Home
>
Lucent Technologies
>
Communications System
>
Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Upgrades And Additions Manual
Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Upgrades And Additions Manual
Have a look at the manual Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Upgrades And Additions Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 413 Lucent Technologies manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Multicarrier G2 Universal Module to R8r EPN 5-43 Standard Reliability 5 Back Up Disk 1. Type backup disk and p ress En t e r to backup all changed files. 2. Type test stored-data long and press En t e r. This instructs the system to verify the c onsistenc y of the MSS files (on the d isk and removab le med ia). Return Replaced Equipment Return unused G2 eq uip ment to Luc ent Tec hnolog ies ac c ord ing to the req uirements outlined in: BCS/Material Log istic s, MSL/Attend ed Stoc king Loc ations Method s and Proc ed ures for Basic Material Returns
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Multicarrier G2 Universal Module to R8r EPN 5-44 High Reliability 5 High Reliability Required Hardware The eq uip ment in Table 5-10 must be on-site before the upgrade begins. To plac e a claim for missing equipment, as part of the Streamlined Implementation p roc ess, c all 1-800-772-5409, or the numb er p rovid ed b y your Luc ent Tec hnolog ies rep resentative. Table 5-10. Required Hardware Equipment Description Quantity J58890A (PEC 6300-05X)Pro c e s s o r Po r t N e t w o r k 1 J58890AF Exp ansion Control Carrier 1 106647985 TN775B Maintenanc e 1 103557294 or 103281788TN776 Exp ansion Interfac e TN570 Exp ansion Interfac e2 or 6 1 2 or 6 1,2 1. Use 2 for a hig h reliab ility system with 2 p ort networks; 6 with 3 port networks. Either 1 or 4 Exp ansion Interfac es (EIs) ship loose with the EPN eq uip ment. The factory has installed either 1 or 2 EIs in the new PPN. 2. Req uired port network interfaces in a Release 8 system with the op tional p ac ket bus. J58890TO-1 L1 Removab le Med ia 4 407439975 20-Foot Multi-mod e Fib er Op tic Cab le 1 or 3 3 3. Use 2 or 6 if the PPN and EPN(s) are remotely loc ated . The fib er that p reviously connec ted an up g raded G2 universal module (not a trad itional mod ule) to the G2 TMS has the c orrec t transc eiver connectors and , therefore, c an b e reused. 106455348 or 1064553639823-A Lig htwave Transc eiver 9823-B Lig htwave Transc eiver2 or 6 4 2 or 6 5 4. One p air for eac h fiber c onnec tion. For eac h c onnec tion, install one 9823-typ e lig htwave transc eiver in an EPN and 1 in the PPN. A 9823-typ e transceiver c an b e reused from eac h upg raded G2 universal mod ule. Add itional transceivers also ship loose with the EPN equipment.
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Multicarrier G2 Universal Module to R8r EPN 5-45 High Reliability 5 Required Tools The following tools and items may b e req uired d uring the up g rad e: nHig h-intensity flashlig ht or AC d rop lig ht n3/8-inc h flat-b lad e sc rewd river with a 10-inc h shank (minimum) n5/16-inc h and 1/4-inc h soc kets with a ratc het and 10-inc h extension nLong -nose p liers to d isc onnec t ground straps and straig hten b ac kplane pins nStatic -p roof or orig inal c irc uit p ac k p ac kag ing for transp orting c irc uit packs nLab els for id entifying the p ort c irc uit p ac ks and c ab les attac hed to the rear of c ab inets nTwelve sp are #12 and #10 self-tap p ing sc rews nFour sp are c arrier g round strap s nWrist ground strap nRep air kit for b ac kp lane p ins (KS-22876 L2 or eq uivalent) nOne c op y of eac h of the following manuals: — DEFINITY Enterp rise Communic ations Server Release 8 Maintenanc e for R8r — DEFINITY Enterp rise Communic ations Server Release 8 Ad ministrator’s Guid e Follow Routine Preventive Maintenance Follow routine p reventive maintenanc e p roc ed ures on the system to b e up g rad ed . For information ab out the p roc ed ures and nec essary eq uip ment, refer to the “ Preventive Maintenanc e” sec tion in DEFINITY Enterp rise Communic ations Server Release 8 Maintenanc e for R8r . Label Cables To make rec onnec ting the c ab les simp ler and more reliable, lab el b oth end s of the c onnec tor c ables assoc iated with the c arrier to b e removed .
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Multicarrier G2 Universal Module to R8r EPN 5-46 High Reliability 5 Check Link Status 1. Type display communication-interface links and p ress En te r. Write d own all enab led links. 2. Type status link number and p ress En t e r. Rep eat this step for all links. 3. Write d own whic h links are in servic e. Disable TTI !CAUTION: If you d o not d isab le the TTI, the translations c an b e c orrup ted . 1. Make sure the ISDN is in servic e. If not, attempt to b usy out and release the ISDN D-c hannel/link. This will b ring the ISDN trunks b ac k into servic e. 2. Type change system-parameters features and press En t e r. 3. On the sec ond sc reen, set the Enabled? field to n to p revent the TTI feature from ac tivating . Power Down G2 System At the power d istribution unit, set the main c irc uit b reaker to OFF. Install Power-Failure Transfer Ground Wire !CAUTION: To avoid c ontaminating sing le-p oint g round , d o not c onnec t the g round wire while the system is p owered up . 1. Connec t a 10 AWG (#25) (2.6 mm2) wire to p in 49 of the c onnec ting b loc k or to pin 49 of the CAP (c ab le ac c ess p anel) on the p ower-failure transfer p anel. 2. Route the op p osite end of the wire to an ap p roved g round and c onnec t.
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Multicarrier G2 Universal Module to R8r EPN 5-47 High Reliability 5 Disconnect Cables 1. With the c ab le retainer in front of you and the p art numb er visib le (4B or 4C), loc ate the slot that is almost vertic al. This slot is ad jac ent to the p art numb er. Insert a #2 flat b lad e sc rewd river into the slot and twist. The retainer will snap op en easily. Remove the c able. 2. Disc onnec t the c ab les assoc iated with the c arrier to b e removed . 3. Remove the rear d oors from the c ab inet. 4. Remove all of the rear p anels. Two d ifferent typ es of sc rews hold the p anels to the c ab inet. Remove the #10 sc rews with a sc rewd river or a 1/4-inc h soc ket. Remove the #12 sc rews with a sc rewd river or a 5/16-inc h soc ket.) Remove Circuit Packs from Module Control Carrier A 1.To ensure that p ower units in the “ A” c arrier are p rop erly rep lac ed , lab el eac h p ower unit with its slot number. 2. Disc onnec t the p ower c ords from the p ower units in the “ A” c arrier. 3. Remove all c irc uit p ac ks and p ower units from c arrier “ A.” Store the c irc uit p ac ks in the static -p roof p ac kag ing . 4. Remove the c irc uit p ac k b lanks from the emp ty slots. 5. Remove the front trim p late from the “ A” c arrier b y p ulling it straig ht off. Remove CURL from Module Control Carrier A Remove the CFY1 c urrent limiter (CURL) from the p in-field b loc k marked “ CURL” on the “ A” c arrier. The CURL will b e reused in the Release 8 EPN. NOTE: Verify that the CURL meets the minimum usab le vintag e req uirements. Remove Module Control Carrier A NOTE: Note the p osition of eac h TDM/LAN c ab les b efore disc onnec ting . 1. Disc onnec t b oth TDM/LAN c ab les from the “ A” c arrier. See Figure 5-10 . Leave the other end c onnec ted to the “ C” c arrier. !CAUTION: When removing the TDM/LAN c ab les from a previously up g rad ed c arrier, b e c areful that none of the short p iec es of shrink tub ing c ome off the 4 c orner p ins of the p in-field b loc k. Otherwise, when the new eq uip ment is c onnec ted, -48 volts c ould short to g round .
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Multicarrier G2 Universal Module to R8r EPN 5-48 High Reliability 5 2. On p ort c arrier J58890BB-1, c onnec t the TDM c ab le or TDM terminator to Slot 02. On p ort c arriers J58890BB-2 and J58890BB-3, c onnec t the TDM c ab les to Slot 01. Figure 5-10. TDM/LAN Connections for High Reliability System Figure Notes 1.Port Carrier (“ C” Position) 2. ZAHF4 TDM/LAN Terminator 3. TDM/LAN Cab le (WP91716 L6) 4. Mod ule Control Carrier (“ A” Position) 5. Port Carrier (“ D” Position)6 . Po r t C a rr i e r ( “ E” Po si t io n ) 7. Slot 21 8. Slot 01 9. TDM/LAN Cable (WP91716 L7)
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Multicarrier G2 Universal Module to R8r EPN 5-49 High Reliability 5 3.Disc onnec t the 16 g round strap s from the top and b ottom of the “ A” c arrier. See Figure 5-11 . These strap s rec onnec t to the new “ A” c arrier. Figure 5-11. Locations of Ground Jumpers Figure Notes 1. Rear of Cab inet 2. Port Carrier (“ C” Position) 3. Ground Jump ers4. Mod ule Control Carrier (“ A” Position) 5. Port Carrier (“ D” Position)
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Multicarrier G2 Universal Module to R8r EPN 5-50 High Reliability 5 4.Disc onnec t the “ P1” and “ P2” c ab les from the “ A” c arrier. See Figure 5-12. 5. Slid e the latc h up , and d isc onnec t the “ P1” c ab le from the “ B” c arrier. Figure 5-12. Location of P1 and P2 Connectors 6. Remove the fan trim p late by p ulling it straig ht off. 7. Clean or rep lac e the air filter (403326820) if nec essary. 8. In the front of the c arrier, remove the 4 sc rews (top 2 first) hold ing the “ A” c arrier to the c ab inet frame. Use a long hand le sc rewdriver or 5/16-inc h soc ket with a 10-inc h (25 c m) extension. 9. Behind the c arrier, remove the 2 sc rews hold ing the “ A” c arrier’s rear c onnec tor p anel to the c ab inet frame. 10. Slid e the c arrier forward 1 to 2 inc hes (2.5 to 5 c m). Be sure that no c ab les or wiring harnesses are c aug ht on the c ab inet/c arrier framework. !CAUTION: Cab les and wiring harnesses c an be d amag ed if they c atc h on the framework and if too muc h pressure is ap p lied in removing the carrier. 11. Remove the c arrier b y slid ing it out the front of the c ab inet. Figure Notes 1. Rear of Control Carrier 2. P2 Connec tor3. P1 Connec tor
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Multicarrier G2 Universal Module to R8r EPN 5-51 High Reliability 5 Unpack and Inspect Expansion Control Carrier 1. Insp ec t the new J58890AF Exp ansion Control Carrier for any d amag e. Also verify that the b ac kp lane p ins are not b ent. 2. Plac e the exp ansion c ontrol c arrier on the floor so that the rear of the carrier faces up. 3.Install the CFY1 c urrent limiter (CURL) on the “ A” c arrier to the p in-field b loc k marked “ CURL.” Install the CURL with the c omp onents on the left. 4. At the rear c onnec tor p anel, d etermine whic h c onnec tors will have a c ab le attac hed , and install a 4B c ab le retainer on eac h of these c onnec tors. Install New Expansion Control Carrier A 1. Install the c arrier in p osition “ A” b y alig ning the p lastic alig nment tip s on the top rear of the c arrier with the sc rew holes in the c ab inet. These alig nment tip s sup p ort the c arrier while installing the sc rews. Ensure that the p ower c ord s are prop erly p lac ed in the slots at the sid es of the c arrier. 2. Fasten the c arrier into p osition with the 4 self-tap p ing sc rews saved from the removal of the old c arrier. !CAUTION: Carefully realig n the thread s on the self-tap ping sc rews b y turning them c ounterc loc kwise 1 turn b efore tig htening them to avoid stripping the threads out of the framework. 3. Behind the c arrier, rep lac e the 2 sc rews saved from the removal of the old carrier. 4. Connec t the “ P2” and “ P1” c ab les to the “ A” c arrier. See Figure 5-12 . Snap the c onnec tor loc k into p lac e to ensure the c onnec tion is p rop erly mad e. 5. Connec t the “ P1” c ab le to the “ C” c arrier. Snap the c onnec tor loc k into p lac e to ensure the c onnec tion is p rop erly mad e. 6. Connec t the 8 g round strap s from the “ D” c arrier to the new “ A” c arrier See Figure 5-11 . These straps were left c onnec ted to the “ D” c arrier. 7. Connec t the 8 g round strap s from the “ C” c arrier to the new “ A” c arrier. These strap s were left c onnec ted to the “ C” c arrier. 8. For an AC-powered system, install the 2 new carrier ground straps. One strap c onnec ts g round point “ 1” to the A-c arrier frame (rig ht sid e), and the other c onnec ts ground p oint “ 8” to the A-c arrier frame (left sid e). NOTE: DC-p owered c arriers d o not use these c arrier g round strap s.
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Multicarrier G2 Universal Module to R8r EPN 5-52 High Reliability 5 9.Connec t the remaining end of the TDM/LAN c able (b etween the “ A” and “ D” c arriers) to the pin-field bloc k marked “ TDM” on the rig ht sid e of the “A” carrier. See Figure 5-13 and Table 5-11. The other end remained c onnec ted to the “ D” c arrier when the old c arrier was removed . 10. Connec t the remaining end of the TDM/LAN c able (b etween the “ A” and “ C” c arriers) to the p in-field b loc k marked “ TDM” on the left sid e of the “ A” c arrier. The other end remained c onnec ted to the “ C” c arrier when the old carrier was removed . 11. On p ort c arrier J58890BB-1, c onnec t the TDM c ab le or TDM terminator to Slot 02. On p ort c arriers J58890BB-2 and J58890BB-3, c onnec t the TDM c ab les to Slot 01.