Home
>
Lucent Technologies
>
Communications System
>
Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Upgrades And Additions Manual
Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Upgrades And Additions Manual
Have a look at the manual Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Upgrades And Additions Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 413 Lucent Technologies manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Adding or Removing Cabinet Hardware 6-29 Install a New EPN Cabinet in an Existing System 6 1. At the rear of the Port Carrier in p osition C in Cab inet 1, install a 9823A lig htwave transc eiver onto Slot 2 (1C02). See Figure 6-16 . 2. Connec t a 20-foot fib er op tic c ab le to the TX and RX c onnec tors on the transc eiver. Lab el the c ab le to make the c onnec tions to Cab inet 4 easier. 3. Route the fib er c ab le to the Port Carrier in position E in Cab inet 4. 4. At the rear of the Port Carrier in p osition E in Cab inet 4, install a 9823A lig htwave transc eiver onto Slot 2 (4E02). 5. Connec t the 20-foot fib er op tic c ab le from the Port Carrier in Cabinet 1 to the TX and RX c onnec tors on the transc eiver on the Port Carrier in Cab inet 4. Be sure the c ab le c onnec ted to the TX c onnec tor on 1 transc eiver is c onnec ted to the RX c onnec tor on the other transc eiver and vic e versa. 6. At the rear of the Expansion Control Carrier in Cabinet 2, install a 9823A lig htwave transc eiver onto Slot 1 (2A01). 7. Connec t a 20-foot fib er op tic c ab le to the TX and RX c onnec tors on the transc eiver. Be sure to lab el the c able. 8. At the rear of the Switc h Nod e Carrier in p osition E in Cab inet 4, install a 9823A lig htwave transc eiver onto Slot 20 (4E20). 9. Connec t the 20-foot fib er op tic c ab le from Cab inet 2 to the TX and RX c onnec tors on the transc eiver on the Switc h Nod e Carrier in Cab inet 4. Be sure the c ab le c onnec ted to the TX c onnec tor on 1 transc eiver is c onnec ted to the RX c onnec tor on the other transc eiver and vic e versa. 10. At the rear of the Port Carrier in p osition D in Cab inet 1, install a 9823A lig htwave transc eiver onto Slot 2 (1D02). 11. Connec t a 20-foot fib er op tic c ab le to the TX and RX c onnec tors on the transc eiver. Be sure to lab el the c able. 12. Route the fib er c ab le to Switc h Nod e Carrier in p osition E in Cab inet 4. 13. At the rear of the Switc h Nod e Carrier in p osition E in Cab inet 4, install a 9823A lig htwave transc eiver onto Slot 3 (4E03). 14. Connec t the 20-foot fib er op tic c ab le from Cab inet 1 to the TX and RX c onnec tors on the transc eiver on the Switc h Nod e Carrier in Cab inet 4. Be sure the c ab le c onnec ted to the TX c onnec tor on 1 transc eiver is c onnec ted to the RX c onnec tor on the other transc eiver and vic e versa. 15. Connec t an H600-278 Metallic Cab le from Slot 1 in the Exp ansion Control Carrier in Cab inet 4 (4A01) to Slot 19 on the Switc h Nod e Carrier in p osition E in Cab inet 4 (4E19).
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Adding or Removing Cabinet Hardware 6-30 Install a New EPN Cabinet in an Existing System 6 Figure 6-16. Switch-Connected Release 8r with SNC in EPN Figure Notes: 1. Cab inet 1 (PPN) 2. Cab inet 2, 3, and 5 through 16 (MCC or SCC EPNs)3. Cab inet 4 (MCC EPN with One Switc h Nod e)
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Adding or Removing Cabinet Hardware 6-31 Install a New EPN Cabinet in an Existing System 6 Switch-Connect New EPN to Existing PPN and EPN (Critical Reliability) For the following c onnec tion examp le, the PPN c ab inet is c alled Cab inet 1, the first EPN c ab inet is c alled Cab inet 2, and the EPN c ab inet c ontaining the Switc h Nod e Carrier is c alled Cab inet 4. NOTE: For the following examp le, ad d links to PNs in alternating ord er, for examp le: 20 and 2, 19 and 3, 18 and 4, and so forth. 1. At the rear of the Port Carrier in p osition C in Cab inet 1, install a lig htwave transc eiver onto Slot 2 (1C02). See Figure 6-17 . 2. Connec t a 20-foot (6 m) fib er op tic c ab le to the TX and RX c onnec tors on the transc eiver. Label the c ab le to make the c onnec tions to Cab inet 4 easier. 3. Route the fib er c able to the Switc h Nod e Carrier in p osition D in Cab inet 4. 4. At the rear of the Switc h Nod e Carrier in p osition D in Cab inet 4, install a lig htwave transc eiver onto Slot 2 (4E02). 5. Connec t the 20-foot (6 m) fib er op tic c ab le from the Port Carrier in Cab inet 1 to the TX and RX c onnec tors on the transc eiver on the Switc h Nod e Carrier in Cab inet 4. Be sure the c ab le c onnec ted to the TX c onnec tor on 1 transc eiver is c onnec ted to the RX c onnec tor on the other transc eiver and vic e versa. 6. At the rear of the Port Carrier in p osition D in Cab inet 1, install a lig htwave transc eiver onto Slot 2 (1D02). 7. Connec t a 20-foot (6 m) fib er op tic c ab le to the TX and RX c onnec tors on the transc eiver. Be sure to lab el the c ab le. 8. At the rear of the Switc h Nod e Carrier in p osition D in Cab inet 4, install a lig htwave transc eiver onto Slot 2 (4D02). 9. Connec t the 20-foot (6 m) fib er op tic c ab le from the Port Carrier in p osition D in Cabinet 1 to the TX and RX c onnec tors on the transc eiver. Be sure to lab el the c ab le. 10. At the rear of the Port Carrier in p osition B in Cab inet 2, install a 9823A lig htwave transc eiver onto Slot 2 (2B02). 11. Connec t a 20-foot (6 m) fib er op tic c ab le to the TX and RX c onnec tors on the transc eiver. Be sure to lab el the c ab le. 12. At the rear of the Switc h Nod e Carrier in p osition D in Cab inet 4, install a lig htwave transc eiver onto Slot 20 (4D20). 13. Connec t the 20-foot (6 m) fib er op tic c ab le from the transc eiver on the Switc h Nod e Carrier p osition D in Cab inet 4. Be sure the c ab le c onnec ted to the TX c onnec tor on 1 transc eiver is c onnec ted to the RX c onnec tor on the other transc eiver and vic e versa.
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Adding or Removing Cabinet Hardware 6-32 Install a New EPN Cabinet in an Existing System 6 14. At the rear of the Exp ansion Control Carrier in p osition A in Cab inet 2, install a lig htwave transc eiver onto Slot 1 (2A01). 15. Connec t a 20-foot (6 m) fib er op tic c ab le to the TX and RX c onnec tors on the transc eiver. Be sure to lab el the c ab le. 16. At the rear of the Switc h Nod e Carrier in p osition E in Cab inet 4, install a lig htwave transc eiver onto Slot 20 (4E20). 17. Connec t the 20-foot (6 m) fib er op tic c ab le from the transc eiver on the Switc h Nod e Carrier p osition E in Cab inet 4. Be sure the c ab le c onnec ted to the TX c onnec tor on 1 transc eiver is c onnec ted to the RX c onnec tor on the other transc eiver and vic e versa. 18. At the rear of the Port Carrier in p osition B in Cab inet 3, install a lig htwave transc eiver onto Slot 2 (3A01). 19. Connec t a 20-foot (6 m) fib er op tic c ab le to the TX and RX c onnec tors on the transc eiver. Be sure to lab el the c ab le. 20. At the rear of the Switc h Nod e Carrier in p osition E in Cab inet 4, install a lig htwave transc eiver onto Slot 3 (4E03). 21. Connec t the 20-foot (6 m) fib er op tic c ab le from the transc eiver on the Switc h Nod e Carrier p osition E in Cab inet 4. Be sure the c ab le c onnec ted to the TX c onnec tor on 1 transc eiver is c onnec ted to the RX c onnec tor on the other transc eiver and vic e versa. 22. At the rear of the Exp ansion Control Carrier in p osition A in Cab inet 3, install a lig htwave transc eiver onto Slot 2 (3B02). 23. Connec t a 20-foot (6 m) fib er op tic c ab le to the TX and RX c onnec tors on the transc eiver. Be sure to lab el the c ab le. 24. At the rear of the Switc h Nod e Carrier in p osition D in Cab inet 4, install a lig htwave transc eiver onto Slot 3 (4D03). 25. Connec t the 20-foot (6 m) fib er op tic c ab le from the transc eiver on the Switc h Nod e Carrier p osition D in Cab inet 4. Be sure the c ab le c onnec ted to the TX c onnec tor on 1 transc eiver is c onnec ted to the RX c onnec tor on the other transc eiver and vic e versa. NOTE: Continue c onnec ting the fib er c ab les in this manner until all fib er c onnec tions are mad e. Be sure to ad d links to PNs in alternating ord er (20 and 2, 19 and 3, 18 and 4, and so forth). 26. Connec t an H600-278 Metallic Cab le from Slot 1 in the Exp ansion Control Carrier in Cab inet 4 (4A01) to Slot 19 on the Switc h Nod e Carrier in p osition E in Cab inet 4 (4E19).
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Adding or Removing Cabinet Hardware 6-33 Install a New EPN Cabinet in an Existing System 6 Figure 6-17. Switch-Connected Release 8r with SNC in EPN 27. Connec t an H600-278 Metallic Cab le from Slot 2 in the Port Carrier in p osition B in Cab inet 4 (4B02) to Slot 19 on the Switc h Node Carrier in p osition D in Cab inet 4 (4D19). NOTE: Both fib ers from eac h PN must c onnec t to the same slot numb er in eac h Switc h Nod e Carrier. For examp le: if Slot 3A01 of EPN 3 c onnec ts to Switc h Nod e Carrier Slot 4E19, then Slot 3B02 of EPN 3 must c onnec t to Switc h Nod e Carrier Slot 4D19. 28. Proc eed to Appendix A, ‘‘Fiber Link Administration’’ to add the new fib er links. Figure Notes: 1. Cab inet 1 (PPN) 2. Cabinet 4 (MCC EPN with One Duplex Switc h Nod e)3. Cab inet 2, 3, and 5 throug h 16 (MCC or SCC EPN s) H600-278 Metallic Cab le
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Adding or Removing Cabinet Hardware 6-34 Remove an EPN Cabinet from an Existing System 6 Remove an EPN Cabinet from an Existing System All Systems Before starting the EPN removal p roc ess, p erform the following : NOTE: If you d o not d isab le the TTI, the translations c an be c orrup ted . 1. Type change system-parameters features and p ress En te r . Use sc reen 2 to d isab le Terminal Translation Initialization (TTI) b y c hanging the setting to n . 2. Unadminister all of the affec ted trunks, attend ant c onsoles, voic e terminals, and d ata modules assoc iated with the p ort c irc uit p ac ks in the EPN c ab inet b eing removed . These p ort-related translations must b e unad ministered b efore removing any hard ware. Refer to DEFINITY Enterp rise Communic ations Server Release 8 Ad ministrator’s Guid e for more information. Unadminister Fiber Links (Simplex Systems) The fib er links routing to and from the EPN c ab inet b eing removed must be unadministered before removing any hard ware from the c ab inet. !CAUTION: Failure to unad minister fib er links b efore removing hard ware c auses unnec essary alarm rep orts to INADS and c auses errors that are very d iffic ult to c lear. The fib er links are ad ministered to matc h hard ware and the Fib er Op tic Cab le Running List. Fib er link ad ministration c reates translation d ata b y id entifying the end p oint pairs for eac h link. To p rop erly unad minister the fib er links, this translation d ata must b e removed . 1. Unadminister the TN570 Exp ansion Interfac e and the TN574 or TN1654 DS1 Converter c irc uit p ac ks. Typ e change circuit-packs and press En t e r. Sc roll throug h the sc reens until the c arrier c ontaining the c irc uit p ac ks is d isp layed . Remove the TN570 and the TN574 or TN1654 c irc uit p ac ks from the slot loc ations on the sc reen. Press En te r when finished . 2. Type list fiber and press En te r. All ad ministered fiber c onnec tions are d isp layed . Make note of whic h fib er links are to b e removed .
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Adding or Removing Cabinet Hardware 6-35 Remove an EPN Cabinet from an Existing System 6 3. Type change fiber link and press En t e r. The Fib er Link Ad ministration sc reen ap p ears. Use this sc reen to unad minister fib er links, eac h of whic h is identified b y a fiber numb er. a. The Is one endpoint remoted via DS1 Converter complex? field must remain administered. b . Remove the loc ation of the TN570 and the TN574 or TN1654 c irc uit p ac k for b oth ENDPOINT-1 and ENDPOINT-2. 4. Sc roll to sc reen 2. a. Type no , as ap plic ab le, in eac h Facility Installed? field (A, B, C, and D). b. The Bit Rate: field must remain ad ministered if other fib er c onnec tions assoc iated with the fac ility will remain. c . The id le c od e in the Idle Code MSB (1) . . . . LSB (8): field must remain administered. d. The Line Coding: field must remain ad ministered . 5. For a T1 site, p roc eed to ‘‘T1 Installations Only’’ . For an E1 site, proc eed to ‘‘E1 Installations Only’’ . T1 Installations Only 1. The Framing Mode: field is d isp lay only. 2. The DS1CONV-1 Line Compensation: and the DS1CONV-2 Line Compensation: fields are display only. 3. Remove the Facility Circuit ID: from the fac ilities b eing unad ministered , if used . Press En t e r. 4. A d isplay similar to the following ap p ears after the p roc ed ure is completed: RESET PORT-NETWORK 2 LEVEL 2 (COLD) PERFORMED . E1 Installations Only 1. The CRC? field must remain administered. 2. The Line Termination: field is display only. 3. Remove the Facility Circuit ID information from the fac ilities b eing unad ministered , if used . Press En t e r. 4. A d isplay similar to the following ap p ears after the p roc ed ure is completed: RESET PORT-NETWORK 2 LEVEL 2 (COLD) PERFORMED .
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Adding or Removing Cabinet Hardware 6-36 Remove an EPN Cabinet from an Existing System 6 All Installations 1. When the system reset is finished, type status port-network 2 and press En t e r. The Port Network Status sc reen ap p ears. Verify that PNC Ac tive is “ up ” and that the Servic e State is “ in.” 2. A Span LED, on the front of the DS1 Converter circuit pack, must be off for eac h inac tive fac ility administered . For examp le, if Fac ility A and Fac ility B are unad ministered , then the top 2 Sp an LEDs on the c irc uit p ac k must b e off. If the yellow LEDs are on, then p rob lems were enc ountered d uring the unad ministration of hard ware. Sp an LEDs assoc iated with ad ministered fac ilities (C and D, in this examp le) should b e on. Removing the Hardware 1. Be sure that you have unad ministered the trunks, attend ant c onsoles, voic e terminals, and d ata mod ules assoc iated with the p ort c irc uit pac ks in the EPN c ab inet. 2. Remove the fib er op tic c ab les from the fib er transc eivers at b oth end s of the fib er sp an. Carefully c oil the fib er op tic c ables. Avoid b end ing c ab les to a rad ius smaller than 1.5 inc hes (3.8 c m). 3. Remove the fib er transc eivers from the DS1 and /or DS1 c onverter c irc uit p ac ks at b oth end s of eac h fib er sp an. 4. Remove the 25-p air c ab les from the c onnec tor p anel on eac h c arrier of the EPN. 5. Type remove cabinet and p ress En t e r. This removes the EPN c ab inet ad ministration. 6. Remove the p ower c ord s from the p ower units in eac h c arrier in the EPN and remove the AC power c ord or DC p ower wires. 7. Chec k the ground ing sc heme for the c ab inets. Perform the following : a. If any c ab inet ground wires c onnec t in series b etween the EPN c ab inet and any other c ab inet, remove the wires from the EPN c ab inet and c onnec t them to the next c abinet in the g round p lane. !CAUTION: Never leave c ab inets ungrounded . When a ground wire is removed from a series-c onnec ted c abinet, the g round p lane b ec omes op en with respec t to all sub seq uent c ab inets. b . If any c abinet g round wires c onnec t in parallel to other c ab inets, or c onnec t d irec tly to the AC p ower panel g round or other ap proved g round , remove the wire from eac h end of the g round sp an. 8. Carefully remove the EPN c ab inet. The c ab inet may weig h as muc h as 800 p ound s. Use c aution.
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Adding or Removing Cabinet Hardware 6-37 Remove an EPN Cabinet from an Existing System 6 9. Type change system-parameters features and p ress En t e r. Use this sc reen to c hang e the TTI field b ac k to its p revious setting b efore the up g rad e. 10. When finished , p lac e d ust c overs over all exp osed fib er c oup ling s that remain after the fib er op tic c ab les are removed . 11. If any fib er op tic c ab les were removed from Lightg uide Interc onnec t Units (LIUs) or Fib er Patc h Panels, remove the assoc iated c able lab eling . This will prevent c onfusion if existing fib er is later moved. 12. Return all unused equipment (not owned by the customer) to Lucent Tec hnolog ies ac c ord ing to the req uirements outlined in: BCS/Material Log istic s, MSL/Attend ed Stoc king Loc ations Method s and Proc ed ures for Basic Material Returns 13. If any messag e waiting lamp s are on, skip to ‘‘Troubleshooting’’ on page 6-40. Unadminister Fiber Links (Duplex Systems) The fib er links routing to and from the EPN c ab inet b eing removed must be unadministered before removing any hard ware from the c ab inet. !CAUTION: Failure to unad minister fib er links b efore removing hard ware c auses unnec essary alarm rep orts to INADS and c auses errors that are very d iffic ult to c lear. The fib er links are ad ministered to matc h hard ware and the Fib er Op tic Cab le Running List. Fib er link ad ministration c reates translation d ata b y id entifying the end p oint pairs for eac h link. To p rop erly unad minister the fib er links, this translation d ata must b e removed . 1. Type list fiber and press En te r. All ad ministered fiber c onnec tions are d isp layed . Make note of the fib er links to b e removed . 2. Type change fiber link and press En t e r. The Fib er Link Ad ministration sc reen ap p ears. On sc reen 1: a. Remove the Board Location: information for ENDPOINT-1 and ENDPOINT-2. This is the c ab inet, c arrier, and slot that id entifies the p hysic al loc ation of an SNI or EI c irc uit p ac k that is the first end p oint of the fib er link. Rep eat for the remaining end points. b. The Board Type field is display only.
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Adding or Removing Cabinet Hardware 6-38 Remove an EPN Cabinet from an Existing System 6 c . In the DS1CONV Board Location : field, remove the c ab inet, c arrier, and slot that id entifies the physic al loc ation of DS1 Converter c irc uit p ac k in the first end p oint of the d up lic ate fib er link. End p oint-1’s d uplic ate along with Endp oint-2’s d up lic ate make up the d up lic ate fib er link c alled the B-PNC link. d. The DS1CONV Board Type : field is a display only field. e. The Is one endpoint remoted via a DS1 Converter Complex? field must remain ad ministered if other fib er c onnec tions assoc iated with the fac ility will remain. 3. Sc roll to sc reen 2. a. Remove the DS1 Converter Fac ilities information. In the Facility Installed? field , typ e no for all fac ilities (A, B, C, and D) to b e removed . b. The Bit Rate : field must remain ad ministered . c . The id le c od e in the Idle Code MSB (1) . . . . LSB (8): field must remain administered. d. The data in the Line Coding: field must remain ad ministered . 4. For a T1 site, p roc eed to ‘‘T1 Installations Only’’ . For an E1 site, proc eed to ‘‘E1 Installations Only’’ . T1 Installations Only 1. The Framing Mode: field is d isp lay only. 2. The DS1CONV-1 Line Compensation: and the DS1CONV-2 Line Compensation: fields are display only. 3. Remove the Facility Circuit ID information from the fac ilities b eing unad ministered , if used . Press En t e r. 4. A d isplay similar to the following ap p ears after the p roc ed ure is completed: RESET PORT-NETWORK 2 LEVEL 2 (COLD) PERFORMED . E1 Installations Only 1. The CRC? field must remain administered. 2. The Line Termination: field is display only. 3. Remove the Facility Circuit ID information from fac ilities b eing unad ministered , if used . Press En t e r. 4. A d isplay similar to the following ap p ears after the p roc ed ure is completed: RESET PORT-NETWORK 2 LEVEL 2 (COLD) PERFORMED .