Have a look at the manual Lucent Technologies DEFINITY Enterprise Communication Server Release 8.2 Installation And Test For Multi-Carrier Cabinets Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 413 Lucent Technologies manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.
DEFINITY ECS Release 8.2 Installation and Test for Multi-Carrier Cabinets 555-233-114 Issue 1 April 2000 Install and Connect Cabinets 1-11 Connect AC Power and Ground 1 Figure 1-2. Typical Cabinet Grounding Wiring Diagram Figure Notes 1. PPN Cab inet 2. EPN Cab inet (if Installed ) 3. 6 AWG (#40) (16 mm 2) CABINET GROUND Wire 4. Sing le-Point Ground Bloc k5. 6 AWG (#40) (16 mm 2) Ground Wire 6. AC Load Center Sing le-Point Ground 7. Over 50 ft (15.2 m) 8. Cab inet Ground Terminal Bloc k 6 122 333 5 widf spgb KLC 100297 74 888
DEFINITY ECS Release 8.2 Installation and Test for Multi-Carrier Cabinets 555-233-114 Issue 1 April 2000 Install and Connect Cabinets 1-12 Connect AC Power and Ground 1 Connect Battery Leads (J58890CH-1) Fi g u re 1 - 3 shows a typ ic al op tional small b attery hold over assemb ly. These assemb lies may ship with the b attery lead s d isc onnec ted to p revent the b atteries from discharging. 1. Plug the b attery c onnec tor into the -48 VDC Batteries c onnec tor on the rear of the J58890CH-1 Power Distrib ution Unit. Figure 1-3. Typical Small Battery Assembly !CAUTION: Power is present in the c ab inet even if the AC p ower c ab le is unp lug g ed . When p roc ed ures require ALL Power to b e removed from the c ab inet and to p revent unnec essary d isc harg ing of the b attery, always p ower d own the c ab inet using the main c irc uit breaker loc ated on the front of the p ower d istrib ution unit. psdfbat b RPY 061797 Battery connector
DEFINITY ECS Release 8.2 Installation and Test for Multi-Carrier Cabinets 555-233-114 Issue 1 April 2000 Install and Connect Cabinets 1-13 Connect AC Power and Ground 1 Figure 1-4. Power Distribution Unit (J58890CH) 2. Be sure the main p ower to the p ower d istrib ution unit is OFF. 3. At the power d istribution unit, set all c arrier c irc uit b reakers OFF. Small Battery Holdover 1. Connec t the small b attery hold over c ab le to J20. See Fi g u re 1 -4. Figure Notes 1. Connec t small battery holdover c ab le (or temperature sensor c ab le from larg e b attery c ab inet) to J20 2. Carrier Circ uit Breakers 3. Ground Terminal Bloc k 4. Connec t -48 VDC Return - 1 AWG (50 mm 2) red cable here. 5. Connec t -48 VDC - 1 AWG (50 mm 2) black cable6. 1 AWG (50 mm 2) 50 ft (15.2 m) c ab le to larg e b attery c ab inet. For c ab les greater than 50 ft (15.2 m), c ontac t your Luc ent Tec hnolog ies rep resentative. 7. Ground Terminal Bloc k 8. To AC load c enter or ap p roved sing le-p oint g round b loc k External Alarms -4 8 V D C R e tu rn Carr ierB A C DEF/G R e m o te Powe r-48VDC Batter ies pcdf010 KLC 020599 1 2 3 4 5 6 7 8
DEFINITY ECS Release 8.2 Installation and Test for Multi-Carrier Cabinets 555-233-114 Issue 1 April 2000 Install and Connect Cabinets 1-14 Connect AC Power and Ground 1 Large Battery Holdover When using larg e b attery hold over, 1 b attery c ab inet is req uired for every system c ab inet req uiring hold over. The 24-c ell b attery c ab inet must have a float voltag e of 54.2 VDC. 1. Connec t the -48 VDC c able to the larg e b attery c onnec tor. See Fi g u re 1 -4 . 2. Connec t the -48 VDC RETURN c ab le to the g round terminal b loc k. 3. Connec t the temperature sensor c ab le, from the b attery c ab inet, to J20. NOTE: An ad apter c ab le may b e req uired when c onnec ting the temp erature sensor c ab le to the J58890CH unit. See Ta b l e 1 - 4 . Connect Shorting Cable to J58890CE-2 !CAUTION: For a c ab inet with a b attery c harg er, read the c aution lab el on the 397C b attery c harg er b efore d isc onnec ting b atteries. Some c ab inets c ontain a J58890CE-2 AC Power Distrib ution Unit without an op tional b attery c harger. Install the shorting c ab le only when a b attery c harg er is not installed . If you d o not install the shorting c ab le or a b attery c harg er, then an alarm ap p ears. Table 1-4. Temperature Sensor Cable Adapter Cables H600-476 Adapter Cable Usage Group 1 (G1) 24-c ell c ustomer-p rovided b attery Group 3 (G3) (included with b attery c ab inet)24-c ell Luc ent Tec hnolog ies battery
DEFINITY ECS Release 8.2 Installation and Test for Multi-Carrier Cabinets 555-233-114 Issue 1 April 2000 Install and Connect Cabinets 1-15 Connect AC Power and Ground 1 Figure 1-5. Shorting Cable Installation 1. Set the c irc uit breakers on the p ower d istrib ution unit OFF. See Fi g u re 1 -5 . 2. At the rear of the c ab inet, insert the shorting c ab le (H600-442-G1) into J11. The c ab le is keyed so it c an fit only 1 way. Connect AC Power 1. Set the main c irc uit b reakers on the p ower d istrib ution unit OFF. 2. Connec t c ab inet AC line c ord s to the AC p ower rec ep tac les. 3. Do not p ower up the system at this time. Figure Notes 1. Shorting Cab le (H600-442-G1) (If Battery Charg er is Not Installed )2. J11
DEFINITY ECS Release 8.2 Installation and Test for Multi-Carrier Cabinets 555-233-114 Issue 1 April 2000 Install and Connect Cabinets 1-16 Connect DC Power and Ground 1 Connect DC Power and Ground Power Distribution Unit (J58890CH-1 Only) Rectifier Modules and Battery Interface Unit Eac h rec tifier mod ule op erates as an integ ral p art of a c omp lete p ower system with b attery b ac kup . The mod ules op erate in a red und ant, hig h reliab ility mod e to p rovid e -48 VDC at 850 Watts to a c ommon p ower b us. The Battery Interfac e Unit (BIU) c ontrols the rec tifier mod ules, manag es the b atteries, and rep orts the status of system power. The BIU p rovid es the Remote Power Off (RPO) op tion and b attery alarm interfac es for internal and external alarms. Figure 1-6. Rectifier Module Installation Figure Notes 1. Install Battery Interfac e Unit into Slot 1 2. Install Rectifier Mod ules into Slots 2-5 3. Rec tifier Mod ule 3 (in Slot 4)4. Test Points 5. Main Circ uit Breakers
DEFINITY ECS Release 8.2 Installation and Test for Multi-Carrier Cabinets 555-233-114 Issue 1 April 2000 Install and Connect Cabinets 1-17 Connect DC Power and Ground 1 1. Install the BU3200A Battery Interfac e Unit (c omc ode 107781502) in the first slot of the p ower d istrib ution unit. See Fig ure 1-6 . NOTE: The BIU and the rec tifier mod ules are keyed and c an only install 1 way. 2. Install the first 2 RM0850HA100 Rec tifier Modules (c omc od e 107793796) into the sec ond and third slots of the p ower d istrib ution unit. 3. If 2 to 3 c arriers are installed in the system, install a third rec tifier mod ule (N+ 1). 4. If 4 to 5 c arriers are installed in the system, install a fourth rec tifier mod ule. 5. The fifth rec tifier mod ule slot is reserved for future system g rowth. Connect Power 1. Have a q ualified elec tric ian c onnec t and route wires from the AC load c enter to the d ed ic ated elec tric al outlet for the power d istribution unit. Connect PPN Cabinet Ground 1. Connec t 1 end of a 6 AWG (#40) (16 mm2) wire to the ground terminal b loc k on the rear of the c ab inet. See Fig ure 1-4 . 2. Route the CABINET GROUND wire to the AC load c enter sing le-p oint g round b loc k and c onnec t. Connect EPN Cabinet Ground(s) 1. Connec t 1 end of a 6 AWG (#40) (16 mm2) CABINET GROUND wire to the g round terminal b loc k at the b ottom rear of the EPN c ab inet. See Fi g u re 1-2. 2. Route the CABINET GROUND wire to the AC load c enter sing le-p oint g round and c onnec t. 3. Connec t eac h remaining EPN c ab inet to the AC load c enter sing le-p oint g round .
DEFINITY ECS Release 8.2 Installation and Test for Multi-Carrier Cabinets 555-233-114 Issue 1 April 2000 Install and Connect Cabinets 1-18 Connect DC Power and Ground 1 DC Power and Ground (J58890CF Only) Fi g u re 1 - 7 shows a typ ic al p ower and g round layout for a DC-powered c ab inet. The size of the wire required for the -48 volt DC and -48 volt return must ensure the voltage sup p lied b y the b attery plant is maintained b etween -42.5 and -54.2 volts DC at all times for p roper op eration and to p revent hard ware d amag e. The wire must b e sized for a maximum voltag e d rop of 0.5 VDC in eac h leg of the DC distribution. This procedure applies to both PPN and EPN cabinets. Figure 1-7. Typical Power and Ground for a DC-Powered Cabinet Ground connection terminal DC battery cabinet Battery + + -- Frame ground 1 AWG -48 V-48 V RTN EPN cabinet 17 -48 V-48 V RTN EPN cabinet n Ground discharge barTo CBC ground terminal bar at the MDF 1 AWG ground wire Approved ground System single point ground Single point ground block 6 AWG 6 AWG 6 AWG 6 AWG 10 AWG DC power from rectifiers cydf_dc KLC 032999 3 1 Main AC supply (AC mains) 4 DC output distribution bus 1 AWG 5 5 51 AWG 7 1 AWG -48 V -48 V RTN PPN cabinet7 1 AWG 1 AWG RTN 75A DC power cabinet 75A circuit breaker 75A 75A 5 5 To n e x t cabinet Rectifiers -48V DC -48V DC 8LV D 2
DEFINITY ECS Release 8.2 Installation and Test for Multi-Carrier Cabinets 555-233-114 Issue 1 April 2000 Install and Connect Cabinets 1-19 Connect DC Power and Ground 1 Connect DC Power and Ground The g round ing method s for the DC-p owered system are more c omp lex than that of an AC-powered system. The following installation p roc ed ures refer to Fig ure 1-7. The numbers 1-8 in Fi g u re 1 -7 matc h the following sub sec tions 1-8. Other fig ures may b e referenc ed as req uired . !CAUTION: Ground ing of the system shall c omp ly with the g eneral rules for g round ing c ontained in Artic le 250 of the National Elec tric al Code, NFPA 70. For more information, refer to ‘‘ Ap p roved Ground s’’ on p age 1-22. 1. Install Coupled Bonding Conductor Wires This is a c ond uc tor that c onnec ts to the sing le-point g round b loc k and run ad jac ent to p airs in an assoc iated c ab le. The mutual c oup ling b etween the CBC and the p airs red uc es p otential d ifferenc es in terminating equip ment. The c ond uc tor c onsists of a 10 AWG (#25) (6 mm 2) wire terminated at the CBC g round terminal b ar at the Main Distrib ution Frame (MDF). 1. At the DC Power Cab inet, c onnec t a 10 AWG (#25) (6 mm 2) ground wire to the Ground Disc harg e Bar. See Fi g u re 1 -7 . 2. Route the 10 AWG (#25) (6 mm 2) ground wire to the CBC g round terminal b ar at the MDF. Be sure a minimum of 12 in. (30.5 c m) sp ac ing is maintained b etween the CBC and other p ower and g round lead s. 3. Tie wrap the g round wire to the insid e wiring c ab le. NOTE: The g round wires are c onnec ted to the CBC as instruc ted in Chap ter 2, ‘‘Install Telec ommunic ations Cab ling’’. 2. Connect DC Battery and Power Cabinet Grounds NOTE: The wire in the next step must b e sized for a maximum voltag e d rop of 0.5 VDC in eac h leg of the DC distrib ution. In this examp le 1 AWG is used . 1. Measure and cut a minimum of a 1 AWG (#70) (44 mm 2) wire long enough to reac h b etween the ground connection t erminal in the DC Battery Cab inet and the Ground Disc harg e Bar in the DC Power Cab inet. See Fi g u re 1 - 7 . 2. Crimp terminal lug s on eac h end of the wire. Terminal lug s are furnished as p art of D-181895, Kit of Parts (c omc od e 105434559).
DEFINITY ECS Release 8.2 Installation and Test for Multi-Carrier Cabinets 555-233-114 Issue 1 April 2000 Install and Connect Cabinets 1-20 Connect DC Power and Ground 1 3. At the DC Power Cab inet, c onnec t the wire to the Ground Disc harg e Bar. 4. Route the wire throug h 1 of the holes in the sid e of the c ab inets and terminate it on the Ground Connec tion Terminal in the DC Battery Cabinet. 3. DC Power Cabinet Approved Ground NOTE: The wire must b e at least as larg e as the larg est d istrib ution wire in the system (req uired b y UL). In this examp le 1 AWG is used . 1. At the DC Power Cab inet, c onnec t a 1 AWG (#70) (44 mm 2) ground wire to the Ground Disc harg e Bar. See Fi g u re 1 -7 . 2. Route the g round wire out of the c ab inet and terminate it on the ap p roved g round . The ap p roved g round must be id entified with a g round ing tag (FORM 15657NR or eq uivalent). See ‘‘ Approved Grounds’’ on pag e 1-22. 4. Connect Main AC Supply to DC Power Cabinet 1. Ensure the assoc iated c irc uit breakers at the AC p ower p anel are OFF . 2. Have a q ualified elec tric ian c onnec t AC power lead s to the rec tifiers in the DC Power Cab inet. Eac h rec tifier should have its own b ranc h c irc uit. Terminate the leads on the AC INPUT terminal b loc k of eac h rec tifier. 5. Connect Ground Wires for DC-Powered Systems !CAUTION: Do not c onnec t any g round wires from an EPN c ab inet to another EPN c ab inet or to a PPN c ab inet. All g round wires must be terminated at the sing le-p oint g round bloc k at the main AC sup p ly (AC mains). 1. Connec t a 6 AWG (#40) (16 mm 2) wire to the PPN c ab inet ground terminal block. 2. Route the wire to the AC mains sing le-p oint g round b loc k and c onnec t. 3. Connect a 6 AWG (#40) (16 mm 2) wire to eac h EPN’s c ab inet g round terminal b loc k. 4. Route the wire(s) to the AC mains sing le-p oint g round bloc k and c onnec t. 5. Connec t a 6 AWG (#40) wire to the DC b attery c abinet and DC p ower c ab inet. 6. Route wires to the AC mains sing le point g round b loc k and c onnec t them.