honda cr v 19997 2000 User Manual
Have a look at the manual honda cr v 19997 2000 User Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 328 Honda manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.

98 - 00 mod€ls: The scan tool indicates Diagnostic Trouble code (DTc) P1457: Evaporative Emission (EVAP) Control system leak detected (EVAP control canister system). Troubl6shooting Flowchart(98 model only)_] I - The MIL has been rePorted on.- DTC P1,157 is storod. Do the fuel tank Pressure sensor test {see page 11-214). ls the {ueltank pressure sensor OK? Do the EVAP Purge contlol solenoid valve test lsea Page 1l_ 220t. (contdl 11-219 www.emanualpro.com

Emission Control System Evaporative Emission (EVAP) Controls (cont,dl iTl457l (ontor APCONTROLCANISTER Ropair op€n in th6 wire betweenthe EVAP purge control 3olenoidvelve and ths ECM/PCM (A61. VACUUMPUMP/GAUGE, O-30 iN.HgA973X - 0rl - xxxxx \) Wire side of lemale terminals EVAP PURGE CONTROL SOI.ENOIDVALVE 2P CONNECTOR (Cl08) PCSIRED/YELI femaletermanals ECM/PCM CONNECTOR A {32P} PCS (RED/YELI ,/3 458/t0 ,,/ 14 ,/t61718l92024 ,/ 262930 JUMPERWIRE - The MIL has been reported on.- DTC P1457 is stored.{EVAP purge control solenoidvalve test.l* Check the EVAP purge conrrol30lenoid velve:L Disconnect the vacuum hosefrom the EVAP conlrol canis,ter, and connect a vacuumpump to the hose.2. Connect the ECM/PCM connector terminal A6 to the bodyground with a jumper wire.3. Turn the ignition switch ON (tl).4. Apply vacuum to the hose. EVAP purge control solenoidvalve is OK. Oo the EVAP bypasssolenoid valve t€3t {see psge 1l-221t. Does the valve hold vacuum? Check for an open in the wire(PCS line):1. Turn the ignition switch OFF.2. Disconnect the EVAP purgecontrol solenoid valve 2P connector,3. Check for continuity betweenthe EVAP pu rge controlsolenoid valve 2P connectorterminal No.2 and bodygrouno, ls there continuity? Check for an open in the wire(lGl line):1. Turn the ignition switch ON t).2. Measure voltage between theEVAP bypass solenoid valve 2pcoonector terminal No. 1 andbody ground. ls there battery voltage? Repah open in lhe wir6 betwoenthe EVAP pu.ge cont.ol solonoidvdlvo and No. 15 ALTERNATORSP SENSOR {7.5 Al fu!€. *: Continued frr 98 model 1-220 www.emanualpro.com

EVAP bypass solenoid valv€ test. {The continuation of DTC P1457 troubleshooting.l Check the EVAP bypass 3olenoid 1. Disconnect the vacuLlm hose from the EVAP two way valve, and conned a vacuum PUmPto the hose.2. Turn the ignition switch ON (ll). 3. Apply vacuum to the hose EVAP bvpas3 30lsnoid vrlvo/ EVAP two way v.lve is OK. Do the EVAP control canisler vent 3hut v.lve te3l (see Psge112221. Does the valve hold vacuum? Ch6ck the EVAP byp.ss solenoid 1. Turn the ignition switch OFF 2. Disconnect the EVAP bypass solenoid valve 2P connector. 3. Check {or continuity between the EVAP bypass soleno id valve 2P connector termlnal No. 2 and body ground ReDlace the EVAP bypass 3olenoid valve and O-rings. Check for a short in lhe wire {2WBS linel:1. Disconnect ECM/PCM connec tor A (32P). 2. Check lor continuity betlveenthe EVAP bypass soleno id valve 2P connector termrnalNo. 2 and body ground. Rcpsir short in th. wire bgtwoen the EcM/PCtrl lA3l lnd the EVAP bypa$ solenoid valvo.ls there continuitY? Sub3tiiute . knowngood ECM/ PCM End recheck. lI sYmptom/ indication goe3 away, tePlace the original ECM/PCM. EVAPBYPASSFUELTANKPRESSUBE SENSORSOLENOIDVALVEEVAP TWO WAY VALVE VACUUMPUMP/GAUGE,0-30 in.HgA973X - 041 - xxxxx EVAP AYPASS SOLENOID VALVE 2P CONNECTOR (C647} q @) T t.-+lt1t?l | 2wBs (d1 terul Y-L Wire side offemaleterminals 2WBS(BLU} (contd) 11-221 www.emanualpro.com

Emission Control System Evaporative Emission (EVAP) Controls (cont,dl lT145il (onto) EVAPTHREE VATVE \t VACUUMPUMP/GAUGE,0 - 30 in.HsA973X - 041 - xxxxx WIRE ECM/PCM CONNECTOR A {32PI vsv Wire side of female terminals EVAPCONTROLCANISTER EVAP CONTROLCANISTER VENT SHUTVALVE 2P CONNECTOR {C361} riErr+J I vsv /A {Lr GRN/WHT| YI Wire side of female terminals CANISTEFVENTSHUTVALVE EVAPCONTROL (}BING Replace. ffilrcr e (BLK/wHr) I 11-222 EVAP control canistor vent shutvalve t6t.(The continuation of DTC p1457 troubl€ahooting.) Chcck the EVAP control c.nirt6lvent ahut vrlve:1. Disconnect the vacuum hosetrom the EVAP thre€ way valve,and connect a vacuum pumpto the hose.2. Connect the ECM,PCM conn6c,tor terminal A4 to the bodyground with a jumper wire.3. Turn the ignition switch ON fil).4. Applyvacuum to the hose. EVAP control crni3ter v6nt shutvelve b OK. Do the canistsr sys-lern loak test {3ee page 11-2231. Does the valve hold vacuum? Check for an open in the wireIVSV linGll1. Turn the ignition swjtch OFF.2. Disconnect the EVAP controlcanister vent shut valve 2pconnector.3. Check for continuity betweenthe EVAP control canister ventshul valve 2P connector termi-nal No. l and body ground. Ropril op6n in tho wire botweonthe EVAP control canister v6ntshut v.lve and the ECM/PCM(A41. Check tor an open in the wire(lGl line):1. Turn the ignition switch ON l).2. Measure voltage between theEVAP control canister vent shutvalve 2P connector terrninalNo. 1 and body ground. Roplace thG EVAP cont.ol canis-ter Yent shut velve and O-ring. Repai. opon in the wire betwoenth6 EVAP control canister vontshut valve .nd No. 15 ALTERNA-TOB SP SENSOR t?.5 Alfus6. {LT GRN/WHT) 36a10 l4/1617l8t9202l232426 272a2930 JUMPER www.emanualpro.com

Canbter system leak test {The continuation of DTC P1457 trouble3hootin9.) Chock the EVAP control canistervent shut valve line and connoc tonS:1. Turn the ignition switch OFF 2. Connect to threeway tee fit_ tings into the hose from the EVAP control canister to the EVAP two way valve. Connect the fuel tank pressure sensor to one of the tee fittings and the vacuum PumP to the other 3. Remove the vent hose from the EVAP control canister vent shut valve and cap the Pon to seal the fresh air vent Ior the EVAP control canister.4. Turn the ignition switch ON (ll). 5. While monitoring the FTP Sensor voltage with the Honda PGM Tester, or measurangvoltage between ECM/PCM connector terminals A29 and C18 slowly PumP the vacuumpump using a stroke every 1 - 2 seconds.6. Continue to PumP vacuum until that voltage droPs to approx. 1.5 V.NOTE: Make sure that the engine coolant temPeraturestillabove 95F (35Cland Yourvacuum PumP has no leak 7. Monitor that voltage for 20 seconds. Check the EVAP Pu.ge control solenoid valve line and connec- tions:1. Turn the ignition switch OFF. 2. Disconnect the Purge lane hose from the EVAP control canister and Plug the Port3. Turn the ignition switch ON (lli. 4. While monitoring the FTP Sensor voltage with the Honda PGM Tester, or measuringvoltage between ECM/PCM connector terminals A29 and Cl8 slowly PumP the vacuumpump using a stroke every 1 - 2 seconds.5. Continue to pump vacuum until that voltage droPs to approx. 1-5 V.NOTE: Make sure that the engine coolant temPeraturestill above 95F (35C) and Yourvacuum pump has no leak- 6. Monitor that voltage tor 20 seconds. Doesthe voltage drop to 1.5 V and holds at least 20 seconds? lGp€ct the EVAP control cani3tel vent 3hut valvo line and connec_ tion5. Inlpect tho EVAP Putge control solenoid valvo line and connec tion3. It th6y lro OK, do the EVAP two way valve te3t (seo page 11- 2211. Does the voltage drop to 1.5 V and holds at least 20 seconds? Reolace the EVAP conirol canister. EVAPBYPASSSOLENOIDVALVE FUEL TANK EVAPCONTROL VENTSHUTVALVE EVAPCONTROLCANISTER SENSOR EVAP TWO WAYVALVE EVAPTHREE VALVE ttrrL ta VACUUMPUMP/GAUGE,0 - 30 in.HgA973X - 041 - XXXXX FITTINGS ECM/PCM CONNECTORS A {32P) PTANK ILT GRN) c (31Pt SG2 {GRN/BLK) Wire side of female terminals {contd) 11-223 www.emanualpro.com

Emission Control System Evaporative Emission (EVAP) Controls (cont,dl Evaporative Emission (EVAP) Two Way Valve Testing 97 model: 1. Remove the fuelfill cap. 2. Remove the vapor Iine from the EVAP two wayvalve on the fuel tank, and connect it to a T_fittingfrom a vacuum gauge and a vacuum pump asshown. VACUUM,/PRESSURE GAUGEotJAz - 001 rDoBT-FITTINGVACUUMPUMP/GAUGE,0 - 30 in.HgA973X-041-XXXXX 3. Apply vacuum slowly and continuouslv whilewatching the gauge. The vacuum should stabilizemomentarily at 0.7 - 2.0 kpa (5 - 1S mmHg, 0.2 _ 0.6in.Hg). lf the vacuum stabilizes (valve opens) below0.7 kPa (5 mmHg,0.2 in,Hg) or above 2.0 kpa(15 mmHg, 0.6 in.Hg), install a new valve and retest. 4.Move the vacuum pump hose from the vacuum fit_ting to the pressure fitting, and move the vacuumgauge hose from the vacuum side to the pressureside as shown. PiESSURESIDE 5. Slowly pressurize the vapor line while watching thegauge. The pressure should stabilize at 1.3 - 4.7 kpa(0 - 35 mmHg, 0.4 - 1.4 in.Hg).. lf the pressure momentarily stabilizes (valve opens) at 1.3 - 4.7 kpa (10 - 35 mmHg, 0.4 _ 1.4in. Hg), the valve is OK.. lf th6 pressure stabilizes below 1.3 kpa fio mmHg,0.4 inrHg) or above 4.7 kpa (35 mmHg, 1.4 in.Hg),install a new valve and retest. T-FITTING 11-224 .98 - 0O models: 1. Remove the fuel fill cap.2. Remove the vapor line from the EVAP two wayvalve {located above the EVAP control canister). andconnect it to a T-fitting from vacuum gauge andvacuum pump as shown. VACUUM/PRESSUFE VACUUM PUMP/GAUGE,0 - 30 in.HgA973X - 041 - xxxxx 5. Apply vacuum slowly and continuously whilewatching the gauge. The vacuum should stabilize momentarily at O.g _ 2.1 kPa (6 - 16 mmHg, 0.2 - 0.6 in.Hg).lf the vacuum stabilizes (valve opens) below0.8 kPa (6 mmHg, 0.2 in.Hg) or above 2.1 kpa(16 mmHg, 0.6 in.Hg), install a new valve and retest.Move the vacuum pump hose from the vacuum fit-ting to the pressure fitting. and move the vacuumgauge hose from the vacuum side to the pressure side as shown. Slowly pressurize the vapor line while watching thegauge. The pressure should stabilize momentarilv above1.0 kPa (8 mmHg, 0.3 in.Hg).a lf the pressure momentarily stabilizes (valve opens) above 1.0 kPa (8 mmHg. 0.3 in.Hg), thevalve is OK.. lf the pressure stabilizes below ,|.0 kpa {g mmHg.0.3 in.Hg), install a new valve and retest. T-FITTING www.emanualpro.com

Transaxle Clutch ...........12-1 Manual Transmission ............................ 13-1 Automatic Transmission .................. ..... 1 4-1 Differential ... 15-1 Driveshafts ... 16-1 www.emanualpro.com

Clutch Speciaf Tools ....,..... .......... 12-2 lllustrated lndex ........... .. 123 Clutch Pedal Adjustment ............12-4 Clutch Master Cylinder RemovaUlnstallation . 125 Slave Cylinder Removal/lnstallation ... 12-6 Pressure Plate RemovaUlnspection ... 12-7 Clutch Disc Removal/lnspection ... 12-8 Flywheel Inspection ...................... 12-9 Replacement ....................................... 1 2-9 Clutch Disc, Pressure Plate lnstallation .................... 12-10 Release Bearing Removal/lnspection ...... 1211 lnstaflation ..................... 12-12 www.emanualpro.com

Special Tools Rel. No. I Tool NumberDescriptionOty Page Reference a IA @ !c, Lo, OTJAF - PM70,I1A 07NAF - PR30l00 07LAB - PV00100 or 07924 - PD20003 07746 0010100 07749 - 0010000 07936 - 3710100 Clutch Alignment Disc Clutch Alignment Shaft Ring Gear Holder Attachment, 32 x 35 mm Driver Ha nd le 1 | t2-7 1 12-7 , A, t0, 11 1 12-7 ,9, 10, 1l I1 I 12-10 1 12-10 1 12-7 , a, 10, 11 b) 2-2 www.emanualpro.com

lllustrated Index NOTE: . Whenever the transmission is removed, clean and grease the release bearing sliding surface .lfthepansmarked*areremoved,theclutchhydraulicsystemmustbebled(seepage1\ 2-6). . Inspect the hoses for damage. leaks. interference, and twisting. LOCK PIN *CLUTCH LINE19 N.m (1.9 kgj.m,14 tbtft) 8 x 1.25 mm13 N.m {1.3 kgf m,9.4lbtft) PEDAL PIN.RESEFVOIR HOSE *RESERVOIR TANK CLUTCH PEDALAdjustment, page 12-4*CI-UTCH MASTER CYLINDERFemoval/lnstallation, page 12-5 6x1.0mm9.8 N.m (1.0 kgf.m,7.2 tbf.ft) *CLUTCH LINE15 N.m (1.5 kgt m,11 tbr.ft) *CLUTCH LINE24 N.m {2.4 kgf.m,17 tbf.ft) CLUTCH DISCRemoval/lnspection, page 1 2-8Installation, page 12,13 8 x 1.25 mm25 N.m {2.6 kgt m,19 rbf.ftt I x 1.25 mm22 N.m 12.2 kglm, 16lbfft) .o-.9r WM\,.0-- ffi-P8Nmlloks{m FLYWHEELInspection, page 12IRepiacement, page 12-9 12 x 1.0 mm103 N.m (10.5 kgtm,75.9 lbf ftl PRESSURE PLATERemoval/lnspection, page12-7 Installation, page12 13 RELEASE BEARINGRemoval/lnspection, page 12-1!Installation, page 12-12 *CLUTCH LINE15 N.m (1.5 kgt m,11 tbf.ft) 12-3 www.emanualpro.com