GE Logiq P5 Service Manual
Have a look at the manual GE Logiq P5 Service Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 45 GE manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.
GE HEALTHCARE DIRECTION 5394141, REVISION 1LOGIQ™ P5 SERVICE MANUAL Section 10-6 - Electrical Safety Tests 10 - 13 10-6-2 GEMS Leakage Current Limits The following limits are summarized for NFPA 99 (For USA) and IEC 60601-1 Medical Equipment Safety Standards. These limits are GEMS standards and in some cases are lower than the above standards listed. NOTE: *Mains Applied refers to the sink leakage test where mains (supply) voltage is applied to the part to determine the am ount of current that will pass (or sink) to ground if a patient contacted mains voltage. The following tests are performed at the factory and sh ould be performed at the site. These tests are: grounding continuity, chassis leakage current, probe leakage current, and ECG leakage current. All measurements are made with an electrical safety an alyzer Model 600/600E built by Dale Technology Corporation or equivalent device. Table 10-14 Chassis Leakage Curre nt Limits—Accessible Metal Surfaces CountryNormal ConditionOpen GroundReverse PolarityOpen Neutral USAN/A 0.3 mA 0.3 mA N/A Other 0.1 mA 0.5 mA 0.5 mA0.5 mA Table 10-15 Type BF Applied Part Leakage Current Limits - Non-Conductive (Floating) Surface and Cavity Probes Country Normal Condition Open GroundReverse PolarityOpen Neutral*Mains Applied USA 0.05 mA 0.05 mA0.05 mA0.05 mA N/A Other 0.1 mA 0.5 mA0.5 mA0.5 mA5.0 mA Table 10-16 Type CF Applied Part Leakag e Current Limits - Surgical Probes and ECG Connections Country Normal Condition Open GroundReverse PolarityOpen Neutral*Mains Applied USA 0.01 mA 0.05mA 0.05 mA N/A 0.025 mA Other 0.01 mA 0.05 mA 0.05 mA 0.05 mA 0.05 mA
GE HEALTHCARE DIRECTION 5394141, REVISION 1LOGIQ™ P5 SERVICE MANUAL 10 - 14 Section 10-6 - Electrical Safety Tests 10-6-3 Outlet Test - Wiring Arrangement - USA & Canada Test all outlets in the area for proper grounding and wiring arrangement by plugging in the neon outlet tester and noting the combination of lights that are illuminated. Any pr oblems found should be reported to the hospital immediately and the receptacle should not be used. The Dale 600 has self-contained lamps designed for testing the outlet wiring arrangement. Plug the Dale 600 into each outlet to be tested comparing the lamp status. NOTE: No outlet tester can detect the condition where the Neutral (grounded supply) conductor and the Grounding (protective earth) conductor are reversed. If later tests indicate high leakage currents, this should be suspected as a possible cause and the outlet wiring should be visually inspected. Figure 10-1 Typical Outlet Tester Figure 10-2 Dale 600 Outlet Test Combination of Lights Condition CORRECT WIRING REVERSE POLARITY OPEN GROUND OPEN HOT HOT/GROUNDREVERSED
GE HEALTHCARE DIRECTION 5394141, REVISION 1LOGIQ™ P5 SERVICE MANUAL Section 10-6 - Electrical Safety Tests 10 - 15 10-6-4 Grounding Continuity Measure the resistance from the third pin of the atta chment plug to the exposed metal parts of the case. The ground wire resistance should be less than 0.2 ohms. reference the procedure in the IEC 601-1.1. 10-6-4-1 Meter Procedure Follow these steps to test the ground wire resistance. 1.) Turn the LOGIQ™ P5 unit OFF. 2.) Plug the unit into the meter, and the meter into the tested AC wall outlet. 3.) Plug the black chassis cable in to the meters “CHASSIS” connecto r and attach the black chassis cable clamp to an exposed metal part of the LOGIQ™ P5 unit. 4.) Set the meters “FUNCTION” swit ch to the RESISTANCE position. 5.) Set the meters “POLARITY” swit ch to the OFF (center) position. 6.) Measure and record the ground wire resistance. CAUTIONElectric Shock Hazard. The patient must not be contacted to the equipment during this test Figure 10-3 Ground Continuity Test
GE HEALTHCARE DIRECTION 5394141, REVISION 1LOGIQ™ P5 SERVICE MANUAL 10 - 16 Section 10-6 - Electrical Safety Tests 10-6-4-2 Dale 600 - Ground Continuity The Dale 600 measures line cord resistance from the third pin of the attachment plug to the meter’s Chassis Cable clamp. Test the grounding continuity of the system to all exposed metal parts in accordance with the IEC 601-1.1 procedure as above. refer to the Dale 600 Instruction Manual for meter self tests and operation. Record measured resist ance of the grounding continuity. The ground wire resistance should be less than 0.2 (Use any safety analyzer.) Figure 10-4 Dale 600 Ground Continuity Test Chassis Cable Clamp Normal Reverse Polarity Neutral Open/Closed Functions Selector Outlet Test Lamps
GE HEALTHCARE DIRECTION 5394141, REVISION 1LOGIQ™ P5 SERVICE MANUAL Section 10-6 - Electrical Safety Tests 10 - 17 10-6-5 Chassis Leakage Current Test 10-6-5-1 Definition This test measures the current t hat would flow in a grounded person who touched accessible metal parts of the bedside station if the ground wire should break. The test ve rifies the isolation of the power line from the chassis. The meter is connected from accessible metal parts of the case to ground. Measurements should be made wi th the unit On and Off, with the power line polarity Normal and Reversed. Record the highest reading. 10-6-5-2 Generic Procedure The test verifies the isolation of the power line from the chassis. The testing meter is connected from accessible metal parts of the case to ground. Meas urements should be made with the unit ON and OFF, with the power line polarity Normal and Reversed. Record the highest reading of current. When using the Microguard or a similar test instrument, its power plug may be inserted into the wall outlet and the equipment under test is plugged into th e receptacle on the panel of the meter. This places the meter in the grounding conductor and the current flowing from the case to ground will be indicated in any of the current ranges. The maximum allowabl e limit for chassis source leakage is shown in Table 10-14 . CAUTIONElectric Shock Hazard. When the meters ground switch is OPEN, dont touch the unit! CAUTIONEquipment damage possibility. Never switch the Polarity and the status of Neutral when the unit is powered ON. Be sure to turn the unit power OFF before switching them using the POLARITY switch and/or the NEUTRAL switch. Otherwise, the unit may be damaged. Figure 10-5 Set Up for Chassis Source Leakage Current, IEC 601-1 Clause 19 - Continuos Leakage Currents and Patient, Auxiliary Currents
GE HEALTHCARE DIRECTION 5394141, REVISION 1LOGIQ™ P5 SERVICE MANUAL 10 - 18 Section 10-6 - Electrical Safety Tests 10-6-5-3 Dale 600 Meter Procedure When measuring system chassis curr ents with the Dale 600, always use the CHASSIS selection of the external/chassis function switch. This requires the ground clip lead and changing the meters switches in accordance with the IEC 601-1.1. refer to the Dale 600 Instruction Manual for meter self-test and operation. Record the highest leakage current measured. Follow these steps to test th e unit for leakage current. 1.) Turn the LOGIQ™ P5 unit OFF. 2.) Plug the unit into the meter, and th e meter into the tested AC wall outlet 3.) Plug the black chassis cable into the meters “CHASSIS” connector and attach the black chassis cable clamp to an exposed metal part of the LOGIQ™ P5. 4.) Set the testers “FUNCTION” switch to CHASSIS position. 5.) Follow the test conditio ns described for respective test points shown in Table 10-17. 6.) Keep a record of the results with other hard copies of PM data kept on site. Figure 10-6 Ground and Chassis Leakage Current Test Table 10-17 Chassis Leakage Current Test Condition TESTCONDITION 1 Mounting screw for probe receptacle 2 caster support 3 Mounting screw for CRT housing 4 Mounting screw for peripheral plugged into unit 5 Mounting screw for other peripheral powered by unit Chassis Cable Clamp Normal Reverse Polarity Neutral Open/Closed Functions Selector Outlet Test Lamps
GE HEALTHCARE DIRECTION 5394141, REVISION 1LOGIQ™ P5 SERVICE MANUAL Section 10-6 - Electrical Safety Tests 10 - 19 10-6-5-4 Data Sheet for Chassis Source Leakage Current The test passes when all readings measure less than the value shown in Table 10-14. Record all data on the PM Inspection Certificate. 10-6-6Isolated Patient Lead (Source) Leakage–Lead to Ground 10-6-6-1 Definition This test measures the current which would flow to ground from any of the isolated ECG leads. The meter simulates a patient who is connected to the monitoring equipment and is grounded by touching some other grounded surface. Measurements should be made with the ground open and closed, with power line polarity normal and reversed, and wit h the ultrasound console Off and On. For each combination the operating controls, such as the lead switch, should be operated to find the worst case condition. Table 10-18 Typical Data Sheet for Chassis Source Leakage Current Unit Power Tester Polarity Switch Tester Neutral or Ground SwitchTest 1 Probe Connector Test 2 casterTest 3 CRTOptional Test 4 Optional Test 5 Enter Name of tested peripheral here: ON NORM OPEN ON NORM CLOSED ONREVOPEN ONREVCLOSED OFFNORMOPEN OFFNORM CLOSED OFF REV OPEN OFF REVCLOSED CAUTIONEquipment damage possibility. Never switch the Polarity when the unit is powered ON. Be sure to turn the unit power OFF before switching the polarity using the POLARITY switch. Otherwise, the unit may be damaged.
GE HEALTHCARE DIRECTION 5394141, REVISION 1LOGIQ™ P5 SERVICE MANUAL 10 - 20 Section 10-6 - Electrical Safety Tests 10-6-6-2 Generic Procedure Measurements should be made with the ground open and closed, with power line polarity normal and reversed, and with the unit Off and On. For each combination, the operating controls such as the lead switch should be operated to find the worst case condition. 10-6-6-3 Dale 600 Meter ProcedureThe Dale 600 provides five snap type ECG buttons for testing patient leads. Snap on all patient leads to the meter and assure that the ground clip is co nnected to the system’s ground terminal. Select the meter’s LEAD-GND function. Select and test each ECG lead positions (except “ALL”) of the LEAD selector, testing each to the power condition combinations f ound in “PATIENT LEAD LEAKAGE” table in the “PM CHECKLIST”. Record the highest leakage current measured for each Power selection. Follow these steps to test the ECG module for leakage current. 1.) Turn the LOGIQ™ P5 unit OFF. 2.) Plug the unit into the meter, and the meter into the tested AC wall outlet. 3.) Plug the black chassis cable into the meters “CHASSIS” connector and attach the black chassis cable clamp to an exposed metal part of the LOGIQ™ P5 unit. 4.) Connect the patient leads to the corresponding s naps located at the upper front of the Dale 600/ 600E. Lead nomenclature for this test is not important. Figure 10-7 Test Circuit for Measuring Non-Isolated Patient Leads CAUTIONLine voltage is applied to the ECG leads during this test. To avoid possible electric shock hazard, the system being tested must not be touched by patients, users or anyone while the ISO TEST switch is depressed. When the meters ground switch is OPEN, dont touch the unit! POWER OUTLET H (Black) N (White) G (Green)Internal circuitry Insulating surface Polarity reversing switch (use both positions) Appliance power switch (use both “off” and “on” positions) Patient connected leads The connection is at service entrance or on the supply side of a separately derived system Building ground Grounding contact switch (use in both “open” and “closed” positions) Current meter H = Hot N = Neutral (grounded) G = Grounding conductor H N G Patient lead selector switch (if any) (activated as required) Appliance Between each patient lead and ground
GE HEALTHCARE DIRECTION 5394141, REVISION 1LOGIQ™ P5 SERVICE MANUAL Section 10-6 - Electrical Safety Tests 10 - 21 10-6-6-3Dale 600 Meter Procedure (cont’d) 5.) Set the meters “FUNCTION” swit ch to LEAD TO GROUND position to measure the patient lead to ground leakage current. 6.) Select and test each ECG lead positions (except ALL) of the LEAD selector, testing each to the power condition combinations. Figure 10-8 ECG Leakage Current Test Table 10-19 Testing Power Conditions ECG PowerMeter’s Polarity SwitchMeter’s Neutral Switch ON NORM CLOSED ON NORM OPEN ON REVERSE CLOSED ON REVERSE OPEN OFF NORM CLOSED OFF NORM OPEN OFF REVERSE CLOSED OFF REVERSE OPEN ECG Patient Cable ISO Rocker Switch ECG Lead Selector
GE HEALTHCARE DIRECTION 5394141, REVISION 1LOGIQ™ P5 SERVICE MANUAL 10 - 22 Section 10-6 - Electrical Safety Tests 10-6-6-3Dale 600 Meter Procedure (cont’d) 7.) Record the patient lead to ground le akage current measured on the data sheet. 8.) Set the meters “FUNCTIO N” switch to LEAD TO LEAD position to measure the lead to lead leakage current. 9.) Select and test each ECG lead positions (except ALL) of the LEAD selector, testing each to the power condition combinations. 10.) Record the lead to lead leakage current measured on the data sheet. 11.) Set the meters “FUNCTION” swit ch to LEAD ISO position to measure the patient lead isolation current. 12.) Select and test each ECG lead positions (except ALL) of the LEAD selector, testing each to the power condition combinations. 13.) Depress the rocker switch to ISO TEST and read the isolation current. To apply the voltage to the lead safely, the voltage is on ly applied when the rocker switch is depressed to ISO TEST. 14.) Record the patient lead isolation current measured on the data sheet. 10-6-7 Isolated Patient Lead (Source) Leakage–Lead to Lead reference the procedure in the IEC 60601-1. When us ing the Dale 600, switch the meter’s function selector to the LEAD-LEAD position. Select and test each of the five ECG lead positions (except ALL) on the LEAD selector, testing each to the power condition combinations found in the table. Record the highest leakage current measured. 10-6-7-1 Dale 600 Patient Lead Tests NEUTRAL POLARITY 1.) Closed Normal 2.) Open Normal 3.) Closed Reversed 4.) Open Reversed 10-6-8 Isolated Patient Lead (S ink) Leakage-Isolation Test reference the procedure in the IEC 60601-1. When us ing the Dale 600, switch the meter’s function selector to the LEAD-ISO. Select the ALL position on the lead selector. Depress the rocker switch to ISO TEST to test lead isolation. NOTE: It is not necessary to test each lead individually or power condition combinations as required in previous tests. CAUTIONLine voltage is applied to the ECG leads duri ng this test. To avoid possible electric shock hazard, the system being tested must not be touched by patients, users or anyone while the ISO TEST switch is depressed.