating dowels 
    on cylinder block.
    6.With assistance, fit cylinder head and carefully 
    position cylinder head onto dowels. 
    						
    All Land Rover manuals Comments (0)

    Related Manuals for Land Rover Range Rover 2002my On Workshop Procedures Lm 6th Edition Nas Rover Manual