Home
>
Lucent Technologies
>
Communications System
>
Lucent Technologies DEFINITY Enterprise Communication Server Release 8.2 Installation And Test For Multi-Carrier Cabinets Manual
Lucent Technologies DEFINITY Enterprise Communication Server Release 8.2 Installation And Test For Multi-Carrier Cabinets Manual
Have a look at the manual Lucent Technologies DEFINITY Enterprise Communication Server Release 8.2 Installation And Test For Multi-Carrier Cabinets Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 413 Lucent Technologies manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.
Install and Connect Cabinets 1-1 Unpack and Inspect Cabinets 1 DEFINITY ECS Release 8.2 Installation and Test for Multi-Carrier Cabinets 555-233-114 Issue 1 April 2000 1 Install and Connect Cabinets This c hapter d isc usses installation of Multic arrier Cab inets only. For information on Sing le-Carrier Cab inets, refer to DEFINITY Enterp rise Communic ations Server Release 8 Installation and Test for Sing le-Carrier Cab inets. Floor p lans and eq uip ment layouts for typic al system installations are p rovid ed in DEFINITY Enterp rise Communic ations Server Release 8 System Desc rip tion. Unpack and Inspect Cabinets Perform these step s for all c abinets. !DANGER: A c ab inet may weig h as muc h as 800 lb (363 kg ) and may b e top heavy. Use extreme c aution. 1. Chec k the status of the SHOCKWATCH and /or TILTWATCH ind ic ators on the c ontainer. If the c ontainer has b een shaken or tilted b eyond sp ec ific ations, the ind ic ators are red , indic ating p otential damag e. Rep ort any damage according to local shipping instructions. !DANGER: Take c are to avoid injury while c utting and removing the 2 metal b and s. 2. Unpack the cabinet and remove all packing material. 3. Move the c ab inets into their p rop er p ositions. 4. Do not ad just the leveling ft at this time.
DEFINITY ECS Release 8.2 Installation and Test for Multi-Carrier Cabinets 555-233-114 Issue 1 April 2000 Install and Connect Cabinets 1-2 Check Customer’s Order 1 Unpack and Inspect Auxiliary Cabinet The Auxiliary c ab inet is normally p ositioned ad jac ent to the PPN c ab inet or the EPN c ab inet, if p rovid ed. 1. Unp ac k the c ab inets as outlined on the p revious p ag e. 2. Remove the lower rear p anel from the Auxiliary c ab inet. Install the lower rear panel when the installation is c omp leted . Unpack and Inspect Stratum 3 Clock Cabinet 1. Chec k the status of the SHOCKWATCH and /or TILTWATCH ind ic ators on the c ardb oard c ontainer. If the c ontainer has b een jarred or tilted b eyond specifications, the indicators are red, indicating possible damage. 2. Remove all packing material. 3. Remove front d oor and rear sc rew-on p anels from the c ab inet. 4. Inspect the cabinet for damage. Report any damage per local instruc tions. Check Customer’s Order 1.Chec k the c ustomer’s order and the ship ping p ac king lists to c onfirm all eq uip ment is p resent. If any eq uip ment is missing , report the information to your Luc ent Tec hnolog ies rep resentative. 2. Ensure all c irc uit pac ks are fully inserted into the prop er slots ac c ord ing to the Customer Servic e Doc ument (CSD). Rep ort any d isc rep anc ies in c irc uit p ac k typ e or q uantity to your Luc ent Tec hnolog ies rep resentative. 3. Chec k the system ad junc ts for d amag e and rep ort all d amag e ac c ord ing to loc al ship p ing instruc tions. Correcting Shipping Errors 1. Red-tag all defective equipment and over-shipped equipment and return p er the nearest Material Stoc king Loc ation (MSL) instruc tions. For international c ustomers, c ontac t your ord er servic e ag ent. 2. Direc t all short-ship p ed reports to the nearest MSL. Contac t the ap p rop riate loc ation for sp ec ific instruc tions. For Streamlined Imp lementation in the United States, c all 1-800-772-5409.
DEFINITY ECS Release 8.2 Installation and Test for Multi-Carrier Cabinets 555-233-114 Issue 1 April 2000 Install and Connect Cabinets 1-3 Install System Cabinets 1 Install System Cabinets Chec k the loc ation of the AC p ower rec eptac les in the eq uip ment room. The rec ep tac les must b e on a separately fused circuit not controlled b y a wall switch. They must b e loc ated within 10 ft (3 m) of the c ab inet and outsid e the Main Distrib ution Frame (MDF) area. Position the PPN Cabinet 1. If the system is sup p lied with c ab le d uc twork, sp ac e the c ab inets on 32 in. (81.3 c m) c enters + -1/8 in. (0.3 c m), they must b e level, and must b e sq uare with resp ec t to eac h other. 2. If the system is supplied with cable slack managers, place the cabinets far enoug h from the c onnec tion field to lay down the 32 in. (81.3 c m) slac k manag ers and to p rovid e a little extra room for the c ab les to ac c ess the cab le slack manag ers. 3. If earthquake p rotec tion is req uired , skip to ‘‘ Earthq uake Protec tion Installation’’ on p age 1-33. 4. If earthq uake p rotec tion is not req uired , level the c ab inets and ad just and loc k the c ab inet stab ilizing bolts to keep the c ab inet from moving . 5. At the bottom of the c ab inet, install hole p lug s (p rovid ed with c ab inet) in the holes p reviously oc c up ied b y the 4 c arriag e b olts. Position the EPN Cabinets Eac h EPN c ab inet is normally p ositioned ad jac ent to the PPN c ab inet b ut may be loc ated remotely in a d ifferent room or a d ifferent build ing . 1. The p roc ed ure for installing an EPN c ab inet is the same as for the PPN c ab inet. 2. If earthquake p rotec tion is req uired , skip to ‘‘ Earthq uake Protec tion Installation’’ on p age 1-33. 3. If earthq uake p rotec tion is not req uired , level the c ab inets and ad just and loc k the c ab inet stab ilizing bolts to keep the c ab inets from moving . NOTE: To install a new EPN c ab inet to an existing system, refer to DEFINTY Enterprise Communic ations Server Release 8 Up g rad es and Ad ditions for R8r.
DEFINITY ECS Release 8.2 Installation and Test for Multi-Carrier Cabinets 555-233-114 Issue 1 April 2000 Install and Connect Cabinets 1-4 Install System Cabinets 1 Position the Auxiliary Cabinet (Optional) 1. Position the Auxiliary c ab inet next to the PPN c abinet (or EPN c ab inet, if installed ). The loc ation of eq uip ment inside the Auxiliary c ab inet is sp ec ified in the Customer Servic e Doc ument (CSD). 2. If earthquake p rotec tion is req uired , skip to ‘‘ Earthq uake Protec tion Installation’’ on p age 1-33. Return to this sec tion when finished . 3. If earthq uake p rotec tion is not req uired , level the c ab inets and ad just and loc k the c ab inet stab ilizing bolts to keep the c ab inet from moving . Install Auxiliary Cabinet Equipment The Auxiliary c ab inet allows for c arrier, 23-in. (58.4 c m) rac k, or p anel mounting of hard ware. The following equip ment is furnished with the c ab inet. nFuse panel — Distributes -48 VDC p ower to fused c ab inet c irc uits nPower receptacle strip — Provid es switc hed and unswitc hed 120 VA C r e c e p t a c l e s nDC c onnec tor b loc k — Req uired when Auxiliary c ab inet is powered by an external DC source nAC to DC power sup p ly — Converts AC p ower p rovid ed by the AC p ower strip switc hed outlet to the req uired DC voltag e 1. Install eq uip ment insid e the c ab inet as sp ec ified in the CSD. The following op tional equip ment c an b e installed : nAud ic hron H9040 Wake-Up Announc ement System n909A/B Universal Coup ler n7400 Series Data Mod ules nZ77A Multip le Data Mounting nFan Assemb ly — Requires 120 volt AC power nCOMSPHERE 3000-series mod ems nExternal Channel Servic e Unit (CSU) — 1 is req uired for eac h T1 c arrier link nPa g e Pa c Pa g in g Sys t e m — 3 mod els are availab le. All Pag ePac mod els require 120 VAC power. nMod el 15A Announc ement System — See Ta b l e 1 - 1 for PEC codes.
DEFINITY ECS Release 8.2 Installation and Test for Multi-Carrier Cabinets 555-233-114 Issue 1 April 2000 Install and Connect Cabinets 1-5 Install System Cabinets 1 The BLD1 c irc uit p ac k p rovid es 8 c hannels with up to 20 sec ond s of rec ord ing time on eac h c hannel. The BLD2 c irc uit p ac k provid es 8 c hannels with up to 40 sec ond s of rec ording time on eac h c hannel. Eac h c hassis c an b e p op ulated with any c omb ination of 2 BLD c irc uit p ac ks. The Model 15A Announc ement System is FCC registered and d oes not req uire a voic e c oup ler. 2. If earthquake p rotec tion is req uired , skip to ‘‘ Earthq uake Protec tion Installation’’ on p age 1-33. Install and Position Stratum 3 Clock Cabinet Chec k the loc ation of the AC p ower rec eptac le. The rec eptac le must b e on a sep arately fused c irc uit that is not c ontrolled b y a wall switc h. It must b e loc ated within 10 ft (3 m) of the c ab inet and should b e loc ated outsid e the MDF area. 1. Position the c loc k c ab inet in the d esig nated loc ation. 2. If earthquake p rotec tion is req uired , skip to ‘‘ Earthq uake Protec tion Installation’’ on p age 1-33. 3. If earthq uake p rotec tion is not req uired , level the c ab inets and ad just and loc k the c ab inet stab ilizing bolts to keep the c ab inet from moving . Table 1-1. Model 15A Announcement Equipment PEC Code Description PEC 63240 1 c hassis and 1 BLD1 c irc uit p ac k PEC 63241 1 BLD1 c irc uit p ac k PEC 63242 1 c hassis and 1 BLD2 c irc uit p ac k PEC 63243 1 BLD2 c irc uit p ac k PEC 63246 1 remote rec ord mod ule
DEFINITY ECS Release 8.2 Installation and Test for Multi-Carrier Cabinets 555-233-114 Issue 1 April 2000 Install and Connect Cabinets 1-6 Connect AC Power and Ground 1 Connect AC Power and Ground Power Requirements Tab le 1-2 shows the p ower req uirements. J58890CE-1, J58890CE-2, and J58890CH-1 The following proc ed ures app ly to the AC-powered PPN and EPN c ab inets. Either of the following p ower sourc es c an supp ly 60 Hz p ower to the AC load in Release 5 and later systems: nSing le-p hase, 4-wire, 120/240 VAC sup p lying 240 VAC. This sourc e has 2 hot wires, 1 g round wire, and 1 neutral wire (J58890CE). nSing le-p hase, 4-wire, 120/208 VAC sup p lying 208 VAC. This sourc e has 2 hot wires, 1 g round wire, and 1 neutral wire (J58890CE). nSing le-p hase, 3-wire, 208 or 240 VAC. This sourc e has 2 hot wires and 1 g round wire (J58890CH). Either of the following p ower sourc es c an supp ly 50 Hz p ower to the AC load in Release 5 and later systems: nNon-United States 5-wire, Y, 220/380 VAC. This sourc e has 3 hot wires, 1 neutral wire, and 1 g round wire. nNon-United States Delta, 4-wire, 220 or 240 VAC. This sourc e has 3 hot wires and 1 g round wire. Table 1-2. DEFINITY System Power Requirements Maximum DEFINITY UL Rating Label Power Capacity Va c I nIac I nMax W I nBTU/Hr 208 24 3245 11071.26 240 21 3276 11177.71 120 40 3120 10645.44
DEFINITY ECS Release 8.2 Installation and Test for Multi-Carrier Cabinets 555-233-114 Issue 1 April 2000 Install and Connect Cabinets 1-7 Connect AC Power and Ground 1 Tab le 1-3 describes the power sources and required AC input power. NOTE: The typ e of p ower req uired is shown on the c ab inet’s rear d oor. !CAUTION: The eq uip ment room AC power and ground wiring must b e p erformed b y a q ualified elec tric ian. Refer to DEFINITY Enterp rise Communic ations Server Release 8 System Desc rip tion Poc ket Referenc e, for site req uirement information. !CAUTION: The p ower c irc uit must b e d ed ic ated to the system and must not b e shared with other eq uip ment and must not b e c ontrolled b y a wall switc h. The AC rec ep tac le should not b e loc ated und er the MDF. !CAUTION: System g rounding must c omp ly with the g eneral rules for g round ing c ontained in Artic le 250 of the National Elec tric al Cod e (NEC), National Fire Protec tion Ag enc y (NFPA) 70, or the ap p lic ab le elec tric c od e in the c ountry c ontaining the eq uip ment. For more information, refer to ‘‘ Approved Ground s’’ on page 1-22. Table 1-3. AC Power Sources and Plug Type Power Distribution Unit Power Sources Power Input AC power distribution (J58890CE-1 and J58890CE-2) Multicarrier Cab inetSing le p hase 120 VAC with neutral Sing le p hase 240 VAC with neutral, or sing le phase of 3-phase, 208 VAC with neutral120 VAC, 60 Hz NEMA 5-50R 208/240 VAC, 60 Hz NEMA L14-30R AC power distribution (J58890CH-1) Multicarrier Cab inetSing le Phase 176-264 VA C 200-240 Volts, 50-60 Hz NEMA L6-30R. Installations outsid e the United States require a receptacle suitab le for use in the c ountry of installation.
DEFINITY ECS Release 8.2 Installation and Test for Multi-Carrier Cabinets 555-233-114 Issue 1 April 2000 Install and Connect Cabinets 1-8 Connect AC Power and Ground 1 Connect Ground to AC-Powered System (J58890CE) Ground ing is relatively simp le for an AC-p owered system. Basic ally, the c ab inets c onnec t to the sing le-p oint g round terminal bloc k loc ated at either the AC load c enter or to a separate sing le-point g round b loc k wired to the AC load c enter (or op tional AC p rotec tor c ab inet). nThe ap p roved g round wire must b e a g reen (or g reen with yellow strip e), 6 AWG (#40) (16 mm2), c op p er, strand ed wire. nBond all ap p roved g round s at the sing le-p oint ground to form a sing le g round ing elec trod e system. AC Load Center is 50 ft (15.2 m) or Less from Cabinet 1. At the bottom rear of the PPN c ab inet, c onnec t a 6 AWG (#40) (16 mm2) CABINET GROUND wire to the c ab inet g round terminal b loc k. See Fi g u re 1 - 1 . 2. Route the CABINET GROUND wire to the sing le-point g round b loc k at the AC load c enter and c onnec t. 3. At the bottom rear of the first EPN c ab inet (if p rovid ed ), c onnec t a 6 AWG (#40) (16 mm 2) CABINET GROUND wire to the c ab inet g round terminal block. 4. Route the CABINET GROUND wire to the sing le-point g round b loc k at the AC load c enter and c onnec t. NOTE: If the EPN c ab inet is loc ated remote from the PPN c ab inet (in a sep arate room or build ing ), c onnec t the CABINET GROUND wire to an ap p roved ground.
DEFINITY ECS Release 8.2 Installation and Test for Multi-Carrier Cabinets 555-233-114 Issue 1 April 2000 Install and Connect Cabinets 1-9 Connect AC Power and Ground 1 Figure 1-1. Typical Cabinet Ground Location 5. Rep eat c onnec ting eac h EPN c ab inet to the sing le-p oint g round bloc k. 6. At the AC load c enter, c onnec t a 10 AWG (#25) (6 mm 2) wire to the sing le-p oint g round b loc k. This g round wire will later b e tie-wrap p ed to the trunk c ab les and c onnec ted to the Coupled Bond ing Cond uc tor (CBC) g round b loc k at the MDF. Figure Notes 1. PPN Cab inet 2. EPN Cab inet (if Installed ) 3. 6 AWG (#40) (16 mm 2) CABINET GROUND Wi re 4. Cabinet Ground Terminal Bloc k5. AC Load Center Single-Point Ground 6. Less than 50 Wire ft (15.2 m) 7. 10 AWG (#25) (6 mm 2) Ground Wire to CBC widmgrnd LJK 092697 122 333 444 5 6 7
DEFINITY ECS Release 8.2 Installation and Test for Multi-Carrier Cabinets 555-233-114 Issue 1 April 2000 Install and Connect Cabinets 1-10 Connect AC Power and Ground 1 AC Load Center is More Than 50 ft (15.2 m) from Cabinet 1. Mount the sing le-p oint ground b loc k to any surfac e b etween the MCC c ab inets and the AC load c enter sing le-p oint g round . The sing le-p oint g round b loc k must b e mounted to a non-metallic surfac e. 2. At the bottom rear of the PPN c ab inet, c onnec t a 6 AWG (#40) (16 mm 2) CABINET GROUND wire to the c ab inet g round b loc k. See Fi g u re 1 - 2 . 3. Route the wire to the sing le-p oint ground b loc k and c onnec t. 4. At the first EPN c abinet (if p rovid ed ), c onnec t a 6 AWG (#40) (16 mm 2) CABINET GROUND wire to the c ab inet g round terminal b loc k. 5. Route the CABINET GROUND wire to the sing le-p oint g round b loc k and c onnec t. NOTE: If the EPN c ab inet is loc ated remote from the PPN c ab inet (in a sep arate room or build ing ), route the EPN CABINET GROUND wire to an ap p roved g round . 6. Rep eat c onnec ting eac h EPN c ab inet to the sing le-p oint g round bloc k. 7. Connect a 6 AWG (#40) (16 mm 2) g round wire to an unused terminal on the single-point ground block. 8. Route the ground wire to the AC load c enter g round and c onnec t.