Home
>
Lucent Technologies
>
Communications System
>
Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Upgrades And Additions Manual
Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Upgrades And Additions Manual
Have a look at the manual Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Upgrades And Additions Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 413 Lucent Technologies manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Multicarrier G2 Universal Module to R8r EPN 5-13 Task Tables 5 Table 5-5. Tasks to Upgrade to Release 8r — Critical Reliability áTask Description Page Upgrade Cabinets 5-75 Follow Routine Preventive Maintenance5-76 Label Cables5-76 Check Link Status5-77 Disable TTI5-77 Power Down G2 System5-77 Install Power-Failure Transfer Ground Wire5-77 Disconnect Cables5-78 Remove Circuit Packs from Module Control Carriers A and B5-78 Remove CURL from Module Control Carrier A5-78 Remove Module Control Carriers A and B5-79 Prepare the New A and B Position Carriers5-83 Install the New A and B Position Carriers5-84 Test the CURL5-90 Install Circuit Packs5-90 Interconnect Port Networks — Critical Reliability5-91 Verify Usable Circuit Pack Vintages5-105 Remove Power-Failure Ground Strap5-106 Boot the Release 8 System5-106 Set Daylight Savings Rules5-107 Set Date and Time5-108 Set Additional Administration5-110 Close Upgraded EPN Cabinet and Reconnect Cables5-110 Power Up the EPN Cabinets5-111 Retranslate Port Circuits5-111 Enable TTI5-111 Check Link Status5-111 Enable Scheduled Maintenance5-111 Continued on next page
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Multicarrier G2 Universal Module to R8r EPN 5-14 Task Tables 5 Resolve Alarms5-112 Enable Customer Options and Alarm Origination5-112 Save Translations5-113 Back Up Disk5-113 Return Replaced Equipment5-113 Table 5-5. Tasks to Upgrade to Release 8r — Critical Reliability — Continued áTask Description Page Continued on next page
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Multicarrier G2 Universal Module to R8r EPN 5-15 Standard Reliability 5 Standard Reliability Required Hardware The equipment in Table 5-6 must be on-site b efore the up g rad e beg ins. To p lac e a c laim for missing eq uip ment, as p art of the Streamlined Imp lementation p roc ess, c all 1-800-772-5409, or the numb er p rovid ed b y your Luc ent Tec hnolog ies rep resentative. Table 5-6. Required Hardware Equipment Description Quantity PEC 6300-05X Proc essor Port Network 1 J58890AF-1 Expansion Control Carrier 1 106647985 TN775B Maintenanc e 1 103557294 or 103281788TN776 Exp ansion Interfac e TN570 Exp ansion Interfac e2 or 6 1 2 or 6 1,2 1.Depend ing on the numb er of Release 8 EPNs. Two are req uired for a stand ard reliab ility system with 2 p ort networks; 6 with 3 p ort networks. Either 1 or 4 Exp ansion Interfac es (EIs) are ship p ed loose with the EPN equipment. The fac tory has installed either 1 or 2 EIs in the new PPN. 2. Required p ort network interfac es in a Release 8 system with the optional p acket b us. 407439975 20-Foot Multi-mod e Fib er Op tic Cab le 1 or 3 3 3. Depend ing on the numb er of DEFINITY ECS Release 8 EPNs. Two or 6 are req uired if the PPN and EPN(s) are remotely loc ated . Assuming ac cep tab le leng ths, the fiber that previously connec ted an up g raded G2 universal mod ule (not a trad itional mod ule) to the G2 TMS has the correc t transc eiver c onnec tors and c an b e reused. 106455348 or 1064553639823A Lig htwave Transc eiver 9823B Lig htwave Transc eiver2 or 6 4 2 or 6 5 4. One p air for each fib er c onnection. For eac h c onnec tion, either 1 lig htwave transc eiver is installed in an EPN and 1 in the PPN. A transc eiver c an b e reused from eac h up g rad ed G2 universal mod ule. Add itional transc eivers, ord ered sep arately, are also ship ped loose with the EPN equipment.
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Multicarrier G2 Universal Module to R8r EPN 5-16 Standard Reliability 5 Required Tools The following tools and items may b e req uired d uring the up g rad e: nHig h-intensity flashlig ht or AC d rop lig ht n3/8-inc h flat-b lad e sc rewd river with a 10-inc h shank (minimum) n5/16-inc h and 1/4-inc h soc kets with a ratc het and 10-inc h extension nLong -nose p liers to d isc onnec t ground straps and straig hten b ac kplane pins nStatic -p roof or orig inal c irc uit p ac k p ac kag ing for transp orting c irc uit packs nLab els for id entifying the p ort c irc uit p ac ks and c ab les attac hed to the rear of c ab inets nTwelve sp are #12 and #10 self-tap p ing sc rews nFour sp are c arrier g round strap s nWrist ground strap nRep air kit for b ac kp lane p ins (KS-22876 L2 or eq uivalent) nOne c op y of eac h of the following manuals: — DEFINITY Enterp rise Communic ations Server Release 8 Maintenanc e for R8si or DEFINITY Enterp rise Communic ations Server Release 8 Maintenance for R8r — DEFINITY Enterp rise Communic ations Server Release 8 Ad ministrator’s Guid e Follow Routine Preventive Maintenance During the up g rad e, follow routine p reventive maintenanc e p roc ed ures on the system to b e up g rad ed . For information ab out the p roc ed ures and nec essary eq uip ment, refer to the “ Preventive Maintenanc e” sec tion in DEFINITY Enterp rise Communic ations Server Release 8 Maintenanc e for R8r . Label Cables To make rec onnec ting the c ab les simp ler and more reliable, lab el b oth end s of the c onnec tor c ables assoc iated with the c arrier to b e removed .
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Multicarrier G2 Universal Module to R8r EPN 5-17 Standard Reliability 5 Check Link Status 1. Type display communication-interface links and p ress En te r. Write d own all enab led links. 2. Type status link number and p ress En t e r. Rep eat this step for all links. 3. Write d own whic h links are in servic e. Disable TTI !CAUTION: If you d o not d isab le the TTI, the translations c an b e c orrup ted . 1. Make sure the ISDN is in servic e. If not, attempt to b usy out and release the ISDN D-c hannel/link. This will b ring the ISDN trunks b ac k into servic e. 2. Type change system-parameters features and p ress En te r . Use sc reen 2 to d isab le Terminal Translation Initialization (TTI) b y c hang ing the value to n . Power Down G2 System 1.At the c ommon c ontrol’s p ower d istrib ution unit, set the main c irc uit b re a k e r t o O FF. 2. At the universal mod ule’s p ower d istrib ution unit, set the main c irc uit b re a k e r t o O FF. Install Power-Failure Transfer Ground Wire !CAUTION: To avoid c ontaminating sing le-p oint g round , d o not c onnec t the g round wire while the system is p owered up . 1. Connec t a 10 AWG (#25) (2.6 mm2) wire to p in 49 of the c onnec ting b loc k or to pin 49 of the CAP (c ab le ac c ess p anel) on the p ower-failure transfer p anel. 2. Route the op p osite end of the wire to an ap p roved g round and c onnec t.
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Multicarrier G2 Universal Module to R8r EPN 5-18 Standard Reliability 5 Disconnect Cables 1. With the c ab le retainer in front of you and the p art numb er visib le (4B or 4C), loc ate the slot that is almost vertic al. This slot is ad jac ent to the p art numb er. Insert a #2 flat b lad e sc rewd river into the slot and twist. The retainer will snap op en easily. Remove the c able. 2. Disc onnec t the c ab les assoc iated with the c arrier to b e removed . 3. Remove the rear d oors from the c ab inet. 4. Behind a p reviously up graded c ab inet, remove all of the rear p anels. Two d ifferent types of sc rews hold the b ac k p anels to the c ab inet. Remove the #10 sc rews with a sc rewd river or a 1/4-inc h soc ket. Remove the #12 sc rews with a sc rewdriver or a 5/16-inc h soc ket. Remove Circuit Packs from Module Control Carrier A 1.To ensure that p ower units in the “ A” c arrier are p rop erly rep lac ed , lab el eac h p ower unit with its slot number. 2. Disc onnec t the p ower c ords from the p ower units in the “ A” c arrier. 3. Remove all c irc uit p ac ks and p ower units from c arrier “ A.” Store the c irc uit p ac ks in the static -p roof p ac kag ing . 4. Remove all circuit pack blanks. 5. Remove the front trim p late from the “ A” c arrier b y p ulling it straig ht off. Remove CURL from Module Control Carrier A 1. Remove the CFY1 c urrent limiter (CURL) from the p in-field b loc k marked “ CURL” on the “ A” c arrier. The CURL is reused in the Release 8 EPN. NOTE: Verify the CURL meets the minimum usab le vintag e req uirements.
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Multicarrier G2 Universal Module to R8r EPN 5-19 Standard Reliability 5 Remove Module Control Carrier A Disconnect TDM/LAN Cables NOTE: Note the p osition of the TDM/LAN c ab les b efore d isc onnec ting . 1.Disc onnec t 1 end of the TDM/LAN c ab le (b etween the “ A” and “ C” c arriers) from the “ A” c arrier. See Figure 5-1 . 2. Disc onnec t 1 end of the TDM/LAN c ab le (b etween the “ A” and “ D” c arriers) from the “ A” c arrier. !WARNING: When removing the TDM/LAN c ab les from a previously up g rad ed c arrier, b e c areful that none of the short p iec es of shrink tub ing c ome off the 4 c orner p ins of the p in-field b loc k. Otherwise, when the new eq uip ment is c onnec ted, -48 volts c ould short to g round . 3. On p ort c arrier J58890BB-1, c onnec t the TDM c ab le or TDM terminator to Slot 02. On p ort c arriers J58890BB-2 and J58890BB-3, c onnec t the TDM c ab les to Slot 01.
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Multicarrier G2 Universal Module to R8r EPN 5-20 Standard Reliability 5 Figure 5-1. TDM/LAN Connections for Standard Reliability Module Figure Notes 1.Port Carrier (“ C” Position) 2. ZAHF4 TDM/LAN Terminator 3. TDM/LAN Cab le (WP91716 L6) 4. Mod ule Control Carrier (“ A” Position) 5. Port Carrier (“ D” Position)6. Port Carrier (“ E” Position) 7. Slot 21 8. Slot 01 9. TDM/LAN Cab le (WP91716 L7)
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Multicarrier G2 Universal Module to R8r EPN 5-21 Standard Reliability 5 Remove Carrier Ground Straps 1.Disc onnec t the top and b ottom g round strap s from the “ A” c arrier. See Figure 5-2 . These straps will rec onnec t to the new “ A” c arrier. Figure 5-2. Location of Ground Jumpers Figure Notes 1. Rear of Cab inet 2. Port Carrier (“ C” Position) 3. Ground Jump ers4. Mod ule Control Carrier (“ A” Po si t io n ) 5. Port Carrier (“ D” Position)
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Multicarrier G2 Universal Module to R8r EPN 5-22 Standard Reliability 5 2.Disc onnec t the “ P1” and “ P2” c ab les from the “ A” c arrier. See Figure 5-3. 3. Remove the fan trim p late by p ulling it straig ht off. 4. Clean or rep lac e the air filter (403326820) if nec essary. 5. In front of the c arrier, remove the 4 sc rews (top 2 first) hold ing the “ A” c arrier to the c ab inet frame. Use a long -hand le sc rewd river or 5/16-inc h soc ket with a 10-inc h extension. 6. Behind the c arrier, remove the 2 sc rews hold ing the “ A” c arrier’s rear c onnec tor p anel to the c ab inet frame. 7. Slid e the c arrier forward 1 to 2 inc hes. Be sure that no c ab les or wiring harnesses are c aught on the c ab inet/c arrier framework. !CAUTION: Cab les and wiring harnesses c an be d amag ed if they c atc h on the framework and if too muc h pressure is ap p lied in removing the carrier. 8. Remove the c arrier b y slid ing it out the front of the c ab inet. Figure 5-3. Location of P1 and P2 ConnectorsFigure Notes 1. Rear of Control Carrier 2. P2 Connec tor3. P1 Connec tor