    17.Make sure the transmission is in E position.
    Fill the transmission with ATF, and run the engine
    for 30 seconds or until approximately 0.951 {1.0 US
    qt., 0.8 lmp qt.) is discharged.
    Remove the drain hose, and reconnect the cooler
    return hose to the transmission (see page 14-266).
    Refill the transmission with ATF to the proper level
    (see page l4161 ).
    18.
    19.
    TOOL MAINTENANCE
    1. €mpty and rinse the flusher after each use. Fill the
    flusher with water and pressurize it, then flush the
    discharge line to ensure that the unit is clean.
    2. lf discharge liquid does not foam, the orifice may be
    blocked.
    3. To clean, disconnect the large coupling nut from the
    flusher.
    FILTER
    \-0--D
    I
    IO.RING
    Remove the in-line filter from the discharge side and
    clean it if necessary.
    The fluid orifice is located behind the filter.
    Clean it with the pick stored in the bottom of the
    tank handle, or blow it clean with air.
    Reassemble all parts.
    COUPLINGNUT
    II
    -@q
    \ORIFICE
    4.
    5.
    6.
    FILLER CAP
    14-265
    www.emanualpro.com  
    						
    							
    ATF Cooler Hoses
    Gonnection
    1. Connect the ATF cooler hoses to the ATF cooler lines. then secure them with the cliDs.
    2. Face the tabs of the clips of the transmission side toward the radiator, and face the tabs of the ATF cooler side down-wa rd.
    CLIPFace tabs toward radiator.
    ATF COOLER LINEATF COOLER LINE
    TRANSMISSION
    6-8mm(0.2 - 0.3 inl
    ATF COOLER
    HOSE CLAMP
    CLIPFace tabs downward.
    2-rlmm10.1 - 0.2 inl
    14-266
    www.emanualpro.com  
    						
    							
    Shift Lever
    Removal/lnstallation
    SRS components are located in this area. Review the
    SRS component locations, precautions, and procedures
    in the SRS section (24) before performing repairs or ser-
    vrce.
    1. Remove the instrument panel lower cover and the
    column covers (see section 171.
    2. Shift to N position, then remove the lock pin from
    the cable adjuster.
    3. Separate the shift cable from the cable adjuster, Do
    not bend the shift cable excessively.
    ADJUSTER ROD
    SHIFT CABLE
    22 N.m (2.2 kgf.m, 16 lbt.ftl
    7.
    Remove the flange nuts and bolts securing the
    steering column, then lower the steering column.
    FLANGE NUTS16 N m (1.6 kgl m, 12 lbtftl
    Disconnect the shift lock solenoid and the park pin
    switch connector.
    Remove the bolts securing the shift lever assembly,
    then remove the shift lever assembly.
    lnstall the shift lever assembly in the reverse order
    of removal.
    NOTE;
    . Make sure the lock pin is seated securely in the
    cable adjuster.
    . Replace the lock pin if it does not snap over the
    cable adjuster securely.
    Check the cable adjustment after installing the shift
    lever (see page 14-27l).
    14-267
    www.emanualpro.com  
    						
    							
    Shift Lever
    Disassembly/Reassembly -97 - 98 Models
    SRS components are located in this area. Review the SRS component locations. precautions. and procedures in the SRS
    section (24) before performing repairs or service.
    Apply silicone grease to these parts
    . Movable parts of the shift lever,
    . Movable parts of the shift lock mechanism.
    . Sliding surfaces on the detent of the control checker and detent guide.
    SHIFT LOCK SOLENOIDSPRING
    SCREW
    SHIFT LOCK2.5 N.m {0.25 kgtm, 1.8 lbtftl
    SCREW2.5 N.m {0.25 kg{.m,1.8 rbf.ft)
    SHIFT LOCK SOLENOIDPLUNGER
    SHIFT LOCKEXTENSION
    DETENT SPFING
    SHIFT LEVER
    PARK PIN SWITCHCONNECTOR
    SHIFT LOCKRELEASE LEVER
    CONTROL BRACKET
    STOP
    DETENT GUIDE
    9.3 N.m 10.95 kgtm,6.8 tbrft)
    SPRING
    9.3 N.m {0.95 kgf.m,6.8 tbf.ftl
    SHIFT LEVERLINK
    9.3 N.m (0.95 kgt.m,6.8 tbf.ftl
    SHIFT CAALE
    KNOBI N.m 10.9 kgt.m,7 rbf.ftl
    14-268
    7 N.m {0.7 kgf.m.5 tbt.fr}
    www.emanualpro.com  
    						
    							
    Disassembly/Reassembly -99 - 00 Models
    SRS components are located in this area. Review the SRS component locations, precautions, and procedures in the SRS
    section (24) before performing repairs or service.
    Apply silicone grease to these parts:
    . Movable parts of the shift lever.
    . Movable parts of the shift lock mechanism.
    . Sliding surfaces on the detent of the control checker and detent guide.
    NOTE: Adjustthe clearance between the O/D switch wires and the edge ofthe shift lever control bracket after reassembly(see page 14-270).
    SHIFT LOCKRELEASE LEVERSHIFT LOCK SOLENOIDSPRING
    SCREW2.5 N.m {0.25 kgf.m, 1.8lbtft)SHIFT LOCK SOLENOID
    SCREW2.5 N.m (0.25 kgl.m, 1.8 lbl.ft)
    SHIFT LOCK SOLENOIOPLUNGER
    DETENT SPRING
    SHIFT LEVER CONTROLBRACKET
    PARK PIN SWITCH _
    o/D swtTcHCONNECTOB
    SHIFT LOCK EXTENSION
    STOP
    DETENT GUIDE
    9.3 N.m {0.95 kgf.m, 6.9 lbl.ftl
    SCREW2.5 N.m {0.25 kgt m,1.8 tbf.ftl
    SHIFT LOCK BELEASELEVER SPRING
    9.3 N.m {0.95 kgl.m,6.9 lbtfr)
    HARNESS CLAMPERACKET
    PARK PINswrTcH
    SCREW2.5 N.m {0.25 kgf.m,1.8 tbl.f0
    9.3 N.m 10.95 kgtm,6.9 tbf.ft)CONTROL CHECKER
    SHIFT LEVER KNOB6- 12 N.m{0.6 - 1.2 kgtm,4 - 8.7 tbnft)LOCKNUT7 N.m {0.7 kgl.m,5 tbf.ftl
    SHIFT LEVERBUSHING
    o/D swtTcH
    14-269
    www.emanualpro.com  
    						
    							
    Shift Lever
    Over-Drive (O/Dl Switch Wire Clearance Adjustment -99 - 00 Models
    NOTE: Be sure to adjust the clearance between the O/D
    switch wires and the shift lever control bracket after
    replacing the O/D switch and park pin switch, and after
    reassembling the shift lever. lf there is the slack in the
    wires or the wires are kept tight, the wires may have
    Dreaks.
    1. Shift the shift lever into E positron.
    2. Pull or push the wires to adjust the clearance
    between the wires and the edge of the shift lever
    control bracket to 13 mm (0.5 in).
    SHIFT LEVER BRACKET
    14-270
    7.
    Secure the wires with the harness clamp.
    Move the shift lever to each position, and verify that
    there is a clearance between the wires and bracket
    in each position.
    lf the wires are kept tight in any position, read.iust
    the clearance.
    Install the shift lever assembly on the steering col-
    umn.
    Move the shift lever to each position, and make
    sure that the wires are kept away from any parts
    such as the steering column.
    www.emanualpro.com  
    						
    							
    Detent Spring Replacement
    1.Install the detent spring on th€ shift lever control
    bracket, and installthe screw loosely.
    Shift the shift lever to E position.
    lnssrt a 0.5 mm (0.02 in) wire gap gauge between
    the control chocker detent and the shift lever, then
    hold the shift lever against the El position in the
    control checker.
    SHIFI LEVER
    GAP GAUGE
    4. Put the detent spring roller in E position on the
    detent guide, then tighten the screw to the specified
    torque,
    97 - 98 Modeb:
    DETENT SPRING
    2.5 N.m 10.25 kgf.m, 1.8lbl.ftl
    SCREW2.5 N.m 10.25 kgl.m, 1.8lbtftl
    14-271
    www.emanualpro.com  
    						
    							
    Shift Gable
    Adjustment
    SRS components are located in this area. Review the SRS
    component locations, precautions, and procedures in the
    SRS section (241 before performing repairs or service.
    1. Release the steering tilt lever.
    2. Remove the access cover from the lower column
    cover.
    LOCK PIN
    AOJUSTINGnoo
    ADJUSTER
    7 N.m (0.7 kg{.m,5 tbf.ft)
    3. Shift to E position. then remove the lock pin from
    the cable adjuster.
    K\ffi
    /* 1 6-,>
    snenrftc YTILT LEVER IACCESS COVER
    14-272
    l 1.
    4. Check that the hole in the cable adjuster is aligned
    with the hole in the adjusting rod. There are two
    holes in the cable adjuster. They are positioned 90
    apart to allow cable adjustments ln l/4 turn incre-
    ments.
    CABLE ADJUSTER
    CablsToo Short
    lf not perfectly aligned, loosen the locknut on the
    shitt cable. and adjust as required.
    Tighten the locknut.
    Install the lock pin on the adjuster. lf you feel the
    lock pin binding as you reinstall it, the cable is still
    out of adjustment and must be readjusted.
    Make sure the lock pin is seated securely in the
    adjuster. Replace the lock pin if it does not snap
    over the cable adjuster securely.
    Move the shift lever to each gear, and verify that the
    A/T gear position indicator follows the A/T gear
    position switch.
    Start the engine, and check the shift lever in all
    gears. lf any gear does not work properly, refer to
    troubleshooting on page 14-153 thru 14-156.
    Insert the ignition key into the key cylinder on the
    upper column cover, and verify that the shift lock
    tever reteases.
    CableToo LongExactAlignment
    7.
    a
    10.
    www.emanualpro.com  
    						
    							
    Replacement
    SRS components are located in this area. Review the SRS
    component locations, precautions, and procedures in the
    SRS section {24} before performing repairs or service.
    1. Remove the instrument panel lower cover and the
    column covers (see section 17).
    2. Shift to E position, then remove the lock pin from
    the cable adiuster.
    LOCK PIN
    SHIFT CABLEBRACKET
    ADJUSTINGROO
    LOCKNUT29 N.m {3.0 kgl.m,2j2lbf.trl
    Loosen the locknut, then remove the shift cablefrom the shift cable bracket.
    Remove the nut securing the shift cable holder,
    then remove the shift cable.
    12 N.m {1.2 kgf.m,8.7 tbtfrl
    CABLE ADJUSTER
    STUO BOLT
    6x1.0mm
    Remove the shift cable cover.
    Remove the shift cable.
    4WD:
    Remove the snap pin and control pin, then separatethe shift cable from the control lever.
    CONTROL PIN
    SHIFT CABLE
    SHIFTCOVER
    2WDi
    Remove the control lever, then
    cable from the control shaft.
    separate the shift
    t r 1.25 mm22 N.n 12.2 *glrn.16 tbf.trl
    CONTROLSHAFT
    8 x 1.25 mm22 N.m12.2 kgl-m,16 tbf.frl
    SHIFT CABLECOVER
    LOCK WASHER6x LOmm14 N.m {1.4 kgf.m,
    (contd)
    SHIFT CABI-E
    10 tbt.lrl
    14-273
    www.emanualpro.com  
    						
    							
    Shift Gable
    Replacement (contd)
    7.
    6x 1.0mm12 N.m 11.2 kgtm,8.7 tbf.ftl
    Install the shift cable ln the
    removat.
    NOTE:
    Remove the nuts securing the shift cable holder,
    then remove the shift cable.
    GROMMETSTUD BOLT
    SHIFT CABLE
    f-
    . Do not bent the shift cable excessively when
    installing it.
    . Make sure the lock pin is seated securely in the
    cable adjuster.
    . Replace the lock pin if it does not snap over the
    cable adjuster securely.
    Check the cable adjustment after installing it.
    14-274
    www.emanualpro.com  
    						