GE Logiq P5 Service Manual
Have a look at the manual GE Logiq P5 Service Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 45 GE manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.
GE HEALTHCARE DIRECTION 5394141, REVISION 1LOGIQ™ P5 SERVICE MANUAL Section 8-2 - DISASSEMBLY/RE-ASSEMBLY 8 - 35 8-2-6-4 Assembly procedure (cont’d) 26.) Screw 2 screws (2337572, FH M3X6 WHT) to assemble the Arm cover L & R. 27.) Screw 4 screws (2159634, BH M4X10 WHT) to assemble the Arm bottom Cover. Figure 8-63 Assembling the Arm Cover L & R Figure 8-64 Assembling the Arm bottom cover
GE HEALTHCARE DIRECTION 5394141, REVISION 1 LOGIQ™ P5 SERVICE MANUAL 8 - 36 Section 8-2 - DISASSEMBLY/RE-ASSEMBLY 8-2-6-4 Assembly procedure (cont’d) 28.) Attach LCD Arm Caution Label, LCD Arm Rotation Label, LCD Lock Caution Label. Figure 8-65 Flexible Arm LCD Arm Caution Label LCD Arm Rotation Label LCD Lock Caution Label
GE HEALTHCARE DIRECTION 5394141, REVISION 1LOGIQ™ P5 SERVICE MANUAL Section 8-2 - DISASSEMBLY/RE-ASSEMBLY 8 - 37 8-2-7 Main Keyboard Assy 8-2-7-1 Tools • Common pilIips screwdrivers 8-2-7-2 Preparations • Shut down the system and switch off the main breaker. 8-2-7-3 Removal procedure 1.) Remove the 3 Probe holders & Cup holder from the keyboard. 2.) Unscrew 4 screws from the bottom front of the keyboard. Figure 8-66 Removing holders Figure 8-67 Unscrews 4 screws (1) (4) (2) (3)
GE HEALTHCARE DIRECTION 5394141, REVISION 1 LOGIQ™ P5 SERVICE MANUAL 8 - 38 Section 8-2 - DISASSEMBLY/RE-ASSEMBLY 8-2-7-3 Removal procedure (cont’d) 3.) Unscrew 2 screws from the rear side of the keyboard. 4.) Lift the top cover of the keyboard and disconnect 4 cables from the keyboard. Figure 8-68 Unscrews 2 screws Figure 8-69 Lifting the top cover & Disconnecting 5 Cables (1) (2)
GE HEALTHCARE DIRECTION 5394141, REVISION 1LOGIQ™ P5 SERVICE MANUAL Section 8-2 - DISASSEMBLY/RE-ASSEMBLY 8 - 39 8-2-7-3 Removal procedure (cont’d) 5.) Perform the following functional tests. If all ar e successful, include the debrief script provided below. 8-2-7-4 Mounting Procedure Install the new parts in the reverse order of removal. Table 8-8 Functional Tests Service ManualSection Functional Test / Diagnostic TestDebrief Script Section 4-3-1 Power On/Boot Up “Service Manual, Direction 5394141, Rev 1+, Section 8-2-7. Equipment passed all required tests and is ready for use. “ Section 4-3-2 Power Off / Shutdown Section 4-7-1 Main Keyboard Assy Function Validation Procedure Section 4-3-4 System B/M-Mode Checks Section 4-3-5 System CFM and PWD Checks Section 10-5-2 Functional Checks (See Also Chapter 4)
GE HEALTHCARE DIRECTION 5394141, REVISION 1 LOGIQ™ P5 SERVICE MANUAL 8 - 40 Section 8-2 - DISASSEMBLY/RE-ASSEMBLY 8-2-8 Sub Keyboard Assy 8-2-8-1 Tools • Common pilIips screwdrivers 8-2-8-2 Preparations • Shut down the system and switch off the main breaker. 8-2-8-3 Removal procedure 1.) Remove the Main Keyboard Assy. Refer to the 8-2-7 Main Keyboard Assy on page 8-37. 2.) Unscrew 4 screws (1-4). 2 screws(1-2) are back side or the speaker and 2 screws(3-4) are bottom of sub keyboard. 3.) Perform the following functional tests. If all are successful, include the debrief script provided below. Figure 8-70 4 Screw Sub Keyboard Assy Table 8-9 Functional Tests Service Manual Section Functional Test / Diagnostic TestDebrief Script Section 4-3-1 Power On/Boot Up “Service Manual, Direction 5394141, Rev 1+, Section 8-2-8. Equipment passed all required tests and is ready for use. “ Section 4-3-2 Power Off / Shutdown Section 4-7-2 Sub Keyboard Assy Function Validation Procedure (1) (2) (3) (4)
GE HEALTHCARE DIRECTION 5394141, REVISION 1LOGIQ™ P5 SERVICE MANUAL Section 8-2 - DISASSEMBLY/RE-ASSEMBLY 8 - 41 8-2-8-4 Mounting Procedure 1.) The product emblem is attached on the sub keyb oard, so proper elblem should be attached on the sub keyboard when replace the sub keyboard. The sub keyboard FRU include 4 kinds of emblem which are LOGIQ P5, LOGIQ P5 Ob, LOGIQ A5, LOGIQ A5 pro. 2.) Attache proper product emblem as same as in stall base system before assemble the sub keyboard assy. 3.) Refer Install the new parts in the reverse order of removal. Figure 8-71 Emblems Figure 8-72 Emblem on Sub Keyboard
GE HEALTHCARE DIRECTION 5394141, REVISION 1 LOGIQ™ P5 SERVICE MANUAL 8 - 42 Section 8-2 - DISASSEMBLY/RE-ASSEMBLY 8-2-9 Trackball Assy 8-2-9-1 Tools • Common pilIips screwdrivers 8-2-9-2 Preparations • Shut down the system and switch off the main breaker. 8-2-9-3 Removal procedure 1.) Remove the Main Keyboard Assy. Refer to the 8-2-7 Main Keyboard Assy on page 8-37. 2.) Unscrew 4 screws (1-4) and disconnect the cable. 3.) Perform the following functional tests. If all are successful, include the debrief script provided below. 8-2-9-4 Mounting Procedure Install the new parts in the reverse order of removal. Figure 8-73 Screws and connector for Trackball Table 8-10 Functional Tests Service Manual Section Functional Test / Diagnostic TestDebrief Script Section 4-3-1 Power On/Boot Up “Service Manual, Direction 5394141, Rev 1+, Section 8-2-9. Equipment passed all required tests and is ready for use. “ Section 4-3-2 Power Off / Shutdown Section 4-7-3 Trackball Assy validation 4 screws connector
GE HEALTHCARE DIRECTION 5394141, REVISION 1LOGIQ™ P5 SERVICE MANUAL Section 8-2 - DISASSEMBLY/RE-ASSEMBLY 8 - 43 8-2-10 English, Greek, Russian, Swedish, Norweg ian A/N Key assy 8-2-10-1 Tools • Common pilIips screwdrivers 8-2-10-2 Preparations • Shut down the system and switch off the main breaker. 8-2-10-3 Removal procedure 1.) Remove the Main Keyboard Assy. Refer to the 8-2-7 Main Keyboard Assy on page 8-37. 2.) Remove USB PCB by unscrewing 6 screws (1-6) and disconnecting the 6 cables. Figure 8-74 A/N Key in keyboard Figure 8-75 USB PCB Connectors 1 ~ 3 Connector 3 4~ 6
GE HEALTHCARE DIRECTION 5394141, REVISION 1 LOGIQ™ P5 SERVICE MANUAL 8 - 44 Section 8-2 - DISASSEMBLY/RE-ASSEMBLY 8-2-10-3 Removal procedure (cont’d) 3.) Unscrew 6 screws from the back side of the A/N key assy. 4.) Perform the following functional tests. If all are successful, include the debrief script provided below. 8-2-10-4 Mounting Procedure Install the new parts in the reverse order of removal. Figure 8-76 Screws on the A/N Key Table 8-11 Functional Tests Service Manual Section Functional Test / Diagnostic TestDebrief Script Section 4-3-1 Power On/Boot Up “Service Manual, Direction 5394141, Rev 1+, Section 8-2-10. Equipment passed all required tests and is ready for use. “ Section 4-3-2 Power Off / Shutdown Section 4-7-4 A/N Key assy validation 12 3 4 5 6