Home
>
Lucent Technologies
>
Communications System
>
Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Upgrades And Additions Manual
Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Upgrades And Additions Manual
Have a look at the manual Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Upgrades And Additions Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 413 Lucent Technologies manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Multicarrier G2 Universal Module to R8r EPN 5-33 Standard Reliability 5 nRoute the c ab le to the c ab le tray and d own, out of the c ab inet, throug h the c ab le manag er to the PDS c ross-c onnec t fac ility. nConnec t the fib er c ab le to the lig htguid e interc onnec t unit p rovid ed . nCarefully attac h the fib er c ab le (with c ab le ties) to the wall of the c ab le tray at the b uilt-in c ab le tie p ositions. nCoil up the surp lus fib er c ab le and p lac e it in the c ab le manag er. For Two Fiber-Remoted Expansion Port Networks 1. Behind control carrier A of PPN c abinet 1: nInstall a lig htwave transc eiver on c ab le c onnec tor at slot 1A02. NOTE: Attenuators may be required for single mode fiber using a 300A Lightwave Transc eiver nConnec t a fib er op tic c ab le to the transc eiver just installed . nRoute the c ab le to the c ab le tray and d own, out of the c ab inet, throug h the c ab le manag er to the PDS c ross-c onnec t fac ility. nConnec t the fib er c ab le to the lig htguid e interc onnec t unit p rovid ed . nCarefully attac h the fib er op tic c ab le (with c ab le ties) to the wall of the c ab le tray at the b uilt-in c ab le tie p ositions. 2. Behind control carrier A of EPN c abinet 3: nInstall a lig htwave transc eiver on c ab le c onnec tor at slot 3A01. NOTE: Attenuators may be required for single mode fiber using a 300A Lightwave Transc eiver nConnec t a fib er op tic c ab le to the transc eiver just installed . nRoute the c ab le to the c ab le tray and d own, out of the c ab inet, throug h the c ab le manag er to the PDS c ross-c onnec t fac ility. nConnec t the fib er c ab le to the lig htguid e interc onnec t unit p rovid ed . nCarefully attac h the fib er op tic c ab le (with c ab le ties) to the wall of the c ab le tray at the b uilt-in c ab le tie p ositions. nCoil up the surp lus fib er c ab le and p lac e it in the c ab le manag er.
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Multicarrier G2 Universal Module to R8r EPN 5-34 Standard Reliability 5 3. Behind control carrier A of EPN c abinet 2: nInstall a lig htwave transc eiver on c ab le c onnec tor at slot 2A02. NOTE: Attenuators may be required for single mode fiber using a 300A Lightwave Transc eiver nConnec t a fib er op tic c ab le to the transc eiver just installed . nRoute the c ab le to the c ab le tray and d own, out of the c ab inet, throug h the c ab le manag er to the PDS c ross-c onnec t fac ility. nConnec t the fib er c ab le to the lig htguid e interc onnec t unit p rovid ed . nCarefully attac h the fib er op tic c ab le (with c ab le ties) to the wall of the c ab le tray at the b uilt-in c ab le tie p ositions. 4. Behind control carrier A of EPN c abinet 3: nInstall a lig htwave transc eiver on c ab le c onnec tor at slot 3A02. NOTE: Attenuators may be required for single mode fiber using a 300A Lightwave Transc eiver nConnec t a fib er op tic c ab le to the transc eiver just installed . nRoute the c ab le to the c ab le tray and d own, out of the c ab inet, throug h the c ab le manag er to the PDS c ross-c onnec t fac ility. nConnec t the fib er c ab le to the lig htguid e interc onnec t unit p rovid ed . nCarefully attac h the fib er op tic c ab le (with c ab le ties) to the wall of the c ab le tray at the b uilt-in c ab le tie p ositions. nCoil up the surp lus fib er c ab le and p lac e it in the c ab le manag er.
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Multicarrier G2 Universal Module to R8r EPN 5-35 Standard Reliability 5 Figure 5-9. Fiber Optic Connections EPN1 to EPN2 Verify Usable Circuit Pack Vintages Verify that eac h G2 c irc uit p ac k reused in the up g rad e c onforms to the usab le vintage requirements for a Release 8 system (see Referenc e Guid e for Circ uit Pac k Vintag es and Chang e Notic es ). Remove Power-Failure Ground Wire Remove the 10 AWG (#25) (2.6 mm2) g round wire from the p ower-failure transfer unit.Figure Notes 1. Lightwave Transc eiver 2 . To EPN 1 C a r r ie r A Sl o t 2 A0 2 3 . To EPN 2 C a r r ie r A Sl o t 3 A0 2 4. Fiber Optic Cable5. Op tic al Cross-Connec t Fac ility 6. 100A Lig htg uid e Interc onnec t Unit 7. TX Connec tor 8. RX Connec tor cydf013 CJL102396 RX TX 2 22 1 11 22 11
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Multicarrier G2 Universal Module to R8r EPN 5-36 Standard Reliability 5 Boot the Release 8 System 1. Connect the PC to the “ TERMINAL” c onnec tor b ehind PPN c ontrol c arrier “ A,” or install the G3-MA ac c ord ing to the “ Set Up G3-MA” c hap ter of DEFINITY Communic ations System Generic 3 Manag ement Ap p lic ations — Operations. 2. Insert the translation c ard in the TN794 fac ep late. 3. At the EPN p ower d istribution unit, set the main c irc uit b reaker to ON. 4. At the PPN p ower d istribution unit, set the main c irc uit b reaker to ON. 5. The system performs the reset level 4 rebooting proc ess, loading default system translations from the translation c ard . This takes 8 to 11 minutes. 6. Get the ord er numb er of the up g rad e, and c all the reg ional CSA to req uest an “ init” log in so that the rig ht-to-use op tions c an b e enab led on the up g rad ed system. 7. To use Ac cess Security Gateway (ASG), see Appendix C, ‘‘Access Security Gateway’’.
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Multicarrier G2 Universal Module to R8r EPN 5-37 Standard Reliability 5 Set Daylight Savings Rules You c an set up to 15 c ustomized d aylig ht saving s time rules. If you have c ab inets in several different time zones, you c an set up rules for eac h on a loc ation b asis. A d aylig ht saving s time rule sp ec ifies the exac t time when you want to transition to and from d aylig ht saving s time. It also sp ec ifies the inc rement at whic h to transition. NOTE: The d efault d aylig ht saving s rule is 0 , no d aylig ht saving s. 1. Type change daylight-savings-rules and press En t e r. 2. Type the appropriate start and stop information in the Change Day , Month , Date , Time , and Increment field s for eac h rule. (for examp le, 1:00 eq uals one hour) NOTE: You c an c hang e any rule exc ep t rule 0 (zero). You c annot delete a d aylig ht saving s rule if it is in use on either the Loc ations or Date and Ti m e s c re e n s . 3. When d one, p ress En te r. DAYLIGHT SAVINGS RULES Rule Change Day Month___Date Time____Increment 0: No Daylight Savings 1: Start: first Sunday ___ on or after April ___ 1 at _2:0001:00Stop: first Sunday___ on or after October _ 25 at _2:002: Start: first _________ on or after _________ __ at __:__ Stop: first _________ on or after _________ __ at __:__ 3: Start: first _________ on or after _________ __ at __:__ Stop: first _________ on or after _________ __ at __:__ 4: Start: first _________ on or after _________ __ at __:__ Stop: first _________ on or after _________ __ at __:__ 5: Start: first _________ on or after _________ __ at __:__ Stop: first _________ on or after _________ __ at __:__ 6: Start: first _________ on or after _________ __ at __:__ Stop: first _________ on or after _________ __ at __:__ 7: Start: first _________ on or after _________ __ at __:__ Stop: first _________ on or after _________ __ at __:__
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Multicarrier G2 Universal Module to R8r EPN 5-38 Standard Reliability 5 Set Date and Time 1. Type set time and press En t e r to b ring up the Date and Time sc reen. Screen 5-1. Typical Date and Time Screen 2. Typ e the d ay of the week in Eng lish (Sunday throug h Saturd ay). See Tab le 5-8 for Eng lish d ay of the week names. Table 5-8. English Day of the Week Names Day Number Day Name 1Sunday 2 Mond ay 3Tuesday 4 Wed nesd ay 5Thursday 6Friday 7Saturday DATE AND TIME DATE Day of the Week: Tuesday Month: FebruaryDay of the Month: 8 Year: 2000 TIME Hour: 20 Minute: 30Second: XX Type: standardDaylight Savings Rule: 0
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Multicarrier G2 Universal Module to R8r EPN 5-39 Standard Reliability 5 3. The c ursor is p ositioned on the Month: field . Typ e the c urrent month in Eng lish (January throug h Dec emb er). See Table 5-9 for Eng lish month names. After the month is entered, p ress Ta b to move to next field . 4. The c ursor is p ositioned on the Day of the Month: field . Typ e the d ay of month (1 through 31) and p ress Ta b to move to the next field. 5. The c ursor is p ositioned on the Year: field . Typ e the c urrent year and p ress TA B to move to the next field . 6. The c ursor is p ositioned on the Hour: field . Typ e the c urrent hour for a 24-hour c loc k. Press Ta b to move to the next field . 7. The c ursor is p ositioned on the Minute: field . Type c urrent minute (0 throug h 59). Sec ond s c annot b e set. 8. Type standard or daylight savings in the Type field . 9. Typ e the rule (numb er) in the Daylight Savings Rule field. 10. Press En t e r when the information is c orrec t. 11. Typ e display time and press En te r to verify d ate/time d ata. Table 5-9. English Month Names Month Number Month Name 1 January 2February 3March 4April 5May 6June 7July 8August 9 Sep temb er 10 Oc tob er 11 November 12 Dec emb er
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Multicarrier G2 Universal Module to R8r EPN 5-40 Standard Reliability 5 Set Additional Administration 1. Type list configuration software-version and p ress En te r to c omp are the version numb er of the Release 8 software p rog ram (d isp layed on the terminal) with the TN786B version numb er (written on a label on the TN786B’s fac ep late). If the version numb ers are not the same, c hang e the version numb er on the TN786B lab el so that they ag ree. 2. Type change system-parameters customer-options and press En te r. Use this sc reen to enable the c ustomer’s rig ht-to-use op tions on the up g rad e ord er. See DEFINITY Enterprise Communic ations Server Release 8 Ad ministrator’s Guid e , for d etails. 3. Type change site-data and press En te r. Use this sc reen to assig n system-sp ec ific information (suc h as b uild ing , floor, stations, and so forth). 4. Type save translation and press En te r. This instruc ts the system to write all translation information from memory to the translation c ard . !CAUTION: If the terminal sc reen d isp lays “ translation c orrup tion d etec ted ; c all Luc ent Tec hnolog ies distrib utor immed iately” , an error was d etec ted in the translations. Call your Luc ent Tec hnolog ies rep resentative. Reconnect Cables to Upgraded EPN Cabinet 1. At the power d istribution unit of the up g rad ed EPN, set the main c irc uit b re a k e r t o O FF. NOTE: Powering d own an EPN without p owering d own the PPN will set off alarms. However, these alarms should c lear after p ower is restored to eac h EPN. 2. Temporarily d isc onnec t the lig htwave transc eivers and fib er op tic c ab les from the ap p ropriate c arriers. 3. Rep lac e the rear d oors or rear p anels p reviously removed . 4. At the EPN c ab inet, rec onnec t the lig htwave transc eivers, fib er op tic c ab les, and the c onnec tor c ab les. 5. Install the front d oor on the EPN c abinet if p reviously removed .
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Multicarrier G2 Universal Module to R8r EPN 5-41 Standard Reliability 5 Power Up the EPN Cabinets 1. At eac h EPN p ower d istrib ution unit, set the main c irc uit breaker to ON. After ab out 40 sec ond s, EPN power and PPN/EPN c ommunic ations return. 2. After p ower returns to eac h EPN and all troub le is c leared , verify the EMERGENCY TRANSFER CONTROL switc h is set to AUTO. This restores the system to the normal mod e. Retranslate Port Circuits If p ort c irc uit p ac ks in the G2 mod ule c ontrol c arrier were reloc ated in order to p lac e: nA c ritic al p ort c irc uit p ac k, requiring long er nominal battery hold over (suc h as a DS1 or an Announc ement c irc uit p ac k), in a p ort slot nA TN736, TN752, or TN755 power sup p ly in p ort slots “ 18” and “ 19” nA TN776 or TN570 Exp ansion Interfac e in p ort slot “ 1” nA TN776 or TN570 in p ort slot “ 2” (for a sec ond d irec tly c onnec ted EPN) of the new exp ansion c ontrol c arrier, verify that they were retranslated d uring the off-site software up g rad e. If not, they must b e retranslated now. Refer to DEFINITY Enterp rise Communic ations Server Release 8 Ad ministrator’s Guid e, for instruc tions on p erforming the retranslations. Enable TTI Ty p e change system-parameters features and press En t e r. Use this sc reen to c hang e the TTI field b ac k to its p revious value b efore the up g rad e. Check Link Status 1. Type display communication-interface links and press En te r. Compare it with the earlier status. 2. Type status link number and p ress En t e r. Rep eat this step for eac h link. Enable Scheduled Maintenance Ty p e change system-parameters maintenance and press En t e r. Enab le the sc hed uled d aily maintenanc e. Resolve Alarms Examine the alarm log . Resolve any alarms that may exist using DEFINITY Enterp rise Communic ations Server Release 8 Maintenanc e for R8r .
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Multicarrier G2 Universal Module to R8r EPN 5-42 Standard Reliability 5 Enable Customer Options and Alarm Origination to INADS 1. Get the DOSS order number of the upgrade from the project manager and ask the reg ional Customer Software Ad ministration to c omp lete the step s in the shad ed b ox. See ‘‘Where to Call for Tec hnic al Sup p ort’’ on p ag e -xx for telep hone numb ers. NOTE: As p art of the system reg istration p roc ess, the INADS Datab ase Ad ministrator enab les Alarm Orig ination. 2. When ad ministration is c omp leted , log in as craft at the Login: prompt. Save Translations 1. Type save translation and press En te r to g et up g rad ed translations onto d isk. If the translations were c orrup ted d uring the up g rad e, the following error message displays when logging in: !WARNING: Translation c orrup tion d etec ted ; c all Luc ent Tec hnolog ies d istrib utor immed iately. NOTE: Th e save translation c ommand c annot func tion if the translation c orruption messag e ap p ears. init login administration: 1. Log in as init . 2. Type change system-parameters customer-options and press En te r to verify that the c ustomer op tions are p roperly set. 3. Go to sc reen 6, QSIG Op tional Features, and set the Basic Call Setup field to y if the customer was using Supplementary Services Protoc ol b or d on an ISDN-PRI trunk g roup b efore the up g rad e. 4. Type change system-parameters offer-options and p ress En te r. 5. If the Activate Offer field is n , set it to y and press Ta b. A warning messag e lets you know whether you need to save translations and reb oot to make the c hang e p ermanent. 6. Press En t e r to effec t the c hang es or Canc el if there were no c hang es. 7. Contac t the req uester when d one.