    Section 8-2 - DISASSEMBLY/RE-ASSEMBLY 8 - 45
    8-2-11 Freeze key assy 
    8-2-11-1 Tools • Common pilIips screwdrivers
    8-2-11-2 Preparations • Shut down the system and switch off the main breaker.
    8-2-11-3 Removal procedure 1.) Remove the Main Keyboard Assy. Refer to the  8-2-7 Main Keyboard Assy on page 8-37.
    2.) Remove the 3 screws (1-3) and disconnect 1 cable. Figure 8-77   Freeze Key in the main keyboard
    Figure 8-78   Freeze Key connector
    connector
    1
    1 2
    3 
    						
    							GE HEALTHCARE
    DIRECTION 5394141, REVISION  1 LOGIQ™ P5 SERVICE MANUAL  
    8 - 46 Section 8-2 - DISASSEMBLY/RE-ASSEMBLY
    8-2-11-3              Removal procedure  (cont’d)
    3.) Perform the following functional tests. If all are successful, include the debrief script provided below.
    8-2-11-4 Mounting Procedure Install the new parts in the reverse order of removal. Table 8-12    Functional Tests
    Service ManualSection
    Functional Test / Diagnostic TestDebrief Script
    Section 4-3-1 Power On/Boot Up
    “Service Manual, Direction
    5394141, Rev 1+, Section 8-2-11. Equipment 
    passed all required tests and is ready for use. “
    Section 4-3-2
    Power Off / Shutdown
    Section 4-7-5 Freeze key validation 
    						
    							GE HEALTHCARE
    DIRECTION 5394141, REVISION  1LOGIQ™ P5 SERVICE MANUAL 
    Section 8-2 - DISASSEMBLY/RE-ASSEMBLY 8 - 47
    8-2-12 TGC key assy / TGC Knob Set 
    8-2-12-1 Tools • Common pilIips screwdrivers
    8-2-12-2 Preparations • Shut down the system and switch off the main breaker.
    8-2-12-3 Removal procedure 1.) Remove the CFUNCKEY Assy. Refer to the  8-2-7 Main Keyboard Assy on page 8-37.
    2.) Remove the TGC Knobs.
    3.) Unscrew 4 screws (1-4).  Figure 8-79   8 TGC Knobs
    Figure 8-80   TGC PCB Assy in Keyboard
    12
    34 
    						
    							GE HEALTHCARE
    DIRECTION 5394141, REVISION  1 LOGIQ™ P5 SERVICE MANUAL  
    8 - 48 Section 8-2 - DISASSEMBLY/RE-ASSEMBLY
    8-2-12-3              Removal procedure  (cont’d)
    4.) Disconnect 1 connector from the PCB.
    5.) Perform the following functional tests. If all are successful, include the debrief script provided below.
    8-2-12-4 Mounting Procedure Install the new parts in the reverse order of removal. Figure 8-81   TGC Key Connector 
    Table 8-13    Functional Tests
    Service Manual Section
    Functional Test / Diagnostic TestDebrief Script
    Section 4-3-1 Power On/Boot Up
    “Service Manual, Direction
    5394141, Rev 1+, Section 8-2-12. Equipment 
    passed all required tests and is ready for use. “
    Section 4-3-2
    Power Off / Shutdown
    Section 4-7-6 TGC key assay / TGC Knob Set validation 
    						
    							GE HEALTHCARE
    DIRECTION 5394141, REVISION  1LOGIQ™ P5 SERVICE MANUAL 
    Section 8-2 - DISASSEMBLY/RE-ASSEMBLY 8 - 49
    8-2-13 Sub Keyboard Encoder Knob Set
    8-2-13-1 Tools • Common pilIips screwdrivers
    8-2-13-2 Preparations • Shut down the system and switch off the main breaker.
    8-2-13-3 Removal procedure 1.) Remove all the Encoder Knobs from the keyboard.
    2.) Perform the following functional tests. If all ar e successful, include the debrief script provided below.
    8-2-13-4 Mounting Procedure Install the new parts in the reverse order of removal. Figure 8-82   Knob in Sub Keyboard
    Table 8-14    Functional Tests
    Service Manual Section
    Functional Test / Diagnostic TestDebrief Script
    Section 4-3-1 Power On/Boot Up
    “Service Manual, Direction
    5394141, Rev 1+, Section 8-2-13. Equipment 
    passed all required tests and is ready for use. “
    Section 4-3-2
    Power Off / Shutdown
    Section 4-7-7 Sub Keyboard Encoder Knob Set validation 
    						
    							GE HEALTHCARE
    DIRECTION 5394141, REVISION  1 LOGIQ™ P5 SERVICE MANUAL  
    8 - 50 Section 8-2 - DISASSEMBLY/RE-ASSEMBLY
    8-2-14 Keycap set, Main  Keyboard Encoder Knob set
    8-2-14-1 Tools
    • Common pilIips screwdrivers
    8-2-14-2 Preparations • Shut down the system and switch off the main breaker.
    8-2-14-3 Removal procedure 1.) Remove key caps from the keyboard.
    2.) Perform the following functional tests. If all are successful, include the debrief script provided below.
    8-2-14-4 Mounting Procedure Install the new parts in the reverse order of removal. Figure 8-83   Key Caps 
    Table 8-15    Functional Tests
    Service Manual Section
    Functional Test / Diagnostic TestDebrief Script
    Section 4-3-1 Power On/Boot Up
    “Service Manual, Direction
    5394141, Rev 1+, Section 8-2-14. Equipment 
    passed all required tests and is ready for use. “
    Section 4-3-2
    Power Off / Shutdown
    Section 4-8-4 TGC key assy/TGC Knob Set, Sub keyboard 
    encoder Knob Set, Keycap set, Main Keyboard  Encoder Knob set Function Validation  Procedure
    Section 10-5-5 Physical Inspection 
    						
    							GE HEALTHCARE
    DIRECTION 5394141, REVISION  1LOGIQ™ P5 SERVICE MANUAL 
    Section 8-2 - DISASSEMBLY/RE-ASSEMBLY 8 - 51
    8-2-15 Side Left Cover
    8-2-15-1 Tools • Common pilIips screwdrivers
    8-2-15-2 Preparations • Shut down the system and switch off the main breaker.
    8-2-15-3 Removal procedure 1.) Unscrew 2 screws (1-2).
    2.) Remove the left cover.
    3.) Perform the following functional tests. If all ar e successful, include the debrief script provided below.
    8-2-15-4 Mounting Procedure Install the new parts in the reverse order of removal. Figure 8-84   2 screw on Side left cover
    Figure 8-85   Open Side left cover
    Table 8-16    Functional Tests
    Service Manual Section
    Functional Test / Diagnostic TestDebrief Script
    Section 4-3-1 Power On/Boot Up
    “Service Manual, Direction
    5394141, Rev 1+, Section 8-2-15. Equipment 
    passed all required tests and is ready for use. “
    Section 4-3-2
    Power Off / Shutdown
    Section 4-8-1 Cover Parts Function Validation
    Section 10-5-5 Physical Inspection 
    						
    							GE HEALTHCARE
    DIRECTION 5394141, REVISION  1 LOGIQ™ P5 SERVICE MANUAL  
    8 - 52 Section 8-2 - DISASSEMBLY/RE-ASSEMBLY
    8-2-16 Side Right Cover
    8-2-16-1 Tools • Common pilIips screwdrivers
    8-2-16-2 Preparations • Shut down the system and switch off the main breaker.
    8-2-16-3 Removal procedure 1.) Unscrew 2 screws (1-2).
    2.) Remove the Right cover.
    3.) Perform the following functional tests. If all are successful, include the debrief script provided below.
    8-2-16-4 Mounting Procedure Install the new parts in the reverse order of removal. Figure 8-86   2 screw on side right cover
    Figure 8-87   Open side right cover
    Table 8-17    Functional Tests
    Service Manual Section
    Functional Test / Diagnostic TestDebrief Script
    Section 4-3-1 Power On/Boot Up
    “Service Manual, Direction
    5394141, Rev 1+, Section 8-2-16. Equipment 
    passed all required tests and is ready for use. “
    Section 4-3-2
    Power Off / Shutdown
    Section 4-8-1 Cover Parts Function Validation
    Section 10-5-5 Physical Inspection 
    						
    							GE HEALTHCARE
    DIRECTION 5394141, REVISION  1LOGIQ™ P5 SERVICE MANUAL 
    Section 8-2 - DISASSEMBLY/RE-ASSEMBLY 8 - 53
    8-2-17 Front Cover
    8-2-17-1 Tools • Common pilIips screwdrivers
    8-2-17-2 Preparations • Shut down the system and switch off the main breaker.
    8-2-17-3 Removal procedure 1.) Remove the Left, and Right side covers. Refer to the  8-2-15 Side Left Cover on page 8-51 and 8-
    2-16 Side Right Cover on page 8-52 .
    2.) Remove the dummy left and right covers. Refer to the Figure 8-88.
    3.) Unscrew 2 screws (1-2) from the left side of the front cover. 
    4.) Unscrew 2 screws (1-2) from  the right side of the Front cover.
    Figure 8-88   Screws of Dummy Cover
    Figure 8-89   Screws of the front cover 
    						
    							GE HEALTHCARE
    DIRECTION 5394141, REVISION  1 LOGIQ™ P5 SERVICE MANUAL  
    8 - 54 Section 8-2 - DISASSEMBLY/RE-ASSEMBLY
    8-2-17-3              Removal procedure  (cont’d)
    5.) Remove the front cover.
    6.) Perform the following functional tests. If all are successful, include the debrief script provided below.
    8-2-17-4 Mounting Procedure Install the new parts in the reverse order of removal. Figure 8-90   Removal of front cover
    Table 8-18    Functional Tests
    Service Manual Section
    Functional Test / Diagnostic TestDebrief Script
    Section 4-3-1 Power On/Boot Up
    “Service Manual, Direction
    5394141, Rev 1+, Section 8-2-17. Equipment 
    passed all required tests and is ready for use. “
    Section 4-3-2
    Power Off / Shutdown
    Section 4-8-1 Cover Parts Function Validation
    Section 10-5-5 Physical Inspection 
    						