    Have a look at the manual Lucent Technologies DEFINITY Enterprise Communication Server Release 8.2 Installation And Test For Multi-Carrier Cabinets Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 413 Lucent Technologies manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.

    Page
    of 467
    							DEFINITY ECS Release 8.2 Installation and Test
    for Multi-Carrier Cabinets  555-233-114  Issue 1
    April 2000
    Install and Connect Cabinets 
    1-31 Fiber Optic Interconnect Cabling 
    1
    Figure 1-13. High-Reliability CSS-Connected with 1 Switch Node
    Critical Reliability
    Fi g u re  1 - 1 4 shows typ ic al fiber op tic  c abling  b etween c ab inets. The c ab le 
    b etween p ort slots 1 and 2 on eac h switc h nod e is a metallic  c ab le (H600-278). 
    1. Connec t the 2 g roup s of 1 to 15 c ab les b etween the PPN and  eac h EPN in 
    an alternating  p ort slot ord er: 20, 3; 19, 4; 18, 5; and  so forth. Figure Notes
    1. Cabinet 1 (PPN with 1 Switc h Nod e)
    2. Cabinet 2 throug h 15 (EPN)3. H600-278 Metallic  Cab le
    4. To other EPNs 
    						
    							DEFINITY ECS Release 8.2 Installation and Test
    for Multi-Carrier Cabinets  555-233-114  Issue 1
    April 2000
    Install and Connect Cabinets 
    1-32 Fiber Optic Interconnect Cabling 
    1
    Figure 1-14. Critical-Reliability CSS-Connected with 1 Switch Node
    2. Both c onnec tions from eac h EPN must go to the same slot numb er. For 
    examp le: EPN c ab inet 2, 2A1 to 1E3 and  c ab inet 2, 2B2 to 1D3. Figure Notes
    1. Cabinet 1 (PPN with 1 Dup lex Switc h 
    Node)
    2. Cabinet 2 throug h 16 (EPN)3. H600-278 Metallic  Cab le
    4. To other EPNs 
    						
    							DEFINITY ECS Release 8.2 Installation and Test
    for Multi-Carrier Cabinets  555-233-114  Issue 1
    April 2000
    Install and Connect Cabinets 
    1-33 Earthquake Protection Installation 
    1
    Earthquake Protection Installation
    Install Concrete Floor Mounting 
    1. Position the c ab inet in the exac t p osition it is to oc c up y when the 
    installation is complete.
    2. Insert a p enc il or marker throug h the holes p reviously oc c up ied by the 
    c arriag e b olts (front and  rear) in the b ottom of the c ab inet and  mark the 
    floor d irec tly b eneath eac h hole.
    3. Roll the c ab inet out of the way and  d rill four 1/2-in. (1.27 c m) d iameter 
    holes ab out 1.5 in. (3.8 c m) d eep  at the loc ations marked  in Step  2.
    4. Insert c onc rete floor anc hors (STARR p art numb er 3425) into the holes.
    5. Roll the c ab inet b ac k into p lac e and  alig n the c ab inet holes over the 
    c onc rete floor anc hors.
    6. Ad just the leveling  leg s until the c ab inet is level. See Fi g u re  1 - 1 5
    .
    NOTE:
    If the system is sup plied  with c ab le duc twork, the c ab inets must b e 
    level from front to rear and  from sid e to side. They must b e sq uare 
    with respec t to eac h other to within ± 1/8-in. (0.3 c m).
    7. Sec ure the c ab inet to the floor with the 4 sup p lied 3/8-16 x 4.5-in. (11.4 
    c m) b olts and  four 3/8-in. flat washers.
    8. Rep eat this p roc ed ure for eac h c abinet to b e installed .
    Install Raised Computer Floor Mounting
    1. Position the c ab inet in the exac t p osition it is to oc c up y when the 
    installation is complete.
    2. Insert a p enc il or marker throug h the holes p reviously oc c up ied by the 
    c arriag e b olts (front and  rear) in the b ottom of the c ab inets and  mark the 
    raised  floor p anels direc tly b eneath eac h hole.
    3. Roll the c ab inet out of the way and  d rill 4 holes 5/8-in. (1.6 c m) in d iameter 
    throug h the raised  floor p anels marked in Step  2.
    !CAUTION:
    Take c are while drilling  the holes throug h the raised  floor that the drill 
    b it d oes not p enetrate any c ab les b elow the floor that c ould  c ause 
    d amag e to the c ab le or injury to the installer.
    4. Insert a long  p unc h throug h the holes d rilled  in Step  3 and  mark the 
    c onc rete floor b eneath the raised floor p anels. 
    						
    							DEFINITY ECS Release 8.2 Installation and Test
    for Multi-Carrier Cabinets  555-233-114  Issue 1
    April 2000
    Install and Connect Cabinets 
    1-34 Earthquake Protection Installation 
    1
    5. Remove the raised  floor p anels in whic h the holes were d rilled.
    6. Using  1/2-in. (1.3 c m) anc hor b its, d rill a hole at eac h of the loc ations 
    marked  in Step 4. Stop drilling  when the mark on the sid e of the b it 
    reac hes the floor level.
    7. Insert a c onc rete floor anc hor (STARR part number 3425) into the hole until 
    the mark on the b it reac hes floor level ag ain. Snap  the top  of the anc hor bit 
    off. Rep eat for the remaining  holes.
    Figure 1-15. Earthquake Mounting — Raised Computer Floor
    3/8 inch
    flat washer
    Nut welded
    to frame
    Leveling
    foot
    variable
    height 4inches
    (10.16 cm)
    concrete
    subfloor3/8 - 16
    Concrete floor
    anchor 3/8 - 16
    threaded rod
    raised
    floor
    cab_base CJL 052096 
    						
    							DEFINITY ECS Release 8.2 Installation and Test
    for Multi-Carrier Cabinets  555-233-114  Issue 1
    April 2000
    Install and Connect Cabinets 
    1-35 Earthquake Protection Installation 
    1
    8. A 3/8-16 thread ed  rod  (p art numb er 845557073) is used  to sec ure the 
    c ab inet to eac h c onc rete floor anc hor. See Figure 1-15
    .
    Measure the d istanc e from 1 of the anc hors to the b ottom of the c ab inet. 
    Ad d  1/2-in. (1.3 c m) to this measurement to allow the rod  to b e thread ed  
    into the floor anc hor. Ad d  an ad d itional 1/2-in. (1.3 c m) to allow the rod  to 
    p rotrud e up  throug h the b ottom of the c ab inet. For examp le: if the 
    d istanc e from the floor anc hor to the b ottom of the c ab inet is 10 in. (25 
    c m), c ut the thread ed  rod  11 in. (27.9 c m) long .
    9. When all 4 threaded  rod s are c ut, replac e the raised  floor panels removed  
    in Step  5.
    10. Position the c ab inet over the holes and  ad just the leveling  leg s until the 
    c ab inet is level.
    NOTE:
    If the system is sup plied  with c ab le duc twork, the c ab inets must b e 
    level from front to rear and  from sid e to side. They must b e sq uare 
    with respec t to eac h other to within + -1/8-in. (0.3 c m).
    11. Insert the thread ed  rod s throug h the c ab inet b ottom and  thread  into the 
    c onc rete floor anc hors.
    12. Plac e a 3/8-in. flat washer onto eac h rod . Thread  a 3/8-16 hex nut onto 
    eac h rod  and  tig hten sec urely.
    13. Rep eat this p roc ed ure for eac h c abinet to b e installed  (inc lud ing  the 
    Auxiliary Cabinet and  the Stratum 3 Cloc k Cabinet). 
    						
    							DEFINITY ECS Release 8.2 Installation and Test
    for Multi-Carrier Cabinets  555-233-114  Issue 1
    April 2000
    Install and Connect Cabinets 
    1-36 Earthquake Protection Installation 
    1 
    						
    							Install Telecommunications Cabling 
    2-1 Equipment Room Hardware 
    2
    DEFINITY ECS Release 8.2 Installation and Test
    for Multi-Carrier Cabinets  555-233-114  Issue 1
    April 2000
    2
    Install Telecommunications Cabling 
    Equipment Room Hardware
    SYSTIMAX 110-typ e hardware is used  for the Main Distrib ution Frame (MDF). 
    110-typ e hard ware is availab le in 2 basic  typ es: the 110A and 110P. The 110A 
    req uires less wall sp ac e than the 110P. The 110P inc lud es horizontal and  vertic al 
    c ab le troug hs for manag ing c ross-c onnec t c ab les. The system c onnec ts to the 
    MDF with the sup p lied  B25A 25-p air c ab les. 
    Refer to DEFINITY Communic ations System Generic  1 and  Generic  3 Main 
    Distrib ution Field  Desig n, 555-230-630, for more information.
    Fi g u re  2 - 1
     shows the c ross-c onnec tions for c ommon c irc uit p ac ks. Refer to the 
    fig ure when c ross-c onnec ting  wire pairs to the MDF. 
    						
    							DEFINITY ECS Release 8.2 Installation and Test
    for Multi-Carrier Cabinets  555-233-114  Issue 1
    April 2000
    Install Telecommunications Cabling 
    2-2 Equipment Room Hardware 
    2
    Figure 2-1. Example MDF Connections
    widfccf2 EWS 102798
    4
    1101941322 21120
    51423 3122161524918
    71625817
    Port Tie Trunk Port MET Line
    4
    4 Port Tie Trunk
    w/ E&M Signaling
    Port Data Line 8
    Port Digital 8
    Port BRI 12Port Hybrid 8Port DID 8
    Port Analog
    Port CO 8
    8
    110 19
    413
    22 21120
    5
    1423 3
    12 21 615
    24 918
    716 25 8
    17
    Port Digital
    2416
    DS1Port Analog
    Port Analog 16
    24Port Digital 
    						
    							DEFINITY ECS Release 8.2 Installation and Test
    for Multi-Carrier Cabinets  555-233-114  Issue 1
    April 2000
    Install Telecommunications Cabling 
    2-3 Equipment Room Hardware 
    2
    Cross-Connect Fields
    Eac h MDF c ontains a trunk/auxiliary field  and  a d istribution field . The 
    trunk/auxiliary field c ontains 3 c ross-c onnec t areas:
    1. The green field terminates the network interface leads from the Central 
    Offic e (CO) and  p rovid es the terminals to c ross-c onnec t the leads to the 
    p urp le or yellow field s as req uired . A sing le row of the 110-typ e terminal 
    b loc k c an terminate twenty-four 1-p air, eig ht 3-p air, or twelve 2-p air 
    trunks.
    2. The p urp le field  terminates the trunk c irc uits from the system with 
    WP-90929, List 1 or 3 c onc entrator c ab les. Also, 25-pair c ab les c an b e 
    used  to terminate trunk c irc uits from the system with eac h trunk c irc uit 
    p ac k c onnec ting  to one 25-p air row of the 110-typ e terminal b loc k. Eac h 
    terminal b loc k row c an terminate twenty-four 1-p air, eight 3-p air, or twelve 
    2-p air trunks.
    3. The yellow field  p rovid es c ross-c onnec t terminals for all misc ellaneous 
    lead s from the system, suc h as alarm monitors, emerg enc y transfer relay 
    p ower, and  attend ant c onsole p ower. This field  is used  for emerg enc y 
    transfer wiring , p ag ing eq uipment, music  sourc es, and  so forth.
    The distribution field c ontains 4 cross-connec t areas:
    1. The purple field (port field) terminates 25-pair c ables from the system. 
    Eac h line c irc uit p ac k c onnec ts to one 25-p air row of the 110-typ e terminal 
    b loc k. One 25-p air c ab le is required  for eac h line c irc uit p ac k.
    NOTE:
    This is the c ase exc ept for the 16 p ort analog  c irc uit p ac k and  the 
    MET c irc uit p ac k. The 16-p ort analog  line c irc uit p ac k req uires an 
    ad ap ter c ab le to c onnec t from 1 c onnec tor on the system to 2 
    25-p air c onnec tors on a 110-typ e terminal b loc k. Two MET c irc uit 
    p ac ks req uire a c onc entrator c ab le to c onnec t from 2 c onnec tors on 
    the system to one 25-p air c onnec tor on a 110-type terminal b loc k.
    2. The yellow field  (auxiliary field ) terminates all 25-p air c ab les from the 
    auxiliary c ab inet and  ad junc t eq uip ment c ab inets. The yellow field  is 
    loc ated  in the lower rig ht-hand  c orner of the d istrib ution field .
    3. The white field  (station field ) terminates the station wiring . The white field  
    indic ates 3-p air station c irc uits (8 c irc uits p er 25-p air c ab le) routed  
    throug h a satellite c loset.
    4. The b lue field  (station field ) also terminates station wiring . The b lue field  
    indic ates 3- and /or 4-p air station c irc uits (8 or 6 c irc uits, resp ec tively, p er 
    25-p air c ab le). The fourth p air, of the 4-p air station c irc uit p rovid es ad junc t 
    p ower from the c ross-c onnec t field  on an as-need ed  b asis to terminals 
    within 250 ft (76 m) (wire leng th) of the MDF. 
    						
    							DEFINITY ECS Release 8.2 Installation and Test
    for Multi-Carrier Cabinets  555-233-114  Issue 1
    April 2000
    Install Telecommunications Cabling 
    2-4 Main Distribution Frame 
    2
    Main Distribution Frame
    The MDF is loc ated  d irec tly b ehind  the system c abinet. Fi g u re  2 - 2 shows a 
    typic al installation using 900-p air 110P-typ e terminal b loc ks.
    Figure 2-2. Typical 110A-Type Terminal BlocksFigure Notes
    1. Multicarrier Cab inet
    2. Z113A Cab le Slac k Manag er
    3. 25-Pair Cab le to System Cab inet
    4. Station Cab les5. Station Distrib ution Field
    6. Port Distribution Field
    7. Trunk/Auxiliary Field
    mccmdf KLC 060596 
    						