Home > Lucent Technologies > Communications System > Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Upgrades And Additions Manual

Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Upgrades And Additions Manual

    Download as PDF Print this page Share this page

    Have a look at the manual Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Upgrades And Additions Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 413 Lucent Technologies manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.

    Page
    of 502
    							DEFINITY Enterprise Communications Server Release 8.2
    Upgrades and Additions for R8r  555-233-115  Issue 1
    April 2000
    Multicarrier G2 Universal Module to R8r EPN 
    5-53 High Reliability 
    5
    Figure 5-13. TDM/LAN Connections for High Reliability Release 8 EPN Figure Notes
    1.Port Carrier (“ C” Position)
    2. ZAHF4 TDM/LAN Terminator
    3. TDM/LAN Cab le (WP91716 L6)
    4. Exp ansion Control Carrier (“ A”  Position)
    5. Port Carrier (“ D” Position)6 . Po r t  C a r r ie r (“ E”  Po s it io n )
    7. Slot 21
    8. Slot 02
    9. TDM/LAN Cab le (WP91716 L7)
    10. Port Carrier (“ B”  Position) 
    						
    							DEFINITY Enterprise Communications Server Release 8.2
    Upgrades and Additions for R8r  555-233-115  Issue 1
    April 2000
    Multicarrier G2 Universal Module to R8r EPN 
    5-54 High Reliability 
    5
    12.Install the front trim p late on the “ A”  c arrier.
    13. Install the p ower units (removed  from G2 mod ule c ontrol c arrier) into the 
    “ A”  c arrier. Do not interc hang e the p hysic al loc ations of the units. The 
    631AR1, 631WA1, 631DA1, or 644A install in the left sid e, while the 
    631BR1, 631WB1, 631DB1, or 645B install in the rig ht sid e.
    NOTE:
    In most c ases, the new Release 8 c arrier will c ontain the same p ower 
    sup p lies as in the existing  system. However, the new Release 8 
    carrier may c ontain a 649A Power Unit. If so, use the power units 
    from the G2 power mod ule.
    14. If the exp ansion c ontrol c arrier c ontains a 631BR1, 631WB1, or 645B 
    p ower unit, install the p reviously removed  TN736 p ower unit in p ort slots 
    “ 18”  and  “ 19”  of the c arrier (ad jac ent to the 631BR1, 631WB1, or 645B). If 
    the system is eq uip p ed  for neon messag e waiting , a TN752 or TN755 
    power unit must be used.
    NOTE:
    The TN736 is not required  when the 631DB1 or 645B p ower unit is 
    used  in the J58890AH c ontrol c arrier or the J58890BB-2 or 
    J58890BB-3 p ort c arriers. It is req uired  in the J58890BB-1 p ort 
    c arrier, regard less of whic h 631 power unit is p rovid ed . Use the 
    TN752 or TN755 if the system is eq uip p ed  with neon messag e 
    waiting .
    15. Connec t the white p ower c ord s to the p ower units.
    Table 5-11. TDM/LAN Connections
    J Number Carrier Type LHS Slot RHS Slot
    J58890BB-1 Port 21 02
    J58890BB-2 Port 21 01
    J58890BB-3 Port 21 01
    J58890AF EPN Control “ A” 21 02 
    						
    							DEFINITY Enterprise Communications Server Release 8.2
    Upgrades and Additions for R8r  555-233-115  Issue 1
    April 2000
    Multicarrier G2 Universal Module to R8r EPN 
    5-55 High Reliability 
    5
    Install Circuit Packs
    1.Install the new Release 8 c ontrol c irc uit p ac ks into c arrier “ A.”  Use the new 
    label and  the annotated  “ list c onfig uration all”  (p rovid ed  with the Release 
    8 removab le med ia) as a g uid e.
    NOTE:
    Currently, the TN768 Tone-Cloc k c irc uit p ac k resid es in a p ort slot of 
    the universal mod ule b eing  up grad ed . Reloc ate this c irc uit p ac k to 
    the “ TONE CLOCK”  slot of c arrier “ A.”  Luc ent Tec hnolog ies 
    rec ommend s that you up g rad e to the TN2182 Tone-Cloc k.
    2. Install c irc uit p ac k b lanks in slots not eq uip p ed  with c irc uit p ac ks.
    3. For a directly-connected high reliability Release 8 system with 2 port 
    networks, ensure the PPN and  this EPN are b oth eq uip p ed  with a TN776 
    or TN570 Exp ansion Interfac e c irc uit p ac k.
    For a d irec tly-c onnec ted  system with 3 p ort networks, ensure that the PPN 
    and  eac h EPN have two TN776 or TN570 c irc uit p ac ks.
    Interconnect Port Networks — High Reliability 
    Fiber op tic  c abling  terminated  to 9823A lig htwave transc eivers c an interc onnec t 
    PNs up  to 4,900 feet (1493 m) ap art. Fib er op tic  c ab ling  terminated to 9823B 
    lig htwave transc eivers c an interc onnec t PNs up  to 25,000 feet (7620 m) ap art. A 
    300A fib er op tic  lig htwave transc eiver c an interc onnec t PNs up  to 115,000 feet 
    (21.7 miles, 35 km) apart.
    NOTE:
    These d istanc e limits are ap p roximate measurements of the ac tual fib er 
    rig ht-of-way (not of the shortest linear d istanc e) b etween the 2 end points.
    NOTE:
    It is imp ortant to lab el every c ab le that you install. 
    NOTE:
    Keep  trac k of whic h fib er attac hes to whic h c onnec tor on eac h lig htwave 
    transc eiver. This sec tion p rovides fig ures offering  the sug gested  way of 
    making  these c onnec tions.
    The c onnec tors on the lig htwave transc eivers are lab eled  either “ TX”  
    (transmit) or “ RX”  (rec eive), while the fib ers attac hing  to eac h c onnec tor are 
    numb ered  either “ 1”  or “ 2.”  A viab le fib er c onnec tion is only mad e when 
    b oth fibers in eac h c ab le (“ 1”  and  “ 2” ) route from the “ TX”  c onnec tor of a 
    p ort network to the “ RX”  c onnec tor of its ad jac ent p ort network. See Figure 
    5-16.
    NOTE:
    When finished , refer to Appendix A, ‘‘Fiber Link Administration’’ to 
    ad minister the fiber links. 
    						
    							DEFINITY Enterprise Communications Server Release 8.2
    Upgrades and Additions for R8r  555-233-115  Issue 1
    April 2000
    Multicarrier G2 Universal Module to R8r EPN 
    5-56 High Reliability 
    5
    Collocated Port Networks
    For a hig h reliab ility system with 1 c olloc ated  exp ansion p ort network, use 1 fib er 
    op tic  c ab le and  2 lig htwave transc eivers to d irec tly c onnec t the networks.
    For a high reliab ility system with 2 c olloc ated  exp ansion p ort networks, use 3 
    fib er op tic  c ab les and 6 lig htwave transc eivers to d irec tly c onnec t the networks.
    NOTE:
    Based  on floor p lan c onsid erations, the leng th of these fib er c ab les may 
    vary. 20 foot (6.1 m) c ab les are normally ad eq uate for a Release 8 with 
    2 port networks.
    For collocated cabinets, the fiber optic cables should be routed directly from the 
    PPN  t o  t h e  EPN c ab inet. If a “ DEFINITY style”  PPN c abinet is c olloc ated  with 
    another “ DEFINITY style”  EPN c ab inet, the p referred  routing  is to run the c ab les 
    up the c ab le tray and  out the top of the PPN c ab inet. The c ab les are then run to 
    the other c ab inet, throug h the top  of the c ab inet, and  d own the c able tray to the 
    desired carrier level.
    NOTE:
    Refer to DEFINITY Enterp rise Communic ations Server Release 8 Installation 
    and  Test for Multic arrier Cabinets
    , for ad d itional g uidelines ab out fib er 
    routing .
    If a “ DEFINITY style”  PPN c ab inet is c olloc ated  with either a small c ab inet, 
    med ium c ab inet, or sing le-c arrier c ab inet stac k, the p referred  routing  is to run the 
    cables 
    down the c ab le tray and  out the bottom of the PPN c ab inet. The c ab les 
    are then run to the EPN c ab inet and  up  the outsid e of the rear panels to the 
    desired carrier level.
    Fiber-Remoted Port Networks
    For a high reliab ility system with 1 fib er-remoted  exp ansion p ort network, 2 fib er 
    op tic  c ab les, 2 lig htwave transc eivers, and  2 lig htg uid e interc onnec t units 
    (provided by the PSC) are required.
    For a hig h reliab ility system with 2 fib er-remoted exp ansion p ort networks, 6 fib er 
    op tic  c ab les, 6 lig htwave transc eivers, and  6 lig htg uid e interc onnec t units 
    (provided by the PSC) are required.
    For fib er-remoted  c ab inets, route the c ab les down the c ab le tray and  out the 
    b ottom of the c ab inet to the c ross-c onnec t field  where the lightg uide interc onnec t 
    units are loc ated .
    In either c ase, use c ab le ties to sec ure the c ab le ag ainst the walls of the c ab le 
    tray at the c ab le tie p ositions b uilt into the trays. 
    						
    							DEFINITY Enterprise Communications Server Release 8.2
    Upgrades and Additions for R8r  555-233-115  Issue 1
    April 2000
    Multicarrier G2 Universal Module to R8r EPN 
    5-57 High Reliability 
    5
    For Either 1 or 2 Collocated Expansion Port Networks
    1. At c ontrol c arrier A of PPN c ab inet 1 (see Figure 5-15 throug h Figure 
    5-18):
    nInstall a lig htwave transc eiver on the c ab le c onnec tor at slot 1A01.
    NOTE:
    Attenuators may be required for single mode fiber using a 
    300A Lightwave Transc eiver
    nConnec t a fib er op tic  c ab le to the transc eiver just installed .
    nCarefully attac h the fib er op tic  c ab le (with c ab le ties) to the wall of 
    the c ab le tray at the b uilt-in c ab le tie p ositions.
    2. Behind control carrier A of EPN c abinet 2:
    nInstall a lig htwave transc eiver on the c ab le c onnec tor at slot 2A01.
    NOTE:
    Attenuators may be required for single mode fiber using a 
    300A Lightwave Transc eiver
    nConnec t the other end  of the fib er op tic  c ab le to the transc eiver just 
    installed .
    nCarefully attac h the fib er op tic  c ab le (with c ab le ties) to the wall of 
    the c ab le tray at the b uilt-in c ab le tie p ositions.
    nAt the top  of the c ab inet, c oil the surp lus of fib er op tic  c ab le and  
    c arefully attac h the c oil to the wall of the c ab le tray. 
    						
    							DEFINITY Enterprise Communications Server Release 8.2
    Upgrades and Additions for R8r  555-233-115  Issue 1
    April 2000
    Multicarrier G2 Universal Module to R8r EPN 
    5-58 High Reliability 
    5
    For Two Collocated Expansion Port Networks
    1. Behind control carrier A of PPN c abinet 1:
    nInstall a lig htwave transc eiver on the c ab le c onnec tor at slot 1A02.
    NOTE:
    Attenuators may be required for single mode fiber using a 
    300A Lightwave Transc eiver
    nConnec t a fib er op tic  c ab le to the transc eiver just installed .
    nCarefully attac h the fib er op tic  c ab le (with c ab le ties) to the wall of 
    the c ab le tray at the b uilt-in c ab le tie p ositions.
    2. Behind control carrier A of EPN c abinet 3:
    nInstall a lig htwave transc eiver on the c ab le c onnec tor at slot 3A01.
    NOTE:
    Attenuators may be required for single mode fiber using a 
    300A Lightwave Transc eiver
    nConnec t the other end  of the fiber op tic  c able to the lig htwave 
    transc eiver just installed .
    nCarefully attac h the fib er op tic  c ab le (with c ab le ties) to the wall of 
    the c ab le tray at the b uilt-in c ab le tie p ositions.
    nAt the top  of the c ab inet, c oil up  the surp lus fiber op tic  c ab le and  
    attac h it to the wall of the c able tray.
    3. Behind control carrier A of EPN c abinet 2:
    nInstall a lig htwave transc eiver on the c ab le c onnec tor at slot 2A02.
    nConnec t a fib er op tic  c ab le to the transc eiver just installed .
    nCarefully attac h the fib er op tic  c ab le (with c ab le ties) to the wall of 
    the c ab le tray at the b uilt-in c ab le tie p ositions.
    4. Behind control carrier A of EPN c abinet 3:
    nInstall a lig htwave transc eiver on the c ab le c onnec tor at slot 3A02.
    NOTE:
    Attenuators may be required for single mode fiber using a 
    300A Lightwave Transc eiver
    nConnec t the other end  of the fib er op tic  c ab le to the transc eiver just 
    installed .
    nCarefully attac h the fib er op tic  c ab le (with c ab le ties) to the wall of 
    the c ab le tray at the b uilt-in c ab le tie p ositions.
    nAt the top  of the c ab inet, c oil up  the surp lus fiber op tic  c ab le and  
    attac h it to the wall of the c able tray. 
    						
    							DEFINITY Enterprise Communications Server Release 8.2
    Upgrades and Additions for R8r  555-233-115  Issue 1
    April 2000
    Multicarrier G2 Universal Module to R8r EPN 
    5-59 High Reliability 
    5
    Figure 5-14. High Reliability Release 8 with Two or Three Port NetworksFigure Notes
    1. Cabinet 1 Proc essor Port Network
    2. Cabinet 2 Exp ansion Port Network 13. Cab inet 3 Exp ansion Port 
    Network 2 
    						
    							DEFINITY Enterprise Communications Server Release 8.2
    Upgrades and Additions for R8r  555-233-115  Issue 1
    April 2000
    Multicarrier G2 Universal Module to R8r EPN 
    5-60 High Reliability 
    5
    Figure 5-15. Fiber Optic Connections PPN to EPN1
    Figure 5-16. Fiber Optic Connections PPN to EPN2 Figure Notes
    1. Lightwave Transc eiver
    2. To PPN Carrier C Slot 1C02
    3. To EPN 1 Carrier A Slot 2A014. Fiber Optic Cable
    5. RX Connec tion
    6. TX Connec tion
    Figure Notes
    1. Lightwave Transc eiver
    2. To PPN Carrier A Slot 1D02
    3. To EPN 1 Carrier A Slot 3A014. Fiber Optic Cable
    5. RX Connec tion
    6. TX Connec tion
    cydff05 CJL 103196
    RX TX
    2211
    cydff05 CJL 103196
    RX TX
    2211 
    						
    							DEFINITY Enterprise Communications Server Release 8.2
    Upgrades and Additions for R8r  555-233-115  Issue 1
    April 2000
    Multicarrier G2 Universal Module to R8r EPN 
    5-61 High Reliability 
    5
    Figure 5-17. Fiber Optic Connections EPN1 to EPN2
    For Either One or Two Fiber-Remoted Expansion Port Networks
    1. At c ontrol c arrier A of PPN c ab inet 1 (see Figure 5-19 throug h Figure 
    5-22):
    nInstall a lig htwave transc eiver on the c ab le c onnec tor at slot 1A01.
    NOTE:
    Attenuators may be required for single mode fiber using a 
    300A Lightwave Transc eiver
    nConnec t a fib er op tic  c ab le to the transc eiver just installed .
    nRoute the c ab le to the c ab le tray and  d own, out of the c ab inet, 
    throug h the c ab le manag er to the PDS c ross-c onnec t fac ility.
    nConnec t the c ab le to the lig htg uid e interc onnec t unit p rovid ed .
    nCarefully attac h the fib er op tic  c ab le (with c ab le ties) to the wall of 
    the c ab le tray at the b uilt-in c ab le tie p ositions. Figure Notes
    1. Lightwave Transc eiver
    2. To EPN Carrier A Slot 2A02
    3. To EPN 1 Carrier A Slot 3A024. Fiber Optic Cable
    5. RX Connec tion
    6. TX Connec tion
    cydff05 CJL 103196
    RX TX
    2211 
    						
    							DEFINITY Enterprise Communications Server Release 8.2
    Upgrades and Additions for R8r  555-233-115  Issue 1
    April 2000
    Multicarrier G2 Universal Module to R8r EPN 
    5-62 High Reliability 
    5
    2. Behind control carrier A of EPN c abinet 2:
    nInstall a lig htwave transc eiver on the c ab le c onnec tor at slot 2A01.
    NOTE:
    Attenuators may be required for single mode fiber using a 
    300A Lightwave Transc eiver
    nConnec t the fib er op tic  c ab le to the transc eiver just installed .
    nRoute the c ab le to the c ab le tray and  d own, out of the c ab inet, 
    throug h the c ab le manag er to the PDS c ross-c onnec t fac ility.
    nConnec t the c ab le to the lig htg uid e interc onnec t unit p rovid ed .
    nCarefully attac h the fib er op tic  c ab le (with c ab le ties) to the wall of 
    the c ab le tray at the b uilt-in c ab le tie p ositions.
    nCoil up  the surp lus fib er c ab le and  p lac e it in the c ab le manag er.
    For 2 Fiber-Remoted Expansion Port Networks
    1. Behind control carrier A of PPN c abinet 1:
    nInstall a lig htwave transc eiver on the c ab le c onnec tor at slot 1A02.
    NOTE:
    Attenuators may be required for single mode fiber using a 
    300A Lightwave Transc eiver
    nConnec t a fib er op tic  c ab le to the transc eiver just installed .
    nRoute the c ab le to the c ab le tray and  d own, out of the c ab inet, 
    throug h the c ab le manag er to the PDS c ross-c onnec t fac ility.
    nConnec t the fib er c ab le to the lig htguid e interc onnec t unit p rovid ed .
    nCarefully attac h the fib er op tic  c ab le (with c ab le ties) to the wall of 
    the c ab le tray at the b uilt-in c ab le tie p ositions. 
    						
    All Lucent Technologies manuals Comments (0)

    Related Manuals for Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Upgrades And Additions Manual