GE HEALTHCARE DIRECTION 5394141, REVISION 1LOGIQ™ P5 SERVICE MANUAL Section 8-2 - DISASSEMBLY/RE-ASSEMBLY 8 - 85 8-2-34-3 Removal procedure (cont’d) 6.) Perform the following functional tests. If all ar e successful, include the debrief script provided below. 8-2-34-4 Mounting Procedure Install the new parts in the reverse order of removal. Table 8-35 Functional Tests Service ManualSection Functional Test / Diagnostic TestDebrief Script Section 4-3-1 Power On/Boot Up “Service Manual, Direction 5394141, Rev 1+, Section 8-2-34. Equipment passed all required tests and is ready for use. “ Section 4-3-2 Power Off / Shutdown Section 4-9-7 SOM Function Validation Procedure Section 4-3-4 System B/M-Mode Checks Section 4-3-5 System CFM and PWD Checks Section 4-5 Peripheral Checks Section 10-5-2 Functional Checks (See Also Chapter 4) Section 10-5-2-2 Peripheral/Option Checks Section 10-5-5 Physical Inspection
GE HEALTHCARE DIRECTION 5394141, REVISION 1 LOGIQ™ P5 SERVICE MANUAL 8 - 86 Section 8-2 - DISASSEMBLY/RE-ASSEMBLY 8-2-35 ASIG Assy 8-2-35-1 Tools • Common pilIips screwdrivers 8-2-35-2 Preparations • Shut down the system and switch off the main breaker. 8-2-35-3 Removal procedure 1.) Remove the Side Right Cover. Refer to the 8-2-16 Side Right Cover on page 8-52. 2.) Remove the EMI Cover R. Refer to the 8-2-27 EMI Cover R on page 8-69. 3.) Unscrew 2 screws (1-2) and eject the PCB. 4.) Perform the following functional tests. If all are successful, include the debrief script provided below. 8-2-35-4 Mounting Procedure Install the new parts in the reverse order of removal. Figure 8-122 Eject the ASIG Table 8-36 Functional Tests Service Manual Section Functional Test / Diagnostic TestDebrief Script Section 4-3-1 Power On/Boot Up “Service Manual, Direction 5394141, Rev 1+, Section 8-2-35. Equipment passed all required tests and is ready for use. “ Section 4-3-2 Power Off / Shutdown Section 4-9-16 ASIG ASSY Function Validation Procedure Section 4-3-4 System B/M-Mode Checks Section 4-3-5 System CFM and PWD Checks Section 10-5-2 Functional Checks (See Also Chapter 4) (2) (1)
GE HEALTHCARE DIRECTION 5394141, REVISION 1LOGIQ™ P5 SERVICE MANUAL Section 8-2 - DISASSEMBLY/RE-ASSEMBLY 8 - 87 8-2-36 Battery on SYSCONPM/CM Assy NOTE: If the battery on SYSCONPM/CM Assy runs out, the system date will be reset. Then can not exit to maintenance mode. NOTE: The Battery is UL critical component. So must use the battery approved. The recommended one is CR2450 manufactured by TOSHIBA. 8-2-36-1 Tools • Common pilIips screwdrivers • Option strings 8-2-36-2 Preparations • Shut down the system and switch off the main breaker. 8-2-36-3 Removal procedure 1.) Remove the Side Right Cover. Refer to the 8-2-16 Side Right Cover on page 8-52. 2.) Remove the EMI Cover R. Refer to the 8-2-27 EMI Cover R on page 8-69. 3.) Unplug the J13 connector. Refer to the Figure 8-123. 4.) Remove the SYSCONPM(SYSCONCM) assy in slot #3 in the nest box. Figure 8-123 Pull out the SYSCONPM(SYSCONCM) Assy Unplug the J13 Connector
GE HEALTHCARE DIRECTION 5394141, REVISION 1 LOGIQ™ P5 SERVICE MANUAL 8 - 88 Section 8-2 - DISASSEMBLY/RE-ASSEMBLY 8-2-36-3 Removal procedure (cont’d) 5.) Remove the battery. 6.) Perform the following functional tests. If all are successful, include the debrief script provided below. 8-2-36-4 Mounting Procedure Install the new parts in the reverse order of removal. Figure 8-124 Pull out the battery from SYSCON PWA Table 8-37 Functional Tests Service Manual Section Functional Test / Diagnostic TestDebrief Script Section 4-3-1 Power On/Boot Up “Service Manual, Direction 5394141, Rev 1+, Section 8-2-36. Equipment passed all required tests and is ready for use. “ Section 4-3-2 Power Off / Shutdown Section 4-9-4 SYSCONML Assy Function Validation Procedure Section 4-3-4 System B/M-Mode Checks Section 4-3-5 System CFM and PWD Checks Section 4-5 Peripheral Checks Section 10-5-2 Functional Checks (See Also Chapter 4) Section 10-5-2-2 Peripheral/Option Checks Section 10-5-5 Physical Inspection
GE HEALTHCARE DIRECTION 5394141, REVISION 1LOGIQ™ P5 SERVICE MANUAL Section 8-2 - DISASSEMBLY/RE-ASSEMBLY 8 - 89 8-2-37 Front Caster / Rear Caster NOTE: Both Front Casters and Rear Casters are swivel type in LOGIQ™ P5 but in LOGIQ™ A5, only Front Casters are swivel type (Rear Casters are “Fixed” type). 8-2-37-1 Tools • Common pilIips screwdrivers • Allen/Unbraco wrench 8-2-37-2 Preparations • Shut down the system and switch off the main breaker. 8-2-37-3 Removal procedure 1.) Unscrew 8 screws (1A-8A) to remove the front caster. 2.) Unscrew 8 screws (1-8) to remove the rear caster. Figure 8-125 Casters
GE HEALTHCARE DIRECTION 5394141, REVISION 1 LOGIQ™ P5 SERVICE MANUAL 8 - 90 Section 8-2 - DISASSEMBLY/RE-ASSEMBLY 8-2-37-3 Removal procedure (cont’d) 3.) Perform the following functional tests. If all are successful, include the debrief script provided below. 8-2-37-4 Mounting Procedure Install the new parts in the reverse order of removal. Table 8-38 Functional Tests Service ManualSection Functional Test / Diagnostic TestDebrief Script Section 4-3-1 Power On/Boot Up “Service Manual, Direction 5394141, Rev 1+, Section 8-2-37. Equipment passed all required tests and is ready for use. “ Section 4-3-2 Power Off / Shutdown Section 4-8-6 Front caster/Rear caster Function Validation Procedure Section 10-5-5Physical Inspection
GE HEALTHCARE DIRECTION 5394141, REVISION 1LOGIQ™ P5 SERVICE MANUAL Section 8-2 - DISASSEMBLY/RE-ASSEMBLY 8 - 91 8-2-38 Rear Handle 8-2-38-1 Tools • Common pilIips screwdrivers • Allen/Unbraco wrench 8-2-38-2 Preparations • Shut down the system and switch off the main breaker. 8-2-38-3 Removal procedure 1.) Unscrew 1 screw. Remove the Handle Dummy brkt. 2.) Unscrew 2 screws (1-2) from the back of the rear handle. 3.) Perform the following functional tests. If all ar e successful, include the debrief script provided below. 8-2-38-4 Mounting Procedure Install the new parts in the reverse order of removal. Figure 8-126 Handle Dummy Bracket Figure 8-127 Rear Handle Table 8-39 Functional Tests Service Manual Section Functional Test / Diagnostic TestDebrief Script Section 4-3-1 Power On/Boot Up “Service Manual, Direction 5394141, Rev 1+, Section 8-2-38. Equipment passed all required tests and is ready for use. “ Section 4-3-2 Power Off / Shutdown Section 4-8-1 Cover Parts Function Validation Section 10-5-5Physical Inspection (1) (2)
GE HEALTHCARE DIRECTION 5394141, REVISION 1 LOGIQ™ P5 SERVICE MANUAL 8 - 92 Section 8-2 - DISASSEMBLY/RE-ASSEMBLY 8-2-39 Rear Hook 8-2-39-1 Tools • Common pilIips screwdrivers 8-2-39-2 Preparations • Shut down the system and switch off the main breaker. 8-2-39-3 Removal procedure 1.) Unscrew 2 screws (1-2) and remove Rear hook. 2.) Unscrew 2 screws (1-2) and remove. Figure 8-128 Screws on rear hook Figure 8-129 Screws on the rear hook fix brkt
GE HEALTHCARE DIRECTION 5394141, REVISION 1LOGIQ™ P5 SERVICE MANUAL Section 8-2 - DISASSEMBLY/RE-ASSEMBLY 8 - 93 8-2-39-3 Removal procedure (cont’d) 3.) Perform the following functional tests. If all ar e successful, include the debrief script provided below. 8-2-39-4 Mounting Procedure Install the new parts in the reverse order of removal. Table 8-40 Functional Tests Service ManualSection Functional Test / Diagnostic TestDebrief Script Section 4-3-1 Power On/Boot Up “Service Manual, Direction 5394141, Rev 1+, Section 8-2-39. Equipment passed all required tests and is ready for use. “ Section 4-3-2 Power Off / Shutdown Section 4-8-1 Cover Parts Function Validation Section 10-5-5Physical Inspection
GE HEALTHCARE DIRECTION 5394141, REVISION 1 LOGIQ™ P5 SERVICE MANUAL 8 - 94 Section 8-2 - DISASSEMBLY/RE-ASSEMBLY 8-2-40 Probe Holder 8-2-40-1 Tools • No need tool 8-2-40-2 Removal procedure 1.) Remove the probe holders from the Keyboard. 2.) Perform the following functional tests. If all are successful, include the debrief script provided below. 8-2-40-3 Mounting Procedure Install the new parts in the reverse order of removal. Figure 8-130 Probe Holders Table 8-41 Functional Tests Service Manual Section Functional Test / Diagnostic TestDebrief Script Section 4-3-1 Power On/Boot Up “Service Manual, Direction 5394141, Rev 1+, Section 8-2-40. Equipment passed all required tests and is ready for use. “ Section 4-3-2 Power Off / Shutdown Section 4-8-7 Probe holder Function Validation Procedure Section 10-5-5Physical Inspection