    Have a look at the manual Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Upgrades And Additions Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 413 Lucent Technologies manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.

    Page
    of 502
    							DEFINITY Enterprise Communications Server Release 8.2
    Upgrades and Additions for R8r  555-233-115  Issue 1
    April 2000
    Multicarrier G2 Universal Module to R8r EPN 
    5-23 Standard Reliability 
    5
    Unpack and Inspect Expansion Control Carrier
    1. Insp ec t the new J58890AF Exp ansion Control Carrier for any d amag e. 
    Also verify that the b ac kp lane p ins are not b ent.
    2. Plac e the exp ansion c ontrol c arrier on the floor so that the rear of the 
    carrier faces up.
    3.Install the CFY1 c urrent limiter (CURL) on the “ A”  c arrier to the p in-field  
    b loc k lab eled  “ CURL”  Install the CURL with the c omp onents on the left.
    4. At the rear c onnec tor p anel, d etermine whic h c onnec tors will have a c ab le 
    attac hed , and  install a 4B c ab le retainer on eac h of these c onnec tors.
    Install New Expansion Control Carrier A
    1. Install the c arrier in p osition “ A”  b y alig ning  the p lastic  alig nment tip s on 
    the top  rear of the c arrier with the sc rew holes in the c ab inet. These 
    alig nment tip s sup p ort the c arrier while installing  the sc rews. Ensure that 
    the p ower c ord s are prop erly p lac ed  in the slots at the sid es of the c arrier.
    2. Fasten the c arrier into p osition with 4 self-tap p ing  sc rews saved  from the 
    removal of the old  c arrier.
    NOTE:
    Carefully realig n the thread s on the self-tap p ing sc rews b y turning 
    them c ounterc loc kwise 1 turn b efore tig htening them to avoid  
    strip p ing  the thread s out of the framework.
    3. Connec t the “ P2”  and “ P1”  c ab les to the “ A”  c arrier. See Figure 5-3
    . Snap  
    the c onnec tor loc k into p lac e to ensure the c onnec tion is p roperly mad e.
    4. Connec t the 8 g round  strap s from the “ C”  c arrier to the new “ A”  c arrier. 
    See Figure 5-2
    . 
    5. Connec t the 8 g round  strap s from the “ D”  c arrier to the new “ A”  c arrier. 
    6. For AC-p owered  systems, install the 2 new g round  strap s. One strap  
    c onnec ts ground  p oint “ 1”  to the “ A”  c arrier frame (rig ht sid e), and  the 
    other c onnec ts ground  p oint “ 8”  to the “ A”  c arrier frame (left sid e).
    NOTE:
    DC-p owered  systems d o not use these c arrier g round  strap s.
    7. Connec t the remaining end  of the TDM/LAN c able (b etween the “ A”  and  
    “ D”  c arriers) to the pin-field  bloc k marked  “ TDM”  on the rig ht sid e of the 
    “A” carrier. See Figure 5-4
     and  Table 5-7. 
    8. Connec t the remaining end  of the TDM/LAN c able (b etween the “ A”  and  
    “ C”  c arriers) to the p in-field  b loc k marked  “ TDM”  on the left sid e of the “ A”  
    carrier.  
    						
    							DEFINITY Enterprise Communications Server Release 8.2
    Upgrades and Additions for R8r  555-233-115  Issue 1
    April 2000
    Multicarrier G2 Universal Module to R8r EPN 
    5-24 Standard Reliability 
    5
    Figure 5-4. TDM/LAN Connections for Standard Reliability Release 8 EPN Figure Notes
    1.Port Carrier (“ C” Position)
    2. ZAHF4 TDM/LAN Terminator
    3. TDM/LAN Cab le (WP91716 L6)
    4. Mod ule Control Carrier (“ A”  Position)
    5. Port Carrier (“ D” Position)6 . Po r t  C a rr i e r  ( “ E”  Po si t io n )
    7. Slot 21
    8. Slot 01
    9. TDM/LAN Cable (WP91716 L7)
    10. Control Carrier (“ B”  Position) 
    						
    							DEFINITY Enterprise Communications Server Release 8.2
    Upgrades and Additions for R8r  555-233-115  Issue 1
    April 2000
    Multicarrier G2 Universal Module to R8r EPN 
    5-25 Standard Reliability 
    5
    9. On p ort c arrier J58890BB-1, c onnec t the TDM c ab le or TDM terminator to 
    Slot 02. On p ort c arriers J58890BB-2 and  J58890BB-3, c onnec t the TDM 
    c ab les to Slot 01.
    10.Install the front trim p late on the “ A”  c arrier. Install the fan trim plate.
    11. Install the p ower units (removed  from G2 universal module) into the “ A”  
    c arrier. Do not interc hang e the p hysic al loc ations of the units. The 
    631AR1, 631WA1, 631DA1, or 644A install in the left sid e, while the 
    631BR1, 631WB1, 631DB1, or 645B install in the rig ht sid e.
    NOTE:
    In most c ases, the new Release 8 c arrier will c ontain the same p ower 
    sup p lies as in the existing  system. However, a Release 8 c arrier may 
    c ontain a 649A Power Unit. If so, re-use the p ower units from the G2 
    power module.
    12. If the exp ansion c ontrol c arrier c ontains a 631BR1, 631WB1, or 645B 
    p ower unit, install the p reviously removed  TN736 p ower unit in p ort slots 
    “ 18”  and  “ 19”  of the c arrier (ad jac ent to the 631BR1, 631WB1, or 645B). If 
    the system is eq uip p ed  for neon messag e waiting , a TN752 or TN755 
    power unit must be used.
    NOTE:
    The TN736 is not required  when the 631DB1 or 645B p ower unit is 
    used  in the J58890AF-1 exp ansion c ontrol c arrier or the J58890BB-2 
    or J58890BB-3 p ort c arriers. It is req uired  in the J58890BB-1 p ort 
    c arrier, regard less of whic h 631 power unit is p rovid ed . Use the 
    TN752 or TN755 if the system c ontains neon messag e waiting .
    13. Connec t the white p ower c ord s to the p ower units.
    Table 5-7. TDM/LAN Connections
    J Number Carrier Type LHS Slot RHS Slot
    J58890BB-1 Port 21 02
    J58890BB-2 Port 21 01
    J58890BB-3 Port 21 01
    J58890AF EPN Control “ A” 21 02 
    						
    							DEFINITY Enterprise Communications Server Release 8.2
    Upgrades and Additions for R8r  555-233-115  Issue 1
    April 2000
    Multicarrier G2 Universal Module to R8r EPN 
    5-26 Standard Reliability 
    5
    Install Circuit Packs
    1. Install the new Release 8 control c irc uit p ac ks into c arrier “ A.”  Use the 
    new lab el and  the annotated  “ list c onfig uration all”  (p rovid ed  with the 
    Release 8 removable med ia) as a g uid e.
    NOTE:
    Currently, the TN768 Tone-Cloc k c irc uit p ac k resid es in a p ort slot of 
    the universal mod ule b eing  up grad ed . Reloc ate this c irc uit p ac k to 
    the “ TONE CLOCK”  slot of c arrier “ A.”  Luc ent Tec hnolog ies 
    rec ommend s up grad ing  to the TN2182 Tone-Cloc k.
    2. Install c irc uit p ac k b lanks in slots not eq uip p ed  with c irc uit p ac ks.
    3. For a d irec tly-c onnec ted  stand ard  reliab ility Release 8 system with 2 p ort 
    networks, ensure the PPN and  this EPN are b oth eq uip p ed  with a TN776 
    or TN570 Exp ansion Interfac e c irc uit p ac k.
    For a d irec tly-c onnec ted  system with 3 p ort networks, ensure the PPN and  
    eac h EPN have two TN776 or TN570 c irc uit p ac ks.
    Interconnect Port Networks
    Fiber op tic  c abling  terminated  to 9823A lig htwave transc eivers c an interc onnec t 
    PNs up  to 4,900 feet (1493 m) ap art. Fib er op tic  c ab ling  terminated to 9823B 
    lig htwave transc eivers c an interc onnec t PNs up  to 25,000 feet (7620 m) ap art. 
    The 300A fib er optic  lightwave transc eiver c an interc onnec t PNs up  to 
    115,000 feet (21.7 miles, 35 km) ap art.
    NOTE:
    These d istanc e limits are ap p roximate measurements of the ac tual fib er 
    rig ht-of-way (not of the shortest linear d istanc e) b etween the 2 end points.
    NOTE:
    It is imp ortant to lab el every c ab le that you install. 
    NOTE:
    Keep  trac k of whic h fib er attac hes to whic h c onnec tor on eac h lig htwave 
    transc eiver. This sec tion p rovides fig ures offering  sug gested  ways of 
    making  these c onnec tions.
    The c onnec tors on the lig htwave transc eivers are lab eled  either “ TX”  
    (transmit) or “ RX”  (rec eive), while the fib ers attac hing  to eac h c onnec tor are 
    numb ered  either “ 1”  or “ 2.”  A viab le fib er c onnec tion is only mad e when 
    b oth fibers in eac h c ab le (“ 1”  and  “ 2” ) route from the “ TX”  c onnec tor of a 
    p ort network to the “ RX”  c onnec tor of its ad jac ent p ort network. See Figure 
    5-6.
    NOTE:
    When finished , refer to Appendix A, ‘‘Fiber Link Administration’’ to 
    ad minister the fiber links. 
    						
    							DEFINITY Enterprise Communications Server Release 8.2
    Upgrades and Additions for R8r  555-233-115  Issue 1
    April 2000
    Multicarrier G2 Universal Module to R8r EPN 
    5-27 Standard Reliability 
    5
    Collocated Port Networks
    For a stand ard reliab ility system with 1 c olloc ated  EPN, use 1 fib er op tic  c ab le 
    and  2 lig htwave transc eivers to d irec tly c onnec t the networks.
    For a stand ard  reliab ility system with 2 c olloc ated  EPNs, use 3 fiber optic  c ab les 
    and  6 lig htwave transc eivers to d irec tly c onnec t the networks.
    NOTE:
    Based  on floor-p lan c onsid erations, the leng th of these c ab les may vary. 
    20 foot (6.1 m) c ables are normally ad eq uate for a Release 8 with 2 p ort 
    networks.
    For c olloc ated  c ab inets, route the fib er optic  c ab les d irec tly from the PPN to the 
    EPN c ab inet. If a “ DEFINITY style”  PPN c ab inet is c olloc ated  with another 
    “ DEFINITY style”  EPN c ab inet, the p referred  routing  is to run the c ab les 
    up the 
    c ab le tray and  out the top  of the PPN c abinet. The c ab les are then run to the 
    other c ab inet, throug h the top  of the c ab inet, and  d own the c able tray to the 
    desired carrier level.
    If a “ DEFINITY style”  PPN c ab inet is c olloc ated  with either a small c ab inet, 
    med ium c ab inet, or sing le-c arrier c ab inet stac k, the p referred  routing  is to run the 
    cables 
    down the c ab le tray and  out the bottom of the PPN c ab inet. The c ab les 
    are then run to the EPN c ab inet and  up  the outsid e of the rear panels to the 
    desired carrier level.
    Fiber-Remoted Port Networks
    For a stand ard reliab ility system with 1 fib er-remoted  EPN, use 2 fib er op tic  
    c ab les, 2 lig htwave transc eivers, and  2 lig htg uid e interc onnec t units (p rovid ed  
    b y the PSC).
    For a stand ard reliab ility system with 2 fib er-remoted  EPNs, use 6 fib er op tic  
    c ab les, 6 lig htwave transc eivers, and  6 lig htg uid e interc onnec t units (p rovid ed  
    b y the PSC).
    For fib er-remoted  c ab inets, route the c ab les down the c ab le tray and  out the 
    b ottom of the c ab inet to the MDF where the lightg uide interc onnec t units are 
    loc ated .
    In either c ase, use c ab le ties to sec ure the c ab le ag ainst the walls of the c ab le 
    tray at the c ab le tie p ositions b uilt into the trays. 
    						
    							DEFINITY Enterprise Communications Server Release 8.2
    Upgrades and Additions for R8r  555-233-115  Issue 1
    April 2000
    Multicarrier G2 Universal Module to R8r EPN 
    5-28 Standard Reliability 
    5
    For Either 1 or 2 Collocated Expansion Port Networks
    1. Behind  c ontrol c arrier A of PPN c ab inet 1 (see Figure 5-5, Figure 5-6, and  
    Figure 5-7
    ):
    nInstall a lig htwave transc eiver on the c ab le c onnec tor at slot 1A01.
    NOTE:
    Attenuators may be required for single mode fiber using a 
    300A Lightwave Transc eiver
    nConnec t 1 end  of the fib er optic  c ab le to the lightwave transc eiver, 
    just installed , at slot 1A01.
    nCarefully attac h the fib er op tic  c ab le (with c ab le ties) to the wall of 
    the c ab le tray at the b uilt-in c ab le tie p ositions.
    2. Behind control carrier A of EPN c abinet 2:
    nInstall a lig htwave transc eiver on c ab le c onnec tor at slot 2A01.
    NOTE:
    Attenuators may be required for single mode fiber using a 
    300A Lightwave Transc eiver
    nConnec t the other end  of the fiber op tic  c able to the lig htwave 
    transc eiver, just installed , at slot 2A01.
    nCarefully attac h the fib er op tic  c ab le (with c ab le ties) to the wall of 
    the c ab le tray at the b uilt-in c ab le tie p ositions.
    nAt the top  of the c ab inet, c oil up  the surp lus fiber op tic  c ab le and  
    attac h it to the wall of the c able tray. 
    						
    							DEFINITY Enterprise Communications Server Release 8.2
    Upgrades and Additions for R8r  555-233-115  Issue 1
    April 2000
    Multicarrier G2 Universal Module to R8r EPN 
    5-29 Standard Reliability 
    5
    For Two Collocated Expansion Port Networks
    1. Behind control carrier A of PPN c abinet 1:
    nInstall a lig htwave transc eiver on c ab le c onnec tor at slot 1A02.
    NOTE:
    Attenuators may be required for single mode fiber using a 
    300A Lightwave Transc eiver
    nConnec t 1 end  of the fib er optic  c ab le to the lightwave transc eiver, 
    just installed , at slot 1A02.
    nCarefully attac h the fib er op tic  c ab le (with c ab le ties) to the wall of 
    the c ab le tray at the b uilt-in c ab le tie p ositions.
    2. Behind control carrier A of EPN c abinet 3:
    nInstall a lig htwave transc eiver on c ab le c onnec tor at slot 3A01.
    NOTE:
    Attenuators may be required for single mode fiber using a 
    300A Lightwave Transc eiver
    nConnec t the other end  of the fiber op tic  c able to the lig htwave 
    transc eiver, just installed , at slot 3A01.
    nCarefully attac h the fib er op tic  c ab le (with c ab le ties) to the wall of 
    the c ab le tray at the b uilt-in c ab le tie p ositions.
    nAt the top  of the c ab inet, c oil up  the surp lus fiber op tic  c ab le and  
    attac h it to the wall of the c able tray.
    3. Behind control carrier A of EPN c abinet 2:
    nInstall a lig htwave transc eiver on c ab le c onnec tor at slot 2A02.
    NOTE:
    Attenuators may be required for single mode fiber using a 
    300A Lightwave Transc eiver
    nConnec t 1 end  of the fib er optic  c ab le to the lightwave transc eiver, 
    just installed , at slot 2A02.
    nCarefully attac h the fib er op tic  c ab le (with c ab le ties) to the wall of 
    the c ab le tray at the b uilt-in c ab le tie p ositions. 
    						
    							DEFINITY Enterprise Communications Server Release 8.2
    Upgrades and Additions for R8r  555-233-115  Issue 1
    April 2000
    Multicarrier G2 Universal Module to R8r EPN 
    5-30 Standard Reliability 
    5
    4. Behind control carrier A of EPN c abinet 3:
    nInstall a lig htwave transc eiver on c ab le c onnec tor at slot 3A02.
    NOTE:
    Attenuators may be required for single mode fiber using a 
    300A Lightwave Transc eiver
    nConnec t the other end  of the fiber op tic  c able to the lig htwave 
    transc eiver, just installed , at slot 3A02. See Figure 5-8
    .
    nCarefully attac h the fib er op tic  c ab le (with c ab le ties) to the wall of 
    the c ab le tray at the b uilt-in c ab le tie p ositions.
    nAt the top  of the c ab inet, c oil up  the surp lus fiber op tic  c ab le and  
    attac h it to the wall of the c able tray.
    Figure 5-5. Standard Reliability Release 8 with Two or Three Port NetworksFigure Notes
    1. Cabinet 1 Proc essor Port Network
    2. Cabinet 2 Exp ansion Port Network 13. Cab inet 3 Exp ansion Port 
    Network 2 
    						
    							DEFINITY Enterprise Communications Server Release 8.2
    Upgrades and Additions for R8r  555-233-115  Issue 1
    April 2000
    Multicarrier G2 Universal Module to R8r EPN 
    5-31 Standard Reliability 
    5
    Figure 5-6. Fiber Optic Connections PPN to EPN1
    Figure 5-7. Collocated Fiber Optic Connections PPN to EPN2 Figure Notes
    1. Lightwave Transc eiver
    2. To PPN Carrier A Slot 1A01
    3. To EPN 1 Carrier A Slot 2A014. Fiber Optic Cable
    5. TX Connec tor
    6. RX Connec tor
    Figure Notes
    1. Lightwave Transc eiver
    2. To PPN Carrier A Slot 1A02
    3. To EPN 1 Carrier A Slot 3A014. Fiber Optic Cable
    5. TX Connec tor
    6. RX Connec tor
    cydff05 CJL 103196
    RX TX
    2211
    cydff05 CJL 103196
    RX TX
    2211 
    						
    							DEFINITY Enterprise Communications Server Release 8.2
    Upgrades and Additions for R8r  555-233-115  Issue 1
    April 2000
    Multicarrier G2 Universal Module to R8r EPN 
    5-32 Standard Reliability 
    5
    Figure 5-8. Collocated Fiber Optic Connections EPN1 to EPN2
    For Either One or Two Fiber-Remoted Expansion Port Networks
    1. At c ontrol c arrier A of PPN c ab inet 1. See Figure 5-5 throug h Figure 5-9.
    nInstall a lig htwave transc eiver on the c ab le c onnec tor at slot 1A01.
    NOTE:
    Attenuators may be required for single mode fiber using a 
    300A Lightwave Transc eiver
    nConnec t a fib er op tic  c ab le to the transc eiver just installed .
    nRoute the c ab le to the c ab le tray and  d own, out of the c ab inet, 
    throug h the c ab le manag er to the PDS c ross-c onnec t fac ility.
    nConnec t the fib er c ab le to the lig htguid e interc onnec t unit p rovid ed .
    nCarefully attac h the c ab le (with c ab le ties) to the wall of the c ab le 
    tray at the b uilt-in c ab le tie p ositions.
    2. Behind control carrier A of EPN c abinet 2:
    nInstall a lig htwave transc eiver on c ab le c onnec tor at slot 2A01.
    NOTE:
    Attenuators may be required for single mode fiber using a 
    300A Lightwave Transc eiver
    nConnec t a fib er op tic  c ab le to the transc eiver just installed . Figure Notes
    1. Lightwave Transc eiver
    2. To PPN Carrier A Slot 2A02
    3. To EPN 1 Carrier A Slot 3A024. Fiber Optic Cable
    5. TX Connec tor
    6. RX Connec tor
    cydff05 CJL 103196
    RX TX
    2211 
    						
    All Lucent Technologies manuals Comments (0)

    Related Manuals for Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Upgrades And Additions Manual