Home
>
Lucent Technologies
>
Communications System
>
Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Upgrades And Additions Manual
Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Upgrades And Additions Manual
Have a look at the manual Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Upgrades And Additions Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 413 Lucent Technologies manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Upgrading R5si/R6si to R8r EPN and Adding Memory 3-29 Release 5/6si to Release 8r 3 For 2 Collocated Expansion Port Networks 1. Behind p ort c arrier D of the multic arrier PPN: a. Install a lig htwave transc eiver on the c onnec tor at slot 1D02. NOTE: Attenuators may be required for single mode fiber using a 300A Lightwave Transc eiver b . Connec t 1 end of the ap p rop riate fib er op tic c ab le to the lig htwave transc eiver at slot 1D02. c.Route the c ab le to the c ab inet’s c ab le tray and d own, out of the c ab inet, to the EPN stac k. d . Carefully attac h the fib er op tic c ab le (with c ab le ties) to the wall of the c ab le tray at the b uilt-in c ab le tie p ositions. 2. Behind control cabinet A of EPN stack 3: a. Install a lig htwave transc eiver on the c onnec tor at slot 3A01. NOTE: Attenuators may be required for single mode fiber using a 300A Lightwave Transc eiver b . Connec t the other end of the fiber op tic c able from the PPN to the lig htwave transc eiver at slot 3A01. c . Carefully attac h the fib er op tic c ab le (with c ab le ties) to the rear c overs of the EPN stac k. d . Coil the surp lus fib er optic c ab le and p lac e it either in the c ab le manag er or on the b ottom shelf (hold ing the p ower supp ly) of the PPN c a b i n e t . 3. Behind control cabinet A of EPN stack 2: a. Install a lig htwave transc eiver on the c onnec tor at slot 2A02. NOTE: Attenuators may be required for single mode fiber using a 300A Lightwave Transc eiver b . Connec t a fib er op tic c ab le to the transc eiver just installed . c . Route the c ab le d own the outsid e of the rear c overs to the other EPN stack. d . Carefully attac h the fib er op tic c ab le (with c ab le ties) to the rear c overs of the EPN stac k.
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Upgrading R5si/R6si to R8r EPN and Adding Memory 3-30 Release 5/6si to Release 8r 3 4. Behind control cabinet A of EPN stack 3: a. Install a lig htwave transc eiver on the c onnec tor at slot 3A02. NOTE: Attenuators may be required for single mode fiber using a 300A Lightwave Transc eiver b . Connec t the other end of the fiber op tic c able from the PPN to the lig htwave transc eiver at slot 3A02. c . Carefully attac h the fib er op tic c ab le (with c ab le ties) to the rear c overs of the EPN stac k. d . Coil the surplus fiber op tic c ab le and attac h it (with a c ab le tie) to a leg of an EPN c ab le c lamp . Figure 3-9. High Reliability Release 8r with 2 or 3 Port NetworksFigure Notes 1. Cabinet 1 PPN 2. Cabinet Stac k 2 EPN 13. Cab inet Stac k 3 EPN 2
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Upgrading R5si/R6si to R8r EPN and Adding Memory 3-31 Release 5/6si to Release 8r 3 Figure 3-10. Fiber Optic Connections PPN to EPN1 For 1 or 2 Fiber-Remoted Expansion Port Networks 1. Behind p ort c arrier C of the multic arrier PPN. See Figure 3-9 and Figure 3-11: a. Install a lig htwave transc eiver on the c onnec tor at slot 1C02. NOTE: Attenuators may be required for single mode fiber using a 300A Lightwave Transc eiver b . Connec t a fib er op tic c ab le to the transc eiver just installed . c . Route the fib er c ab le to the c ab inet c ab le tray and out of the c ab inet throug h the c ab le manag er to the PDS c ross-c onnec t fac ility. d . Connec t the fib er c ab le to the lig htg uid e interfac e unit p rovided . e. Carefully attac h the fib er op tic c ab le (with c ab le ties) to the wall of the c ab le tray at the b uilt-in c ab le tie p ositions. Figure Notes 1. Lightwave Transc eiver 2. To PPN Carrier C Slot 1C02 3. To EPN 1 Carrier A Slot 2A01 (Cab inet Stac k 2)4. Fiber Optic Cable 5. TX Connec tor 6. RX Connec tor cydff05 CJL 103196 RX TX 2211
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Upgrading R5si/R6si to R8r EPN and Adding Memory 3-32 Release 5/6si to Release 8r 3 2. Behind control cabinet A of EPN stack 2: a. Install a lig htwave transc eiver on the c onnec tor at slot 2A01. NOTE: Attenuators may be required for single mode fiber using a 300A Lightwave Transc eiver b . Connec t a fib er c able to the transc eiver just installed . c . Route the fib er c ab le d own the outsid e of the rear c overs and throug h the c ab le manag er to the PDS c ross-c onnec t fac ility. d . Connec t the fib er c ab le to the lig htg uid e interfac e unit p rovided . e. Carefully attac h the fib er op tic c ab le (with c ab le ties) to the rear c overs of the EPN stac k. f. Coil the surplus fib er optic c ab le and plac e it in the c ab le manag er. Figure 3-11. Fiber Optic Connections PPN to EPN1 Figure Notes 1. Lightwave Transc eiver 2. To PPN Carrier B Slot 1C02 3. To EPN 1 Carrier A Slot 2A01 (Cab inet Stac k 2) 4. Fiber Optic Cable5. Fib er Op tic Cross-Connec t Fac ility 6. Lig htg uid e Interfac e Unit (LIU) 7. TX Connec tor 8. RX Connec tor cydf013 CJL102396 RX TX 2 22 1 11 22 11
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Upgrading R5si/R6si to R8r EPN and Adding Memory 3-33 Release 5/6si to Release 8r 3 Interconnect Port Networks with Fiber Cabling — Critical Reliability Release 8r 1. Keep trac k of whic h fib er attac hes to whic h c onnec tor on eac h lig htwave transc eiver. This sec tion p rovid es fig ures showing typ ic al ways of making these connec tions. The c onnec tors on the lightwave transc eivers are lab eled “ TX” (transmit) or “ RX” (rec eive), while the fib ers attac hing to eac h c onnec tor are numb ered “ 1” or “ 2.” ’ See Figure 3-13 . Collocated Port Networks For a c ritic al reliab ility system with 1 c olloc ated exp ansion p ort network, use 2 fib er op tic c ab les and 4 lig htwave transc eivers to d irec tly c onnec t the networks. For a c ritic al reliab ility system with 2 c olloc ated exp ansion p ort networks, use 6 fib er op tic c ab les and 12 lig htwave transc eivers to d irec tly c onnec t the networks. NOTE: Based on floor p lan c onsid erations, the leng th of these c ab les may vary. 20-foot (6.1 m) c ab les are normally ad eq uate for a Release 8r with 2 p ort networks. For c olloc ated c ab inets, route the fib er op tic c ab les d irec tly from the PPN to eac h EPN c ab inet. Sinc e a Release 8r PPN c ab inet is c olloc ated with a Sing le-Carrier Cab inet stac k, the p referred routing is to run the c ab les down the c ab le tray and out the b ottom of the PPN c ab inet. The c ab les are then run to the EPN c ab inet and up the outsid e of the rear p anels to the d esired c arrier level. Fiber-Remoted Port Networks For a c ritic al reliab ility system with 1 fib er-remoted EPN, use 4 fib er op tic c ab les, 4 lig htwave transc eivers, and 4 lig htguid e interfac e units (p rovid ed b y the PSC). For a c ritic al reliab ility system with 2 fib er-remoted EPN, use 12 fib er optic c ab les, 12 lig htwave transc eivers, and 12 lig htg uid e interfac e units (p rovided b y the PSC).
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Upgrading R5si/R6si to R8r EPN and Adding Memory 3-34 Release 5/6si to Release 8r 3 DS1 CONV-Remoted Port Networks For a c ritic al reliab ility system with 1 DS1 CONV-remoted EPN, this arrang ement req uires: nFour DS1 CONV c irc uit p ac ks (TN1654) nFour DS1 CONV-to-EI c ab les (847245750 and/or 847245768) nFour H-600-348 c ab les nTwo, 4, 6, or 8 p airs of c hannel servic e units (CSUs) nTwo, 4, 6, or 8 p airs of wall-field c ab les (p rovid ed with the CSUs) n5, 10, or 15 d B attenuators (sing le-mod e fib er only). For a c ritic al reliab ility system with 2 DS1 CONV-remoted EPNs, this arrangement req uires: n12 DS1 CONV c irc uit p ac ks (TN1654) n12 DS1 CONV-to-EI c ab les (847245750 and/or 847245768) n12 H-600-348 c ab les n6, 12, 18, or 24 pairs of CSUs n6, 12, 18, or 24 p airs of wall-field c ab les (provid ed with CSUs) n5, 10, or 15 d B attenuators (sing le-mod e fib er only). 5d B Attenuator 106060718 10d B Attenuator 106060734 15d B Attenuator 106061021 5d B Attenuator 106060718 10d B Attenuator 106060734 15d B Attenuator 106061021
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Upgrading R5si/R6si to R8r EPN and Adding Memory 3-35 Release 5/6si to Release 8r 3 For 1 or 2 Collocated Expansion Port Networks 1. Behind p ort c arrier C of the multic arrier PPN. See Figure 3-12 and Figure 3-13: a. Install a lig htwave transc eiver on the c onnec tor at slot 1C02. NOTE: Attenuators may be required for single mode fiber using a 300A Lightwave Transc eiver b . Connec t 1 end of the ap p rop riate fib er op tic c ab le to the lig htwave transc eiver just installed . c . Route the fib er optic c ab le from the lig htwave transc eiver to the c ab inet’s c ab le tray and d own, out of the c ab inet, to the EPN stac k. d . Carefully attac h the fib er op tic c ab le (with c ab le ties) to the wall of the c ab le tray at the b uilt-in c ab le tie p ositions. 2. Behind p ort c ab inet B of EPN stac k 2: a. Install a lig htwave transc eiver on the c onnec tor at slot 2B02. NOTE: Attenuators may be required for single mode fiber using a 300A Lightwave Transc eiver b . Connec t the other end of the fib er op tic c ab le c oming from the PPN to the lig htwave transc eiver just installed . c . Carefully attac h the fib er op tic c ab le (with c ab le ties) to the rear c overs of the EPN stac k. d . Coil the surp lus fib er c ab le and plac e it either in the c able manag er or on the b ottom shelf (hold ing the p ower sup p ly) of the PPN c ab inet. 3. Behind p ort c arrier D of the multic arrier PPN: a. Install a lig htwave transc eiver on the c onnec tor at slot 1D02. NOTE: Attenuators may be required for single mode fiber using a 300A Lightwave Transc eiver b . Connec t a fib er op tic c ab le to the transc eiver just installed . c . Route the fib er c ab le to the c ab inet’s c ab le tray and d own, out of the c ab inet, to the EPN stac k. d . Carefully attac h the fib er op tic c ab le (with c ab le ties) to the wall of the c ab le tray at the b uilt-in c ab le tie p ositions.
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Upgrading R5si/R6si to R8r EPN and Adding Memory 3-36 Release 5/6si to Release 8r 3 4. Behind control cabinet A of EPN stack 2: a. Install a lig htwave transc eiver on the c onnec tor at slot 2A01. NOTE: Attenuators may be required for single mode fiber using a 300A Lightwave Transc eiver b . Connec t the other end of the fib er op tic c ab le c oming from the PPN to the lig htwave transc eiver at slot 2A01. c . Carefully attac h the fib er op tic c ab le (with c ab le ties) to the rear c overs of the EPN stac k. d . Coil the surp lus fib er c ab le and plac e it in the c able manag er or on the b ottom shelf (hold ing the p ower sup p ly) of the PPN c ab inet. Figure 3-12. Critical Reliability Release 8r with 2 or 3 Port Networks Figure Notes 1. Cabinet 1 PPN 2. Cabinet Stac k 2 EPN 13. Cab inet Stac k 3 EPN 2
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Upgrading R5si/R6si to R8r EPN and Adding Memory 3-37 Release 5/6si to Release 8r 3 Figure 3-13. Fiber Optic Connections PPN to EPN1 Figure Notes 1. Lightwave Transc eiver 2. To PPN Carrier D Slot 1D02 3. To EPN 1 Carrier A Slot 2A01 (Cab inet Stac k 2) 4. PPN Carrier C Slot 1C025. EPN1 Cab inet B Slot 2B02 6. Fiber Optic Cable 7. TX Connec tor 8. RX Connec tor cydff06 CJL 103196 RX RXTX TX 4 24 2 3 13 1
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Upgrading R5si/R6si to R8r EPN and Adding Memory 3-38 Release 5/6si to Release 8r 3 Switch-Connected Port Networks For 1 to 15 Standard Reliability EPNs. 1. Behind the PPN c ab inet. See Figure 3-14 : a. Install a lig htwave transc eiver on c ab le c onnec tor at slot 1E02. b . Install a lig htwave transc eiver on c ab le c onnec tor at slot 1B02. c . Connec t 1 end of the metallic interc arrier c ab le to the lig htwave transc eiver at slot 1E02. d . Route the interc arrier c ab le from the lig htwave transc eiver to the c ab inet c ab le tray and up ward to c arrier ‘‘B. e. Connec t the other end of the interc arrier c ab le to the lig htwave transc eiver at slot 1B02. f. Attac h the interc arrier c able (with c ab le ties) to the wall of the c ab le tray at the b uilt-in c ab le tie p ositions. 2. Behind switc h node carrier E of PPN c abinet 1. See Figure 3-14 : a. For eac h EPN, install 1 lig htwave transc eiver on a c ab le c onnec tor with the following ord er of slots: 1E20, 1E03, 1E19, 1E04, 1E18, 1E05, and so forth. b . Connec t 1 end of eac h fiber op tic c able to eac h lig htwave transc eiver, just installed . c . Carefully attac h the fib er optic c ab les (with c ab le ties) to the wall of the c ab le tray at the b uilt-in c ab le tie p ositions. 3. Behind c ontrol c ab inet A of eac h sing le-c arrier EPN: a. Install a lig htwave transc eiver on c ab le c onnec tor at slot A01. b . Connec t the other end of the fiber op tic c able to the lig htwave transc eiver, just installed , at slot A01. c . Carefully attac h the fib er op tic c ab le (with c ab le ties) to the rear c overs of the EPN stac k. d . Coil up the surp lus leng th of fib er op tic c ab le, and p lac e the c oil either in the c ab le manag er or on the b ottom shelf (hold ing the p ower sup p ly) of the PPN c ab inet.