GE HEALTHCARE DIRECTION 5394141, REVISION 1LOGIQ™ P5 SERVICE MANUAL Section 8-2 - DISASSEMBLY/RE-ASSEMBLY 8 - 45 8-2-11 Freeze key assy 8-2-11-1 Tools • Common pilIips screwdrivers 8-2-11-2 Preparations • Shut down the system and switch off the main breaker. 8-2-11-3 Removal procedure 1.) Remove the Main Keyboard Assy. Refer to the 8-2-7 Main Keyboard Assy on page 8-37. 2.) Remove the 3 screws (1-3) and disconnect 1 cable. Figure 8-77 Freeze Key in the main keyboard Figure 8-78 Freeze Key connector connector 1 1 2 3
GE HEALTHCARE DIRECTION 5394141, REVISION 1 LOGIQ™ P5 SERVICE MANUAL 8 - 46 Section 8-2 - DISASSEMBLY/RE-ASSEMBLY 8-2-11-3 Removal procedure (cont’d) 3.) Perform the following functional tests. If all are successful, include the debrief script provided below. 8-2-11-4 Mounting Procedure Install the new parts in the reverse order of removal. Table 8-12 Functional Tests Service ManualSection Functional Test / Diagnostic TestDebrief Script Section 4-3-1 Power On/Boot Up “Service Manual, Direction 5394141, Rev 1+, Section 8-2-11. Equipment passed all required tests and is ready for use. “ Section 4-3-2 Power Off / Shutdown Section 4-7-5 Freeze key validation
GE HEALTHCARE DIRECTION 5394141, REVISION 1LOGIQ™ P5 SERVICE MANUAL Section 8-2 - DISASSEMBLY/RE-ASSEMBLY 8 - 47 8-2-12 TGC key assy / TGC Knob Set 8-2-12-1 Tools • Common pilIips screwdrivers 8-2-12-2 Preparations • Shut down the system and switch off the main breaker. 8-2-12-3 Removal procedure 1.) Remove the CFUNCKEY Assy. Refer to the 8-2-7 Main Keyboard Assy on page 8-37. 2.) Remove the TGC Knobs. 3.) Unscrew 4 screws (1-4). Figure 8-79 8 TGC Knobs Figure 8-80 TGC PCB Assy in Keyboard 12 34
GE HEALTHCARE DIRECTION 5394141, REVISION 1 LOGIQ™ P5 SERVICE MANUAL 8 - 48 Section 8-2 - DISASSEMBLY/RE-ASSEMBLY 8-2-12-3 Removal procedure (cont’d) 4.) Disconnect 1 connector from the PCB. 5.) Perform the following functional tests. If all are successful, include the debrief script provided below. 8-2-12-4 Mounting Procedure Install the new parts in the reverse order of removal. Figure 8-81 TGC Key Connector Table 8-13 Functional Tests Service Manual Section Functional Test / Diagnostic TestDebrief Script Section 4-3-1 Power On/Boot Up “Service Manual, Direction 5394141, Rev 1+, Section 8-2-12. Equipment passed all required tests and is ready for use. “ Section 4-3-2 Power Off / Shutdown Section 4-7-6 TGC key assay / TGC Knob Set validation
GE HEALTHCARE DIRECTION 5394141, REVISION 1LOGIQ™ P5 SERVICE MANUAL Section 8-2 - DISASSEMBLY/RE-ASSEMBLY 8 - 49 8-2-13 Sub Keyboard Encoder Knob Set 8-2-13-1 Tools • Common pilIips screwdrivers 8-2-13-2 Preparations • Shut down the system and switch off the main breaker. 8-2-13-3 Removal procedure 1.) Remove all the Encoder Knobs from the keyboard. 2.) Perform the following functional tests. If all ar e successful, include the debrief script provided below. 8-2-13-4 Mounting Procedure Install the new parts in the reverse order of removal. Figure 8-82 Knob in Sub Keyboard Table 8-14 Functional Tests Service Manual Section Functional Test / Diagnostic TestDebrief Script Section 4-3-1 Power On/Boot Up “Service Manual, Direction 5394141, Rev 1+, Section 8-2-13. Equipment passed all required tests and is ready for use. “ Section 4-3-2 Power Off / Shutdown Section 4-7-7 Sub Keyboard Encoder Knob Set validation
GE HEALTHCARE DIRECTION 5394141, REVISION 1 LOGIQ™ P5 SERVICE MANUAL 8 - 50 Section 8-2 - DISASSEMBLY/RE-ASSEMBLY 8-2-14 Keycap set, Main Keyboard Encoder Knob set 8-2-14-1 Tools • Common pilIips screwdrivers 8-2-14-2 Preparations • Shut down the system and switch off the main breaker. 8-2-14-3 Removal procedure 1.) Remove key caps from the keyboard. 2.) Perform the following functional tests. If all are successful, include the debrief script provided below. 8-2-14-4 Mounting Procedure Install the new parts in the reverse order of removal. Figure 8-83 Key Caps Table 8-15 Functional Tests Service Manual Section Functional Test / Diagnostic TestDebrief Script Section 4-3-1 Power On/Boot Up “Service Manual, Direction 5394141, Rev 1+, Section 8-2-14. Equipment passed all required tests and is ready for use. “ Section 4-3-2 Power Off / Shutdown Section 4-8-4 TGC key assy/TGC Knob Set, Sub keyboard encoder Knob Set, Keycap set, Main Keyboard Encoder Knob set Function Validation Procedure Section 10-5-5 Physical Inspection
GE HEALTHCARE DIRECTION 5394141, REVISION 1LOGIQ™ P5 SERVICE MANUAL Section 8-2 - DISASSEMBLY/RE-ASSEMBLY 8 - 51 8-2-15 Side Left Cover 8-2-15-1 Tools • Common pilIips screwdrivers 8-2-15-2 Preparations • Shut down the system and switch off the main breaker. 8-2-15-3 Removal procedure 1.) Unscrew 2 screws (1-2). 2.) Remove the left cover. 3.) Perform the following functional tests. If all ar e successful, include the debrief script provided below. 8-2-15-4 Mounting Procedure Install the new parts in the reverse order of removal. Figure 8-84 2 screw on Side left cover Figure 8-85 Open Side left cover Table 8-16 Functional Tests Service Manual Section Functional Test / Diagnostic TestDebrief Script Section 4-3-1 Power On/Boot Up “Service Manual, Direction 5394141, Rev 1+, Section 8-2-15. Equipment passed all required tests and is ready for use. “ Section 4-3-2 Power Off / Shutdown Section 4-8-1 Cover Parts Function Validation Section 10-5-5 Physical Inspection
GE HEALTHCARE DIRECTION 5394141, REVISION 1 LOGIQ™ P5 SERVICE MANUAL 8 - 52 Section 8-2 - DISASSEMBLY/RE-ASSEMBLY 8-2-16 Side Right Cover 8-2-16-1 Tools • Common pilIips screwdrivers 8-2-16-2 Preparations • Shut down the system and switch off the main breaker. 8-2-16-3 Removal procedure 1.) Unscrew 2 screws (1-2). 2.) Remove the Right cover. 3.) Perform the following functional tests. If all are successful, include the debrief script provided below. 8-2-16-4 Mounting Procedure Install the new parts in the reverse order of removal. Figure 8-86 2 screw on side right cover Figure 8-87 Open side right cover Table 8-17 Functional Tests Service Manual Section Functional Test / Diagnostic TestDebrief Script Section 4-3-1 Power On/Boot Up “Service Manual, Direction 5394141, Rev 1+, Section 8-2-16. Equipment passed all required tests and is ready for use. “ Section 4-3-2 Power Off / Shutdown Section 4-8-1 Cover Parts Function Validation Section 10-5-5 Physical Inspection
GE HEALTHCARE DIRECTION 5394141, REVISION 1LOGIQ™ P5 SERVICE MANUAL Section 8-2 - DISASSEMBLY/RE-ASSEMBLY 8 - 53 8-2-17 Front Cover 8-2-17-1 Tools • Common pilIips screwdrivers 8-2-17-2 Preparations • Shut down the system and switch off the main breaker. 8-2-17-3 Removal procedure 1.) Remove the Left, and Right side covers. Refer to the 8-2-15 Side Left Cover on page 8-51 and 8- 2-16 Side Right Cover on page 8-52 . 2.) Remove the dummy left and right covers. Refer to the Figure 8-88. 3.) Unscrew 2 screws (1-2) from the left side of the front cover. 4.) Unscrew 2 screws (1-2) from the right side of the Front cover. Figure 8-88 Screws of Dummy Cover Figure 8-89 Screws of the front cover
GE HEALTHCARE DIRECTION 5394141, REVISION 1 LOGIQ™ P5 SERVICE MANUAL 8 - 54 Section 8-2 - DISASSEMBLY/RE-ASSEMBLY 8-2-17-3 Removal procedure (cont’d) 5.) Remove the front cover. 6.) Perform the following functional tests. If all are successful, include the debrief script provided below. 8-2-17-4 Mounting Procedure Install the new parts in the reverse order of removal. Figure 8-90 Removal of front cover Table 8-18 Functional Tests Service Manual Section Functional Test / Diagnostic TestDebrief Script Section 4-3-1 Power On/Boot Up “Service Manual, Direction 5394141, Rev 1+, Section 8-2-17. Equipment passed all required tests and is ready for use. “ Section 4-3-2 Power Off / Shutdown Section 4-8-1 Cover Parts Function Validation Section 10-5-5 Physical Inspection