    Have a look at the manual Lucent Technologies DEFINITY Enterprise Communication Server Release 8.2 Installation And Test For Multi-Carrier Cabinets Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 413 Lucent Technologies manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.

    Page
    of 467
    							DEFINITY ECS Release 8.2 Installation and Test
    for Multi-Carrier Cabinets  555-233-114  Issue 1
    April 2000
    Accessing and Activating the System 
    3-35 Administer Fiber Links (Release 8r Only) 
    3
    9. The DS1CONV Board Type
    : field  is d isplay only and shows the type of 
    DS1 Converter c irc uit p ac k in End p oint-1. The c irc uit p ac k type in 
    Endpoint-1 (A-PNC) and Endpoint-1 (B-PNC) must be the same.
    10. In the Is one endpoint remoted via a DS1 Converter 
    Complex?
     field , enter y
     to sp ec ify that a DS1 Converter c omp lex is used  
    to remote 1 end p oint. If a y 
    is entered , administer the A-PNC DS1 
    Converter Board  Loc ation on Pag e 1. The A-PNC DS1 Converter Board  
    Typ e d isp lays. Ad minister the A-PNC DS1 Converter (DS1CONV) 
    Attrib utes on Pag e 2 of this form.
    11. On Pag e 2 of the form, enter the DS1 Converter Fac ilities information. In 
    the Facility Installed?
     field , enter y
     for all installed  fac ilities (A, B, 
    C, and  D).
    12. In the Bit Rate
    : field, enter 1.544
     for T1 op eration or 2.048
     for E1 
    op eration. 
    NOTE:
    One b it rate ap p lies for all fac ilities within the same DS1 Converter 
    complex. The Bit Rate:
     field displays only under Facility A.
    13. Enter the id le c od e in the Idle Code MSB (1) . . . . LSB (8):
     
    field . The default value is 11101000
    . It is rec ommend ed  that the d efault 
    value b e used  unless it b ec omes ab solutely nec essary to c hang e it. The 
    “ MSB”  means Most Sig nific ant Bit, the “ LSB”  means Least Sig nific ant Bit. 
    14. In the Line Coding: 
    field , enter the line c od ing  information. This 
    information should  matc h the line c od ing  of the fac ility. For T1, examp le 
    line c od ing  is b8zs
    . For E1, examp le line c od ing  is hdb3
    . Sc roll to Pag e 3 
    and  mod ify the field s as needed  for the B-PNC.
    NOTE:
    If this d ata is not c orrec t, wid eb and  errors (suc h as multimed ia c all 
    hand ling ) may oc c ur. 
    15. For T1 sites, refer to ‘‘
    T1 Installations Only’’. For E1 sites, refer to ‘‘E1  
    Installations Only’’.
    T1 Installations Only
    1. The Framing Mode:
     field  is d isp lay only and  shows the hard ware setting .
    2. The DS1CONV-1 Line Compensation:
     and the DS1CONV-2 Line 
    Compensation:
     field s are d isp lay only and  show the hard ware setting . 
    3. In the Facility A Circuit ID:
     field , enter an op tional fac ility name 
    that is uniq ue to eac h fac ility (up  to 40 alp hanumeric  c harac ters). Press 
    En t e r.
    4. A d isp lay similar to the following ap p ears after the fib er link ad ministration 
    is c omp leted : 
    RESET PORT-NETWORK 2 LEVEL 2 (COLD) PERFORMED
    . 
    						
    							DEFINITY ECS Release 8.2 Installation and Test
    for Multi-Carrier Cabinets  555-233-114  Issue 1
    April 2000
    Accessing and Activating the System 
    3-36 Administer Fiber Links (Release 8r Only) 
    3
    E1 Installations Only
    1. Type y
     or n
     in the CRC?
     field . The “ CRC”  means Cyc lic  Red und anc y 
    Chec k. This is an error d etec tion alg orithm.
    2. The Line Termination:
     field  is d isp lay only. A 75 (75 Ohms) or 120 
    (120 Ohms) typ ic ally d isp lays.
    3. In the Facility A Circuit ID:
     field , enter an op tional fac ility name 
    that is uniq ue to eac h fac ility (up  to 40 alp hanumeric  c harac ters). Press 
    En t e r.
    4. A d isp lay similar to the following ap p ears after the fib er link ad ministration 
    is c omp leted : 
    RESET PORT-NETWORK 2 LEVEL 2 (COLD) PERFORMED
    .
    All Installations
    1. When the system reset is finished, type status port-network 2
     and press 
    En t e r. The Port Network Status sc reen ap p ears. Verify that PNC Ac tive is 
    “ up ”  and that the Servic e State is “ in.”  
    2. A Sp an LED, on the front of the DS1 Converter c irc uit p ac k, must b e on for 
    eac h ac tive fac ility ad ministered . For examp le, if Fac ility A and  Fac ility B 
    are ad ministered , then the top  2 Sp an LEDs on the c irc uit p ac k must be on 
    (yellow). The yellow LEDs are on only if no p rob lems were enc ountered  
    d uring the ad ministration of hard ware. Sp an LEDs assoc iated  with 
    non-ad ministered  fac ilities (C and  D, in this example) should  b e off.
    3. Perform a test c all, if d esired .
    Fiber Link Administration Form
    This form ad ministers fib er links, eac h of whic h is identified  b y a fiber numb er.
    NOTE:
    Fib er link ad ministration only ap p lies to R5r and  later c onfig urations.
    Port networks (PNs) are c onnec ted via d irec t fib er link c onnec tions or throug h a 
    c enter stag e switc h (CSS) to p rovid e the interc onnec tion of p ort networks 
    req uired for voic e/d ata information transfer. The CSS is c omp osed  of switc h 
    nod es that c an b e interc onnec ted  in one or two levels to provid e Port Network 
    Connec tivity (PNC). The CSS p rovides c irc uit-switc hed  c onnec tivity for voic e and  
    d ata c ommunic ations as well as pac ket-switc hed  c onnec tivity. Fib er link 
    ad ministration p ermits an ad ministration of translation d ata assoc iated  with a  
    						
    							DEFINITY ECS Release 8.2 Installation and Test
    for Multi-Carrier Cabinets  555-233-114  Issue 1
    April 2000
    Accessing and Activating the System 
    3-37 Administer Fiber Links (Release 8r Only) 
    3
    switc h c onnec tion (suc h as op tic al fiber, metallic  c able, or DS1CONV c irc uit 
    packs and DS1 facility links between two endpoints). The two fiber endpoints can 
    be:
    nAn exp ansion interfac e (EI) c irc uit p ac k
    nA switc h nod e interfac e (SNI) c irc uit p ac k
    NOTE:
    Only one ad ministrative terminal c an ad minister fiber links at a time; 
    others c an d isp lay fib er link information.
    Administration commands
    Use the following  c ommand s to ad minister the Fiber Link Ad ministration form.
    PNCs have three d ifferent reliab ility c onfig urations (one for eac h system reliability 
    configuration) as follows:
    Simplex PNC
    For Simp lex PNC, PNC Dup lic ation is d isab led  on the System-Parameters 
    Customer-Op tions form and  Op eration of Dup lic ation is d isab led  on the 
    Dup lic ation-Related  System-Parameters form.Action Object Qualifier
    1
    1. Brackets [  ]  ind ic ate the q ualifier is op tional. Sing le 
    quotes (‘ ’) indicate the text inside the quote must 
    b e entered  exactly as shown or an ab b reviated 
    form of the word  may b e entered.
    ad d fib er-linklink numb er or [‘next’]
    c hang e fib er-link link numb er
    d isp lay fib er-link link numb er
    list fib er-link link numb er
    remove fib er-link link numb er
    System Configuration PNC
    Stand ard  Reliability Simp lex Fibers
    Hig h Reliab ility Simp lex Fibers to Exp ansion Port Networks and
    Dup lic ated  Fib ers b etween Proc essor Port 
    N e t w o rk s  (PPN )  a n d  Sw it c h  N o d e s
    Critical Reliab ility Dup licated  Fib ers 
    						
    							DEFINITY ECS Release 8.2 Installation and Test
    for Multi-Carrier Cabinets  555-233-114  Issue 1
    April 2000
    Accessing and Activating the System 
    3-38 Administer Fiber Links (Release 8r Only) 
    3
    Administration of PNC Duplication
    The PNC Dup lic ation feature is enab led  on the System-Parameters 
    Customer-Op tions form and  Op eration of Dup lic ation is enab led  on the 
    Dup lic ation-Related  System-Parameters form. When PNC Dup lic ation is enab led  
    on the System-Parameters Customer-Op tions form, the following  ad ministration 
    forms c hang e:
    nCab inet form — Ad d itional field s ap p ear to allow ad ministration of switc h 
    nod es to A-PNC and  B-PNC sid es of the CSS. The B-PNC is the 
    d up lic ated  hard ware for the A-PNC. Either the A-PNC or the B-PNC c an 
    p rovid e full c ustomized  servic e. B-PNC c annot b e used  in a simp lex PNC 
    configuration. Pairing of switc h nodes is also defined here.
    nFi b e r  L i n k  f o r m  — Ad d itional field s ap p ear to allow administration of fib er 
    links on the B-PNC sid e of the CSS. If an end p oint on the A-PNC side is 
    ad ministered  as an SNI, its c orresp ond ing  endp oint on the B-PNC sid e is 
    d etermined  (if switc h nodes are paired  in the c ab inet form p rior to this 
    ad ministration) and  d isp layed . However, ad ministration of the d up lic ate 
    B-PNC link is not enforc ed  until dup lic ation is in full op eration.
    nDup lic ation-Related  System-Parameters form — An ad d itional field  
    ap p ears to enable op eration of PNC d uplic ation.
    Form instructions
    Page 1 of the form
    Screen 3-10. Fiber Link Administration form
    Basic Fiber Link Administration. 
    The following fields appear:
    nFiber Link #
     — Disp lay-only field . From the c ommand  line, enter a 1- to 
    3-d ig it numb er to uniq uely id entify a switc h c onnec tion in the system and 
    its d up lic ate if ap prop riate.
                                                                      Page 1 of 1
                               FIBER LINK ADMINISTRATION         
    Fiber Link #: 1
    Is one endpoint remoted via a DS1 Converter Complex? ___
    ENDPOINT-1                                ENDPOINT-2
                  (A-PNC)                                   (A-PNC)
               Board Location: _____ Board Location: _____
                   Board Type: xxx Board Type: xxx 
    						
    							DEFINITY ECS Release 8.2 Installation and Test
    for Multi-Carrier Cabinets  555-233-114  Issue 1
    April 2000
    Accessing and Activating the System 
    3-39 Administer Fiber Links (Release 8r Only) 
    3
    nBoard Location
     — Enter the c ab inet, c arrier, and  slot that id entifies the 
    p hysic al loc ation of an SNI or EI b oard  that is the first endp oint of the fib er 
    link.
    nBoard Type
     — Disp lay-only field  showing  the typ e of c irc uit p ac k in 
    Endpoint-1.
    nBoard Location
     — Enter the c ab inet, c arrier, and  slot that id entifies the 
    p hysic al loc ation of an SNI or EI b oard  that is the sec ond  end point of the 
    fib er link.
    nBoard Type
     — Disp lay-only field  showing  the typ e of c irc uit p ac k in 
    Endpoint-2.
    nIs one endpoint remoted via a DS1 Converter Complex?
     — En t e r  y
     to 
    sp ec ify that a DS1 Converter c omp lex is used  to remote one end p oint. If a 
    y
     is entered , A-PNC DS1 Converter c irc uit p ac k Loc ation must b e 
    ad ministered  on Pag e 1. A-PNC DS1 Converter c irc uit pac k Typ e d isp lays. 
    A-PNC DS1 Converter (DS1CONV) Attrib utes must b e ad ministered  on 
    Pag e 2 of this form.
    Duplicated Fiber Link Administration. 
    Screen 3-11. Fiber Link Administration form (page 1 of 3)
    The following fields appear when Administration of PNC Duplication
     is 
    enab led  on the System-Parameters Customer-Op tions form:
    nFiber Link #
     — Disp lay-only field . From the c ommand  line, enter a 1- to 
    3-d ig it numb er to uniq uely id entify a switc h c onnec tion in the system and 
    its d up lic ate if ap prop riate.
    add fiber-link next   Page 1 of 3
    FIBER LINK ADMINISTRATION
    Fiber Link #: 1
    Is one endpoint remoted via DS1 Converter Complex? yes
    ENDPOINT-1 ENDPOINT-2
    (A-PNC) (A-PNC)
    Board Location: 01E01  Board Location: 02A01
    Board Type: ei  Board Type: ei
    DS1CONV Board Location: 01B01  DS1CONV Board Location: 02B01
    DS1CONV Board Type: TN574  DS1CONV Board Type: TN574
    ENDPOINT-1 ENDPOINT-2
    (B-PNC) (B-PNC)
    Board Location: 01D01  Board Location: 02A02
    Board Type: ei  Board Type: ei
    DS1CONV Board Location: 01C01  DS1CONV Board Location: 02C01
    DS1CONV Board Type: TN574  DS1CONV Board Type: TN574 
    						
    							DEFINITY ECS Release 8.2 Installation and Test
    for Multi-Carrier Cabinets  555-233-114  Issue 1
    April 2000
    Accessing and Activating the System 
    3-40 Administer Fiber Links (Release 8r Only) 
    3
    nIs one endpoint remoted via DS1 Converter Complex?
     — En t e r  yes
     to 
    sp ec ify that a DS1 c onverter c omp lex is used  to remote one end p oint. If 
    yes
     is entered , A-PNC and  B-PNC DS1 Converter (DS1CONV) Attrib utes 
    must b e ad ministered  on Pag es 2 and  3 (resp ec tively) of the form.
    nBoard Location
     — Enter the c ab inet, c arrier, and  slot that id entifies the 
    p hysic al loc ation of a c irc uit pac k in the first end p oint of the d up lic ate fib er 
    link. End p oint-1’s d up lic ate along  with End p oint-2’s d up lic ate make up  the 
    d up lic ate fib er link c alled  the B-PNC link.
    nBoard Type
     — Disp lay-only field  showing  the typ e of c irc uit p ac k in 
    End p oint-1. The c irc uit p ac k typ e in Endp oint-1 (A-PNC) and  End p oint-1 
    (B-PNC) must be the same.
    nDS1CONV Board Location
     — Enter the c ab inet, c arrier, and  slot that 
    id entifies the p hysic al loc ation of DS1 Converter c irc uit p ac k in the first 
    endpoint of the duplicate fiber link. Endpoint-1’s duplicate along with 
    End p oint-2’s d uplic ate make up  the d up lic ate fib er link c alled  the B-PNC 
    link.
    nDS1CONV Board Type
     — Disp lay-only field showing  the type of DS1 
    Converter c irc uit pac k in End p oint-1. The c irc uit p ac k typ e in Endp oint-1 
    (A-PNC) and  End p oint-1 (B-PNC) must b e the same. This field is upd ated  
    via the Chang e Circ uit-pac ks c ommand.
    nBoard Location
     — Enter the c ab inet, c arrier, and  slot that id entifies the 
    p hysic al loc ation of a c irc uit p ac k in the sec ond  end p oint of the d up lic ate 
    fiber link. Endpoint-2’s duplicate along with Endpoint-1’s duplicate make 
    up  the d up lic ate fib er link c alled  the B-PNC link.
    nBoard Type
     — Disp lay-only field  showing  the typ e of c irc uit p ac k in 
    End p oint-2. The c irc uit p ac k typ e in Endp oint-2 (A-PNC) and  End p oint-2 
    (B-PNC) must be the same.
    nDS1CONV Board Location
     — Enter the c ab inet, c arrier, and  slot that 
    id entifies the p hysic al loc ation of DS1 Converter c irc uit pac k in the sec ond  
    endpoint of the duplicate fiber link. Endpoint-2’s duplicate along with 
    End p oint-1’s d uplic ate make up  the d up lic ate fib er link c alled  the B-PNC 
    link.
    nDS1CONV Board Type
     — Disp lay-only field showing  the type of DS1 
    Converter c irc uit pac k in End p oint-2. The c irc uit p ac k typ e in Endp oint-2 
    (A-PNC) and  End p oint-2 (B-PNC) must b e the same. This field is upd ated  
    via the Chang e Circ uit-pac ks c ommand. 
    						
    							DEFINITY ECS Release 8.2 Installation and Test
    for Multi-Carrier Cabinets  555-233-114  Issue 1
    April 2000
    Accessing and Activating the System 
    3-41 Administer Fiber Links (Release 8r Only) 
    3
    DS1C Converter Complex Administration for TN574 Circuit Packs. 
    Screen 3-12. Fiber Link Administration form for TN574 Circuit Pack (DS1 Converter 
    Complex Administration) (page 2 of 3)
    The following DS1 Converter Comp lex field s ap p ear on Pag e 2 when the Is one 
    endpoint remoted via a DS1 Converter Complex field is y
    .
    NOTE:
    When you ad minister DS1 Converter TN1654 c irc uit p ac ks, d ifferent field s 
    display.
    nDS1CONV Board Location
     — Enter the c ab inet, c arrier, and  slot that 
    id entifies the p hysic al loc ation of the c onverter c irc uit p ac k c onnec ted  to 
    the first end point of the fib er link. This is entered  on Pag e 1 and  d isp lays 
    on Pag e 2.
    nDS1CONV Board Type
     — Disp lay-only field showing  the type of DS1 
    Converter c irc uit pac k for the first end p oint. 
    nDS1CONV Board Location
     — Enter the c ab inet, c arrier, and  slot that 
    id entifies the p hysic al loc ation of the c onverter c irc uit p ac k c onnec ted  to 
    the sec ond end p oint of the fib er link.
    nDS1CONV Board Type
     — Disp lay-only field showing  the type of DS1 
    Converter c irc uit pac k for the sec ond  end point. This field  is up d ated via 
    the Chang e Circ uit-p ac ks c ommand .
    add fiber-link next  Page 2 of 3
     FIBER LINK ADMINISTRATION
    A-PNC DS1 CONVERTER (DS1CONV) ATTRIBUTES
    DS1CONV Board Location: 01B01  DS1CONV Board Location: 02B01
    DS1CONV Board Type: TN574  DS1CONV Board Type: TN574
    DS1 CONVERTER FACILITIES
      ABC D
             Facility Installed? yes  no  no  no
           Passes Far-end Clock? yes  yes  yes  yes
        Digital Data Compatible? yes  yes  yes  yes
                    Line Coding: ami-zcs  ami-zcs ami-zcs ami-zcs
                   Framing Mode: esf esf esf esf
    DS1CONV-1 Line Compensation: 1 1 1 1
    DS1CONV-2 Line Compensation: 1 1 1 1
    Facility A Circuit ID: 09876543 
    						
    							DEFINITY ECS Release 8.2 Installation and Test
    for Multi-Carrier Cabinets  555-233-114  Issue 1
    April 2000
    Accessing and Activating the System 
    3-42 Administer Fiber Links (Release 8r Only) 
    3
    nFacility Installed
     — Enter yes
     in the B, C, and  D c olumns und er the DS1 
    Converter Fac ilities head ing  to ind ic ate that this DS1 fac ility is p hysic ally 
    installed . At least fac ility A must b e installed  within the c onverter c omp lex. 
    Default is yes
     for Fac ility A.
    nPasses Far-end Clock
     — Enter yes
     in the B, C, and  D c olumns und er 
    the DS1 Converter Fac ilities heading  to ind ic ate that this DS1 fac ility is 
    suitab le to b e used  as a c loc k sourc e. If the DS1 sig nal d oes not c ome 
    d irec tly from the far end c onverter c irc uit pac k or the network (suc h as 
    when the sig nal is c onverted  from d ig ital to analog and  then bac k to 
    digital), enter no
    .”  Default is yes
     for Fac ility A.
    This field  d etermines whether the DS1 c onverter c irc uit p ac k c an use 
    rec eive DS1 sig nal timing  to time the transmit fib er sig nal. This is 
    nec essary for p assing  timing  from a master PN to a slave PN ac ross a 
    Converter Comp lex.
    nDigital Data Compatible
     — Enter yes
     (d efault) in the B, C, and D 
    c olumns und er the DS1 Converter Fac ilities head ing  to ind ic ate that this 
    DS1 fac ility is suitab le for transmission of d ig ital d ata. At least Fac ility A 
    must b e suitab le for transmission of d ig ital d ata. If Customer Premises 
    Eq uip ment that alters d ig ital d ata exists on this fac ility (suc h as with a 
    channel exp ansion multip lexer), enter no
    .
    nLine Coding
     — Enter the line c od ing  format, ami-zcs
     (d efault), or 
    ami-basic
    , b8zs
    , or hdb3
     in the A, B, C, and  D c olumns und er the DS1 
    Converter Fac ilities head ing  for eac h DS1 fac ility.
    When ami-zc s line c od ing  is used , all-zero b ytes are p revented  from b eing  
    transmitted  on the DS1 fac ility b ec ause a 1 is arb itrarily written into the 
    sec ond  p osition of eac h b yte. Thus, if no measures are taken to p revent it, 
    ami-zc s line c oding results in data c orruption. The DS1CONV circuit pac k 
    p rotec ts the p ac ket fac ility (one of up to four fac ilities d ynamic ally 
    alloc ated  b y the DS1CONV c irc uit pac k) from c orrup tion throug h a sp ec ial 
    esc ap e mec hanism.
    When b 8zs line c od ing  is used , it maintains DS1 fac ility’s ones-d ensity 
    req uirements by enc od ing  a zero d ata b yte into a sp ec ific  uniq ue p attern 
    of b ip olar violations on the DS1 line. The op p osite end  rec og nizes this 
    p attern and  rep lac es it with a zero d ata b yte when the data is rec overed  at 
    the rec eiving  end .
    NOTE:
    Note that althoug h the esf framing  mod e and  b 8zs line c od ing are 
    the p referab le modes of op eration, you should  c onfirm that the DS1 
    fac ilities sup p ort them b efore selec ting  this line c oding . 
    						
    							DEFINITY ECS Release 8.2 Installation and Test
    for Multi-Carrier Cabinets  555-233-114  Issue 1
    April 2000
    Accessing and Activating the System 
    3-43 Administer Fiber Links (Release 8r Only) 
    3
    nFraming Mode
     — Enter the framing  format, esf
     (d efault) or d4
    , in the A, 
    B, C, and D c olumns und er the DS1 Converter Fac ilities head ing  for eac h 
    DS1 fac ility.
    NOTE:
    The D4 format is sup p orted by the Converter c irc uit p ac ks, b ut 
    b ec ause of p rob lems inherent with this format (sp ec ific ally, inability 
    to frame on a b it stream that c ontains d ata that emulates the D4 
    framing pattern), its use is d isc ourag ed .
    nDS1CONV-1 Line Compensation
     — Enter the line c omp ensation (1
     to 5
    ) 
    in the A, B, C, and  D c olumns und er the DS1 Converter Fac ilities head ing  
    for eac h DS1 fac ility c onnec ted to ENDPOINT-1 (see Ta b l e  3 - 8
    ).
    The DS1 line sig nal is p re-eq ualized  at the transmitter so that DS1 line 
    p ulses are the c orrec t amp litud e and  shap e when they reac h the Network 
    Interfac e. The amount of eq ualization nec essary is d etermined  b y the 
    d istanc e to the Network Interfac e (when the end p oint supp lies a DSX-1 
    interfac e) and  also b y the typ e of wiring  used  to c onnec t to the Network 
    Interfac e. The typ es of wiring  allowed  are 22 g aug e ABAM (shield ed  
    twisted  p air) c ab le, 24 g aug e Premises Distrib ution System (PDS) wiring, 
    and  26 g aug e PDS wiring .
    NOTE:
    The line eq ualization setting  d efaults to 2 and  remains in effec t until 
    c hang ed by administration. Bec ause inc orrec t eq ualizer settings 
    c ause a p otentially hig her error rate on the DS1 fac ility, it is 
    nec essary to p rovid e the c orrec t setting s b ased  on the d istanc e to 
    the Network interfac e.
    If it is a TN574 c irc uit p ac k, the default for all fac ilities is 1
    .
    Table 3-8. Distance to DSX-1 Interface (in feet) 
    Equalizer 
    Setting 22 AWG ABAM & 24 AWG PDS 26 AWG PDS
    1   1 to 133  0 to 90
    2 133 to 266  90 to 180
    3 266 to 399 180 to 270
    4 399 to 533 270 to 360
    5 533 to 655 360 to 450
    Continued on next page 
    						
    							DEFINITY ECS Release 8.2 Installation and Test
    for Multi-Carrier Cabinets  555-233-114  Issue 1
    April 2000
    Accessing and Activating the System 
    3-44 Administer Fiber Links (Release 8r Only) 
    3
    nDS1CONV-2 Line Compensation
     — Enter the line c omp ensation (1
     to 5
    ) 
    in the A, B, C, and  D c olumns und er the DS1 Converter Fac ilities head ing  
    for eac h DS1 fac ility c onnec ted to ENDPOINT-2 (see Ta b l e  3 - 8
    ). The DS1 
    line sig nal is p re-equalized  at the transmitter so that DS1 line p ulses are 
    the c orrec t amp litud e and  shape when they reac h the Network Interfac e. 
    The amount of eq ualization nec essary is d etermined  b y the d istanc e to 
    the Network Interfac e (when the end point sup p lies a DSX-1 interfac e) and  
    also b y the typ e of wiring  used to c onnec t to the Network Interfac e. The 
    types of wiring  allowed  are 22-gaug e ABAM (shield ed  twisted  p air) c ab le, 
    24-g aug e Premises Distrib ution System (PDS) wiring , and  26-g aug e PDS 
    wiring .
    nFacility A Circuit ID — Disp lays when the value in Facility 
    Installed
     for Fac ility A is yes
    . Enter up to 40 c harac ters to id entify the 
    c ab inet, c arrier, and  slot of the DS1 Converter c irc uit p ac k’s p hysic al 
    loc ation. 
    Similarly, Fac ility B Circ uit ID, Fac ility C Circ uit ID, and  Fac ility D Circ uit ID 
    field s display for eac h of the DS1 Converter Fac ilities when yes
     is entered  
    in the c orresp ond ing  Fac ility Installed  field .
    Duplicated DS1C Converter Complex Administration
    for TN574 Circuit Packs. 
    Screen 3-13. Fiber Link Administration form for TN574 Circuit Pack (Duplicated DS1 
    Converter Complex Administration) (page 3 of 3)
    Pag e 3 ap p ears when the Is one end p oint remoted  via a DS1 Converter Comp lex 
    field  is yes
     and d up lic ation is enab led .
    add fiber-link next  Page 3 of 3
     FIBER LINK ADMINISTRATION
    B-PNC DS1 CONVERTER (DS1CONV) ATTRIBUTES
    DS1CONV Board Location: 01C01  DS1CONV Board Location: 02C01
    DS1CONV Board Type: TN574  DS1CONV Board Type: TN574
    DS1 CONVERTER FACILITIES
      ABC D
             Facility Installed? yes  no  no  no
           Passes Far-end Clock? yes  yes  yes  yes
        Digital Data Compatible? yes  yes  yes  yes
                    Line Coding: ami-zcs  ami-zcs ami-zcs ami-zcs
                   Framing Mode: esf esf esf esf
    DS1CONV-1 Line Compensation: 1 1 1 1
    DS1CONV-2 Line Compensation: 1 1 1 1
    Facility B Circuit ID: 01112343 
    						