Home > Lucent Technologies > Communications System > Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Upgrades And Additions Manual

Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Upgrades And Additions Manual

    Download as PDF Print this page Share this page

    Have a look at the manual Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Upgrades And Additions Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 413 Lucent Technologies manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.

    Page
    of 502
    							DEFINITY Enterprise Communications Server Release 8.2
    Upgrades and Additions for R8r  555-233-115  Issue 1
    April 2000
    Multicarrier G2 Universal Module to R8r EPN 
    5-93 Critical Reliability 
    5
    For 2 Collocated Expansion Port Networks
    1. Behind control carrier A of PPN c abinet 1:
    nInstall a lig htwave transc eiver on the c ab le c onnec tor at slot 1A02.
    nConnec t a fib er op tic  c ab le to the transc eiver just installed .
    nCarefully attac h the fib er op tic  c ab le (with c ab le ties) to the wall of 
    the c ab le tray at the b uilt-in c ab le tie p ositions.
    2. Behind control carrier A of EPN c abinet 3:
    nInstall a lig htwave transc eiver on the c ab le c onnec tor at slot 3A01.
    nConnec t the other end  of the fiber c ab le to the transc eiver just 
    installed .
    nCarefully attac h the fib er op tic  c ab le (with c ab le ties) to the wall of 
    the c ab le tray at the b uilt-in c ab le tie p ositions.
    nAt the top  of the c ab inet, c oil up  the surp lus fiber op tic  c ab le and  
    attac h it to the wall of the c able tray.
    3. Behind control carrier B of PPN c abinet 1:
    nInstall a lig htwave transc eiver on the c ab le c onnec tor at slot 1B02.
    nConnec t a fib er op tic  c ab le to the transc eiver just installed .
    nCarefully attac h the fib er op tic  c ab le (with c ab le ties) to the wall of 
    the c ab le tray at the b uilt-in c ab le tie p ositions.
    4. Behind  p ort c arrier B of EPN c ab inet 3:
    nInstall a lig htwave transc eiver on c ab le c onnec tor at slot 3B02.
    nConnec t the other end  of the fiber op tic  c able to the lig htwave 
    transc eiver, just installed , at slot 3B02.
    nCarefully attac h the fib er op tic  c ab le (with c ab le ties) to the wall of 
    the c ab le tray at the b uilt-in c ab le tie p ositions.
    nAt the top  of the c ab inet, c oil up  the surp lus leng th of fib er op tic  
    c ab le, and  c arefully attac h the c oil to the wall of the c ab le tray.
    5. Behind control carrier A of EPN c abinet 2:
    nInstall a lig htwave transc eiver on c ab le c onnec tor at slot 2A02.
    nConnec t 1 end  of the fib er optic  c ab le to the lightwave transc eiver, 
    just installed , at slot 2A02.
    nCarefully attac h the fib er op tic  c ab le (with c ab le ties) to the wall of 
    the c ab le tray at the b uilt-in c ab le tie p ositions. 
    						
    							DEFINITY Enterprise Communications Server Release 8.2
    Upgrades and Additions for R8r  555-233-115  Issue 1
    April 2000
    Multicarrier G2 Universal Module to R8r EPN 
    5-94 Critical Reliability 
    5
    6. Behind control carrier A of EPN c abinet 3:
    nInstall a lig htwave transc eiver on c ab le c onnec tor at slot 3A02.
    nConnec t the other end  of the fiber op tic  c able to the lig htwave 
    transc eiver, just installed , at slot 3A02.
    nCarefully attac h the fib er op tic  c ab le (with c ab le ties) to the wall of 
    the c ab le tray at the b uilt-in c ab le tie p ositions.
    nAt the top  of the c ab inet, c oil the surp lus fib er op tic  c ab le, and  
    c arefully attac h the c oil to the wall of the c ab le tray.
    7. Behind  p ort c arrier B of EPN c ab inet 2:
    nInstall a lig htwave transc eiver on c ab le c onnec tor at slot 2B03.
    nConnec t 1 end  of the fib er optic  c ab le to the lightwave transc eiver, 
    just installed , at slot 2B03.
    nCarefully attac h the fib er op tic  c ab le (with c ab le ties) to the wall of 
    the c ab le tray at the b uilt-in c ab le tie p ositions.
    8. Behind  p ort c arrier B of EPN c ab inet 3:
    nInstall a lig htwave transc eiver on c ab le c onnec tor at slot 3B03.
    nConnec t the other end  of the fiber op tic  c able to the lig htwave 
    transc eiver, just installed , at slot 3B03.
    nCarefully attac h the fib er op tic  c ab le (with c ab le ties) to the wall of 
    the c ab le tray at the b uilt-in c ab le tie p ositions.
    nAt the top  of the c ab inet, c oil the surp lus fib er op tic  c ab le, and  
    c arefully attac h the c oil to the wall of the c ab le tray. 
    						
    							DEFINITY Enterprise Communications Server Release 8.2
    Upgrades and Additions for R8r  555-233-115  Issue 1
    April 2000
    Multicarrier G2 Universal Module to R8r EPN 
    5-95 Critical Reliability 
    5
    Figure 5-28. Critical Reliability Release 8 with 2 or 3 Port NetworksFigure Notes
    1. Cabinet 1 PPN
    2. Cabinet 2 EPN 13. Cab inet 3 EPN 2 
    						
    							DEFINITY Enterprise Communications Server Release 8.2
    Upgrades and Additions for R8r  555-233-115  Issue 1
    April 2000
    Multicarrier G2 Universal Module to R8r EPN 
    5-96 Critical Reliability 
    5
    Figure 5-29. Fiber Optic Connections PPN to EPN1 Figure Notes
    1. Lightwave Transc eiver
    2. To PPN Carrier A Slot 1A01
    3 . To  EPN 1  C a r r ie r A Sl o t  2 A0 1
    4. PPN Carrier B Slot 1B015. EPN1 Carrier B Slot 2B02
    6. Fiber Optic Cable
    7. TX Connec tor
    8. RX Connec tor
    cydff06 CJL 103196
    RX
    RXTX
    TX
    4
    24
    2 3
    13
    1 
    						
    							DEFINITY Enterprise Communications Server Release 8.2
    Upgrades and Additions for R8r  555-233-115  Issue 1
    April 2000
    Multicarrier G2 Universal Module to R8r EPN 
    5-97 Critical Reliability 
    5
    Figure 5-30. Fiber Optic Connections PPN to EPN2 Figure Notes
    1. Lightwave Transc eiver
    2. To PPN Carrier A Slot 1A02
    3 . To  EPN 2  C a r r ie r A Sl o t  3 A0 1
    4. To PPN Carrier B Slot 1B025. To EPN2 Carrier A Slot 3A01
    6. Fiber Optic Cable
    7. TX Connec tor
    8. RX Connec tor
    cydff06 CJL 103196
    RX
    RXTX
    TX
    4
    24
    2 3
    13
    1 
    						
    							DEFINITY Enterprise Communications Server Release 8.2
    Upgrades and Additions for R8r  555-233-115  Issue 1
    April 2000
    Multicarrier G2 Universal Module to R8r EPN 
    5-98 Critical Reliability 
    5
    Figure 5-31. Fiber Optic Connections EPN1 to EPN2 Figure Notes
    1. Lightwave Transc eiver
    2 . To  EPN 1  C a r r ie r A Sl o t  2 A0 2
    3 . To  EPN 2  C a r r ie r A Sl o t  3 A0 2
    4 . To  EPN 1  C a r r ie r B Sl o t  2 B0 35. To EPN2 Carrier B Slot 3B03
    6. Fiber Optic Cable
    7. TX Connec tor
    8. RX Connec tor
    cydff06 CJL 103196
    RX
    RXTX
    TX
    4
    24
    2 3
    13
    1 
    						
    							DEFINITY Enterprise Communications Server Release 8.2
    Upgrades and Additions for R8r  555-233-115  Issue 1
    April 2000
    Multicarrier G2 Universal Module to R8r EPN 
    5-99 Critical Reliability 
    5
    For Either 1 or 2 Fiber-Remoted Expansion Port Networks
    1. Behind  c ontrol c arrier A of PPN c ab inet 1 (see Figure 5-33 throug h Figure 
    5-35):
    nInstall a lig htwave transc eiver on the c ab le c onnec tor at slot 1A01.
    nConnec t a fib er op tic  c ab le to the transc eiver just installed .
    nRoute the c ab le to the c ab le tray and  d own, out of the c ab inet, 
    throug h the c ab le manag er to the PDS c ross-c onnec t fac ility.
    nConnec t the fib er c ab le to the lig htguid e interc onnec t unit p rovid ed .
    nCarefully attac h the fib er op tic  c ab le (with c ab le ties) to the wall of 
    the c ab le tray at the b uilt-in c ab le tie p ositions.
    2. Behind control carrier A of EPN c abinet 2:
    nInstall a lig htwave transc eiver on the c ab le c onnec tor at slot 2A01.
    nConnect the fiber optic c able to the lightwave transc eiver slot 2A01.
    nRoute the c ab le to the c ab le tray and  d own, out of the c ab inet, 
    throug h the c ab le manag er to the PDS c ross-c onnec t fac ility.
    nConnec t the fib er c ab le to the lig htguid e interc onnec t unit p rovid ed .
    nCarefully attac h the fib er op tic  c ab le (with c ab le ties) to the wall of 
    the c ab le tray at the b uilt-in c ab le tie p ositions.
    nCoil the surplus fib er optic  c ab le and  plac e it in the c ab le manag er.
    3. Behind control carrier B of PPN c abinet 1:
    nInstall a lig htwave transc eiver on the c ab le c onnec tor at slot 1B01.
    nConnec t a fib er op tic  c ab le to the transc eiver just installed .
    nRoute the c ab le to the c ab le tray and  d own, out of the c ab inet, 
    throug h the c ab le manag er to the PDS c ross-c onnec t fac ility.
    nConnec t the fib er c ab le to the lig htguid e interc onnec t unit p rovid ed .
    nCarefully attac h the fib er op tic  c ab le (with c ab le ties) to the wall of 
    the c ab le tray at the b uilt-in c ab le tie p ositions.
    4. Behind  p ort c arrier B of EPN c ab inet 2:
    nInstall a lig htwave transc eiver on the c ab le c onnec tor at slot 2B02.
    nConnec t the fib er op tic  c ab le to the transc eiver just installed .
    nRoute the c ab le to the c ab le tray and  d own, out of the c ab inet, 
    throug h the c ab le manag er to the PDS c ross-c onnec t fac ility.
    nConnec t the fib er c ab le to the lig htguid e interc onnec t unit p rovid ed .
    nCarefully attac h the fib er op tic  c ab le (with c ab le ties) to the wall of 
    the c ab le tray at the b uilt-in c ab le tie p ositions.
    nCoil the surplus fib er optic  c ab le and  plac e it in the c ab le manag er. 
    						
    							DEFINITY Enterprise Communications Server Release 8.2
    Upgrades and Additions for R8r  555-233-115  Issue 1
    April 2000
    Multicarrier G2 Universal Module to R8r EPN 
    5-100 Critical Reliability 
    5
    For Two Fiber-Remoted Expansion Port Networks
    1. Behind control carrier A of PPN c abinet 1:
    nInstall a lig htwave transc eiver on the c ab le c onnec tor at slot 1A02.
    nConnec t a fib er op tic  c ab le to the transc eiver just installed .
    nRoute the c ab le to the c ab le tray and  d own, out of the c ab inet, 
    throug h the c ab le manag er to the PDS c ross-c onnec t fac ility.
    nConnec t the fib er c ab le to the lig htguid e interc onnec t unit p rovid ed .
    nCarefully attac h the fib er op tic  c ab le (with c ab le ties) to the wall of 
    the c ab le tray at the b uilt-in c ab le tie p ositions.
    2. Behind control carrier A of EPN c abinet 3:
    nInstall a lig htwave transc eiver on c ab le c onnec tor at slot 3A01.
    nConnec t the fib er op tic  c ab le to the transc eiver just installed .
    nRoute the fib er c ab le to the c ab le tray and  down, out of the c ab inet, 
    throug h the c ab le manag er to the PDS c ross-c onnec t fac ility.
    nConnec t the fib er c ab le to the lig htguid e interc onnec t unit p rovid ed .
    nCarefully attac h the fib er op tic  c ab le (with c ab le ties) to the wall of 
    the c ab le tray at the b uilt-in c ab le tie p ositions.
    nCoil the surplus fib er optic  c ab le and  plac e it in the c ab le manag er.
    3. Behind control carrier B of PPN c abinet 1:
    nInstall a lig htwave transc eiver on c ab le c onnec tor at slot 1B02.
    nConnec t a fib er op tic  c ab le to the transc eiver just installed .
    nRoute the c ab le to the c ab le tray and  d own, out of the c ab inet, 
    throug h the c ab le manag er to the PDS c ross-c onnec t fac ility.
    nConnec t the fib er c ab le to the lig htguid e interc onnec t unit p rovid ed .
    nCarefully attac h the fib er op tic  c ab le (with c ab le ties) to the wall of 
    the c ab le tray at the b uilt-in c ab le tie p ositions.
    4. Behind  p ort c arrier B of EPN c ab inet 3:
    nInstall a lig htwave transc eiver on the c ab le c onnec tor at slot 3B02.
    nConnec t the fib er op tic  c ab le to the transc eiver just installed .
    nRoute the c ab le to the c ab le tray and  d own, out of the c ab inet, 
    throug h the c ab le manag er to the PDS c ross-c onnec t fac ility.
    nConnec t the fib er c ab le to the lig htguid e interc onnec t unit p rovid ed .
    nCarefully attac h the fib er op tic  c ab le (with c ab le ties) to the wall of 
    the c ab le tray at the b uilt-in c ab le tie p ositions.
    nCoil up  the surp lus fib er c ab le and  p lac e it in the c ab le manag er. 
    						
    							DEFINITY Enterprise Communications Server Release 8.2
    Upgrades and Additions for R8r  555-233-115  Issue 1
    April 2000
    Multicarrier G2 Universal Module to R8r EPN 
    5-101 Critical Reliability 
    5
    5. Behind control carrier A of EPN c abinet 2:
    nInstall a lig htwave transc eiver on the c ab le c onnec tor at slot 2A02.
    nConnec t a fib er op tic  c ab le to the transc eiver just installed .
    nRoute the c ab le to the c ab le tray and  d own, out of the c ab inet, 
    throug h the c ab le manag er to the PDS c ross-c onnec t fac ility.
    nConnec t the fib er c ab le to the lig htguid e interc onnec t unit p rovid ed .
    nCarefully attac h the fib er op tic  c ab le (with c ab le ties) to the wall of 
    the c ab le tray at the b uilt-in c ab le tie p ositions.
    6. Behind control carrier A of EPN c abinet 3:
    nInstall a lig htwave transc eiver on the c ab le c onnec tor at slot 3A02.
    nConnec t the fib er op tic  c ab le to the transc eiver just installed .
    nRoute the fib er c ab le to the c ab le tray and  down, out of the c ab inet, 
    throug h the c ab le manag er to the PDS c ross-c onnec t fac ility.
    nConnec t the fib er c ab le to the lig htguid e interc onnec t unit p rovid ed .
    nCarefully attac h the fib er op tic  c ab le (with c ab le ties) to the wall of 
    the c ab le tray at the b uilt-in c ab le tie p ositions.
    nCoil up  the surp lus fib er c ab le and  p lac e it in the c ab le manag er.
    7. Behind  p ort c arrier B of EPN c ab inet 2:
    nInstall a lig htwave transc eiver on the c ab le c onnec tor at slot 2B03.
    nConnec t a fib er op tic  c ab le to the transc eiver just installed .
    nRoute the fib er c ab le to the c ab le tray and  down, out of the c ab inet, 
    throug h the c ab le manag er to the PDS c ross-c onnec t fac ility.
    nConnec t the fib er c ab le to the lig htguid e interc onnec t unit p rovid ed .
    nCarefully attac h the fib er op tic  c ab le (with c ab le ties) to the wall of 
    the c ab le tray at the b uilt-in c ab le tie p ositions.
    8. Behind  p ort c arrier B of EPN c ab inet 3:
    nInstall a lig htwave transc eiver on the c ab le c onnec tor at slot 3B03.
    nConnec t the fib er c ab le to the transc eiver just installed.
    nRoute the fib er c ab le to the c ab le tray and  down, out of the c ab inet, 
    throug h the c ab le manag er to the PDS c ross-c onnec t fac ility.
    nConnec t the fib er c ab le to the lig htguid e interc onnec t unit p rovid ed .
    nCarefully attac h the fib er op tic  c ab le (with c ab le ties) to the wall of 
    the c ab le tray at the b uilt-in c ab le tie p ositions.
    nCoil up  the surp lus fib er c ab le and  p lac e it in the c ab le manag er. 
    						
    							DEFINITY Enterprise Communications Server Release 8.2
    Upgrades and Additions for R8r  555-233-115  Issue 1
    April 2000
    Multicarrier G2 Universal Module to R8r EPN 
    5-102 Critical Reliability 
    5
    Figure 5-32. Critical Reliability Release 8 with 2 or 3 Port Networks
    Rear View
    Cabinet 1
    PPN
    C
    Port Carrier - J58890BB2019181716151413121110987654321
    B
    Control Carrier - J58890AJ1098765432
    .
    .
    .
    .
    .
    .
    .
    .
    . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .To Cabinet 3
    B2
    1
    To Cabinet 2
    B2
    AUXTerminal
    A
    Control Carrier - J58890AH1098765432
    .
    .
    .
    .
    .
    .
    .
    .
    . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
    To Cabinet 3
    A1
    1
    To Cabinet 2
    A1
    AUXTerminal
    FanFanFan
    D
    Port Carrier - J58890BB2019181716151413121110987654321
    E
    Port Carrier - J58890BB2019181716151413121110987654321
    Power-Distribution
    Unit
    Rear View
    Cabinet 2
    EPN 1
    C
    Port Carrier - J58890BB2019181716151413121110987654321
    B
    Port Carrier - J58890BB20191817161514131211109876543
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    . .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .
    To Cabinet 3
    B3
    2
    To Cabinet 1
    B1
    1
    A
    Expansion Control Carrier - J58890AF1918171615141312111098765432
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    .
    . .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .
    To Cabinet 3
    A2
    1
    To Cabinet 1
    A1
    AUXTRM
    FanFanFan
    D
    Port Carrier - J58890BB2019181716151413121110987654321
    E
    Port Carrier - J58890BB2019181716151413121110987654321
    Power-Distribution
    Unit
    Rear View
    Cabinet 3
    EPN 2
    C
    Port Carrier - J58890BB2019181716151413121110987654321
    B
    Port Carrier - J58890BB20191817161514131211109876543
    .
    .
    . .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .To Cabinet 2
    B3
    2
    .
    .
    .
    .
    .
    .
    .
    .
    . .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . .  .  .  .  .  .  .  .
    To Cabinet 1
    B2
    1
    A
    Expansion Control Carrier - J58890AF1918171615141312111098765432
    .
    .
    . .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .To Cabinet 2
    A2
    1
    .
    .
    .
    .
    .
    .
    .
    .
    . .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . .  .  .  .  .  .  .  .
    To Cabinet 1
    A2
    AUXTRM
    FanFanFan
    D
    Port Carrier - J58890BB2019181716151413121110987654321
    E
    Port Carrier - J58890BB2019181716151413121110987654321
    Power-Distribution
    Unit 
    						
    All Lucent Technologies manuals Comments (0)

    Related Manuals for Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Upgrades And Additions Manual