    Have a look at the manual Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Upgrades And Additions Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 413 Lucent Technologies manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.

    Page
    of 502
    							DEFINITY Enterprise Communications Server Release 8.2
    Upgrades and Additions for R8r  555-233-115  Issue 1
    April 2000
    Multicarrier G2 Universal Module to R8r EPN 
    5-73 High Reliability 
    5
    Resolve Alarms
    Examine the alarm log . Resolve any alarms that may exist using  DEFINITY 
    Enterp rise Communic ations Server Release 8 Maintenanc e for R8si
    . 
    Enable Customer Options and Alarm Origination 
    to INADS
    1. Get the DOSS order number of the upgrade from the project manager and 
    ask the reg ional Customer Software Ad ministration to c omp lete the step s 
    in the shad ed  b ox. See ‘‘Where to Call for Tec hnic al Sup p ort’’ on p ag e -xx
     
    for telep hone numb ers.
    NOTE:
    As p art of the system reg istration p roc ess, the INADS Datab ase 
    Ad ministrator enab les Alarm Orig ination.
    2. When ad ministration is c omp leted , log  in as craft
     at the Login:
     prompt.
    init login administration:
    1. Log in as init
    .
    2. Type change system-parameters customer-options
     and press 
    En te r 
    to verify that the c ustomer op tions are p roperly set.
    3. Go to sc reen 6, QSIG Op tional Features, and  set the Basic Call 
    Setup 
    field  to y
     if the customer was using Supplementary Services 
    Protoc ol b  or d  on an ISDN-PRI trunk g roup  b efore the up g rad e.
    4. Type change system-parameters offer-options
     and  p ress 
    En te r.
    5. If the Activate Offer
     field  is n
    , set it to y 
    and press 
    Ta b. A warning  
    messag e lets you know whether you need  to save translations and  
    reb oot to make the c hang e p ermanent.
    6. Press 
    En t e r to effec t the c hang es or Canc el if there were no c hang es.
    7. Contac t the req uester when d one. 
    						
    							DEFINITY Enterprise Communications Server Release 8.2
    Upgrades and Additions for R8r  555-233-115  Issue 1
    April 2000
    Multicarrier G2 Universal Module to R8r EPN 
    5-74 High Reliability 
    5
    Save Translations
    1. Type save translation
     and press En te r to g et up g rad ed  translations onto 
    d isk. If the translations were c orrup ted  d uring  the up g rad e, the following  
    error message displays when logging in:
    !WARNING:
    Translation c orrup tion d etec ted ; c all Luc ent Tec hnolog ies d istrib utor 
    immed iately.
    NOTE:
    Th e  save translation
     c ommand c annot func tion if the translation 
    c orruption messag e ap p ears.
    Back Up Disk
    1. Type backup disk
     and  p ress En t e r to backup all changed files.
    2. Type test stored-data long
     and press 
    En t e r. This instructs the system to 
    verify the c onsistenc y of the MSS files (on the d isk and  removab le med ia).
    Return Replaced Equipment
    Return unused  G2 eq uip ment to Luc ent Tec hnolog ies ac c ord ing  to the 
    req uirements outlined  in:
    BCS/Material Log istic s, MSL/Attend ed  Stoc king  Loc ations
    Method s and Proc ed ures for Basic  Material Returns 
    						
    							DEFINITY Enterprise Communications Server Release 8.2
    Upgrades and Additions for R8r  555-233-115  Issue 1
    April 2000
    Multicarrier G2 Universal Module to R8r EPN 
    5-75 Critical Reliability 
    5
    Critical Reliability
    Upgrade Cabinets
    An existing  universal mod ule c ab inet is always up g rad ed  to an EPN. 
    Required Hardware
    The eq uip ment in Table 5-14 must be on-site before the upgrade begins. To 
    plac e a claim for missing equipment, as part of the Streamlined Implementation 
    p roc ess, c all “ 1-800-772-5409”  or the numb er p rovided  b y your Luc ent 
    Tec hnolog ies rep resentative.
    Table 5-14. Required Hardware 
    Equipment Description Quantity
    PEC 6300-05X Proc essor Port Network 1
    J58890AF Exp ansion Control Carrier 1
    J58890BB-3 Port Carrier 1
    106647985 TN775B Maintenanc e 1
    103557294
    or
    103281788TN776 Exp ansion Interfac e
    TN570 Exp ansion Interfac e4 or 12 
    1
    4 or 12 1,2
    1. Use 4 for a c ritic al reliability system with 2 p ort networks or 12 with 3 port networks.
    Either 2 or 8 Exp ansion Interfac es (EIs) ship loose with the EPN eq uip ment. The factory
    has installed  the other 2 or 4 EIs in the new PPN.
    2. Req uired  port network interfaces in a Release 8 system with the op tional p ac ket bus.J58890TO-1 L1 Removab le Med ia 4
    H-600-204 G1 ICC 2 
    3
    3. Req uired  for an EPN in a c ritical reliab ility system.407439975 20-Foot Multi-mod e Fiber Op tic  Cab le 2 or 6 
    4
    4. Use 4 or 12 if the EPNs and the PPN are remotely loc ated . Assuming  ac cep tab le
    lengths, the fib ers previously connecting  an upg raded  G2 universal mod ule (not a
    trad itional module) to the G2 TMS have the c orrect transceiver connec tors and  can b e
    reused .
    106455348
    or
    1064553639823-A Lightwave Transc eiver
    9823-B Lightwave Transc eiver4 or 12 (See Note 1)
    4 or 12 (See Note 1)
    106689516 TN771D Maintenanc e Test 1 or 2  
    						
    							DEFINITY Enterprise Communications Server Release 8.2
    Upgrades and Additions for R8r  555-233-115  Issue 1
    April 2000
    Multicarrier G2 Universal Module to R8r EPN 
    5-76 Critical Reliability 
    5
    Required Tools
    The following tools and  items may b e req uired  d uring  the up g rad e:
    nHig h-intensity flashlig ht or AC d rop  lig ht
    n3/8-inc h flat-b lad e sc rewd river with a 10-inc h shank (minimum)
    n5/16-inc h and  1/4-inc h soc kets with a ratc het and  10-inc h extension
    nLong -nose p liers to d isc onnec t ground ing  strap s and straig hten 
    backplane pins
    nStatic -p roof or orig inal c irc uit p ac k p ac kag ing  for transp orting  c irc uit 
    packs
    nLab els for id entifying  the p ort c irc uit p ac ks and  c ab les attac hed  to the 
    rear of c ab inets
    nTwelve #12 and  #10 self-tap p ing  sc rews
    nFour sp are c arrier g round ing  straps
    nWrist ground strap
    nRep air kit for b ac kp lane p ins (KS-22876 L2 or eq uivalent)
    nOne c op y of eac h of the following  manuals:
    — DEFINITY Enterp rise Communic ations Server Release 8 
    Maintenanc e for R8r
    — DEFINITY Enterp rise Communic ations Server Release 8 
    Ad ministrator’s Guid e
    Follow Routine Preventive Maintenance
    During  the up g rad e, follow routine p reventive maintenanc e p roc ed ures on the 
    system to b e up g rad ed . For information ab out the p roc ed ures and  nec essary 
    eq uip ment, refer to the “ Preventive Maintenanc e”  sec tion in 
    DEFINITY Enterp rise 
    Communic ations Server Release 8 Maintenanc e for R8r
    .
    Label Cables
    To make rec onnec ting  the c ab les simp ler and  more reliable, lab el b oth end s of 
    the c onnec tor c ables assoc iated with the c arrier to b e removed . 
    						
    							DEFINITY Enterprise Communications Server Release 8.2
    Upgrades and Additions for R8r  555-233-115  Issue 1
    April 2000
    Multicarrier G2 Universal Module to R8r EPN 
    5-77 Critical Reliability 
    5
    Check Link Status
    1. Type display communication-interface links
     and p ress En te r. Write d own 
    all enab led  links.
    2. Type status link
     
    number and  p ress En t e r. Rep eat this step  for all links.
    3. Write d own whic h links are in servic e.
    Disable TTI
    !CAUTION:
    If you d o not d isab le the TTI, the translations c an b e c orrup ted .
    1. Make sure the ISDN is in servic e. If not, attempt to b usy out and release 
    the ISDN D-c hannel/link. This will b ring  the ISDN trunks b ac k into servic e.
    2. Type change system-parameters features
     and press 
    En t e r. 
    3. On the sec ond  sc reen, set the Enabled?
     field  to n
     to p revent the TTI 
    feature from ac tivating .
    Power Down G2 System
    At the power d istribution unit, set the main c irc uit b reaker to OFF.
    Install Power-Failure Transfer Ground Wire
    !CAUTION:
    To avoid  c ontaminating  sing le-p oint g round , d o not c onnec t the g round  wire 
    while the system is p owered  up .
    1. Connec t 1 end  of a 10 AWG (#25) (2.6 mm2) wire either to pin 49 of the 
    c onnec ting b loc k or to p in 49 of the CAP (c ab le ac c ess p anel) assoc iated 
    with the p ower-failure transfer p anel.
    2. Route the op p osite end  of the wire to an ap p roved  g round  sourc e and  
    c onnec t. 
    						
    							DEFINITY Enterprise Communications Server Release 8.2
    Upgrades and Additions for R8r  555-233-115  Issue 1
    April 2000
    Multicarrier G2 Universal Module to R8r EPN 
    5-78 Critical Reliability 
    5
    Disconnect Cables
    1. With the c ab le retainer in front of you and  the p art numb er visib le (4B or 
    4C), loc ate the slot that is almost vertic al. This slot is ad jac ent to the p art 
    numb er. Insert a flat b lad e sc rewd river with a 1/4-inc h b lad e into the slot 
    and  twist. The retainer will snap  op en easily. Remove the c ab le.
    2. Disconnect previously labeled c ables assoc iated with the carrier to be 
    removed .
    3.Behind  a “ DEFINITY style”  c ab inet, remove the b ac k d oors from the 
    c ab inet.
    4. Behind  a p reviously up graded  c ab inet, remove all of the b ac k panels. 
    (Two d ifferent typ es of sc rews hold  the b ac k p anels to the c ab inet. The 
    #10 sc rews c an b e removed  with a sc rewd river or a 1/4-inc h soc ket. The 
    #12 screws c an be removed with a sc rewdriver or a 5/16-inch soc ket.)
    Remove Circuit Packs from Module Control
    Carriers A and B
    1. To ensure that p ower units in the “ A”  and  “ B”  c arriers are p rop erly 
    replaced, label each power unit with its slot number.
    2. Disc onnec t the p ower c ords from the p ower units in the “ A”  and  “ B”  
    carriers.
    3. Remove all c irc uit p ac ks and  p ower units from c arrier “ A.”  Store the c irc uit 
    p ac ks in the static -p roof p ac kag ing .
    4. Remove all c irc uit p ac ks from c arrier “ B.”  Store the c irc uit p ac ks in the 
    static -proof p ac kag ing .
    5. Remove the c irc uit p ac k b lanks from slots that d o not c ontain c irc uit 
    p acks.
    6. Remove the front trim p late from the “ B”  c arrier b y p ulling  it straig ht off. 
    Then remove the front trim p late from the “ A”  c arrier.
    Remove CURL from Module Control Carrier A
    Remove the CFY1 c urrent limiter (CURL) from the p in-field  b loc k marked  “ CURL”  
    on the “ A”  c arrier. The CURL will b e reused  in the DEFINITY ECS Release 8 EPN.
    NOTE:
    Note the p osition of the c omp onents on the left side of the CURL.
    NOTE:
    Verify that the CURL meets the minimum usab le vintag e req uirements. 
    						
    							DEFINITY Enterprise Communications Server Release 8.2
    Upgrades and Additions for R8r  555-233-115  Issue 1
    April 2000
    Multicarrier G2 Universal Module to R8r EPN 
    5-79 Critical Reliability 
    5
    Remove Module Control Carriers A and B
    1.Remove the TDM/LAN c ab le from b etween the “ A”  and  “ B”  c arriers. See 
    Figure 5-23
    . This c ab le will b e reused .
    2. Disc onnec t 1 end  of the TDM/LAN c ab le (b etween the “ A”  and  “ D”  
    c arriers) from the “ A”  c arrier. Leave the other end  c onnec ted  to the “ D”  
    c arrier, and  move the c ab le into a p osition so that it will not interfere with 
    removing  the “ A”  c arrier.
    NOTE:
    Note the p osition of the TDM/LAN c ab le b efore d isc onnec ting .
    3. Disc onnec t 1 end  of the TDM/LAN c ab le (b etween the “ B”  and  “ C”  
    c arriers) from the “ B”  c arrier. Leave the other end  c onnec ted  to the “ C”  
    c arrier, and  move the c ab le into a p osition so that it will not interfere with 
    removing  the “ B”  c arrier.
    !CAUTION:
    When removing the TDM/LAN c ab les from a previously up g rad ed  
    c arrier, b e c areful that none of the short p iec es of shrink tub ing c ome 
    off the 4 c orner p ins of the p in-field  b loc k. Otherwise, when the new 
    eq uip ment is c onnec ted, -48 volts c ould  short to g round .
    4. Remove and  retain the 8 g round strap s from b etween the “ A”  and  “ B”  
    carriers. See Figure 5-24
    .
    5. Disconnect 1 end of the 8 ground straps from between the “A” and “D”  
    c arriers. These strap s will rec onnec t to the new “ A”  c arrier.
    6. Disconnect 1 end of the 8 ground straps from between the “B” and “C”  
    c arriers. These strap s will rec onnec t to the new “ B”  c arrier.
    7. Disc onnec t the “ P1”  (small 9-pin) c onnec tor and  the “ P2”  (larg e 38-p in) 
    c onnec tor from the “ A”  c arrier. See Figure 5-25
    . Move the c ab les into a 
    p osition where they will not interfere with removing  the c arrier.
    8. Slid e the latc h up , and  d isc onnec t the “ P1”  (small 9-p in) c onnec tor from 
    the “ B”  c arrier. Move the c ab le into a p osition where it will not interfere with 
    removing  the c arrier.
    9. Disc onnec t and  remove the ICC c ab les. See Figure 5-23
    . They will not b e 
    reused.
    10. Remove the fan trim p late by p ulling  it straig ht off.
    11. Clean or rep lac e the air filter (403326820) if nec essary.
    12. In front of c arrier, remove the 4 sc rews (top  2 first) hold ing  the “ B”  c arrier 
    to the c ab inet frame. Use a long -hand le sc rewd river or 5/16-inc h soc ket 
    with a 10-inc h extension.
    13. Behind  the c arrier, remove the 2 sc rews hold ing  the “ B”  c arrier’s rear 
    c onnec tor p anel to the c ab inet frame. 
    						
    							DEFINITY Enterprise Communications Server Release 8.2
    Upgrades and Additions for R8r  555-233-115  Issue 1
    April 2000
    Multicarrier G2 Universal Module to R8r EPN 
    5-80 Critical Reliability 
    5
    14. Slid e the c arrier forward  1 to 2 inc hes; then, from the b ac k, b e sure that no 
    c ab les or wiring  harnesses are c aug ht on the c ab inet/c arrier framework.
    !CAUTION:
    Cab les and  wiring harnesses c an be d amag ed  if they c atc h on the 
    framework and  if too muc h pressure is ap p lied  in removing  the 
    carrier.
    15. Remove the c arrier b y slid ing  it out the front of the c ab inet.
    16.Rep eat Step s 12 through 15 for the “ A”  c arrier.
    17. On p ort c arrier J58890BB-1, c onnec t the TDM c ab le or the TDM 
    terminator to Slot 02. On p ort c arriers J58890BB-2 and  J58890BB-3, 
    c onnec t the TDM c ab les or the TDM terminator to Slot 01. If the port 
    c arrier has J58890BB-1 
    and J58890BB-2 p rinted on it, treat it as a 
    J58890BB-1. 
    						
    							DEFINITY Enterprise Communications Server Release 8.2
    Upgrades and Additions for R8r  555-233-115  Issue 1
    April 2000
    Multicarrier G2 Universal Module to R8r EPN 
    5-81 Critical Reliability 
    5
    Figure 5-22. TDM/LAN Connections for Duplicated G2 Universal Module Figure Notes
    1.Port Carrier (“ C” Position)
    2. ZAHF4 TDM/LAN Terminator
    3. TDM/LAN Cab le (WP91716 L6)
    4. Mod ule Control Carrier (“ A”  
    Po s it io n )
    5. Port Carrier (“ D” Position)
    6. Port Carrier (“ E”  Position)7. Slot 21
    8. Slot 01
    9. TDM/LAN Cab le (WP91716 L7)
    10. Dup lic ated  Mod ule Control Carrier 
    (“ B”  Position)
    11. ICCA Cab le (Slot 03)
    12. ICCB Cab le 
    						
    							DEFINITY Enterprise Communications Server Release 8.2
    Upgrades and Additions for R8r  555-233-115  Issue 1
    April 2000
    Multicarrier G2 Universal Module to R8r EPN 
    5-82 Critical Reliability 
    5
    Figure 5-23. Locations of Ground Jumpers Figure Notes
    1. Rear of Cab inet
    2.Mod ule Control Carrier (“ A”  Position)
    3. Exp ansion Mod ule Control Carrier
    (“ B”  Position)4. Ground  Jump ers
    5. Port Carrier (“ C”  Position)
    6. Port Carrier (“ D”  Position) 
    						
    All Lucent Technologies manuals Comments (0)

    Related Manuals for Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Upgrades And Additions Manual