Home > Lucent Technologies > Communications System > Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Upgrades And Additions Manual

Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Upgrades And Additions Manual

    Download as PDF Print this page Share this page

    Have a look at the manual Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Upgrades And Additions Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 413 Lucent Technologies manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.

    Page
    of 502
    							DEFINITY Enterprise Communications Server Release 8.2
    Upgrades and Additions for R8r  555-233-115  Issue 1
    April 2000
    Upgrading R5si/R6si to R8r EPN and Adding Memory 
    3-49 Release 5/6si to Release 8r 
    3
    Reconnect Cables
    1. Behind  eac h EPN c ab inet p ower sup ply, set the c irc uit b reaker to OFF.
    NOTE:
    Powering  d own an EPN c ab inet without p owering  d own the PPN will 
    set off alarms. However, these alarms should  c lear after p ower is 
    restored  to the EPN.
    2. Rep lac e all c ab les that were lab eled  and  removed.
    3. Install the top  and  b ottom rear c overs. Be sure the c orrec t rear c overs are 
    installed  on the new J58890N Exp ansion Control Cab inet. Do not use 
    these rear c overs on the p ort c abinets.
    NOTE:
    The rear c overs for Release 8r c ontrol c arriers may need  2 d etents (1 
    for the TDM/LAN c ab le and  another for the ICC c ab les). If the 
    Release 5/6si was up g rad ed  to a c ritic al reliab ility Release 8r and  
    the EPN was orig inally an R1V3, rep lac e the lower rear c over of p ort 
    c ab inet “ B”  with a new c over (846307817) so the ICC c ab les and  the 
    new g round  p late c an be installed  b etween c ab inets “ A”  and  “ B.”  
    Power Up the EPN Cabinet
    1. Behind  eac h EPN c ab inet p ower sup ply, set the c irc uit b reaker to ON. 
    After ab out 40 sec ond s, EPN power and  PPN/EPN c ommunic ations return.
    2. After p ower returns to the EPN and  all troub le is c leared, verify the 
    EMERGENCY TRANSFER CONTROL switc h is set to AUTO. This restores 
    the system to the normal mod e.
    Install Rear Ground Plates (Systems with
    Earthquake Protection)
    1. Loosen the 4 sc rews at the b ottom of the top  c ab inet and  at the top  of the 
    c ab inet und erneath the top  c ab inet. See Figure 3-17
    .
    2. Alig n the mounting  holes in the rear g round  p late over the b ottom sc rews 
    in the top  c ab inet. See Figure 3-17
    .
    3. Alig n the mounting  holes in the g round  p late with the 4 holes at the top  of 
    the c ab inet b elow the top  c ab inet. Slid e the mounting  p late d own to seat 
    on the sc rews.
    4. Chec k all TDM b us c ab les and  the ICC to b e sure they are not p inc hed  b y 
    the p lates.
    5. Rep eat Step s 1-3 until the rear ground  p lates are installed  b etween all 
    stacked cabinets.
    6. Do not tig hten the sc rews yet. 
    						
    							DEFINITY Enterprise Communications Server Release 8.2
    Upgrades and Additions for R8r  555-233-115  Issue 1
    April 2000
    Upgrading R5si/R6si to R8r EPN and Adding Memory 
    3-50 Release 5/6si to Release 8r 
    3
    Install Front Ground Plates (Systems with
    Earthquake Protection)
    Use 1 front g round  p late b etween 2 stac ked c ab inets.
    1. At the front of the c ab inets, alig n the holes in the top  of the front g round  
    p late with the holes at the b ottom of the up p er c ab inet, and  insert the 4 
    sc rews. Do not tighten the sc rews yet. See Figure 3-17
    .
    2. At the front of the c ab inets, alig n the holes in the b ottom of the front 
    g round  p late with the holes at the top of the lower c ab inet. Insert the 4 
    sup p lied  #12-24 x 1/2-inc h (1.27 c m) thread -forming sc rews. Do not 
    tig hten the sc rews yet.
    3. Rep eat Step s 1 and 2 until all stac ked  c abinets are fastened  tog ether.
    4. Tighten all screws securely.
    Figure 3-17. Rear Ground Plate and Front Plate or Cabinet Clip — Side View Figure Notes
    1. Front Ground  Plate or Cab inet Clip
    2. Battery3. Rear Ground  Plate
    3
    2
    1
    grdpltec LJK 031096 
    						
    							DEFINITY Enterprise Communications Server Release 8.2
    Upgrades and Additions for R8r  555-233-115  Issue 1
    April 2000
    Upgrading R5si/R6si to R8r EPN and Adding Memory 
    3-51 Release 5/6si to Release 8r 
    3
    Install Cabinet Clips (Systems without
    Earthquake Protection)
    A c ab inet c lip  is required  b etween eac h p air of stac ked  c ab inets.
    1. At the front of the c ab inets, install a c ab inet c lip  b etween eac h p air of 
    c ab inets b y hooking  the c lip  into the slot of the up per c ab inet and  
    snap p ing  the straig ht leg  of the c lip into the slot on the lower c ab inet. See 
    Figure 3-18
    .
    Figure 3-18. Location of Cabinet Clips Figure Notes
    1. Control Cab inet 
    2. Port Cab inet or Exp ansion Control Cab inet
    3. Port Cab inet4. Port Cabinet
    5. Cabinet Clips 
    						
    							DEFINITY Enterprise Communications Server Release 8.2
    Upgrades and Additions for R8r  555-233-115  Issue 1
    April 2000
    Upgrading R5si/R6si to R8r EPN and Adding Memory 
    3-52 Release 5/6si to Release 8r 
    3
    Install Cable Clamps
    1. Behind  the c ab inets, using  sc rews p rovid ed , install 2 c ab le c lamp s on 
    eac h g round  p late. See Figure 3-19
    . These clamps hold the port cables.
    Figure 3-19. Location of Ground Plate and Cable Clamps
    Retranslate Port Circuits
    If p ort c irc uit p ac ks in the Release 5/6si c ontrol c ab inet were reloc ated  in ord er 
    to:
    nUse a TN748B to rep lac e the tone d etec tor c irc uits on a TN756
    nPut a c ritic al p ort c irc uit p ac k, req uiring  long er nominal b attery hold over (a 
    DS1 or an Announc ement c irc uit p ac k), in a p ort slot
    nPut a TN570 EI c irc uit p ac k in p ort slot 1 or p ort slot 2 (for a sec ond  EPN)
    nPut a TN755B power supply in port slots 16 and 17
    1. Verify the port c irc uit p ac ks were retranslated  d uring the off-site software 
    up g rad e. If not, retranslate them now. Refer to 
    DEFINITY Enterp rise 
    Communic ations Server Release 8 Ad ministrator’s Guid e
    . Figure Notes
    1. Port Cab inet 
    2. Control Cab inet3. Cab le Clamp s
    4. Ground  Plate
    cadf008 CJL 103096 
    						
    							DEFINITY Enterprise Communications Server Release 8.2
    Upgrades and Additions for R8r  555-233-115  Issue 1
    April 2000
    Upgrading R5si/R6si to R8r EPN and Adding Memory 
    3-53 Release 5/6si to Release 8r 
    3
    Re-record Announcements (TN750/B Only)
    1. The off-site STS translation up g rad e does not p reserve the c ontents of 
    rec ord ed  announc ements. Therefore, if a TN750/B Announc ement c irc uit 
    p ac k resid es in the system, re-rec ord  the announc ements that were stored  
    on the c irc uit p ac k. 
    NOTE:
    If a TN750C resid es in the system, re-rec ord ing  of announc ements is 
    not nec essary.
    Administer Fiber Links
    1. After all fib er op tic  eq uip ment is installed , refer to Chapter A, ‘‘Fiber Link 
    Administration’’.
    Enable TTI
    1. Type change system-parameters features
     and press En t e r.
    2. On the sec ond  sc reen, set the Enabled?
     field  to y
     to ac tivate the TTI 
    feature.
    Check Link Status
    1. Type display communication-interface links
     and  p ress En t e r. 
    2. Make note of all enab led links.
    3. Type status link
       and  p ress 
    En t e r. 
    4. Chec k the following  items and  note whic h links are in-servic e.
    nPPP li n k s
    nAud ix links
    nCMS links at b oth end s (Also, c hec k the rec overy time.)
    nASAI links at the DEFINITY ECS end
    5. Chec k that DS1 trunks and  BRI p hones are func tioning  normally.
    6. Rep eat steps 3 - 5 for eac h enab led  link.
    Resolve Alarms
    1. Examine the alarm log . Resolve any alarms using  DEFINITY Enterp rise 
    Communic ations Server Release 8 Maintenanc e for R8r
    .  
    						
    							DEFINITY Enterprise Communications Server Release 8.2
    Upgrades and Additions for R8r  555-233-115  Issue 1
    April 2000
    Upgrading R5si/R6si to R8r EPN and Adding Memory 
    3-54 Release 5/6si to Release 8r 
    3
    Enable Customer Options and Alarm Origination 
    to INADS
    1. Get the DOSS order number of the upgrade from the project manager and 
    ask the reg ional Customer Software Ad ministration to c omp lete the step s 
    in the shad ed  b ox. See ‘‘Where to Call for Tec hnic al Sup p ort’’ on p ag e -xx
     
    for telep hone numb ers.
    NOTE:
    As p art of the system reg istration p roc ess, the INADS Datab ase 
    Ad ministrator enab les Alarm Orig ination.
    2. When ad ministration is c omp leted , log  in as craft
     at the Login:
     prompt.
    init login administration:
    1. Log in as init
    .
    2. Type change system-parameters customer-options
     and press 
    En te r 
    to verify that the c ustomer op tions are p roperly set.
    3. Go to sc reen 6, QSIG Op tional Features, and  set the Basic Call 
    Setup 
    field  to y
     if the customer was using Supplementary Services 
    Protoc ol b  or d  on an ISDN-PRI trunk g roup  b efore the up g rad e.
    4. Type change system-parameters offer-options
     and  p ress 
    En te r.
    5. If the Activate Offer
     field  is n
    , set it to y 
    and press 
    Ta b. A warning  
    messag e lets you know whether you need  to save translations and  
    reb oot to make the c hang e p ermanent.
    6. Press 
    En t e r to effec t the c hang es or Canc el if there were no c hang es.
    7. Contac t the req uester when d one. 
    						
    							DEFINITY Enterprise Communications Server Release 8.2
    Upgrades and Additions for R8r  555-233-115  Issue 1
    April 2000
    Upgrading R5si/R6si to R8r EPN and Adding Memory 
    3-55 Release 5/6si to Release 8r 
    3
    Save Translations
    1. Type save translation
     and press En te r to g et up g rad ed  translations onto 
    d isk. If the translations were c orrup ted  d uring  the up g rad e, the following  
    error message displays when logging in:
    !WARNING:
    Translation c orrup tion d etec ted ; c all Luc ent Tec hnolog ies d istrib utor 
    immed iately.
    NOTE:
    Th e  save translation
     c ommand c annot func tion if the translation 
    c orruption messag e ap p ears.
    Return Replaced Equipment
    1. Return rep lac ed  eq uip ment to Luc ent Tec hnolog ies ac c ord ing  to the 
    req uirements outlined  in:
    BCS/Material Log istic s, MSL/Attend ed  Stoc king  Loc ations
    Method s and Proc ed ures for Basic  Material Returns 
    						
    							DEFINITY Enterprise Communications Server Release 8.2
    Upgrades and Additions for R8r  555-233-115  Issue 1
    April 2000
    Upgrading R5si/R6si to R8r EPN and Adding Memory 
    3-56 DEFINITY AUDIX Power Procedures 
    3
    DEFINITY AUDIX Power Procedures
    Power Down the AUDIX System
    A yellow c aution stic ker on the system’s power unit notifies tec hnic ians to shut 
    d own the DEFINITY AUDIX System p rior to p owering  d own the system.
    1. Log  into the AUDIX System as craft
    . 
    2. Type reset system shutdown
     and press 
    En t e r. Press En te r onc e.
    NOTE:
    Do not p ress En t e r again. This will forc e the AUDIX to shutd own 
    immed iately, d rop p ing  all ac tive c alls on the AUDIX.
    3. The “ SHUTDOWN Comp leted ”  messag e ap p ears when the AUDIX is 
    suc c essfully shutd own. This takes ab out 2 minutes.
    4. The AUDIX System can now b e removed  for service.
    Power Up the AUDIX System
    nIf the AUDIX was removed  from the c ab inet:
    1. Re-install the AUDIX and  allow it to b oot up  automatic ally.
    2. Check for AUDIX System errors.
    nIf the AUDIX remained in the c ab inet b ut p ower was removed  from the 
    c ab inet:
    1. Power up  the c ab inet. The AUDIX reb oots automatic ally.
    2. Check for AUDIX System errors.
    nIf the AUDIX remained in the c ab inet and  the c ab inet was not powered 
    down:
    1. At the AUDIX c onsole, hold  the 
    crtl key and  typ e cc
    .
    2. Type 5
     at the p romp t. In ab out 2 minutes, the AUDIX b oots up .
    3. When the system initialization is c omp lete, log  in as craft
    .
    4. Check for AUDIX System errors. 
    						
    							G3vs with Intel 386 or Risc Processor to R8r 
    4-1  
    4
    DEFINITY Enterprise Communications Server Release 8.2
    Upgrades and Additions for R8r  555-233-115  Issue 1
    April 2000
    4
    G3vs with Intel 386 or Risc
    Processor to R8r 
    This c hapter p rovid es the information nec essary to p erform an up g rad e from 
    either a Release 5/6 system with a RISC Proc essor, or from a Generic  3 (G3) vs 
    system with an Intel
    ® 386 p roc essor, to a Release 8r system. 
    The up g rad e to a Release 8r system req uires a major c hang e of hard ware and  
    software. The p ort c irc uit p ac ks from the p resent system may b e reused  only if a 
    site insp ec tion d etermines that the p ort c irc uit p ac k vintages are usab le in the 
    Release 8r. 
    Some of the I/O c ab les from the existing  system may b e too short to reac h from 
    the Release 8r c abinet to the Main Distrib ution Frame (MDF). If so, the c ab les 
    must b e rep lac ed  as p art of the up g rad e proc ess. 
    						
    							DEFINITY Enterprise Communications Server Release 8.2
    Upgrades and Additions for R8r  555-233-115  Issue 1
    April 2000
    G3vs with Intel 386 or Risc Processor to R8r 
    4-2 Read This First 
    4
    Read This First
    Service Interruption
    This up g rad e p roc ess req uires a servic e interrup tion that d ep end s on whether 
    the Release 8r c abinet c an b e installed while the p resent system is in servic e. In 
    this c ase, the servic e interrup tion may only b e ab out 2 hours. If, however, the 
    p resent system must b e removed  to allow room for the Release 8r c ab inet, then 
    the servic e interrup tion may b e 8 hours, or more.
    This up g rad e must b e c losely c oord inated  with the c ustomer and  the loc al 
    ac c ount team.
    Call Management System (CMS)
    The CMS link is dropped and restarted during the upgrade. This causes CMS 
    d ata to b e lost. This d ata loss c an be minimized  if the up g rad e is p erformed  just 
    after the last CMS measurement interval.
    All measurement d ata is lost d uring  the up g rad e (inc lud ing  BCMS). If need ed , 
    the reports may be printed before the upgrade begins.
    CMS c ould  ab ort the p roc essing of a c all if a measured  trunk that was part of the 
    c onferenc e d rop p ed  off the c all b efore the end  of the c all. Customers 
    exp erienc ing  this symp tom and  who are running  R3V4 CMS should  upd ate to 
    r3v4ao.e or hig her.
    Preventing Translation Errors
    When instruc ted  in this c hap ter, p erform the save translation
     c ommand . 
    Afterward , c hec k for translation errors b efore p roc eed ing  with the up g rad e.
    NOTE:
    Be sure that the translations g et saved  without errors b efore c ontinuing  with 
    any up g rad e.
    If errors are d etec ted , refer to ‘‘No Translations After Upgrade’’
     in Appendix B, 
    ‘‘Troubleshooting  an Upgrade’’ to c orrec t the p rob lem. Do not c ontinue with the 
    up g rad e until the errors are c orrec ted . 
    Communication Between Equipment Rooms
    For an up g rad e where some of the eq uip ment resid es at a remote loc ation, the 
    up g rad e ac tivity is muc h easier if temp orary c ommunic ation is established  
    b etween the equip ment rooms. 
    						
    All Lucent Technologies manuals Comments (0)

    Related Manuals for Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Upgrades And Additions Manual