    Have a look at the manual Lucent Technologies DEFINITY Enterprise Communication Server Release 8.2 Installation And Test For Multi-Carrier Cabinets Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 413 Lucent Technologies manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.

    Page
    of 467
    							Install and Connect Cabinets 
    1-1 Unpack and Inspect Cabinets 
    1
    DEFINITY ECS Release 8.2 Installation and Test
    for Multi-Carrier Cabinets  555-233-114  Issue 1
    April 2000
    1
    Install and Connect Cabinets
    This c hapter d isc usses installation of Multic arrier Cab inets only. For information 
    on Sing le-Carrier Cab inets, refer to DEFINITY Enterp rise Communic ations Server 
    Release 8 Installation and  Test for Sing le-Carrier Cab inets.
    Floor p lans and  eq uip ment layouts for typic al system installations are p rovid ed  in 
    DEFINITY Enterp rise Communic ations Server Release 8 System Desc rip tion.
    Unpack and Inspect Cabinets 
    Perform these step s for all c abinets.
    !DANGER:
    A c ab inet may weig h as muc h as 800 lb  (363 kg ) and  may b e top  heavy. 
    Use extreme c aution.
    1. Chec k the status of the SHOCKWATCH and /or TILTWATCH ind ic ators on 
    the c ontainer. If the c ontainer has b een shaken or tilted  b eyond  
    sp ec ific ations, the ind ic ators are red , indic ating p otential damag e. Rep ort 
    any damage according to local shipping instructions.
    !DANGER:
    Take c are to avoid  injury while c utting  and  removing  the 2 metal b and s.
    2. Unpack the cabinet and remove all packing material. 
    3. Move the c ab inets into their p rop er p ositions. 
    4. Do not ad just the leveling  ft at this time. 
    						
    							DEFINITY ECS Release 8.2 Installation and Test
    for Multi-Carrier Cabinets  555-233-114  Issue 1
    April 2000
    Install and Connect Cabinets 
    1-2 Check Customer’s Order 
    1
    Unpack and Inspect Auxiliary Cabinet
    The Auxiliary c ab inet is normally p ositioned  ad jac ent to the PPN c ab inet or the 
    EPN c ab inet, if p rovid ed. 
    1. Unp ac k the c ab inets as outlined on the p revious p ag e.
    2. Remove the lower rear p anel from the Auxiliary c ab inet. Install the lower 
    rear panel when the installation is c omp leted .
    Unpack and Inspect Stratum 3 Clock Cabinet
    1. Chec k the status of the SHOCKWATCH and /or TILTWATCH ind ic ators on 
    the c ardb oard  c ontainer. If the c ontainer has b een jarred  or tilted  b eyond  
    specifications, the indicators are red, indicating possible damage.
    2. Remove all packing material.
    3. Remove front d oor and  rear sc rew-on p anels from the c ab inet.
    4. Inspect the cabinet for damage. Report any damage per local 
    instruc tions.
    Check Customer’s Order
    1.Chec k the c ustomer’s order and  the ship ping  p ac king  lists to c onfirm all 
    eq uip ment is p resent. If any eq uip ment is missing , report the information 
    to your Luc ent Tec hnolog ies rep resentative. 
    2. Ensure all c irc uit pac ks are fully inserted  into the prop er slots ac c ord ing  to 
    the Customer Servic e Doc ument (CSD). Rep ort any d isc rep anc ies in 
    c irc uit p ac k typ e or q uantity to your Luc ent Tec hnolog ies rep resentative.
    3. Chec k the system ad junc ts for d amag e and  rep ort all d amag e ac c ord ing 
    to loc al ship p ing  instruc tions.
    Correcting Shipping Errors
    1. Red-tag all defective equipment and over-shipped equipment and return 
    p er the nearest Material Stoc king  Loc ation (MSL) instruc tions. For 
    international c ustomers, c ontac t your ord er servic e ag ent.
    2. Direc t all short-ship p ed  reports to the nearest MSL. Contac t the 
    ap p rop riate loc ation for sp ec ific  instruc tions. For Streamlined  
    Imp lementation in the United  States, c all 1-800-772-5409. 
    						
    							DEFINITY ECS Release 8.2 Installation and Test
    for Multi-Carrier Cabinets  555-233-114  Issue 1
    April 2000
    Install and Connect Cabinets 
    1-3 Install System Cabinets 
    1
    Install System Cabinets
    Chec k the loc ation of the AC p ower rec eptac les in the eq uip ment room. The 
    rec ep tac les must b e on a separately fused  circuit not controlled b y a wall switch. 
    They must b e loc ated  within 10 ft (3 m) of the c ab inet and  outsid e the Main 
    Distrib ution Frame (MDF) area.
    Position the PPN Cabinet
    1. If the system is sup p lied  with c ab le d uc twork, sp ac e the c ab inets on 32 in. 
    (81.3 c m) c enters + -1/8 in. (0.3 c m), they must b e level, and  must b e 
    sq uare with resp ec t to eac h other.
    2. If the system is supplied with cable slack managers, place the cabinets far 
    enoug h from the c onnec tion field  to lay down the 32 in. (81.3 c m) slac k 
    manag ers and  to p rovid e a little extra room for the c ab les to ac c ess the 
    cab le slack manag ers.
    3. If earthquake p rotec tion is req uired , skip  to ‘‘
    Earthq uake Protec tion 
    Installation’’ on p age 1-33.
    4. If earthq uake p rotec tion is not req uired , level the c ab inets and ad just and  
    loc k the c ab inet stab ilizing  bolts to keep  the c ab inet from moving .
    5. At the bottom of the c ab inet, install hole p lug s (p rovid ed  with c ab inet) in 
    the holes p reviously oc c up ied  b y the 4 c arriag e b olts.
    Position the EPN Cabinets
    Eac h EPN c ab inet is normally p ositioned  ad jac ent to the PPN c ab inet b ut may be 
    loc ated  remotely in a d ifferent room or a d ifferent build ing .
    1. The p roc ed ure for installing  an EPN c ab inet is the same as for the PPN 
    c ab inet.
    2. If earthquake p rotec tion is req uired , skip  to ‘‘
    Earthq uake Protec tion 
    Installation’’ on p age 1-33.
    3. If earthq uake p rotec tion is not req uired , level the c ab inets and ad just and  
    loc k the c ab inet stab ilizing  bolts to keep  the c ab inets from moving .
    NOTE:
    To install a new EPN c ab inet to an existing system, refer to DEFINTY 
    Enterprise Communic ations Server Release 8 Up g rad es and  
    Ad ditions for R8r. 
    						
    							DEFINITY ECS Release 8.2 Installation and Test
    for Multi-Carrier Cabinets  555-233-114  Issue 1
    April 2000
    Install and Connect Cabinets 
    1-4 Install System Cabinets 
    1
    Position the Auxiliary Cabinet (Optional)
    1. Position the Auxiliary c ab inet next to the PPN c abinet (or EPN c ab inet, if 
    installed ). The loc ation of eq uip ment inside the Auxiliary c ab inet is 
    sp ec ified  in the Customer Servic e Doc ument (CSD).
    2. If earthquake p rotec tion is req uired , skip  to ‘‘
    Earthq uake Protec tion 
    Installation’’ on p age 1-33. Return to this sec tion when finished .
    3. If earthq uake p rotec tion is not req uired , level the c ab inets and ad just and  
    loc k the c ab inet stab ilizing  bolts to keep  the c ab inet from moving .
    Install Auxiliary Cabinet Equipment
    The Auxiliary c ab inet allows for c arrier, 23-in. (58.4 c m) rac k, or p anel mounting  
    of hard ware. The following  equip ment is furnished with the c ab inet. 
    nFuse panel — Distributes -48 VDC p ower to fused  c ab inet c irc uits
    nPower receptacle strip — Provid es switc hed  and  unswitc hed  120 
    VA C  r e c e p t a c l e s
    nDC c onnec tor b loc k — Req uired  when Auxiliary c ab inet is 
    powered by an external DC source
    nAC to DC power sup p ly — Converts AC p ower p rovid ed by the AC 
    p ower strip  switc hed  outlet to the req uired  DC voltag e
    1. Install eq uip ment insid e the c ab inet as sp ec ified in the CSD. The following  
    op tional equip ment c an b e installed :
    nAud ic hron H9040 Wake-Up  Announc ement System
    n909A/B Universal Coup ler
    n7400 Series Data Mod ules
    nZ77A Multip le Data Mounting  
    nFan Assemb ly — Requires 120 volt AC power
    nCOMSPHERE 3000-series mod ems
    nExternal Channel Servic e Unit (CSU) — 1 is req uired  for eac h T1 
    c arrier link
    nPa g e Pa c  Pa g in g  Sys t e m  — 3 mod els are availab le. All Pag ePac  
    mod els require 120 VAC power.
    nMod el 15A Announc ement System — See Ta b l e  1 - 1 for PEC 
    codes. 
    						
    							DEFINITY ECS Release 8.2 Installation and Test
    for Multi-Carrier Cabinets  555-233-114  Issue 1
    April 2000
    Install and Connect Cabinets 
    1-5 Install System Cabinets 
    1
    The BLD1 c irc uit p ac k p rovid es 8 c hannels with up  to 20 sec ond s of 
    rec ord ing  time on eac h c hannel. The BLD2 c irc uit p ac k provid es 8 
    c hannels with up  to 40 sec ond s of rec ording  time on eac h c hannel. Eac h 
    c hassis c an b e p op ulated  with any c omb ination of 2 BLD c irc uit p ac ks.
    The Model 15A Announc ement System is FCC registered and  d oes not 
    req uire a voic e c oup ler.
    2. If earthquake p rotec tion is req uired , skip  to ‘‘
    Earthq uake Protec tion 
    Installation’’ on p age 1-33.
    Install and Position Stratum 3 Clock Cabinet
    Chec k the loc ation of the AC p ower rec eptac le. The rec eptac le must b e on a 
    sep arately fused  c irc uit that is not c ontrolled  b y a wall switc h. It must b e loc ated  
    within 10 ft (3 m) of the c ab inet and  should  b e loc ated  outsid e the MDF area.
    1. Position the c loc k c ab inet in the d esig nated  loc ation. 
    2. If earthquake p rotec tion is req uired , skip  to ‘‘
    Earthq uake Protec tion 
    Installation’’ on p age 1-33.
    3. If earthq uake p rotec tion is not req uired , level the c ab inets and ad just and  
    loc k the c ab inet stab ilizing  bolts to keep  the c ab inet from moving .
    Table 1-1. Model 15A Announcement Equipment
    PEC Code Description
    PEC 63240 1 c hassis and  1 BLD1 c irc uit p ac k
    PEC 63241 1 BLD1 c irc uit p ac k
    PEC 63242 1 c hassis and  1 BLD2 c irc uit p ac k
    PEC 63243 1 BLD2 c irc uit p ac k
    PEC 63246 1 remote rec ord  mod ule 
    						
    							DEFINITY ECS Release 8.2 Installation and Test
    for Multi-Carrier Cabinets  555-233-114  Issue 1
    April 2000
    Install and Connect Cabinets 
    1-6 Connect AC Power and Ground 
    1
    Connect AC Power and Ground
    Power Requirements
    Tab le 1-2 shows the p ower req uirements. 
    J58890CE-1, J58890CE-2, and J58890CH-1
    The following proc ed ures app ly to the AC-powered  PPN and  EPN c ab inets. 
    Either of the following  p ower sourc es c an supp ly 60 Hz p ower to the AC load  in 
    Release 5 and later systems: 
    nSing le-p hase, 4-wire, 120/240 VAC sup p lying  240 VAC. This sourc e has 2 
    hot wires, 1 g round  wire, and 1 neutral wire (J58890CE).
    nSing le-p hase, 4-wire, 120/208 VAC sup p lying  208 VAC. This sourc e has 2 
    hot wires, 1 g round  wire, and 1 neutral wire (J58890CE).
    nSing le-p hase, 3-wire, 208 or 240 VAC. This sourc e has 2 hot wires and  1 
    g round  wire (J58890CH).
    Either of the following  p ower sourc es c an supp ly 50 Hz p ower to the AC load  in 
    Release 5 and later systems:
    nNon-United  States 5-wire, Y, 220/380 VAC. This sourc e has 3 hot wires, 1 
    neutral wire, and  1 g round  wire.
    nNon-United  States Delta, 4-wire, 220 or 240 VAC. This sourc e has 3 hot 
    wires and  1 g round  wire.
    Table 1-2. DEFINITY System Power Requirements
    Maximum DEFINITY UL Rating Label Power Capacity
    Va c  I
    nIac I
    nMax W I
    nBTU/Hr
    208 24 3245 11071.26
    240 21 3276 11177.71
    120 40 3120 10645.44 
    						
    							DEFINITY ECS Release 8.2 Installation and Test
    for Multi-Carrier Cabinets  555-233-114  Issue 1
    April 2000
    Install and Connect Cabinets 
    1-7 Connect AC Power and Ground 
    1
    Tab le 1-3 describes the power sources and required AC input power.
    NOTE:
    The typ e of p ower req uired  is shown on the c ab inet’s rear d oor.
    !CAUTION:
    The eq uip ment room AC power and ground  wiring  must b e p erformed  b y a 
    q ualified  elec tric ian. Refer to DEFINITY Enterp rise Communic ations Server 
    Release 8 System Desc rip tion Poc ket Referenc e, for site req uirement 
    information.
    !CAUTION:
    The p ower c irc uit must b e d ed ic ated  to the system and  must not b e shared  
    with other eq uip ment and  must not b e c ontrolled  b y a wall switc h. The AC 
    rec ep tac le should  not b e loc ated  und er the MDF.
    !CAUTION:
    System g rounding  must c omp ly with the g eneral rules for g round ing  
    c ontained  in Artic le 250 of the National Elec tric al Cod e (NEC), National Fire 
    Protec tion Ag enc y (NFPA) 70, or the ap p lic ab le elec tric  c od e in the c ountry 
    c ontaining  the eq uip ment. For more information, refer to ‘‘
    Approved 
    Ground s’’ on page 1-22.
    Table 1-3. AC Power Sources and Plug Type
    Power Distribution 
    Unit Power Sources Power Input
    AC power distribution 
    (J58890CE-1 and 
    J58890CE-2) 
    Multicarrier Cab inetSing le p hase 120 VAC 
    with neutral 
    Sing le p hase 240 VAC 
    with neutral, or sing le 
    phase of 3-phase, 208 
    VAC with neutral120 VAC, 60 Hz NEMA 
    5-50R
    208/240 VAC, 60 Hz NEMA 
    L14-30R 
    AC power distribution 
    (J58890CH-1) 
    Multicarrier Cab inetSing le Phase 176-264 
    VA C  200-240 Volts, 50-60 Hz 
    NEMA L6-30R. Installations 
    outsid e the United  States 
    require a receptacle 
    suitab le for use in the 
    c ountry of installation.  
    						
    							DEFINITY ECS Release 8.2 Installation and Test
    for Multi-Carrier Cabinets  555-233-114  Issue 1
    April 2000
    Install and Connect Cabinets 
    1-8 Connect AC Power and Ground 
    1
    Connect Ground to AC-Powered System
    (J58890CE)
    Ground ing  is relatively simp le for an AC-p owered  system. Basic ally, the c ab inets 
    c onnec t to the sing le-p oint g round  terminal bloc k loc ated  at either the AC load  
    c enter or to a separate sing le-point g round  b loc k wired  to the AC load  c enter (or 
    op tional AC p rotec tor c ab inet). 
    nThe ap p roved  g round  wire must b e a g reen (or g reen with yellow strip e), 6 
    AWG (#40) (16 mm2), c op p er, strand ed  wire.
    nBond  all ap p roved  g round s at the sing le-p oint ground  to form a sing le 
    g round ing elec trod e system.
    AC Load Center is 50 ft (15.2 m) or Less from 
    Cabinet
    1. At the bottom rear of the PPN c ab inet, c onnec t a 6 AWG (#40) (16 mm2) 
    CABINET GROUND wire to the c ab inet g round  terminal b loc k. See 
    Fi g u re  1 - 1
    .
    2. Route the CABINET GROUND wire to the sing le-point g round  b loc k at the 
    AC load  c enter and  c onnec t.
    3. At the bottom rear of the first EPN c ab inet (if p rovid ed ), c onnec t a 6 AWG 
    (#40) (16 mm
    2) CABINET GROUND wire to the c ab inet g round  terminal 
    block.
    4. Route the CABINET GROUND wire to the sing le-point g round  b loc k at the 
    AC load  c enter and  c onnec t.
    NOTE:
    If the EPN c ab inet is loc ated  remote from the PPN c ab inet (in a 
    sep arate room or build ing ), c onnec t the CABINET GROUND wire to 
    an ap p roved  ground. 
    						
    							DEFINITY ECS Release 8.2 Installation and Test
    for Multi-Carrier Cabinets  555-233-114  Issue 1
    April 2000
    Install and Connect Cabinets 
    1-9 Connect AC Power and Ground 
    1
    Figure 1-1. Typical Cabinet Ground Location
    5. Rep eat c onnec ting  eac h EPN c ab inet to the sing le-p oint g round bloc k.
    6. At the AC load c enter, c onnec t a 10 AWG (#25) (6 mm
    2) wire to the 
    sing le-p oint g round  b loc k. This g round  wire will later b e tie-wrap p ed  to the 
    trunk c ab les and  c onnec ted  to the Coupled  Bond ing  Cond uc tor (CBC) 
    g round  b loc k at the MDF. Figure Notes
    1. PPN Cab inet
    2. EPN Cab inet (if Installed )
    3. 6 AWG (#40) (16 mm
    2) CABINET GROUND 
    Wi re
    4. Cabinet Ground  Terminal Bloc k5. AC Load  Center 
    Single-Point Ground
    6. Less than 50 Wire ft 
    (15.2 m)
    7. 10 AWG (#25) (6 mm
    2) 
    Ground  Wire to CBC
    widmgrnd LJK 092697
    122
    333
    444
    5
    6
    7 
    						
    							DEFINITY ECS Release 8.2 Installation and Test
    for Multi-Carrier Cabinets  555-233-114  Issue 1
    April 2000
    Install and Connect Cabinets 
    1-10 Connect AC Power and Ground 
    1
    AC Load Center is More Than 50 ft (15.2 m) from 
    Cabinet
    1. Mount the sing le-p oint ground b loc k to any surfac e b etween the MCC 
    c ab inets and  the AC load  c enter sing le-p oint g round . The sing le-p oint 
    g round  b loc k must b e mounted  to a non-metallic  surfac e.
    2. At the bottom rear of the PPN c ab inet, c onnec t a 6 AWG (#40) (16 mm
    2) 
    CABINET GROUND wire to the c ab inet g round  b loc k. See Fi g u re  1 - 2
    .
    3. Route the wire to the sing le-p oint ground  b loc k and  c onnec t.
    4. At the first EPN c abinet (if p rovid ed ), c onnec t a 6 AWG (#40) (16 mm
    2) 
    CABINET GROUND wire to the c ab inet g round  terminal b loc k.
    5. Route the CABINET GROUND wire to the sing le-p oint g round  b loc k and  
    c onnec t.
    NOTE:
    If the EPN c ab inet is loc ated  remote from the PPN c ab inet (in a 
    sep arate room or build ing ), route the EPN CABINET GROUND wire 
    to an ap p roved  g round .
    6. Rep eat c onnec ting  eac h EPN c ab inet to the sing le-p oint g round bloc k.
    7. Connect a 6 AWG (#40) (16 mm
    2) g round  wire to an unused  terminal on 
    the single-point ground block.
    8. Route the ground wire to the AC load  c enter g round  and  c onnec t. 
    						