    Have a look at the manual Lucent Technologies DEFINITY Enterprise Communication Server Release 8.2 Installation And Test For Multi-Carrier Cabinets Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 413 Lucent Technologies manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.

    Page
    of 467
    							DEFINITY ECS Release 8.2 Installation and Test
    for Multi-Carrier Cabinets  555-233-114  Issue 1
    April 2000
    Install Telecommunications Cabling 
    2-35 Station Circuit Distribution from Equipment Room 
    2
    The 4-p air station c ab les c an b e run d irec tly from the eq uip ment room to the 
    information outlets if 4-p air terminal b loc ks are used  in the d istrib ution field . See 
    Figure 2-20
    . The station c ables must b e field -terminated  on the 110-typ e terminal 
    blocks.
    Figure 2-20. 4-Pair Run to Equipment Room or Satellite Location Figure Notes:
    1. Station Sid e of MDF or Satellite 
    Loc ation
    2. 4-Pair Circ uit3. Blue Field
    4. DIW Station Cab le (D-Insid e Wire)
    5. Information Outlet
    3
    4
    15
    2
    2
    r764798a CJL 030796 
    						
    							DEFINITY ECS Release 8.2 Installation and Test
    for Multi-Carrier Cabinets  555-233-114  Issue 1
    April 2000
    Install Telecommunications Cabling 
    2-36 Station Circuit Distribution from Equipment Room 
    2
    If 110-type terminal b loc ks are used  with a mod ular p lug -end ed  station c ab le, an 
    ad ap ter c an be c onnec ted  d irec tly to the 110-typ e terminal b loc k c onnec tors. 
    See Fig ure 2-21
    .
    Figure 2-21. 4-Pair Run to Equipment Room or Satellite Location Figure Notes:
    1. Part of MDF
    2. 3-Pair Connec ting  Bloc ks
    3. 4-Pair Connec ting  Bloc ks
    4. Purple Field
    5. Patc h Cord or Cross-Connec t Jump ers
    6. Blue Field7. To System Cab inet (3 pair 
    mod ularity) 
    8. A25D Cab le
    9. 258A or BR2580A Ad ap ter
    10. Information Outlet
    11. 4-Pair Circ uit (DIW station 
    cab le (D-Inside Wire))
    8
    7
    19
    10
    11
    r758532a CJL 031196
    2
    4
    3
    6
    5 
    						
    							DEFINITY ECS Release 8.2 Installation and Test
    for Multi-Carrier Cabinets  555-233-114  Issue 1
    April 2000
    Install Telecommunications Cabling 
    2-37 Station Circuit Distribution from Equipment Room 
    2
    3-Pair to 4-Pair Station Circuit Distribution
    Fi g u re  2 - 2 2 shows the 3-p air c irc uit distrib ution from an eq uipment room MDF to 
    a satellite loc ation using  110-typ e hard ware. Four-p air c irc uits are d istrib uted  
    from the satellite loc ation to the information outlets.
    Figure 2-22. 3-Pair to 4-Pair Satellite Location Connectivity Figure Notes:
    1. Part of MDF
    2. 3-Pair Connec ting  Bloc ks
    3. Purple Field
    4. White Field
    5. Patc h Cord or Cross-Connec t 
    Jump ers
    6. To System Cab inet (3 Pair Mod ularity)
    7. A25D Cab le (3-Pair Circ uits)
    8. B25A Cable9. Connec torized  (stag g ered  fing er) 
    Multip le 25-Pair Cable
    10. 4-Pair Connec ting  Bloc ks
    11. Blue Field
    12. 258A or BR2580A Ad ap ter
    13. Information Outlet
    14. 4-Pair Circ uit [ DIW Station Cab le 
    (D-Insid e Wire)]
    15. Part of Satellite Loc ation
    16. 4-Pair Circ uits (B25A Cab le)
    2
    2
    3
    8
    8
    4
    4
    9
    10
    3
    11
    7
    6
    1
    12
    16
    15
    14
    13 
    						
    							DEFINITY ECS Release 8.2 Installation and Test
    for Multi-Carrier Cabinets  555-233-114  Issue 1
    April 2000
    Install Telecommunications Cabling 
    2-38 Station Circuit Distribution from Equipment Room 
    2
    Three-p air c irc uits c an also b e run direc tly from the eq uip ment room MDF to a 
    356A ad ap ter as shown in Fig ure 2-23
    . Four-p air station c ab les c onnec t the 
    ad ap ter to the information outlets. Four-p air station c ables c an b e run d irec tly 
    from a satellite loc ation to the information outlets as p reviously d esc rib ed .
    Figure 2-23. 3-Pair to 4-Pair Circuit Distribution and Connectivity
    NOTE:
    Brid g ed  tap s are not allowed  on any p art of the station wiring . Figure Notes:
    1. Part of Main Distrib ution Frame (MDF)
    2. 3-Pair Connec ting  Bloc ks
    3. Purple Field
    4. Blue Field
    5. Patc h Cord or Cross-Connec t Jump ers
    6. To System Cab inet (3-Pair Mod ularity)7. B25A Cable
    8. 3-Pair Circuits
    9. 356A Ad ap ter
    10. Information Outlet
    11. 3-Pair Circ uit in 4-Pair Wire
    12. DIW Station Cab le (D-Insid e 
    Wire )
    8
    7
    1
    9
    10
    11
    12
    r758533a CJL 031196
    22
    43
    6
    5 
    						
    							DEFINITY ECS Release 8.2 Installation and Test
    for Multi-Carrier Cabinets  555-233-114  Issue 1
    April 2000
    Install Telecommunications Cabling 
    2-39 Layout 
    2
    Layout
    Locate Information Outlets
    The customer or marketing representative must provide floor plans showing the 
    information outlet loc ations and  typ es (flush- or surfac e-mounted ) req uired . The 
    floor plans must also show a c omplete overview of all c onduit and cabling 
    fac ilities in the b uild ing.
    Locate Satellites and Sites
    Use the following  information when determining  site, satellite, or adap ter 
    loc ations.
    a. Keep  the numb er of loc ations to a minimum.
    b . To minimize the station wiring d istanc es, c entrally loc ate the 
    sites/satellites, or ad ap ters among  the information outlets.
    c . Site/satellite loc ations must b e easily ac c essib le and  c ontain AC-p owered  
    rec ep tac les.
    Adapter Requirements
    One 258A/BR2580A ad ap ter is req uired for eac h 25-pair station c ab le c ontaining  
    4-p air station c irc uits. One 356A ad ap ter is req uired  for eac h 25-p air station 
    c ab le c ontaining  3-p air station c irc uits.
    Hardware Requirements
    Hard ware req uirements are the same as for the eq uip ment room.
    Sizing 4-Pair Station Cables
    Use the sc ale of the floor p lan to d etermine the ap p roximate leng th of the station 
    c ab les req uired  p er the stand ard SYSTIMAX wiring  c onc epts. 
    						
    							DEFINITY ECS Release 8.2 Installation and Test
    for Multi-Carrier Cabinets  555-233-114  Issue 1
    April 2000
    Install Telecommunications Cabling 
    2-40 Layout 
    2
    Sizing 25-Pair and Multiple 25-Pair Station 
    Cables
    Use the sc ale of the floor p lan to d etermine the ap p roximate leng th of eac h 
    25-p air station c ab le. The c ables must b e selec ted and  p rop erly sized  to make 
    maximum use of the hard ware at the equip ment room or satellite loc ation.
    Use 25-p air B25A c ab les to c onnec t ad ap ters d irec tly to the MDF or satellite 
    loc ation. Stag g ered -fing er c ab les, eq uip ped  with fac tory-installed  25-pair 
    c onnec tors at b oth end s, should  b e used  when multip le 25-p air c ab les are used  
    b etween the eq uip ment room or satellite loc ation and  the ad ap ters. B25A c ab les 
    are req uired at the eq uip ment room or satellite loc ation to c onnec t the 
    stag g ered-fing er c ab les to the 110-typ e terminal bloc ks.
    Use the following  information to d etermine the c ab le size (c ab le p airs) req uired  
    for either 3-p air or 4-p air c irc uits. Note the leng th and  size on the floor p lan to aid  
    in the ord ering  and installation of the station c ab les.
    3-Pair Station Cable Circuits
    To d etermine the size of station c ab les c ontaining  3-p air c irc uits, multip ly the 
    numb er of 3-pair c irc uits req uired  at the satellite loc ation b y 3.5. Then, using  the 
    minimum size c ab le req uirement, round  up  the c ab le size req uirement to the next 
    highest available c ab le b und le size. This will p rovid e add itional p airs for g rowth 
    and  c omp ensate for every twenty-fifth p air in a c ab le that is not used .
    4-Pair Station Cable Circuits
    To d etermine the size of station c ab les c ontaining  4-p air c irc uits, find  out how 
    many information outlets are served  b y the eq uip ment room MDF or satellite 
    loc ation MDF. Multiply the numb er of information outlets by 4. Then, using  the 
    minimum size c ab le req uirement, round  up  the c ab le size req uirement to the next 
    highest available c ab le b und le size.
    NOTE:
    This formula may not c omp ensate for the unused  twenty-fifth p air in all 
    c ases. If not, it must b e allowed  for. 
    						
    							DEFINITY ECS Release 8.2 Installation and Test
    for Multi-Carrier Cabinets  555-233-114  Issue 1
    April 2000
    Install Telecommunications Cabling 
    2-41 Voice and Data Terminals 
    2
    Voice and Data Terminals
    The system c an c onnec t to all DTE terminals and  have RS-232 (or EIA-232) or 
    DCP interfac es. Ta b l e  2 - 4
     lists some of the terminals that c an c onnec t to the 
    system. Contac t your Luc ent Tec hnolog ies rep resentative for more information.
    Table 2-4. Voice and Data Terminals
    Station Type Type
    Analog  sets: 
    500, 2500, 7101A, 7103A, 7104A, 8110, DS1SA, and  
    DS1FDAnalog  voic e
    Other Analog  Ports
    1, Wired  Sp are Ports, and  Non-wired  
    Sp are PortsAnalog  voic e
    10MET set — 10 b uttons 
    20MET set — 20 b uttons 
    30MET set — 30 b uttonsVo i c e
    Terminal — 510 BCT 
    Terminal — 515 BCTData
    602A1 Callmaster I
    603A1 Callmaster II
    603D1 Callmaster III
    603E1 Callmaster III
    606A1 Callmaster IVData and  voic e
    Dig ital set — 6402
    Dig ital set — 6408
    Dig ital set — 6408D
    Dig ital set — 6408D+
    Dig ital set — 6416D+
    Dig ital set — 6416D+ w/XM24B exp ansion mod ule
    Dig ital set — 6424D+
    Dig ital set — 6424D+ w/XM24B exp ansion mod uleDig ital voic e
    Voic e/d ata — 6538 Data and  voic e
    Hybrid  set — 7303S
    Hybrid  set — 7305S
    Hybrid  set — 7309H
    Hybrid  set — 7313H
    Hybrid  set — 7314H
    Hybrid  set — 7315H
    Hybrid  set — 7316H
    Hybrid  set — 7317HHyb rid  voic e
    Continued on next page 
    						
    							DEFINITY ECS Release 8.2 Installation and Test
    for Multi-Carrier Cabinets  555-233-114  Issue 1
    April 2000
    Install Telecommunications Cabling 
    2-42 Voice and Data Terminals 
    2
    Dig ital set — 7401D/7401+
    Dig ital set — 7403D
    Dig ital set — 7404D
    Dig ital set — 7404D w/d isp lay
    Dig ital set — 7405D
    Dig ital set — 7405D w/d isp lay
    Dig ital set — 7405D w/c ov
    Dig ital set — 7406D
    Dig ital set — 7406D w/d isp lay
    Dig ital set — 7406+
    Dig ital set — 7406+  w/d isp lay
    Dig ital set — 7407D 
    Dig ital set — 7407+
    Dig ital set — 7410D
    Dig ital set — 7410+
    Dig ital set — 7434D
    Dig ital set — 7434D w/d isp lay
    Dig ital set — 7434D w/c all c overag e mod ule
    Dig ital set — 7444DDig ital voic e
    Dig ital set — 8403B
    Dig ital set — 8405B/B+
    Dig ital set — 8405D/D+
    Dig ital set — 8410B
    Dig ital set — 8410D
    Dig ital set — 8411B
    Dig ital set — 8411D
    Dig ital set — 8434 D
    Dig ital set — 8434 with XM24B Exp ansion Mod ule
    Dig ital set — 9403B
    Dig ital set — 9410D
    Dig ital set — 9434DDig ital voic e
    Basic  attend ant c onsole (302A, 302B)
    Enhanc ed attend ant c onsole (302C)
    Attend ant selec tor c onsole (26B1)Data and  voic e
    ISDN-BRI 
    — 7505D
    — 7506D
    — 7507D
    — 8503D
    — 8510T w/d isp lay
    — 8520T w/d isp layBRI voice
    Wireless 9601A
    2Vo i c e
    Table 2-4. Voice and Data Terminals — Continued
    Station Type Type
    Continued on next page 
    						
    							DEFINITY ECS Release 8.2 Installation and Test
    for Multi-Carrier Cabinets  555-233-114  Issue 1
    April 2000
    Install Telecommunications Cabling 
    2-43 Voice and Data Terminals 
    2
    The following notes ap p ly to the b utton and  d ata mod ule rec ord s in Ta b l e  2 - 4:
    nAny DCP p hone (exc ep t 6400- and  8400-series) c an ad d  a 7400B, 
    req uiring 1 d ata module rec ord .
    nA d ata mod ule c an b e ad d ed  to a 7403D or 7405D, req uiring  1 d ata 
    mod ule rec ord .
    nA d ata mod ule (ADM-T) c an b e ad ded  to a 7505D, 7506D, or 7507D, 
    req uiring 1 d ata module rec ord .
    nAn ISDN-BRI end p oint rec ord  is req uired  for eac h d istinc t ISDN-BRI 
    end p oint. Thus eac h voic e-only, d ata-only, or voic e-d ata end p oint uses 1 
    of these rec ord s. ADJLK
    3
    ADX8D
    ADX16A
    ADX16D
    ASAI
    CP9530
    DIG800
    K2500
    MDC9000
    MDW9000
    PCVo i c e
    VM I
    4
    VM I FD4
    VM I SA4
    VRU5
    VRU FD
    VRU SA
    WC B RI
    105TLVo i c e
    1. Includ es music -on-hold , rec ord ed announc ement, and  loud sp eaker p ag ing .
    2. The rad io c ontroller sup p orts 24 simultaneous calls and  2 wireless fixed b ases.
    3.Need s ASAI interfac e and  ASAI p rop ad junct links turned  on in “ system-p arameters 
    c ustomer op tions.”
    4. Turn on mod e c od e in ” system-p arameters customer op tions.”
    5. Need s DTMF turned  on in “ system-p arameters customer op tions.”
    Table 2-4. Voice and Data Terminals — Continued
    Station Type Type
    Continued on next page 
    						
    							DEFINITY ECS Release 8.2 Installation and Test
    for Multi-Carrier Cabinets  555-233-114  Issue 1
    April 2000
    Install Telecommunications Cabling 
    2-44 Label the Main Distribution Frame 
    2
    Administration Terminals
    Tab le 2-5 lists the ad ministration terminals that c an b e c onnec ted  to the system.
    NOTE:
    The 715 BCS (406803148 and 406803155), has a 6-p in mini-DIN keyb oard 
    c onnec tor. The 2900/715 BCS (4073113881 and  407313899), has a 6-p in 
    RJ-11 keyb oard  jac k loc ated  on the sid e of the terminal.
    Label the Main Distribution Frame
    Fi g u re  2 - 2 4 shows the g rap hic  symb ols used  on labels for the system, 
    c ross-c onnec tions, information outlets, and  c ab les. The lab els are c olor-c od ed  to 
    id entify system wiring :
    nGreen — To Central Offic e (CO)
    nPu r p le  — To system p orts
    nYe l l o w  — To auxiliary eq uip ment and  misc ellaneous system lead s
    nBlue — To information outlets
    nWh i t e  — From Main Distrib ution Frame to satellite loc ations (3-p air)
    Table 2-5. Administration Terminals
    Administration Terminal Application
    510D Remote ad ministration
    610D, 513, 610, 615, 715
    1 BCT, 
    4410, 4425, and  VT220
    1. The keyb oard s and  terminals are interc hangeable when an ad ap ter c able is used .
    Manag ement Terminal: ad ministration and 
    g eneral p urp ose
    515 Business Communic ations 
    Terminal (BCT)Remote ad ministration, g eneral p urp ose
    615 Manag ement Terminal  Manag ement Terminal system 
    ad ministration and  maintenanc e terminal
    715 BCS, 2900/715 BCS, and  715 
    BCS-2 Management TerminalManag ement Terminal system 
    ad ministration and  maintenanc e terminal 
    						