    Have a look at the manual Lucent Technologies DEFINITY Enterprise Communication Server Release 8.2 Installation And Test For Multi-Carrier Cabinets Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 413 Lucent Technologies manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.

    Page
    of 467
    							DEFINITY ECS Release 8.2 Installation and Test
    for Multi-Carrier Cabinets  555-233-114  Issue 1
    April 2000
    Install Telecommunications Cabling 
    2-45 Patch Cord/Jumper Installation and Administration 
    2
    Figure 2-24. Label Graphic Symbols and Nomenclature
    Eac h 110-typ e lab el id entifies 2 rows on the 110-typ e terminal b loc k. The up p er 
    half id entifies the row ab ove it and  the lower half id entifies the row b elow it. The 
    labels are inserted into the c lear p lastic  d esig nation strip s furnished  with the 
    110-typ e terminal b loc ks. The strip  is snap p ed  in p lac e b etween the terminal 
    b loc k rows. Lab el c od e numb er 220A (c omc od e 103970000) c ontains all of the 
    110-typ e lab els.
    Patch Cord/Jumper Installation and 
    Administration
    Before starting  the p atc h c ord  installation, ob tain a c opy of the Port Assig nment 
    Rec ord  forms from the c ustomer or marketing  rep resentative. See Fi g u re  2 - 2 5
    . 
    These forms c ontain the p ort assig nments and id entify the extension numb ers 
    (Te r m i n a l  N o .
    ) of the telephones/voic e terminals. Enter the jac k assig nments at 
    the eq uip ment room and  ind ic ate if ad junc t p ower is req uired  and  where it is 
    p rovid ed (MDF, site/satellite c loset, or information outlet).Figure Notes:
    1. Write Floor or Building  Id entific ation on 
    Lab el
    2. Cab inet
    3. Carrier
    4. Slot5. Information Outlet
    6. Site/Satellite Closet
    7. Tie Circ uit
    8. Floor
    9. Build ing
    r758422i LJK 050996 
    						
    							DEFINITY ECS Release 8.2 Installation and Test
    for Multi-Carrier Cabinets  555-233-114  Issue 1
    April 2000
    Install Telecommunications Cabling 
    2-46 Patch Cord/Jumper Installation and Administration 
    2
    Figure 2-25. Port Assignment Record Form
    When satellite loc ations are p rovid ed , enter the satellite letter desig nation (“ A”  
    throug h “ F” ) and  the jac k ap p earanc e in the eq uip ment room on the form. Also, 
    enter the floor d esig nation and /or b uild ing  d esig nation if ap prop riate. For 1-p oint 
    ad ministration, this entry is all that is req uired. 
    Labeling
    The white lab el id entifying  the terminal b loc k row assoc iated  with c irc uits 17 to 24 
    c onnec ts to an id entic ally lab eled  terminal b loc k row at the satellite c loset. See 
    Fi g u re  2 - 2 6
    . This is always the c ase for either 1-p oint or 2-p oint ad ministration.
    01
    02
    03
    04
    05
    06
    07
    08
    09
    10
    11
    12
    13
    14
    15
    16
    17
    18
    19
    20
    21
    22
    23
    24 Slot
    CKT PK
    Ty p eSlot Port Jack* Old New Type Color Module Power* User Name/Use
    Extension
    NumberVo i c e
    Te r m i n a l Bldg
    Flr
    RmVo i c e
    Terminal
    Adjunct CARRIERPage
    PORT ASSIGNMENT RECORD
    * To be completed by installation technician
    r764787 PDH 071596 
    						
    							DEFINITY ECS Release 8.2 Installation and Test
    for Multi-Carrier Cabinets  555-233-114  Issue 1
    April 2000
    Install Telecommunications Cabling 
    2-47 Patch Cord/Jumper Installation and Administration 
    2
    Figure 2-26. Example 3-Pair Labeling to Information Outlet
    The satellite symb ol must be installed  at all c onnec tion p oints b etween the b lue 
    field  and  the information outlet. It must also be installed  at the information outlet 
    itself.Figure Notes:
    1. Eq uip ment Room
    2. Satellite Loc ation
    3. Work Loc ation
    4. White Row on 110 Terminal Bloc k
    5. Purple Row on 110 Terminal Block
    6. Blue Row on 110 Terminal Bloc k
    7. Central Location for Terminals 1 through 68. D-Insid e Wire Cut Down to 
    Connec ting  Bloc k
    9. 258A Ad ap ter
    10. Information Outlet
    11. Voic e Terminal
    12. To Port Connec tor on Cab inet 
    (Cabinet 1, Carrier A, Slot 03)
    crdf5pr CJL 103096 
    						
    							DEFINITY ECS Release 8.2 Installation and Test
    for Multi-Carrier Cabinets  555-233-114  Issue 1
    April 2000
    Install Telecommunications Cabling 
    2-48 Patch Cord/Jumper Installation and Administration 
    2
    Fi g u re  2 - 2 7 shows an examp le labeling  sc heme for 4-p air c irc uits from the 
    eq uip ment room to the information outlets. The lab eling  sc heme for 3-pair c irc uits 
    from the MDF to a satellite loc ation.
    Figure 2-27. Example 4-Pair Labeling to Information Outlet Figure Notes:
    1. Eq uip ment Room
    2. To Central Loc ation for Terminals 1 throug h 6
    3. Blue Row on 110 Terminal Bloc k
    4. Purple Row on 110 Terminal Block
    5. To Port Connec tor on Cab inet (Cab inet 1, 
    Carrier A, Slot 03)6. 258A Ad ap ter
    7. D-Insid e Wire Cut Down 
    to Connec ting  Bloc k
    8. Information Outlet
    9. Voice Terminal
    crdf4pr CJL 102996 
    						
    							DEFINITY ECS Release 8.2 Installation and Test
    for Multi-Carrier Cabinets  555-233-114  Issue 1
    April 2000
    Install Telecommunications Cabling 
    2-49 Create a Provisioning Plan 
    2
    Create a Provisioning Plan
    Determine an ap p rop riate availab le p ort c irc uit on the system for eac h telep hone, 
    trunk, and  p erip heral c onnec tion need ed , and , in ad d ition, p lan for auxiliary 
    p ower for Basic  Rate Interfac e (BRI) and c ertain d isp lay sets.
    Create a Port Assig nment Rec ord  to inc lud e the following . See Figure 2-25
    .
    nStation or trunk typ e or feature/servic e
    nBuild ing  loc ation (floor/room/d esk/information outlet)
    nExtension numb er or trunk group  and  memb er numb er
    nPort c irc uit loc ation on the system for eac h end p oint (c ab inet/c arrier/ 
    slot/c irc uit)
    nRoute from eq uip ment room throug h eq uip ment c losets to eac h end p oint
    nAuxiliary p ower sup p ly, if req uired 
    						
    							DEFINITY ECS Release 8.2 Installation and Test
    for Multi-Carrier Cabinets  555-233-114  Issue 1
    April 2000
    Install Telecommunications Cabling 
    2-50 Create a Provisioning Plan 
    2 
    						
    							Accessing and Activating the System 
    3-1  
    3
    DEFINITY ECS Release 8.2 Installation and Test
    for Multi-Carrier Cabinets  555-233-114  Issue 1
    April 2000
    3
    Accessing and Activating the System
    This c hapter c ontains p roc ed ures for installing the PC and  b ring ing  the system 
    up  to a “ no red  LEDs”  state. This c hap ter d etails how to:
    nAc cess the System
    nAc tivate the System
    nPower Up  the System
    nSc reens and Command s
    nSystem Administration
    nSet Country Op tions
    nChang e Craft Password
    nSet Date and  Time
    nAd minister System Config urations (Release 8r)
    nAd minister Fib er Links (Release 8r Only)
    nSet System Maintenanc e Parameters
    nSave Translations
    nInitiate DEFINITY AUDIX Power Proc ed ures
    !CAUTION:
    To prevent unnec essary troub le tic kets, d o not enab le the system alarms 
    (Alarm Orig ination feature) b efore c omp leting  all installation and  
    ad ministration p roc ed ures. This c hapter d esc rib es b asic  system start-up  
    procedures only and is not intended to identify all system alarms or error 
    c ond itions. 
    						
    							DEFINITY ECS Release 8.2 Installation and Test
    for Multi-Carrier Cabinets  555-233-114  Issue 1
    April 2000
    Accessing and Activating the System 
    3-2 Access the System 
    3
    Access the System
    To administer the DEFINITY ECS, you must be ab le to ac c ess the system. With 
    Release 7 and  later, the DEFINITY ECS no long er req uires a d ed ic ated  
    manag ement terminal, known as a system ad ministration terminal, or SAT. 
    Personal c omp uters and  tec hnic ian lap top s eq uip p ed  with DEFINITY Site 
    Ad ministration (DSA) or DEFINITY Network Ad ministration (DNA) software are the 
    p rimary supp ort ac c ess for system initialization, aftermarket ad d itions, and  
    ong oing  maintenanc e. For information on DSA or DNA, g o to
    http ://www.b c s.luc ent.c om/sales_market/d efinity. SAT is now an op tion.
    The following sections d escrib e 
    nInstalling  and  using DSA
    nConnec ting  a PC
    Installing and using DSA
    To install DSA, your PC or laptop  must meet the minimum req uirements 
    described in Tab le 3-1
    :
    NOTE:
    For information on DNA, refer to DEFINITY Network Ad ministration 
    Release 2 Installation and  Configuration.
    Table 3-1. Minimum requirements to run DSA
    Op erating  systems:
    MS Wind ows 95
    MS Wind ows 98
    MS Wind ows NT 4.0
    MS Wind ows 2000Pr o c e ss o r / RAM :
    486SL/66/16 MB
    Pentium/32 MB
    Pentium/64 MB
    Pentium-c lass 300 MHz/64 MB
    Grap hic s ad ap ter SVGA with minimum sc reen resolution of 800 x 
    600 
    Floppy disk drive 3-1/2 in. 1.44-MB floppy disk drive
    CD-ROM CD-ROM d rive (req uired  to install DSA from 
    CD)
    Available hard  d isk sp ac e A minimum of 100-MB free hard  d isk sp ac e is 
    req uired . The req uirement for d isk sp ac e 
    d ep end s on the size and  numb er of 
    c onfig uration d ata sets. 
    Continued on next page 
    						
    							DEFINITY ECS Release 8.2 Installation and Test
    for Multi-Carrier Cabinets  555-233-114  Issue 1
    April 2000
    Accessing and Activating the System 
    3-3 Access the System 
    3
    To install DSA on your c omp uter, p lac e the DSA CD in the CD-ROM d rive and  
    follow the installation instructions. To start DSA or DNA, click on Start > 
    Programs > DEFINITY Site Administration
    . 
    DSA sup p orts SAT emulation, whic h is d irec tly eq uivalent to using  the SAT (see 
    Fi g u re  3 - 1
    ). DSA also sup p orts a whole rang e of other features, inc lud ing the 
    g rap hic ally enhanc ed  DEFINITY interfac e (GEDI) (see Fi g u re  3 -2
    ) and  Data 
    Imp ort. For more information refer to the Help , Guid ed  Tour, and Show Me 
    acc essed from the DSA Help menu.Pri n t e r p o rt St a n d a r d  PC  o r n e t w o r k  p r i n t e r  p o r t  is  re q u ir e d  
    for c onnec ting  to a p rinter to p rod uc e station 
    button labels. 
    Network ad ap ter May b e req uired  for network ac c ess to AUDIX 
    and  other network-c onnec ted  systems. 
    Free serial p orts One free serial port c ap able of 9600-b p s 
    op eration is req uired  for a c onnec tion to eac h 
    serial device (ADU, modem, data module) or 
    d irec t c onnec tion to a DEFINITY ECS.
    We rec ommend  that PCs have at least a 
    16550A UART or 16550A UART simulator 
    (c apab le of 56 kbp s DTE-sp eed  c onnec tions). 
    USB and internal modems should  emulate this 
    hardware.
    A sec ond  serial p ort is required  for 
    simultaneous c onnec tion to AUDIX throug h a 
    serial c onnec tion.
    Table 3-1. Minimum requirements to run DSA
    Continued on next page 
    						
    							DEFINITY ECS Release 8.2 Installation and Test
    for Multi-Carrier Cabinets  555-233-114  Issue 1
    April 2000
    Accessing and Activating the System 
    3-4 Access the System 
    3
    Figure 3-1. Typical DSA screen in SAT emulation mode