Home
>
Lucent Technologies
>
Communications System
>
Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Upgrades And Additions Manual
Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Upgrades And Additions Manual
Have a look at the manual Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Upgrades And Additions Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 413 Lucent Technologies manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Adding or Removing Cabinet Hardware 6-19 Add the Fiber Optic Cable 6 Figure 6-10. Replace the Fan Cover 13. Connec t the fib er c ab le to the ang led c onnec tor on the front of the c irc uit pack. See Figure 6-11 . lcda5fop EWS 110398 ENTER /YES ENTER /YES NEXT /NO NEXT / NO BACK BACK AUDIX AUDIXBOOT/ SHUTDOWN BOOT/ SHUTDOWN ALARMS EMER TR EMERTR
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Adding or Removing Cabinet Hardware 6-20 Add the Fiber Optic Cable 6 Figure 6-11. Connect Fiber Cable to Circuit Pack 14. Dress the cable using the supplied cable ties and cable tie mounts. See Figure 6-12 . NOTE: Dress the fiber optic c able straight down the front of the circuit pack. Do not allow the c ab le to c ross in front of another c irc uit p ac k. scdafo_4 KLC 051298 C12 456789101112131415161718TONE - CL O CKPOWER UNIT EXPN INTFC3EX PN INTFC
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Adding or Removing Cabinet Hardware 6-21 Add the Fiber Optic Cable 6 Figure 6-12. Dress the Cable 15. If a c irc uit p ac k was removed to ac c ess 2 op en slots (from ‘‘Cabinet Preparation’’ on page 6-10), rep lac e the c irc uit p ac k into its orig inal slot. 16. Close the front d oor. 17. Discard the pass-thru tool. Test the Installation 1. Log in to the manag ement terminal. 2. Ad minister the system b y referring to the ATM sec tion of the Installation and Test for Ad junc ts and Perip herals . 3. Type list configuration all and p ress En t e r to determine if the new c irc uit p ac k ap p ears in the c orrec t slot and that there are no c irc uit p ac k conflicts. lcda4fop RPY 021398
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Adding or Removing Cabinet Hardware 6-22 Install a New EPN Cabinet in an Existing System 6 Install a New EPN Cabinet in an Existing System Figure 6-13 shows a typ ic al multic arrier EPN c ab inet. Eac h EPN c ab inet is normally p ositioned ad jac ent to the PPN c abinet b ut may b e loc ated remotely in a d ifferent room or a d ifferent b uild ing . Figure 6-13. Typical Multicarrier EPN Cabinet 1. Unc rate and p osition the c ab inet as instruc ted at the beg inning of this chapter. 2. Install earthq uake p rotec tion as instruc ted on p ag e 1-9. 32 Port Carrier C Port Carrier B Control Carrier A Po r t Ca r r ie r D Port Carrier EFa ns Power Distribution 0075_0 RBP 080196
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Adding or Removing Cabinet Hardware 6-23 Install a New EPN Cabinet in an Existing System 6 Connect Power and Ground 1. For an AC- or DC-p owered system, c onnec t p ower and ground to the c ab inet as instruc ted in DEFINITY Enterp rise Communic ations Server Release 8 Installation and Test for Multic arrier Cab inets . 2. Connec t the ap p roved g round to the new c abinet as instruc ted in DEFINITY Enterp rise Communic ations Server Release 8 Installation and Test for Multic arrier Cabinets. NOTE: Do not p ower up the system until all p ower and g round c onnec tions are c omp leted . Interconnect Cabling Release 8r For fib er op tic c ab ling information and c omc od e numb ers, refer to DEFINITY Enterp rise Communic ations Server Release 8 Installation and Test for Multic arrier Cab inets . The fib er c onnec tions installed in this sec tion are later ad ministered using the fib er link ad ministration instruc tions in Appendix A, ‘‘Fiber Link Administration’’. NOTE: Use multi-mod e fib er transc eivers and fib er op tic c ab les b etween c ab inets unless sing le-mode is req uired for d istanc e restric tions. Direct-Connect New EPN to Existing PPN (Standard Reliability) Figure 6-14. Rear of J58890AH Control Carrier (PPN) 0063_0 RBP 071096 98 7 6 5 43 2 1 P1P2 TERMINALDUPLICATION OPTION TERMINAL PROCESSOR INTERFACEDATA COMMUNICATION EQUIPMENTAUX CLOCK
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Adding or Removing Cabinet Hardware 6-24 Install a New EPN Cabinet in an Existing System 6 1. Install a 9823A lig htwave transc eiver onto Slot 1 on the rear of the PPN Control Carrier. See Figure 6-14 . 2. Connec t a 20-foot fib er op tic c ab le to the TX and RX c onnec tors on the transc eiver. Lab el the c ab le to make the c onnec tions to the EPN c ab inet easier. 3. Route the fib er c ab le to the J58890AF Exp ansion Control Carrier in the EPN c a b i n e t . 4. On the rear of the EPN Exp ansion Control Carrier, install a 9823A lig htwave transc eiver onto Slot 2. 5. Connec t the 20-foot fib er op tic c ab le from the PPN Control Carrier to the TX and RX c onnec tors on the transc eiver on the EPN Exp ansion Control Carrier. Be sure the c ab le c onnec ted to the TX c onnec tor on the PPN transc eiver is c onnec ted to the RX c onnec tor on the EPN transc eiver and vic e versa. Direct-Connect New EPN to Existing PPN (High or Critical Reliability) 1. On the rear of the Dup lic ated Control Carrier, install a 9823A lig htwave transc eiver onto Slot 1. 2. Connec t a 20-foot fib er op tic c ab le to the TX and RX c onnec tors on the transc eiver. Lab el the c ab le to make the c onnec tions to the EPN c ab inet easier. 3. Route the fib er c ab le to the J58890BB Port Carrier in position C in the EPN c ab inet. 4. On the rear of the Port Carrier, install a 9823A lig htwave transc eiver onto Slot 2. 5. Connec t the 20-foot fib er op tic c ab le from the PPN Dup lic ated Control Carrier to the TX and RX c onnec tors on the transc eiver on the EPN Port Carrier. Be sure the c ab le c onnec ted to the TX c onnec tor on the PPN transc eiver is c onnec ted to the RX c onnec tor on the EPN transc eiver and vic e versa.
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Adding or Removing Cabinet Hardware 6-25 Install a New EPN Cabinet in an Existing System 6 Direct-Connect New EPN to Existing PPN and EPN (Standard Reliability) For the following c onnec tion examp le, the PPN c ab inet is c alled Cab inet 1, the first EPN c ab inet (next to the PPN c ab inet) is c alled Cab inet 2, and the last EPN c ab inet is c alled Cab inet 3. 1. At the rear of the Port Carrier in p osition C in Cab inet 1, install a 9823A lig htwave transc eiver onto Slot 2. 2. Connec t a 20-foot fib er op tic c ab le to the TX and RX c onnec tors on the transc eiver. Lab el the c ab le to make the c onnec tions to Cab inet 3 easier. 3. Route the fib er c ab le to the Exp ansion Control Carrier in Cab inet 3. 4. At the rear of the Expansion Control Carrier in Cabinet 3, install a 9823A lig htwave transc eiver onto Slot 1. 5. Connec t the 20-foot fib er op tic c ab le from the Port Carrier in Cabinet 1 to the TX and RX c onnec tors on the transc eiver on the Exp ansion Control Carrier in Cab inet 3. Be sure the c ab le c onnec ted to the TX c onnec tor on 1 transc eiver is c onnec ted to the RX c onnec tor on the other transc eiver and vic e versa. 6. At the rear of the Expansion Control Carrier in Cabinet 3, install a 9823A lig htwave transc eiver onto Slot 2. 7. Connec t a 20-foot fib er op tic c ab le to the TX and RX c onnec tors on the transc eiver. Be sure to lab el the c able. 8. At the rear of the Expansion Control Carrier in Cabinet 2, install a 9823A lig htwave transc eiver onto Slot 2. 9. Connec t the 20-foot fib er op tic c ab le from Cab inet 2 to the TX and RX c onnec tors on the transc eiver on the Exp ansion Control Carrier in Cab inet 3. Be sure the c ab le c onnec ted to the TX c onnec tor on 1 transc eiver is c onnec ted to the RX c onnec tor on the other transc eiver and vic e versa. 10. At the rear of the Expansion Control Carrier in Cabinet 2, install a 9823A lig htwave transc eiver onto Slot 1. 11. Connec t a 20-foot fib er op tic c ab le to the TX and RX c onnec tors on the transc eiver on the Exp ansion Control Carrier in Cab inet 2. 12. Route the fib er c ab le to the Port Carrier in position B in Cab inet 1. 13. Install a 9823A lig htwave transc eiver onto Slot 2 on the Port Carrier in p osition D in Cab inet 1. 14. Connec t the 20-foot fib er op tic c ab le from Cab inet 2 to the TX and RX c onnec tors on the transc eiver on the Port Carrier in Cab inet 1. Be sure the c ab le c onnec ted to the TX c onnec tor on 1 transc eiver is c onnec ted to the RX c onnec tor on the other transc eiver and vic e versa.
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Adding or Removing Cabinet Hardware 6-26 Install a New EPN Cabinet in an Existing System 6 Direct-Connect New EPN to Existing PPN and EPN (High or Critical Reliability) For the following c onnec tion examp le, the PPN c ab inet is c alled Cab inet 1, the first EPN c ab inet (next to the PPN c ab inet) is c alled Cab inet 2, and the last EPN c ab inet is c alled Cab inet 3. 1. At the rear of the Port Carrier in p osition C in Cab inet 1, install a 9823A lig htwave transc eiver onto Slot 2. 2. Connec t a 20-foot fib er op tic c ab le to the TX and RX c onnec tors on the transc eiver. Lab el the c ab le to make the c onnec tions to Cab inet 2 easier. 3. Route the fib er c ab le to the Exp ansion Control Carrier in Cab inet 2. 4. At the rear of the Expansion Control Carrier in Cabinet 2, install a 9823A lig htwave transc eiver onto Slot 1. 5. Connec t the 20-foot fib er op tic c ab le from the Port Carrier in Cabinet 1 to the TX and RX c onnec tors on the transc eiver on the Exp ansion Control Carrier in Cab inet 2. Be sure the c ab le c onnec ted to the TX c onnec tor on 1 transc eiver is c onnec ted to the RX c onnec tor on the other transc eiver and vic e versa. 6. At the rear of the Expansion Control Carrier in Cabinet 2, install a 9823A lig htwave transc eiver onto Slot 2. 7. Connec t a 20-foot fib er op tic c ab le to the TX and RX c onnec tors on the transc eiver. Be sure to lab el the c able. 8. At the rear of the Expansion Control Carrier in Cabinet 3, install a 9823A lig htwave transc eiver onto Slot 2. 9. Connec t the 20-foot fib er op tic c ab le from Cab inet 2 to the TX and RX c onnec tors on the transc eiver on the Exp ansion Control Carrier in Cab inet 3. Be sure the c ab le c onnec ted to the TX c onnec tor on 1 transc eiver is c onnec ted to the RX c onnec tor on the other transc eiver and vic e versa. 10. At the rear of the Expansion Control Carrier in Cabinet 3, install a 9823A lig htwave transc eiver onto Slot 1. 11. Connec t a 20-foot fib er op tic c ab le to the TX and RX c onnec tors on the transc eiver on the Exp ansion Control Carrier in Cab inet 3. 12. Route the fib er c ab le to the Port Carrier in position D in Cab inet 1. 13. At the rear of the Port Carrier in p osition D in Cab inet 1, install a 9823A lig htwave transc eiver onto Slot 2. 14. Connec t the 20-foot fib er op tic c ab le from Cab inet 3 to the TX and RX c onnec tors on the transc eiver on the Port Carrier in Cab inet 1. Be sure the c ab le c onnec ted to the TX c onnec tor on 1 transc eiver is c onnec ted to the RX c onnec tor on the other transc eiver and vic e versa.
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Adding or Removing Cabinet Hardware 6-27 Install a New EPN Cabinet in an Existing System 6 Interconnect Cabling Release 8r For more fib er op tic c ab ling information, refer to DEFINITY Enterp rise Communications Server Release 8 Installation and Test for Multicarrier Cabinets . Switch-Connect New EPN to Existing PPN and EPN (Standard Reliability) For the following c onnec tion examp le, the PPN c ab inet is c alled Cab inet 1, the first EPN c ab inet is c alled Cab inet 2, and the EPN c ab inet c ontaining the Switc h Nod e Carrier is c alled Cab inet 4. NOTE: For the following examp le, ad d links to PNs in alternating ord er, for examp le: 20 and 2, 19 and 3, 18 and 4, and so forth. 1. At the rear of the Port Carrier in p osition B in Cab inet 1, install a 9823A lig htwave transc eiver onto Slot 2 (1B02). See Figure 6-15 . 2. Connec t a 20-foot fib er op tic c ab le to the TX and RX c onnec tors on the transc eiver. Lab el the c ab le to make the c onnec tions to Cab inet 4 easier. 3. Route the fib er c ab le to the Port Carrier in position E in Cab inet 4. 4. At the rear of the Port Carrier in p osition E in Cab inet 4, install a 9823A lig htwave transc eiver onto Slot 2 (4E02). 5. Connec t the 20-foot fib er op tic c ab le from the Port Carrier in Cabinet 1 to the TX and RX c onnec tors on the transc eiver on the Port Carrier in Cab inet 4. Be sure the c ab le c onnec ted to the TX c onnec tor on 1 transc eiver is c onnec ted to the RX c onnec tor on the other transc eiver and vic e versa. 6. At the rear of the Expansion Control Carrier in Cabinet 2, install a 9823A lig htwave transc eiver onto Slot 1 (2A01). 7. Connec t a 20-foot fib er op tic c ab le to the TX and RX c onnec tors on the transc eiver. Be sure to lab el the c able. 8. At the rear of the Switc h Nod e Carrier in p osition E in Cab inet 4, install a 9823A lig htwave transc eiver onto Slot 20 (4E20). 9. Connec t the 20-foot fib er op tic c ab le from Cab inet 2 to the TX and RX c onnec tors on the transc eiver on the Switc h Nod e Carrier in Cab inet 4. Be sure the c ab le c onnec ted to the TX c onnec tor on 1 transc eiver is c onnec ted to the RX c onnec tor on the other transc eiver and vic e versa. 10. Connec t an H600-278 Metallic Cab le from Slot 1 in the Exp ansion Control Carrier in Cab inet 4 (4A01) to Slot 19 on the Switc h Nod e Carrier in p osition E in Cab inet 4 (4E19).
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Adding or Removing Cabinet Hardware 6-28 Install a New EPN Cabinet in an Existing System 6 Figure 6-15. Switch-Connected Release 8r with SNC in EPN Switch-Connect New EPN to Existing PPN and EPN (High Reliability) For the following c onnec tion examp le, the PPN c ab inet is c alled Cab inet 1, the first EPN c ab inet is c alled Cab inet 2, and the EPN c ab inet c ontaining the Switc h Nod e Carrier is c alled Cab inet 4. NOTE: For the following examp le, ad d links to PNs in alternating ord er, for examp le: 20 and 2, 19 and 3, 18 and 4, and so forth. Figure Notes: 1. Cab inet 1 (PPN) 2. Cabinet 4 (MCC EPN with One Switc h Node) 3. Cab inet 2, 3, and 5 through 16 (MCC or SCC EPNs)