Home > Lucent Technologies > Communications System > Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Upgrades And Additions Manual

Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Upgrades And Additions Manual

    Download as PDF Print this page Share this page

    Have a look at the manual Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Upgrades And Additions Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 413 Lucent Technologies manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.

    Page
    of 502
    							DEFINITY Enterprise Communications Server Release 8.2
    Upgrades and Additions for R8r  555-233-115  Issue 1
    April 2000
    Adding or Removing Cabinet Hardware 
    6-109 Add a Switch Node Carrier (High or Critical Reliability) 
    6
    Save Translations
    1. Log  in at the manag ement terminal.
    2. If the system is hig h- or c ritic al-reliab ility, typ e status spe
     and press 
    En te r  
    to verify that the stand b y SPE is refreshed  and  that the stand b y d isk is in 
    servic e.
    3. Type save translation [spe-a 
    or both] disk
     and press 
    En t e r. This 
    c ommand  instruc ts the system to take all translation information in 
    memory and  write it to the d isk(s).
    4. If the system c ontains a TN750/B Announc ement c irc uit p ac k, type 
    display announcements
     and  p ress 
    En t e r.
    5. If administered  rec ord ed  announc ements are listed , typ e list 
    configuration software-version
     and  p ress 
    En t e r. Chec k sc reen 2 to find  
    out when the announc ements were last saved . Save the c urrent 
    announc ements b y typ ing  save announcements disk
     and pressing 
    En t e r.
    6. Type backup disk [spe-a 
    or both]
     and  p ress 
    En te r. This instruc ts the 
    system to b ac kup  the c urrent information on d isk to the system tap e(s).
    7. Up d ate b ac kup  tape(s), if required .
    Shut Down DEFINITY LAN Gateway System
    If a DEFINITY LAN Gateway system resid es in the c ontrol c ab inet to b e 
    up g rad ed , p rep are to shut d own the DEFINITY LAN Gateway assemb ly and  
    allow the disk to c omp letely sp in d own. 
    !CAUTION:
    Make sure that you save the system p arameters if you p lan to reuse the 
    c urrent system.
    !WARNING:
    Neg lec ting  to shut d own a DEFINITY LAN Gateway assemb ly b efore 
    p owering  d own the system c ab inet where it resides c an d amage the LAN 
    Gateway d isk.
    1. Log  onto the DEFINITY LAN Gateway. See the DEFINITY Communic ations 
    System Generic  3 Installation, Ad ministration and  Maintenanc e of 
    CallVisor ASAI over the DEFINITY LAN Gateway
    .
    2. When the main menu ap p ears, selec t 
    Maintenanc e.
    3. Select 
    Reset System from the Maintenanc e menu.
    4. Select 
    Sh u t d o w n from the Res et Sy ste m menu.
    5. Unseat the LAN Gateway assemb ly from its b ac kp lane c onnec tors. 
    						
    							DEFINITY Enterprise Communications Server Release 8.2
    Upgrades and Additions for R8r  555-233-115  Issue 1
    April 2000
    Adding or Removing Cabinet Hardware 
    6-110 Add a Switch Node Carrier (High or Critical Reliability) 
    6
    Shut Down DEFINITY AUDIX System
    1. Shut down the AUDIX assemb ly and  allow the d isk to c omp letely sp in 
    d own. Refer to ‘‘DEFINITY AUDIX Power Procedures’’ on page 6-141
    .
    !WARNING:
    Neg lec ting  to shut d own an AUDIX assembly b efore p owering  d own 
    the system c ab inet where it resides c an damag e the AUDIX d isk.
    2. Unseat the AUDIX assemb ly from its b ac kp lane c onnec tors.
    Power Down System
    1. At the PPN, set the main c irc uit b reaker to OFF.
    Remove Doors and Panels and Disconnect Cables
    1. Remove the front d oor from the multic arrier c ab inet where the switc h nod e 
    c arrier will b e installed .
    2. With the c ab le retainer in front of you and  the p art numb er visib le, loc ate 
    the slot that is almost vertic al. (This slot is adjac ent to the p art numb er.) 
    Insert a flat-b lad e sc rewd river with a wid e blad e (1/4-inc h rec ommended ) 
    into the slot, and  twist the sc rewd river. The retainer will snap  open easily 
    so that the c able c an b e removed .
    3. At the c ab inet, d isc onnec t the p reviously lab eled  c ab les assoc iated  with 
    the c arrier to b e removed .
    4. Remove the rear d oors from the c ab inet.
    Remove Circuit Packs from Port Carrier D
    NOTE:
    Skip  these step s if a switc h nod e c arrier is b eing  add ed  to an emp ty c arrier 
    position.
    1.To ensure that circuit packs and power units in the “D”  carrier are properly 
    rep lac ed , lab el eac h c omp onent with its slot numb er.
    2. Disc onnec t the p ower c ords from the p ower units in the “ D”  c arrier.
    3. Remove all c irc uit p ac ks and p ower units from c arrier “ D.”  Store the c irc uit 
    p ac ks in the static -p roof p ac kag ing .
    4. Remove the c irc uit p ac k b lanks from slots that d o not c ontain c irc uit 
    p acks.
    5. Remove the front trim p late from the “ D”  c arrier b y p ulling  it straig ht off. 
    						
    							DEFINITY Enterprise Communications Server Release 8.2
    Upgrades and Additions for R8r  555-233-115  Issue 1
    April 2000
    Adding or Removing Cabinet Hardware 
    6-111 Add a Switch Node Carrier (High or Critical Reliability) 
    6
    Remove Port Carrier D
    NOTE:
    Note the p osition of the TDM/LAN c ab les b efore d isc onnec ting .
    1.If a switc h node c arrier is b eing  installed  in the “ D”  p osition of an EPN, 
    remove the TDM/LAN c ab le from b etween the “ D”  and  “ A”  c arriers.
    For other EPNs or the PPN, d isc onnec t 1 end  of the TDM/LAN c ab le 
    (between the “D” and “A” carriers) from the “D” carrier.
    2. Remove the ZAHF4 TDM/LAN b us terminator from slot “ 21”  of the “ D”  
    carrier.
    3. Disc onnec t 1 end  of the 8 g round  strap s (b etween the “ D”  and  “ E”  
    carriers) from the “ D” c arrier (See Figure 6-38
    ). These strap s will b e 
    rec onnec ted  to the new “ D”  c arrier.
    4. Disc onnec t the 8 g round  straps from the D c arrier (between the “ D”  and  
    “ A”  c arriers or the D c arrier and  the enhanc ed  fan unit—see Figure 6-38
    ). 
    Rec onnec t the 8 g round  strap s to the D c arrier.
    5. Disc onnec t the “ P1”  (small 9-p in) c onnec tor from the “ D”  c arrier. Move the 
    c ab le into a p osition where it will not interfere with removing  the c arrier.
    6. Remove the 4 sc rews (top  2 first) hold ing  the “ D”  c arrier to the c ab inet 
    frame. Use a long -hand le sc rewd river or 5/16-inc h soc ket with a 10-inc h 
    extension.
    7. Behind  the “ D”  c arrier in a “ DEFINITY style”  c ab inet, remove the 2 sc rews 
    hold ing the “ D”  c arrier to the c abinet frame.
    8. Slid e the c arrier forward  1 to 2 inc hes; then, from the b ac k, b e sure that no 
    c ab les or wiring  harnesses are c aug ht on the c ab inet/c arrier framework.
    !CAUTION:
    Cab les and  wiring harnesses c an be d amag ed  if they c atc h on the 
    framework and  if too muc h pressure is ap p lied  in removing  the 
    carrier.
    9. Remove the c arrier b y slid ing  it out the front of the c ab inet. 
    						
    							DEFINITY Enterprise Communications Server Release 8.2
    Upgrades and Additions for R8r  555-233-115  Issue 1
    April 2000
    Adding or Removing Cabinet Hardware 
    6-112 Add a Switch Node Carrier (High or Critical Reliability) 
    6
    Figure 6-38. Locations of Ground JumpersFigure Notes
    1.Port Carrier (“ C” Position)
    2. Ground  Jump ers
    3. Control Carrier (“ A”  Position)4. Switc h Nod e Carrier (“ D”  Position)
    5. Switc h Nod e Carrier (“ E”  Position)
    6. Cabinet with standard  fan unit and  c arrier
    7. Cabinet with enhanc ed  fan unit and  
    enhanc ed  c arrier
    ldcf001 ljk 021700
    11
    22
    22
    33
    44
    55
    67 
    						
    							DEFINITY Enterprise Communications Server Release 8.2
    Upgrades and Additions for R8r  555-233-115  Issue 1
    April 2000
    Adding or Removing Cabinet Hardware 
    6-113 Add a Switch Node Carrier (High or Critical Reliability) 
    6
    Prepare New Switch Node Carrier D
    1. Visually inspec t the new c arrier for any d amag e. Verify that the b ac kp lane 
    pins are not bent.
    2. Plac e the switc h nod e c arrier on the floor so that the rear of the c arrier 
    fac es up .
    3. Verify that the four AHF105 switc h nod e (SN) b us terminators are installed 
    on the “ D”  c arrier to the p in-field  b loc ks marked  “ SNTRM”  (top  and  b ottom 
    p ortions of slots “ 02”  and  “ 20” ). See Figure 6-39
    . The SN b us terminators 
    are attac hed  with the c omp onents on the left sid e as viewed  from the rear.
    4. At the rear c onnec tor p anel, d etermine whic h c onnec tors will have a c ab le 
    attac hed , and  install a 4C c ab le retainer on eac h of these c onnec tors.
    Figure 6-39. ICC Connections for Switch Node Carrier
    ROW 49
    ROW 35
    ROW 25
    SLOT #
    ROW 24
    .
    .
    .
    .
    ..
    .
    .
    .
    ..
    .
    .
    .
    ..
    .
    .
    .
    .
    04.
    .
    .
    .
    ..
    .
    .
    .
    .
    03.
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    ..
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    ..
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    ..
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    SNITRM1
    02
    .
    .
    .
    ..
    .
    .
    ..
    .
    .
    ..
    .
    .
    .
    SNITRM2
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    ..
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    ..
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    ..
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    TDM/LAN
    01.
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    ..
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    ..
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    ..
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    TDM/LAN
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    ..
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    ..
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    ..
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    00 
    						
    							DEFINITY Enterprise Communications Server Release 8.2
    Upgrades and Additions for R8r  555-233-115  Issue 1
    April 2000
    Adding or Removing Cabinet Hardware 
    6-114 Add a Switch Node Carrier (High or Critical Reliability) 
    6
    Install New Switch Node Carrier D
    1.Install the J58890SA switc h nod e c arrier in p osition “ D”  b y lining  up  the 
    p lastic  alignment tip s on the top rear of the c arrier with the sc rew holes in 
    the c ab inet. These alig nment tip s will sup port the c arrier while the sc rews 
    are b eing  rep lac ed . Ensure that the p ower c ord s are p rop erly plac ed  in 
    the slots at the sid es of the c arrier.
    2. Fasten the c arrier into p osition with 4 self-tap p ing  sc rews saved  from the 
    removal of the old  c arrier.
    !CAUTION:
    Carefully realig n the thread s on the self-tap ping  sc rews b y turning  
    them c loc kwise 1 turn before tightening  them to avoid  strip p ing  the 
    thread s out of the framework.
    3. Behind the carrier in a “DEFINITY style” c abinet, replace the 2 sc rews 
    saved  from the removal of the old  c arrier.
    4. Connec t the “ P1”  (small) c onnec tor to the “ D”  c arrier. If nec essary, to g et 
    enoug h slac k in the c ab les, c ut the tie wrap  hold ing  the interc ab inet c ab le 
    from the up rig ht in the area b eing  installed . Snap  the c onnec tor loc k into 
    p lac e to ensure the c onnec tion is p rop erly mad e.
    5. Connec t the 8 g round  strap s from either the “ A”  c arrier or the enhanc ed  
    fan unit to the new D c arrier. See Figure 6-38
    . These strap s were left 
    c onnec ted  when the old  “ D”  c arrier was removed .
    6. Connec t the 8 g round  strap s from the “ E”  c arrier (if installed ) to the new 
    “ D”  c arrier. See Figure 6-38
    . These straps were left c onnec ted  to the “ E”  
    c arrier when the old “ D”  c arrier was removed .
    7. For a stand ard  AC-p owered  c ontrol c arrier, install the 4 c arrier g round  
    strap s. The strap s c onnec t g round  p oints G1 and  G8 from the top  of the 
    B-c arrier b ac kp lane to the B-c arrier c onnec tor p anel  brac ket and  g round 
    p oints G9 and  G16 from the b ottom of the B-c arrier b ac kplane to the 
    B-c arrier c onnec tor p anel  b rac ket. 
    For an enhanc ed  c arrier, install the 16 c arrier-g round  strap s. The strap s 
    c onnec t g round  p oints G1 through G8 from the top  of the B-c arrier 
    b ac kp lane to the B-c arrier c onnec tor p anel  and  g round  p oints G9 through 
    G16 from the bottom of the B-c arrier b ac kp lane to the B-c arrier c onnec tor 
    p anel . Use the 8 sc rews to c onnec t the g round  strap s to the c onnec tor 
    p anel  (see Figure 6-40
    ).
    NOTE:
    An enhanc ed  c arrier is used  only in an R8r PPN c ab inet that uses 
    either AC p ower (U.S.) or Glob al power.
    NOTE:
    DC-p owered  c ab inets DO NOT use any of the ab ove c arrier-g round  
    strap s. 
    						
    							DEFINITY Enterprise Communications Server Release 8.2
    Upgrades and Additions for R8r  555-233-115  Issue 1
    April 2000
    Adding or Removing Cabinet Hardware 
    6-115 Add a Switch Node Carrier (High or Critical Reliability) 
    6
    Figure 6-40. Locations of Top and Bottom Ground Straps on Standard and 
    Enhanced Carriers
    8.If a switc h node c arrier is b eing  installed  in the “ D”  p osition of the PPN, 
    install the TDM/LAN c able (b etween the “ E”  and  “ D”  c arriers) to the 
    p in-field  b loc k marked  “ TDM/LAN”  on the rig ht sid e of b oth c arriers. See 
    Figure 6-41
     and  Table 6-10. Figure Notes
    1. Stand ard  AC-p owered  Carrier
    2. Enhanc ed  Carrier (in R8r PPNs using  
    either AC p ower [ U.S.]  or Glob al 
    power)3. Top  Ground  Strap s
    4. Bottom Ground  Strap s
    P1P1
    12
    lcdfgrn2 KLC 022100
    G
    9G
    9
    G
    1
    0
    0
    00
    1
    TDM/
    LAN
    ICCA
    ICCB
    0
    20304
    G
    1
    G
    2
    7
    8 10
    11
    1
    3
    2 4 5
    6
    3
    4
    3
    4 
    						
    							DEFINITY Enterprise Communications Server Release 8.2
    Upgrades and Additions for R8r  555-233-115  Issue 1
    April 2000
    Adding or Removing Cabinet Hardware 
    6-116 Add a Switch Node Carrier (High or Critical Reliability) 
    6
    9. Also, for the PPN, connect the loose end of the TDM/LAN c able (between 
    the “ A”  and  “ D”  c arriers) to the other pin-field  b loc k marked  “ TDM/LAN”  on 
    the rig ht sid e of the “ D”  c arrier. See Figure 6-41
     and  Table 6-10. The other 
    end  remained  c onnec ted  to the “ A”  c arrier when the old  c arrier was 
    removed .
    Figure 6-41. TDM/LAN Connections for Critical Reliability R8r EPN
    J58890SA-1J58890BB
    B POSITION
    J58890AF-1 SLOT 21
    SEE NOTE
    SLOT 01 PORT CARRIER
    SWITCH NODE CARRIERD POSITIONA POSITION SLOT 21
    PORT CARRIERTDM/LAN BUS TERMINATOR
    (ZAHF4)
    J58890BB
    SLOT 21
    C POSITION
    TDM/LAN BUS
    TERMINATOR
    (ZAHF4)
    SLOT 01
    REAR VIEWE POSITION
    SWITCH NODE CARRIERJ58890SA-1
    NOTE:
    ON PORT CARRIER J68890BB-1, CONNECT TDM/LAN CABLE OR TDM/LAN TERMINATOR TO SLOT 02.
    ON PORT CARRIERS J58890BB-2 AND -3, CONNECT THE TDM/LAN CABLE OR TDM/LAN TERMINATOR
    TO SLOT 1.
    EXPANSION
    CONTROL
    CARRIER
    ICCB
    ICCB
    ICCA
    SEE NOTE
    ICCA
    INTERCARRIER
    CABLES A AND B
    H600-204 G1 TDM/LAN CABLE
    WP91716 L6TDM/LAN CABLE
    WP91716 L6 
    						
    							DEFINITY Enterprise Communications Server Release 8.2
    Upgrades and Additions for R8r  555-233-115  Issue 1
    April 2000
    Adding or Removing Cabinet Hardware 
    6-117 Add a Switch Node Carrier (High or Critical Reliability) 
    6
    Figure 6-42. TDM/LAN Connections for Critical Reliability R8r PPN
    CONTROL
    CARRIERCONTROL CARRIER
    SWITCH NODE CARRIERD POSITIONA POSITION SLOT 21
    PORT CARRIERTDM/LAN BUS TERMINATOR
    (ZAHF4)
    J58890BB
    SLOT 21
    C POSITION
    TDM/LAN BUS
    TERMINATOR
    (ZAHF4)
    REAR VIEWE POSITION
    SWITCH NODE CARRIERJ58890SA-1
    SLOT 01
    NOTE:
    ON PORT CARRIER J68890BB-1, CONNECT TDM/LAN CABLE OR TDM/LAN TERMINATOR TO SLOT 02.
    ON PORT CARRIERS J58890BB-2 AND -3, CONNECT THE TDM/LAN CABLE OR TDM/LAN TERMINATOR
    TO SLOT 1.
    ICCD
    ICCD
    ICCC
    ICCC
    INTERCARRIER
    CABLES C AND D
    H600-182 AND WP-91954 TDM/LAN CABLE
    WP91716 L6
    TDM/LAN CABLE
    WP91716 L6TDM/LAN CABLE
    WP91716 L6
    TDM/LAN CABLE
    WP91716 L7
    J58890SA-1J58890AP-1
    B POSITION
    J58890AP-1 SLOT 21
    SEE NOTE
    SLOT 01 
    						
    							DEFINITY Enterprise Communications Server Release 8.2
    Upgrades and Additions for R8r  555-233-115  Issue 1
    April 2000
    Adding or Removing Cabinet Hardware 
    6-118 Add a Switch Node Carrier (High or Critical Reliability) 
    6
    10.If a switc h node c arrier is b eing  installed  in the “ D”  p osition of an EPN, 
    verify that the ZAHF4 TDM/LAN b us terminator is installed  at slot “ 02”  of 
    exp ansion c ontrol c arrier “ A” . See Figure 6-42
    .
    If a switc h node c arrier is b eing  installed  in the “ E”  p osition of an EPN, 
    verify that the ZAHF4 TDM/LAN b us terminator is installed  at slot “ 21”  of 
    port carrier “D.”
    For a PPN, install the ZAHF4 TDM/LAN bus terminator at slot “ 01”  of switc h 
    nod e c arrier “ E.”
    11. Install the front trim p lates on the “ D”  c arrier.
    12. Install the new p ower units into the c arrier. One 649A is installed  on the left 
    and  rig ht sid es of the c arrier.
    13. Connec t the p ower c ord s to the p ower units. The p ower c ords are the 
    white c ab les eq uip p ed  with p lug s that are run throug h the slots in the front 
    of each carrier.
    Install Circuit Packs
    1. Install the new c irc uit p ac ks into c arrier “ D.”  Use the d ec al and  the 
    up g rad e c onfig uration doc ument (p rovid ed  with the eq uip ment) as a 
    guide.
    2. Install c irc uit p ac k b lanks in slots not eq uip p ed  with c irc uit p ac ks.
    Table 6-10. TDM/LAN Connections
    “J” Number Carrier Type LHS Slot RHS Slot
    J58890BB L1 Port 21 02
    J58890BB L2 Port 21 01
    J58890BB L3 Port 21 01
    J58890AP Control 21 02 
    						
    All Lucent Technologies manuals Comments (0)

    Related Manuals for Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Upgrades And Additions Manual