Home
>
Lucent Technologies
>
Communications System
>
Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Upgrades And Additions Manual
Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Upgrades And Additions Manual
Have a look at the manual Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Upgrades And Additions Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 413 Lucent Technologies manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Adding or Removing Cabinet Hardware 6-109 Add a Switch Node Carrier (High or Critical Reliability) 6 Save Translations 1. Log in at the manag ement terminal. 2. If the system is hig h- or c ritic al-reliab ility, typ e status spe and press En te r to verify that the stand b y SPE is refreshed and that the stand b y d isk is in servic e. 3. Type save translation [spe-a or both] disk and press En t e r. This c ommand instruc ts the system to take all translation information in memory and write it to the d isk(s). 4. If the system c ontains a TN750/B Announc ement c irc uit p ac k, type display announcements and p ress En t e r. 5. If administered rec ord ed announc ements are listed , typ e list configuration software-version and p ress En t e r. Chec k sc reen 2 to find out when the announc ements were last saved . Save the c urrent announc ements b y typ ing save announcements disk and pressing En t e r. 6. Type backup disk [spe-a or both] and p ress En te r. This instruc ts the system to b ac kup the c urrent information on d isk to the system tap e(s). 7. Up d ate b ac kup tape(s), if required . Shut Down DEFINITY LAN Gateway System If a DEFINITY LAN Gateway system resid es in the c ontrol c ab inet to b e up g rad ed , p rep are to shut d own the DEFINITY LAN Gateway assemb ly and allow the disk to c omp letely sp in d own. !CAUTION: Make sure that you save the system p arameters if you p lan to reuse the c urrent system. !WARNING: Neg lec ting to shut d own a DEFINITY LAN Gateway assemb ly b efore p owering d own the system c ab inet where it resides c an d amage the LAN Gateway d isk. 1. Log onto the DEFINITY LAN Gateway. See the DEFINITY Communic ations System Generic 3 Installation, Ad ministration and Maintenanc e of CallVisor ASAI over the DEFINITY LAN Gateway . 2. When the main menu ap p ears, selec t Maintenanc e. 3. Select Reset System from the Maintenanc e menu. 4. Select Sh u t d o w n from the Res et Sy ste m menu. 5. Unseat the LAN Gateway assemb ly from its b ac kp lane c onnec tors.
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Adding or Removing Cabinet Hardware 6-110 Add a Switch Node Carrier (High or Critical Reliability) 6 Shut Down DEFINITY AUDIX System 1. Shut down the AUDIX assemb ly and allow the d isk to c omp letely sp in d own. Refer to ‘‘DEFINITY AUDIX Power Procedures’’ on page 6-141 . !WARNING: Neg lec ting to shut d own an AUDIX assembly b efore p owering d own the system c ab inet where it resides c an damag e the AUDIX d isk. 2. Unseat the AUDIX assemb ly from its b ac kp lane c onnec tors. Power Down System 1. At the PPN, set the main c irc uit b reaker to OFF. Remove Doors and Panels and Disconnect Cables 1. Remove the front d oor from the multic arrier c ab inet where the switc h nod e c arrier will b e installed . 2. With the c ab le retainer in front of you and the p art numb er visib le, loc ate the slot that is almost vertic al. (This slot is adjac ent to the p art numb er.) Insert a flat-b lad e sc rewd river with a wid e blad e (1/4-inc h rec ommended ) into the slot, and twist the sc rewd river. The retainer will snap open easily so that the c able c an b e removed . 3. At the c ab inet, d isc onnec t the p reviously lab eled c ab les assoc iated with the c arrier to b e removed . 4. Remove the rear d oors from the c ab inet. Remove Circuit Packs from Port Carrier D NOTE: Skip these step s if a switc h nod e c arrier is b eing add ed to an emp ty c arrier position. 1.To ensure that circuit packs and power units in the “D” carrier are properly rep lac ed , lab el eac h c omp onent with its slot numb er. 2. Disc onnec t the p ower c ords from the p ower units in the “ D” c arrier. 3. Remove all c irc uit p ac ks and p ower units from c arrier “ D.” Store the c irc uit p ac ks in the static -p roof p ac kag ing . 4. Remove the c irc uit p ac k b lanks from slots that d o not c ontain c irc uit p acks. 5. Remove the front trim p late from the “ D” c arrier b y p ulling it straig ht off.
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Adding or Removing Cabinet Hardware 6-111 Add a Switch Node Carrier (High or Critical Reliability) 6 Remove Port Carrier D NOTE: Note the p osition of the TDM/LAN c ab les b efore d isc onnec ting . 1.If a switc h node c arrier is b eing installed in the “ D” p osition of an EPN, remove the TDM/LAN c ab le from b etween the “ D” and “ A” c arriers. For other EPNs or the PPN, d isc onnec t 1 end of the TDM/LAN c ab le (between the “D” and “A” carriers) from the “D” carrier. 2. Remove the ZAHF4 TDM/LAN b us terminator from slot “ 21” of the “ D” carrier. 3. Disc onnec t 1 end of the 8 g round strap s (b etween the “ D” and “ E” carriers) from the “ D” c arrier (See Figure 6-38 ). These strap s will b e rec onnec ted to the new “ D” c arrier. 4. Disc onnec t the 8 g round straps from the D c arrier (between the “ D” and “ A” c arriers or the D c arrier and the enhanc ed fan unit—see Figure 6-38 ). Rec onnec t the 8 g round strap s to the D c arrier. 5. Disc onnec t the “ P1” (small 9-p in) c onnec tor from the “ D” c arrier. Move the c ab le into a p osition where it will not interfere with removing the c arrier. 6. Remove the 4 sc rews (top 2 first) hold ing the “ D” c arrier to the c ab inet frame. Use a long -hand le sc rewd river or 5/16-inc h soc ket with a 10-inc h extension. 7. Behind the “ D” c arrier in a “ DEFINITY style” c ab inet, remove the 2 sc rews hold ing the “ D” c arrier to the c abinet frame. 8. Slid e the c arrier forward 1 to 2 inc hes; then, from the b ac k, b e sure that no c ab les or wiring harnesses are c aug ht on the c ab inet/c arrier framework. !CAUTION: Cab les and wiring harnesses c an be d amag ed if they c atc h on the framework and if too muc h pressure is ap p lied in removing the carrier. 9. Remove the c arrier b y slid ing it out the front of the c ab inet.
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Adding or Removing Cabinet Hardware 6-112 Add a Switch Node Carrier (High or Critical Reliability) 6 Figure 6-38. Locations of Ground JumpersFigure Notes 1.Port Carrier (“ C” Position) 2. Ground Jump ers 3. Control Carrier (“ A” Position)4. Switc h Nod e Carrier (“ D” Position) 5. Switc h Nod e Carrier (“ E” Position) 6. Cabinet with standard fan unit and c arrier 7. Cabinet with enhanc ed fan unit and enhanc ed c arrier ldcf001 ljk 021700 11 22 22 33 44 55 67
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Adding or Removing Cabinet Hardware 6-113 Add a Switch Node Carrier (High or Critical Reliability) 6 Prepare New Switch Node Carrier D 1. Visually inspec t the new c arrier for any d amag e. Verify that the b ac kp lane pins are not bent. 2. Plac e the switc h nod e c arrier on the floor so that the rear of the c arrier fac es up . 3. Verify that the four AHF105 switc h nod e (SN) b us terminators are installed on the “ D” c arrier to the p in-field b loc ks marked “ SNTRM” (top and b ottom p ortions of slots “ 02” and “ 20” ). See Figure 6-39 . The SN b us terminators are attac hed with the c omp onents on the left sid e as viewed from the rear. 4. At the rear c onnec tor p anel, d etermine whic h c onnec tors will have a c ab le attac hed , and install a 4C c ab le retainer on eac h of these c onnec tors. Figure 6-39. ICC Connections for Switch Node Carrier ROW 49 ROW 35 ROW 25 SLOT # ROW 24 . . . . .. . . . .. . . . .. . . . . 04. . . . .. . . . . 03. . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . SNITRM1 02 . . . .. . . .. . . .. . . . SNITRM2 . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . TDM/LAN 01. . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . TDM/LAN . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . 00
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Adding or Removing Cabinet Hardware 6-114 Add a Switch Node Carrier (High or Critical Reliability) 6 Install New Switch Node Carrier D 1.Install the J58890SA switc h nod e c arrier in p osition “ D” b y lining up the p lastic alignment tip s on the top rear of the c arrier with the sc rew holes in the c ab inet. These alig nment tip s will sup port the c arrier while the sc rews are b eing rep lac ed . Ensure that the p ower c ord s are p rop erly plac ed in the slots at the sid es of the c arrier. 2. Fasten the c arrier into p osition with 4 self-tap p ing sc rews saved from the removal of the old c arrier. !CAUTION: Carefully realig n the thread s on the self-tap ping sc rews b y turning them c loc kwise 1 turn before tightening them to avoid strip p ing the thread s out of the framework. 3. Behind the carrier in a “DEFINITY style” c abinet, replace the 2 sc rews saved from the removal of the old c arrier. 4. Connec t the “ P1” (small) c onnec tor to the “ D” c arrier. If nec essary, to g et enoug h slac k in the c ab les, c ut the tie wrap hold ing the interc ab inet c ab le from the up rig ht in the area b eing installed . Snap the c onnec tor loc k into p lac e to ensure the c onnec tion is p rop erly mad e. 5. Connec t the 8 g round strap s from either the “ A” c arrier or the enhanc ed fan unit to the new D c arrier. See Figure 6-38 . These strap s were left c onnec ted when the old “ D” c arrier was removed . 6. Connec t the 8 g round strap s from the “ E” c arrier (if installed ) to the new “ D” c arrier. See Figure 6-38 . These straps were left c onnec ted to the “ E” c arrier when the old “ D” c arrier was removed . 7. For a stand ard AC-p owered c ontrol c arrier, install the 4 c arrier g round strap s. The strap s c onnec t g round p oints G1 and G8 from the top of the B-c arrier b ac kp lane to the B-c arrier c onnec tor p anel brac ket and g round p oints G9 and G16 from the b ottom of the B-c arrier b ac kplane to the B-c arrier c onnec tor p anel b rac ket. For an enhanc ed c arrier, install the 16 c arrier-g round strap s. The strap s c onnec t g round p oints G1 through G8 from the top of the B-c arrier b ac kp lane to the B-c arrier c onnec tor p anel and g round p oints G9 through G16 from the bottom of the B-c arrier b ac kp lane to the B-c arrier c onnec tor p anel . Use the 8 sc rews to c onnec t the g round strap s to the c onnec tor p anel (see Figure 6-40 ). NOTE: An enhanc ed c arrier is used only in an R8r PPN c ab inet that uses either AC p ower (U.S.) or Glob al power. NOTE: DC-p owered c ab inets DO NOT use any of the ab ove c arrier-g round strap s.
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Adding or Removing Cabinet Hardware 6-115 Add a Switch Node Carrier (High or Critical Reliability) 6 Figure 6-40. Locations of Top and Bottom Ground Straps on Standard and Enhanced Carriers 8.If a switc h node c arrier is b eing installed in the “ D” p osition of the PPN, install the TDM/LAN c able (b etween the “ E” and “ D” c arriers) to the p in-field b loc k marked “ TDM/LAN” on the rig ht sid e of b oth c arriers. See Figure 6-41 and Table 6-10. Figure Notes 1. Stand ard AC-p owered Carrier 2. Enhanc ed Carrier (in R8r PPNs using either AC p ower [ U.S.] or Glob al power)3. Top Ground Strap s 4. Bottom Ground Strap s P1P1 12 lcdfgrn2 KLC 022100 G 9G 9 G 1 0 0 00 1 TDM/ LAN ICCA ICCB 0 20304 G 1 G 2 7 8 10 11 1 3 2 4 5 6 3 4 3 4
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Adding or Removing Cabinet Hardware 6-116 Add a Switch Node Carrier (High or Critical Reliability) 6 9. Also, for the PPN, connect the loose end of the TDM/LAN c able (between the “ A” and “ D” c arriers) to the other pin-field b loc k marked “ TDM/LAN” on the rig ht sid e of the “ D” c arrier. See Figure 6-41 and Table 6-10. The other end remained c onnec ted to the “ A” c arrier when the old c arrier was removed . Figure 6-41. TDM/LAN Connections for Critical Reliability R8r EPN J58890SA-1J58890BB B POSITION J58890AF-1 SLOT 21 SEE NOTE SLOT 01 PORT CARRIER SWITCH NODE CARRIERD POSITIONA POSITION SLOT 21 PORT CARRIERTDM/LAN BUS TERMINATOR (ZAHF4) J58890BB SLOT 21 C POSITION TDM/LAN BUS TERMINATOR (ZAHF4) SLOT 01 REAR VIEWE POSITION SWITCH NODE CARRIERJ58890SA-1 NOTE: ON PORT CARRIER J68890BB-1, CONNECT TDM/LAN CABLE OR TDM/LAN TERMINATOR TO SLOT 02. ON PORT CARRIERS J58890BB-2 AND -3, CONNECT THE TDM/LAN CABLE OR TDM/LAN TERMINATOR TO SLOT 1. EXPANSION CONTROL CARRIER ICCB ICCB ICCA SEE NOTE ICCA INTERCARRIER CABLES A AND B H600-204 G1 TDM/LAN CABLE WP91716 L6TDM/LAN CABLE WP91716 L6
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Adding or Removing Cabinet Hardware 6-117 Add a Switch Node Carrier (High or Critical Reliability) 6 Figure 6-42. TDM/LAN Connections for Critical Reliability R8r PPN CONTROL CARRIERCONTROL CARRIER SWITCH NODE CARRIERD POSITIONA POSITION SLOT 21 PORT CARRIERTDM/LAN BUS TERMINATOR (ZAHF4) J58890BB SLOT 21 C POSITION TDM/LAN BUS TERMINATOR (ZAHF4) REAR VIEWE POSITION SWITCH NODE CARRIERJ58890SA-1 SLOT 01 NOTE: ON PORT CARRIER J68890BB-1, CONNECT TDM/LAN CABLE OR TDM/LAN TERMINATOR TO SLOT 02. ON PORT CARRIERS J58890BB-2 AND -3, CONNECT THE TDM/LAN CABLE OR TDM/LAN TERMINATOR TO SLOT 1. ICCD ICCD ICCC ICCC INTERCARRIER CABLES C AND D H600-182 AND WP-91954 TDM/LAN CABLE WP91716 L6 TDM/LAN CABLE WP91716 L6TDM/LAN CABLE WP91716 L6 TDM/LAN CABLE WP91716 L7 J58890SA-1J58890AP-1 B POSITION J58890AP-1 SLOT 21 SEE NOTE SLOT 01
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Adding or Removing Cabinet Hardware 6-118 Add a Switch Node Carrier (High or Critical Reliability) 6 10.If a switc h node c arrier is b eing installed in the “ D” p osition of an EPN, verify that the ZAHF4 TDM/LAN b us terminator is installed at slot “ 02” of exp ansion c ontrol c arrier “ A” . See Figure 6-42 . If a switc h node c arrier is b eing installed in the “ E” p osition of an EPN, verify that the ZAHF4 TDM/LAN b us terminator is installed at slot “ 21” of port carrier “D.” For a PPN, install the ZAHF4 TDM/LAN bus terminator at slot “ 01” of switc h nod e c arrier “ E.” 11. Install the front trim p lates on the “ D” c arrier. 12. Install the new p ower units into the c arrier. One 649A is installed on the left and rig ht sid es of the c arrier. 13. Connec t the p ower c ord s to the p ower units. The p ower c ords are the white c ab les eq uip p ed with p lug s that are run throug h the slots in the front of each carrier. Install Circuit Packs 1. Install the new c irc uit p ac ks into c arrier “ D.” Use the d ec al and the up g rad e c onfig uration doc ument (p rovid ed with the eq uip ment) as a guide. 2. Install c irc uit p ac k b lanks in slots not eq uip p ed with c irc uit p ac ks. Table 6-10. TDM/LAN Connections “J” Number Carrier Type LHS Slot RHS Slot J58890BB L1 Port 21 02 J58890BB L2 Port 21 01 J58890BB L3 Port 21 01 J58890AP Control 21 02