Home
>
Lucent Technologies
>
Communications System
>
Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Upgrades And Additions Manual
Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Upgrades And Additions Manual
Have a look at the manual Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Upgrades And Additions Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 413 Lucent Technologies manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Multicarrier G2 Universal Module to R8r EPN 5-73 High Reliability 5 Resolve Alarms Examine the alarm log . Resolve any alarms that may exist using DEFINITY Enterp rise Communic ations Server Release 8 Maintenanc e for R8si . Enable Customer Options and Alarm Origination to INADS 1. Get the DOSS order number of the upgrade from the project manager and ask the reg ional Customer Software Ad ministration to c omp lete the step s in the shad ed b ox. See ‘‘Where to Call for Tec hnic al Sup p ort’’ on p ag e -xx for telep hone numb ers. NOTE: As p art of the system reg istration p roc ess, the INADS Datab ase Ad ministrator enab les Alarm Orig ination. 2. When ad ministration is c omp leted , log in as craft at the Login: prompt. init login administration: 1. Log in as init . 2. Type change system-parameters customer-options and press En te r to verify that the c ustomer op tions are p roperly set. 3. Go to sc reen 6, QSIG Op tional Features, and set the Basic Call Setup field to y if the customer was using Supplementary Services Protoc ol b or d on an ISDN-PRI trunk g roup b efore the up g rad e. 4. Type change system-parameters offer-options and p ress En te r. 5. If the Activate Offer field is n , set it to y and press Ta b. A warning messag e lets you know whether you need to save translations and reb oot to make the c hang e p ermanent. 6. Press En t e r to effec t the c hang es or Canc el if there were no c hang es. 7. Contac t the req uester when d one.
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Multicarrier G2 Universal Module to R8r EPN 5-74 High Reliability 5 Save Translations 1. Type save translation and press En te r to g et up g rad ed translations onto d isk. If the translations were c orrup ted d uring the up g rad e, the following error message displays when logging in: !WARNING: Translation c orrup tion d etec ted ; c all Luc ent Tec hnolog ies d istrib utor immed iately. NOTE: Th e save translation c ommand c annot func tion if the translation c orruption messag e ap p ears. Back Up Disk 1. Type backup disk and p ress En t e r to backup all changed files. 2. Type test stored-data long and press En t e r. This instructs the system to verify the c onsistenc y of the MSS files (on the d isk and removab le med ia). Return Replaced Equipment Return unused G2 eq uip ment to Luc ent Tec hnolog ies ac c ord ing to the req uirements outlined in: BCS/Material Log istic s, MSL/Attend ed Stoc king Loc ations Method s and Proc ed ures for Basic Material Returns
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Multicarrier G2 Universal Module to R8r EPN 5-75 Critical Reliability 5 Critical Reliability Upgrade Cabinets An existing universal mod ule c ab inet is always up g rad ed to an EPN. Required Hardware The eq uip ment in Table 5-14 must be on-site before the upgrade begins. To plac e a claim for missing equipment, as part of the Streamlined Implementation p roc ess, c all “ 1-800-772-5409” or the numb er p rovided b y your Luc ent Tec hnolog ies rep resentative. Table 5-14. Required Hardware Equipment Description Quantity PEC 6300-05X Proc essor Port Network 1 J58890AF Exp ansion Control Carrier 1 J58890BB-3 Port Carrier 1 106647985 TN775B Maintenanc e 1 103557294 or 103281788TN776 Exp ansion Interfac e TN570 Exp ansion Interfac e4 or 12 1 4 or 12 1,2 1. Use 4 for a c ritic al reliability system with 2 p ort networks or 12 with 3 port networks. Either 2 or 8 Exp ansion Interfac es (EIs) ship loose with the EPN eq uip ment. The factory has installed the other 2 or 4 EIs in the new PPN. 2. Req uired port network interfaces in a Release 8 system with the op tional p ac ket bus.J58890TO-1 L1 Removab le Med ia 4 H-600-204 G1 ICC 2 3 3. Req uired for an EPN in a c ritical reliab ility system.407439975 20-Foot Multi-mod e Fiber Op tic Cab le 2 or 6 4 4. Use 4 or 12 if the EPNs and the PPN are remotely loc ated . Assuming ac cep tab le lengths, the fib ers previously connecting an upg raded G2 universal mod ule (not a trad itional module) to the G2 TMS have the c orrect transceiver connec tors and can b e reused . 106455348 or 1064553639823-A Lightwave Transc eiver 9823-B Lightwave Transc eiver4 or 12 (See Note 1) 4 or 12 (See Note 1) 106689516 TN771D Maintenanc e Test 1 or 2
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Multicarrier G2 Universal Module to R8r EPN 5-76 Critical Reliability 5 Required Tools The following tools and items may b e req uired d uring the up g rad e: nHig h-intensity flashlig ht or AC d rop lig ht n3/8-inc h flat-b lad e sc rewd river with a 10-inc h shank (minimum) n5/16-inc h and 1/4-inc h soc kets with a ratc het and 10-inc h extension nLong -nose p liers to d isc onnec t ground ing strap s and straig hten backplane pins nStatic -p roof or orig inal c irc uit p ac k p ac kag ing for transp orting c irc uit packs nLab els for id entifying the p ort c irc uit p ac ks and c ab les attac hed to the rear of c ab inets nTwelve #12 and #10 self-tap p ing sc rews nFour sp are c arrier g round ing straps nWrist ground strap nRep air kit for b ac kp lane p ins (KS-22876 L2 or eq uivalent) nOne c op y of eac h of the following manuals: — DEFINITY Enterp rise Communic ations Server Release 8 Maintenanc e for R8r — DEFINITY Enterp rise Communic ations Server Release 8 Ad ministrator’s Guid e Follow Routine Preventive Maintenance During the up g rad e, follow routine p reventive maintenanc e p roc ed ures on the system to b e up g rad ed . For information ab out the p roc ed ures and nec essary eq uip ment, refer to the “ Preventive Maintenanc e” sec tion in DEFINITY Enterp rise Communic ations Server Release 8 Maintenanc e for R8r . Label Cables To make rec onnec ting the c ab les simp ler and more reliable, lab el b oth end s of the c onnec tor c ables assoc iated with the c arrier to b e removed .
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Multicarrier G2 Universal Module to R8r EPN 5-77 Critical Reliability 5 Check Link Status 1. Type display communication-interface links and p ress En te r. Write d own all enab led links. 2. Type status link number and p ress En t e r. Rep eat this step for all links. 3. Write d own whic h links are in servic e. Disable TTI !CAUTION: If you d o not d isab le the TTI, the translations c an b e c orrup ted . 1. Make sure the ISDN is in servic e. If not, attempt to b usy out and release the ISDN D-c hannel/link. This will b ring the ISDN trunks b ac k into servic e. 2. Type change system-parameters features and press En t e r. 3. On the sec ond sc reen, set the Enabled? field to n to p revent the TTI feature from ac tivating . Power Down G2 System At the power d istribution unit, set the main c irc uit b reaker to OFF. Install Power-Failure Transfer Ground Wire !CAUTION: To avoid c ontaminating sing le-p oint g round , d o not c onnec t the g round wire while the system is p owered up . 1. Connec t 1 end of a 10 AWG (#25) (2.6 mm2) wire either to pin 49 of the c onnec ting b loc k or to p in 49 of the CAP (c ab le ac c ess p anel) assoc iated with the p ower-failure transfer p anel. 2. Route the op p osite end of the wire to an ap p roved g round sourc e and c onnec t.
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Multicarrier G2 Universal Module to R8r EPN 5-78 Critical Reliability 5 Disconnect Cables 1. With the c ab le retainer in front of you and the p art numb er visib le (4B or 4C), loc ate the slot that is almost vertic al. This slot is ad jac ent to the p art numb er. Insert a flat b lad e sc rewd river with a 1/4-inc h b lad e into the slot and twist. The retainer will snap op en easily. Remove the c ab le. 2. Disconnect previously labeled c ables assoc iated with the carrier to be removed . 3.Behind a “ DEFINITY style” c ab inet, remove the b ac k d oors from the c ab inet. 4. Behind a p reviously up graded c ab inet, remove all of the b ac k panels. (Two d ifferent typ es of sc rews hold the b ac k p anels to the c ab inet. The #10 sc rews c an b e removed with a sc rewd river or a 1/4-inc h soc ket. The #12 screws c an be removed with a sc rewdriver or a 5/16-inch soc ket.) Remove Circuit Packs from Module Control Carriers A and B 1. To ensure that p ower units in the “ A” and “ B” c arriers are p rop erly replaced, label each power unit with its slot number. 2. Disc onnec t the p ower c ords from the p ower units in the “ A” and “ B” carriers. 3. Remove all c irc uit p ac ks and p ower units from c arrier “ A.” Store the c irc uit p ac ks in the static -p roof p ac kag ing . 4. Remove all c irc uit p ac ks from c arrier “ B.” Store the c irc uit p ac ks in the static -proof p ac kag ing . 5. Remove the c irc uit p ac k b lanks from slots that d o not c ontain c irc uit p acks. 6. Remove the front trim p late from the “ B” c arrier b y p ulling it straig ht off. Then remove the front trim p late from the “ A” c arrier. Remove CURL from Module Control Carrier A Remove the CFY1 c urrent limiter (CURL) from the p in-field b loc k marked “ CURL” on the “ A” c arrier. The CURL will b e reused in the DEFINITY ECS Release 8 EPN. NOTE: Note the p osition of the c omp onents on the left side of the CURL. NOTE: Verify that the CURL meets the minimum usab le vintag e req uirements.
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Multicarrier G2 Universal Module to R8r EPN 5-79 Critical Reliability 5 Remove Module Control Carriers A and B 1.Remove the TDM/LAN c ab le from b etween the “ A” and “ B” c arriers. See Figure 5-23 . This c ab le will b e reused . 2. Disc onnec t 1 end of the TDM/LAN c ab le (b etween the “ A” and “ D” c arriers) from the “ A” c arrier. Leave the other end c onnec ted to the “ D” c arrier, and move the c ab le into a p osition so that it will not interfere with removing the “ A” c arrier. NOTE: Note the p osition of the TDM/LAN c ab le b efore d isc onnec ting . 3. Disc onnec t 1 end of the TDM/LAN c ab le (b etween the “ B” and “ C” c arriers) from the “ B” c arrier. Leave the other end c onnec ted to the “ C” c arrier, and move the c ab le into a p osition so that it will not interfere with removing the “ B” c arrier. !CAUTION: When removing the TDM/LAN c ab les from a previously up g rad ed c arrier, b e c areful that none of the short p iec es of shrink tub ing c ome off the 4 c orner p ins of the p in-field b loc k. Otherwise, when the new eq uip ment is c onnec ted, -48 volts c ould short to g round . 4. Remove and retain the 8 g round strap s from b etween the “ A” and “ B” carriers. See Figure 5-24 . 5. Disconnect 1 end of the 8 ground straps from between the “A” and “D” c arriers. These strap s will rec onnec t to the new “ A” c arrier. 6. Disconnect 1 end of the 8 ground straps from between the “B” and “C” c arriers. These strap s will rec onnec t to the new “ B” c arrier. 7. Disc onnec t the “ P1” (small 9-pin) c onnec tor and the “ P2” (larg e 38-p in) c onnec tor from the “ A” c arrier. See Figure 5-25 . Move the c ab les into a p osition where they will not interfere with removing the c arrier. 8. Slid e the latc h up , and d isc onnec t the “ P1” (small 9-p in) c onnec tor from the “ B” c arrier. Move the c ab le into a p osition where it will not interfere with removing the c arrier. 9. Disc onnec t and remove the ICC c ab les. See Figure 5-23 . They will not b e reused. 10. Remove the fan trim p late by p ulling it straig ht off. 11. Clean or rep lac e the air filter (403326820) if nec essary. 12. In front of c arrier, remove the 4 sc rews (top 2 first) hold ing the “ B” c arrier to the c ab inet frame. Use a long -hand le sc rewd river or 5/16-inc h soc ket with a 10-inc h extension. 13. Behind the c arrier, remove the 2 sc rews hold ing the “ B” c arrier’s rear c onnec tor p anel to the c ab inet frame.
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Multicarrier G2 Universal Module to R8r EPN 5-80 Critical Reliability 5 14. Slid e the c arrier forward 1 to 2 inc hes; then, from the b ac k, b e sure that no c ab les or wiring harnesses are c aug ht on the c ab inet/c arrier framework. !CAUTION: Cab les and wiring harnesses c an be d amag ed if they c atc h on the framework and if too muc h pressure is ap p lied in removing the carrier. 15. Remove the c arrier b y slid ing it out the front of the c ab inet. 16.Rep eat Step s 12 through 15 for the “ A” c arrier. 17. On p ort c arrier J58890BB-1, c onnec t the TDM c ab le or the TDM terminator to Slot 02. On p ort c arriers J58890BB-2 and J58890BB-3, c onnec t the TDM c ab les or the TDM terminator to Slot 01. If the port c arrier has J58890BB-1 and J58890BB-2 p rinted on it, treat it as a J58890BB-1.
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Multicarrier G2 Universal Module to R8r EPN 5-81 Critical Reliability 5 Figure 5-22. TDM/LAN Connections for Duplicated G2 Universal Module Figure Notes 1.Port Carrier (“ C” Position) 2. ZAHF4 TDM/LAN Terminator 3. TDM/LAN Cab le (WP91716 L6) 4. Mod ule Control Carrier (“ A” Po s it io n ) 5. Port Carrier (“ D” Position) 6. Port Carrier (“ E” Position)7. Slot 21 8. Slot 01 9. TDM/LAN Cab le (WP91716 L7) 10. Dup lic ated Mod ule Control Carrier (“ B” Position) 11. ICCA Cab le (Slot 03) 12. ICCB Cab le
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Multicarrier G2 Universal Module to R8r EPN 5-82 Critical Reliability 5 Figure 5-23. Locations of Ground Jumpers Figure Notes 1. Rear of Cab inet 2.Mod ule Control Carrier (“ A” Position) 3. Exp ansion Mod ule Control Carrier (“ B” Position)4. Ground Jump ers 5. Port Carrier (“ C” Position) 6. Port Carrier (“ D” Position)