honda cr v 19997 2000 User Manual
Have a look at the manual honda cr v 19997 2000 User Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 328 Honda manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.

17.Make sure the transmission is in E position. Fill the transmission with ATF, and run the engine for 30 seconds or until approximately 0.951 {1.0 US qt., 0.8 lmp qt.) is discharged. Remove the drain hose, and reconnect the cooler return hose to the transmission (see page 14-266). Refill the transmission with ATF to the proper level (see page l4161 ). 18. 19. TOOL MAINTENANCE 1. €mpty and rinse the flusher after each use. Fill the flusher with water and pressurize it, then flush the discharge line to ensure that the unit is clean. 2. lf discharge liquid does not foam, the orifice may be blocked. 3. To clean, disconnect the large coupling nut from the flusher. FILTER \-0--D I IO.RING Remove the in-line filter from the discharge side and clean it if necessary. The fluid orifice is located behind the filter. Clean it with the pick stored in the bottom of the tank handle, or blow it clean with air. Reassemble all parts. COUPLINGNUT II -@q \ORIFICE 4. 5. 6. FILLER CAP 14-265 www.emanualpro.com

ATF Cooler Hoses Gonnection 1. Connect the ATF cooler hoses to the ATF cooler lines. then secure them with the cliDs. 2. Face the tabs of the clips of the transmission side toward the radiator, and face the tabs of the ATF cooler side down-wa rd. CLIPFace tabs toward radiator. ATF COOLER LINEATF COOLER LINE TRANSMISSION 6-8mm(0.2 - 0.3 inl ATF COOLER HOSE CLAMP CLIPFace tabs downward. 2-rlmm10.1 - 0.2 inl 14-266 www.emanualpro.com

Shift Lever Removal/lnstallation SRS components are located in this area. Review the SRS component locations, precautions, and procedures in the SRS section (24) before performing repairs or ser- vrce. 1. Remove the instrument panel lower cover and the column covers (see section 171. 2. Shift to N position, then remove the lock pin from the cable adjuster. 3. Separate the shift cable from the cable adjuster, Do not bend the shift cable excessively. ADJUSTER ROD SHIFT CABLE 22 N.m (2.2 kgf.m, 16 lbt.ftl 7. Remove the flange nuts and bolts securing the steering column, then lower the steering column. FLANGE NUTS16 N m (1.6 kgl m, 12 lbtftl Disconnect the shift lock solenoid and the park pin switch connector. Remove the bolts securing the shift lever assembly, then remove the shift lever assembly. lnstall the shift lever assembly in the reverse order of removal. NOTE; . Make sure the lock pin is seated securely in the cable adjuster. . Replace the lock pin if it does not snap over the cable adjuster securely. Check the cable adjustment after installing the shift lever (see page 14-27l). 14-267 www.emanualpro.com

Shift Lever Disassembly/Reassembly -97 - 98 Models SRS components are located in this area. Review the SRS component locations. precautions. and procedures in the SRS section (24) before performing repairs or service. Apply silicone grease to these parts . Movable parts of the shift lever, . Movable parts of the shift lock mechanism. . Sliding surfaces on the detent of the control checker and detent guide. SHIFT LOCK SOLENOIDSPRING SCREW SHIFT LOCK2.5 N.m {0.25 kgtm, 1.8 lbtftl SCREW2.5 N.m {0.25 kg{.m,1.8 rbf.ft) SHIFT LOCK SOLENOIDPLUNGER SHIFT LOCKEXTENSION DETENT SPFING SHIFT LEVER PARK PIN SWITCHCONNECTOR SHIFT LOCKRELEASE LEVER CONTROL BRACKET STOP DETENT GUIDE 9.3 N.m 10.95 kgtm,6.8 tbrft) SPRING 9.3 N.m {0.95 kgf.m,6.8 tbf.ftl SHIFT LEVERLINK 9.3 N.m (0.95 kgt.m,6.8 tbf.ftl SHIFT CAALE KNOBI N.m 10.9 kgt.m,7 rbf.ftl 14-268 7 N.m {0.7 kgf.m.5 tbt.fr} www.emanualpro.com

Disassembly/Reassembly -99 - 00 Models SRS components are located in this area. Review the SRS component locations, precautions, and procedures in the SRS section (24) before performing repairs or service. Apply silicone grease to these parts: . Movable parts of the shift lever. . Movable parts of the shift lock mechanism. . Sliding surfaces on the detent of the control checker and detent guide. NOTE: Adjustthe clearance between the O/D switch wires and the edge ofthe shift lever control bracket after reassembly(see page 14-270). SHIFT LOCKRELEASE LEVERSHIFT LOCK SOLENOIDSPRING SCREW2.5 N.m {0.25 kgf.m, 1.8lbtft)SHIFT LOCK SOLENOID SCREW2.5 N.m (0.25 kgl.m, 1.8 lbl.ft) SHIFT LOCK SOLENOIOPLUNGER DETENT SPRING SHIFT LEVER CONTROLBRACKET PARK PIN SWITCH _ o/D swtTcHCONNECTOB SHIFT LOCK EXTENSION STOP DETENT GUIDE 9.3 N.m {0.95 kgf.m, 6.9 lbl.ftl SCREW2.5 N.m {0.25 kgt m,1.8 tbf.ftl SHIFT LOCK BELEASELEVER SPRING 9.3 N.m {0.95 kgl.m,6.9 lbtfr) HARNESS CLAMPERACKET PARK PINswrTcH SCREW2.5 N.m {0.25 kgf.m,1.8 tbl.f0 9.3 N.m 10.95 kgtm,6.9 tbf.ft)CONTROL CHECKER SHIFT LEVER KNOB6- 12 N.m{0.6 - 1.2 kgtm,4 - 8.7 tbnft)LOCKNUT7 N.m {0.7 kgl.m,5 tbf.ftl SHIFT LEVERBUSHING o/D swtTcH 14-269 www.emanualpro.com

Shift Lever Over-Drive (O/Dl Switch Wire Clearance Adjustment -99 - 00 Models NOTE: Be sure to adjust the clearance between the O/D switch wires and the shift lever control bracket after replacing the O/D switch and park pin switch, and after reassembling the shift lever. lf there is the slack in the wires or the wires are kept tight, the wires may have Dreaks. 1. Shift the shift lever into E positron. 2. Pull or push the wires to adjust the clearance between the wires and the edge of the shift lever control bracket to 13 mm (0.5 in). SHIFT LEVER BRACKET 14-270 7. Secure the wires with the harness clamp. Move the shift lever to each position, and verify that there is a clearance between the wires and bracket in each position. lf the wires are kept tight in any position, read.iust the clearance. Install the shift lever assembly on the steering col- umn. Move the shift lever to each position, and make sure that the wires are kept away from any parts such as the steering column. www.emanualpro.com

Detent Spring Replacement 1.Install the detent spring on th€ shift lever control bracket, and installthe screw loosely. Shift the shift lever to E position. lnssrt a 0.5 mm (0.02 in) wire gap gauge between the control chocker detent and the shift lever, then hold the shift lever against the El position in the control checker. SHIFI LEVER GAP GAUGE 4. Put the detent spring roller in E position on the detent guide, then tighten the screw to the specified torque, 97 - 98 Modeb: DETENT SPRING 2.5 N.m 10.25 kgf.m, 1.8lbl.ftl SCREW2.5 N.m 10.25 kgl.m, 1.8lbtftl 14-271 www.emanualpro.com

Shift Gable Adjustment SRS components are located in this area. Review the SRS component locations, precautions, and procedures in the SRS section (241 before performing repairs or service. 1. Release the steering tilt lever. 2. Remove the access cover from the lower column cover. LOCK PIN AOJUSTINGnoo ADJUSTER 7 N.m (0.7 kg{.m,5 tbf.ft) 3. Shift to E position. then remove the lock pin from the cable adjuster. K\ffi /* 1 6-,> snenrftc YTILT LEVER IACCESS COVER 14-272 l 1. 4. Check that the hole in the cable adjuster is aligned with the hole in the adjusting rod. There are two holes in the cable adjuster. They are positioned 90 apart to allow cable adjustments ln l/4 turn incre- ments. CABLE ADJUSTER CablsToo Short lf not perfectly aligned, loosen the locknut on the shitt cable. and adjust as required. Tighten the locknut. Install the lock pin on the adjuster. lf you feel the lock pin binding as you reinstall it, the cable is still out of adjustment and must be readjusted. Make sure the lock pin is seated securely in the adjuster. Replace the lock pin if it does not snap over the cable adjuster securely. Move the shift lever to each gear, and verify that the A/T gear position indicator follows the A/T gear position switch. Start the engine, and check the shift lever in all gears. lf any gear does not work properly, refer to troubleshooting on page 14-153 thru 14-156. Insert the ignition key into the key cylinder on the upper column cover, and verify that the shift lock tever reteases. CableToo LongExactAlignment 7. a 10. www.emanualpro.com

Replacement SRS components are located in this area. Review the SRS component locations, precautions, and procedures in the SRS section {24} before performing repairs or service. 1. Remove the instrument panel lower cover and the column covers (see section 17). 2. Shift to E position, then remove the lock pin from the cable adiuster. LOCK PIN SHIFT CABLEBRACKET ADJUSTINGROO LOCKNUT29 N.m {3.0 kgl.m,2j2lbf.trl Loosen the locknut, then remove the shift cablefrom the shift cable bracket. Remove the nut securing the shift cable holder, then remove the shift cable. 12 N.m {1.2 kgf.m,8.7 tbtfrl CABLE ADJUSTER STUO BOLT 6x1.0mm Remove the shift cable cover. Remove the shift cable. 4WD: Remove the snap pin and control pin, then separatethe shift cable from the control lever. CONTROL PIN SHIFT CABLE SHIFTCOVER 2WDi Remove the control lever, then cable from the control shaft. separate the shift t r 1.25 mm22 N.n 12.2 *glrn.16 tbf.trl CONTROLSHAFT 8 x 1.25 mm22 N.m12.2 kgl-m,16 tbf.frl SHIFT CABLECOVER LOCK WASHER6x LOmm14 N.m {1.4 kgf.m, (contd) SHIFT CABI-E 10 tbt.lrl 14-273 www.emanualpro.com

Shift Gable Replacement (contd) 7. 6x 1.0mm12 N.m 11.2 kgtm,8.7 tbf.ftl Install the shift cable ln the removat. NOTE: Remove the nuts securing the shift cable holder, then remove the shift cable. GROMMETSTUD BOLT SHIFT CABLE f- . Do not bent the shift cable excessively when installing it. . Make sure the lock pin is seated securely in the cable adjuster. . Replace the lock pin if it does not snap over the cable adjuster securely. Check the cable adjustment after installing it. 14-274 www.emanualpro.com