GE Logiq P5 Service Manual
Have a look at the manual GE Logiq P5 Service Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 45 GE manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.
GE HEALTHCARE DIRECTION 5394141, REVISION 1LOGIQ™ P5 SERVICE MANUAL Section 8-3 - Software Loading Procedure 8 - 165 8-6-2-1 Perform So ftware Reloading in the Service Platform (cont’d) 9.) Select “Reload System Software” 10.) Verify that “Local Archive” is available under Dataflow. 11.) Press “ReLoad”. 12.) Confirmation message pops up. 13.) Press “Yes” to proceed. 14.) Progress bar is displayed Figure 8-233 Reload system Software Figure 8-234 Reloading setup in progress
GE HEALTHCARE DIRECTION 5394141, REVISION 1 LOGIQ™ P5 SERVICE MANUAL 8 - 166 Section 8-3 - Software Loading Procedure 8-6-2-1 Perform Software Reloading in the Service Platform (cont’d) 15.) Setup is completed successfully a.) If you do s/w reloading from the system directly, please shut down the system now. b.) For remote s/w reloading, please enable Disruptive mode. 16.) Press “Disruptive mode” Figure 8-235 setup completed message Figure 8-236 Disruptive mode
GE HEALTHCARE DIRECTION 5394141, REVISION 1LOGIQ™ P5 SERVICE MANUAL Section 8-3 - Software Loading Procedure 8 - 167 8-6-2-1 Perform So ftware Reloading in the Service Platform (cont’d) 17.) If “Disruptive Mode Status” is disabl ed, Press “Yes” to enable disruptive mode. For the remote reloading, customer has to agree to the diruptive mode. The following window (Figure 8-237) pops up in the system screen and cu stomer has to press “Yes” to enable Disruptive mode. 18.) Press “System Shutdown” NOTE: If the service dongle is inserted or the system is logged on to the maintenance mode, “System shutdown” will not work. Please close progra ms and reboot the system manually. Figure 8-237 Insite Notification Figure 8-238 System Shutdown
GE HEALTHCARE DIRECTION 5394141, REVISION 1 LOGIQ™ P5 SERVICE MANUAL 8 - 168 Section 8-3 - Software Loading Procedure 8-6-2-1 Perform Software Reloading in the Service Platform (cont’d) 19.) Select “Restart System” 20.) Press “Submit” 21.) Press “Confirm” when confirmation message is displayed. 22.) After a while, the system restarts automatically. 23.) Verify that correct date an d time are displayed correctly. Figure 8-239 Restart System
GE HEALTHCARE DIRECTION 5394141, REVISION 1LOGIQ™ P5 SERVICE MANUAL Section 8-3 - Software Loading Procedure 8 - 169 8-6-2-2 Software Reloading 1.) The Base S/W load starts auto matically immediately after boot up 2.) After finishing C: partition reload ing, the system restarts automatically. 3.) When the system restarts, an application installation st arts automatically. Figure 8-240 Reloading C: partition from Reloading Ghost Image Figure 8-241 Application installation
GE HEALTHCARE DIRECTION 5394141, REVISION 1 LOGIQ™ P5 SERVICE MANUAL 8 - 170 Section 8-3 - Software Loading Procedure 8-6-2-2 Software Reloading (cont’d) 4.) When installation is finished, the system shuts down automatically. 5.) Press Power Button to start the system. 6.) When system fully boots up after the softwa re reloading, please shutdown system again. NOTE: For the following procedure, disruptive mode should be approved in order to be in done remotely. 7.) Start the system. 8.) Press “Patient” button, and verify under Dataflow that “Local Archive” is available. If its not available, shut down the unit one more time. 9.) To put the Local Time Zone ba ck, Go to Utility->System->General 10.) Click “Date/Time” Figure 8-242 Date/Time
GE HEALTHCARE DIRECTION 5394141, REVISION 1LOGIQ™ P5 SERVICE MANUAL Section 8-3 - Software Loading Procedure 8 - 171 8-6-2-2 Software Reloading (cont’d) 11.) Press Time Zone 12.) Change the time zone to the local time zone from Table 1. 13.) Press “Apply” 14.) Press “Date & Time” tab. Figure 8-243 Time Zone Figure 8-244 Date & Time
GE HEALTHCARE DIRECTION 5394141, REVISION 1 LOGIQ™ P5 SERVICE MANUAL 8 - 172 Section 8-3 - Software Loading Procedure 8-6-2-2 Software Reloading (cont’d) 15.) Change the Date and Time correctly if needed. 16.) Press “Apply” 17.) Press “OK” 18.) Turn off the system. 19.) Start the system. 20.) Check if the correct date and time are displayed. 21.) The software reloading is completed. Figure 8-245 Date and Time check
GE HEALTHCARE DIRECTION 5394141, REVISION 1LOGIQ™ P5 SERVICE MANUAL Section 8-3 - Software Loading Procedure 8 - 173 Section 8-7 Mechanical Option Ins tallation instruction These service in subtractions descr ibe the installation procedures of following mechanical options to LOGIQ™ P5.
GE HEALTHCARE DIRECTION 5394141, REVISION 1 LOGIQ™ P5 SERVICE MANUAL 8 - 174 Section 8-3 - Software Loading Procedure 8-7-1 Endo Probe Holder Installation 1.) Check out the 2 screw holes to be used to install Endo Probe Holder. 2.) Install Endo Probe holder on the bottom side of the Cable Arm Hook by screwing 2 screws(2159634, BH M4x10 WHT). Figure 8-246 Endo Probe Holder Installation Figure 8-247 Endo Probe Holder