Home
>
Lucent Technologies
>
Communications System
>
Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Upgrades And Additions Manual
Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Upgrades And Additions Manual
Have a look at the manual Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Upgrades And Additions Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 413 Lucent Technologies manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Upgrading G3rV2, V3, V4 to R8r and Adding Memory 1-15 Upgrade the software and hardware 1 Verify Interchange (H/C only) This step is p erformed twic e, onc e for eac h c arrier b ut not at the same time. NOTE: Bec ause of the memory mismatc h b etween the stand b y and ac tive SPEs, typ ing the status spe c ommand yield s two d ifferent sc enarios. After the c irc uit p ac ks have b een rep lac ed in the first c arrier: 1. Type status spe and press En t e r : nTh e Standby Refreshed field shows no nTh e Standby Shadowing field shows off nTh e Standby Handshake field shows up 2. Go to Upgrade other carrier (H/C only) After the c irc uit p ac ks have b een rep lac ed in the sec ond c arrier: 1. Type status spe and press En t e r to make sure the ac tive sid e is read y for interc hange. When it is read y, nTh e Standby Refreshed field shows yes nTh e Standby Shadowing field shows on nTh e Standby Handshake field shows up 2. Go to Affix position label(s) Upgrade other carrier (H/C only) To u p g r a d e t h e o t h e r c a r r ie r, lo c k t h e SPE s w i t c h e s o n t h e D U PI N T t o t h e o t h e r carrier. NOTE: The new ac tive c arrier resets (c old 2 restart). Wait until the log in p rompt ap p ears then log in. Rep eat the step s from Check the active tone-clock (H/C only) throug h Verify Interchange (H/C only). Affix position label(s) 1. Plac e the new strip lab el(s) over the old c arrier lab el(s).
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Upgrading G3rV2, V3, V4 to R8r and Adding Memory 1-16 Upgrade the software and hardware 1 Verify software version NOTE: Th e Tape Resident field shows the software load numb er. Write it d own for use later. If stand ard reliab ility: 1. Type list configuration software-version and press En t e r to verify that the removab le media c ontains the Release 8 software. This takes ab out 2 minutes. If hig h or c ritic al reliab ility: 1. Type list configuration software-version long and p ress En te r to verify that the removab le media c ontains the Release 8 software. Save Translations 1. Type save translations tape and press En t e r to save translations to the new removab le med ia, whic h takes ab out 2 minutes. Save Announcements (if necessary) 1. Type save announce tape and press En te r to save announc ements to the new removab le med ia. Restore Disk If stand ard reliab ility: 1. Type restore disk full and p ress En te r to write the new software to d isk. Release 8 system software is now resident on the d isk. If hig h or c ritic al reliab ility: 2. Type restore disk full both and press En t e r to write the new software to disk. NOTE: This c ommand may take up to 25 minutes to c omp lete. Until this c ommand finishes, the system p rovid es no user feed b ac k on the system ac cess sc reen. Do not p ress En t e r while the c ommand exec utes. Doing so c lears the terminal sc reen as the c ommand finishes, erasing any suc c ess or failure messag es the system may provide.
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Upgrading G3rV2, V3, V4 to R8r and Adding Memory 1-17 Upgrade the software and hardware 1 Upgrade Software This c ommand c op ies the software from the removab le med ia to the system d isk and takes ab out 15 minutes to c omp lete. For stand ard reliab ility: !CAUTION: All c alls are d rop p ed —this is a service interrup tion. 1. Type upgrade software G3V8r.xx.x.xxx.x (entire alp hanumeric string of new software version) and p ress En te r. At the prompt, press En t e r to save translations. For hig h or c ritic al reliab ility: 1. Type upgrade software G3V8r.xx.x.xxx.x no-calls (entire alp hanumeric string of new software version) and p ress En te r. At the prompt, press En t e r to save translations and attemp t to p reserve c alls ac ross the interc hang e. For all reliabilities: 2. After the system resets, log in as craft . 3. Check for the Translation Corruption Detected message before p roc eed ing with the up g rad e. If c orruption is d etec ted , refer to No Translations After Upgrade in Appendix B, ‘‘Troubleshooting an Upgrade’’ to c orrec t the p rob lem. !CAUTION: Do not c ontinue with the up g rad e until the translations errors are corrected. Reset SPE status (H/C only) 1. Type status SPE and press En te r. Wait until the Standby Handshake field displays up, which takes about 3 minutes. 2. Type reset spe-standby 4 and p ress En te r. NOTE: Yo u c a n c o n t i n u e t h e p ro c e ss w h il e t h e SPE is re se t t i n g . List Configuration Control 1. Type list configuration control and press En te r to verify the system rec og nizes the third TN1650B Memory c irc uit p ac k.
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Upgrading G3rV2, V3, V4 to R8r and Adding Memory 1-18 Upgrade the software and hardware 1 Set Daylight Savings Rules You c an set up to 15 c ustomized d aylig ht saving s time rules. If you have c ab inets in several different time zones, you c an set up rules for eac h on a loc ation b asis. A d aylig ht saving s time rule sp ec ifies the exac t time when you want to transition to and from d aylig ht saving s time. It also sp ec ifies the inc rement at whic h to transition. NOTE: The d efault d aylig ht saving s rule is 0 , no d aylig ht saving s. 1. Type change daylight-savings-rules and press En t e r. 2. Type the appropriate start and stop information in the Change Day , Month , Date , Time , and Increment field s for eac h rule. (for examp le, 1:00 eq uals one hour) NOTE: You c an c hang e any rule exc ep t rule 0 (zero). You c annot delete a d aylig ht saving s rule if it is in use on either the Loc ations or Date and Ti m e s c re e n s . 3. When d one, p ress En te r. DAYLIGHT SAVINGS RULES Rule Change Day Month___Date Time____Increment 0: No Daylight Savings 1: Start: first Sunday ___ on or after April___ 1 at _2:00 01:00Stop: first Sunday___ on or after October_ 25 at _2:002: Start: first _________ on or after _________ __ at __:__ Stop: first _________ on or after _________ __ at __:__ 3: Start: first______ on or after ____ __ at __:__ Stop: first ______ on or after ____ __ at __:__ 4: Start: first _____ on or after ____ __ at __:__ Stop: first ______ on or after ____ __ at __:__ 5: Start: first _____ on or after ____ __ at __:__ Stop: first ______ on or after ____ __ at __:__ 6: Start: first _____ on or after ____ __ at __:__ Stop: first ______ on or after ____ __ at __:__ 7: Start: first _____ on or after ____ __ at __:__ Stop: first ______ on or after ____ __ at __:__
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Upgrading G3rV2, V3, V4 to R8r and Adding Memory 1-19 Upgrade the software and hardware 1 Set Date and Time 1. Type set time and press En t e r to b ring up the Date and Time sc reen. . 2. Typ e the d ay in Eng lish (Sund ay throug h Saturd ay) in the Day of the Week: field. See Table 1-3 for Eng lish d ay names When done, p ress Ta b to move to next field . 3. Typ e the c urrent month in Eng lish (January throug h Dec emb er) in the Month: field . See Table 1-4 for Eng lish month names. When d one, p ress Ta b to move to next field . Table 1-3. English Day of the Week Names Day Number Day Name 1Sunday 2 Mond ay 3Tuesday 4 Wed nesd ay 5Thursday 6Friday 7Saturday DATE AND TIME DATE Day of the Week: Tuesday Month: FebruaryDay of the Month: 8 Year: 2000 TIME Hour: 20 Minute: 30Second: XX Type: standardDaylight Savings Rule: 0
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Upgrading G3rV2, V3, V4 to R8r and Adding Memory 1-20 Upgrade the software and hardware 1 4. Typ e the d ay of month (1 throug h 31) in the Day of the Month: field and p ress Ta b to move to the next field . 5. Typ e the c urrent year in the Year: field and p ress TA B to move to the next field . 6. Typ e the c urrent hour for a 24-hour c loc k in the Hour: field and p ress Ta b to move to the next field . 7. Typ e the c urrent minute (0 throug h 59) in the Minute: field (sec ond s c annot b e set). When d one, p ress Ta b to move to next field 8. Type standard or daylight savings in the Type field , ac c ord ing to the c urrent time in the loc al time zone. For examp le, if c urrently on stand ard time, typ e standard . 9. Typ e the rule numb er in the Daylight Savings Rule field . 10. When all the information is c orrec t, p ress En t e r. 11. Typ e display time and press En te r to verify d ate and time d ata. Set Core Dump Vector 1. Type set vector f spe-maint and p ress En te r to set the c ore d ump vec tor to p erform a c ore d ump on any system restart. Enable TTI NOTE: Do this step only if the TTI is d isab led and you want it enab led . 1. Type change system-parameters features and p ress En te r to change the TTI field b ac k to its value b efore the up g rad e. Table 1-4. English Month Names Number Name Number Name 1 January 7 July 2February8August 3 Marc h 9 September 4 April 10 October 5 May 11 Novemb er 6 June 12 December
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Upgrading G3rV2, V3, V4 to R8r and Adding Memory 1-21 Upgrade the software and hardware 1 Release MMI (H/C only) 1. Type release board cabinet carrier slot and press En te r to release the c irc uit p ac ks, whic h were b usied out earlier. Resolve Alarms 1. Type display alarms and p ress En t e r to examine the alarm log . Resolve any alarms that may exist using DEFINITY Enterp rise Communic ations Server Release 8 Maintenanc e for R8r . Check Link Status 1. Type display communication-interface links and press En te r. Compare it with the earlier status. 2. Type status link number and p ress En t e r. Rep eat this step for eac h link. Enable Scheduled Maintenance 1. Type change system-parameters maintenance and press En t e r. 2. Typ e the ap p rop riate time in the Start field to enab le sc heduled d aily maintenanc e. Make sure the Save Translation field is set to daily . Enable Customer Options and Alarm Origination to INADS 1. Get the DOSS order number of the upgrade from the project manager and ask the reg ional Customer Software Ad ministration to c omp lete the step s in the shad ed b ox. See ‘‘Where to Call for Tec hnic al Sup p ort’’ on p ag e -xx for telep hone numb ers. NOTE: As p art of the system reg istration p roc ess, the INADS Datab ase Ad ministrator enab les Alarm Orig ination and c ustomer op tions. 2. When ad ministration is c omp leted , log in as craft at the Login: prompt.
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Upgrading G3rV2, V3, V4 to R8r and Adding Memory 1-22 Upgrade the software and hardware 1 Check SPE status (H/C only) 1. Type status SPE and press En te r. Wait until nTh e Standby Refreshed field shows yes nTh e Standby Shadowing field shows on nTh e Standby Handshake field shows up Save Translations 1. Type save translation and press En te r to c op y up g rad ed translations to the system d isk, whic h takes ab out 2 minutes. Save Announcements (if necessary) 1. Type save announcements and press En te r to c op y announc ements to the system d isk. init login administration: 1. Log in as init . 2. Type change system-parameters customer-options and press En te r to verify that the c ustomer op tions are p roperly set. 3. Go to sc reen 6, QSIG Op tional Features, and set the Basic Call Setup field to y if the customer was using Supplementary Services Protoc ol b or d on an ISDN-PRI trunk g roup b efore the up g rad e. 4. Type change system-parameters offer-options and p ress En te r. 5. If the Activate Offer field is n , set it to y and press Ta b. A warning messag e lets you know whether you need to save translations and reb oot to make the c hang e p ermanent. 6. Press En t e r to effec t the c hang es or Canc el if there were no c hang es. 7. Contac t the req uester when d one.
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Upgrading G3rV2, V3, V4 to R8r and Adding Memory 1-23 Upgrade the software and hardware 1 Back Up Disk 1. Type backup disk and p ress En t e r to b ac k up all c hang ed files to the removab le media. This takes ab out 15 minutes. 2. Type test stored-data and press En t e r to verify the c onsistenc y of the MSS files on the d isk and removab le med ia. If stand ard reliab ility: 3. Type list configuration software-version and p ress En te r to verify all the files one last time. If hig h or c ritic al reliab ility: 3. Type list configuration software-version long and p ress En t e r to verify all the files one last time. Return Replaced Equipment 1. Return rep lac ed eq uip ment to Luc ent Tec hnolog ies ac c ord ing to the requirements outlined in the following books: BCS/Material Log istic s, MSL/Attend ed Stoc king Loc ations Method s and Proc ed ures for Basic Material Returns
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Upgrading G3rV2, V3, V4 to R8r and Adding Memory 1-24 Upgrade the software and hardware 1