Home > GE > Medical Equipment > GE Logiq P5 Service Manual

GE Logiq P5 Service Manual

    Download as PDF Print this page Share this page

    Have a look at the manual GE Logiq P5 Service Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 45 GE manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.

    Page
    of 520
    							GE HEALTHCARE
    DIRECTION 5394141, REVISION  1LOGIQ™ P5 SERVICE MANUAL 
    Section 8-2 - DISASSEMBLY/RE-ASSEMBLY 8 - 85
    8-2-34-3              Removal procedure  (cont’d)
    6.) Perform the following functional tests. If all ar e successful, include the debrief script provided below.
    8-2-34-4 Mounting Procedure Install the new parts in the reverse order of removal. Table 8-35    Functional Tests
    Service ManualSection
    Functional Test / Diagnostic TestDebrief Script
    Section 4-3-1 Power On/Boot Up
    “Service Manual, Direction
    5394141, Rev 1+, Section 8-2-34. Equipment 
    passed all required tests and is ready for use. “
    Section 4-3-2
    Power Off / Shutdown
    Section 4-9-7 SOM Function Validation Procedure
    Section 4-3-4 System B/M-Mode Checks
    Section 4-3-5 System CFM and PWD Checks
    Section 4-5 Peripheral Checks
    Section 10-5-2 Functional Checks (See Also Chapter 4)
    Section 10-5-2-2 Peripheral/Option Checks
    Section 10-5-5 Physical Inspection 
    						
    							GE HEALTHCARE
    DIRECTION 5394141, REVISION  1 LOGIQ™ P5 SERVICE MANUAL  
    8 - 86 Section 8-2 - DISASSEMBLY/RE-ASSEMBLY
    8-2-35 ASIG Assy
    8-2-35-1 Tools • Common pilIips screwdrivers
    8-2-35-2 Preparations • Shut down the system and switch off the main breaker.
    8-2-35-3 Removal procedure 1.) Remove the Side Right Cover. Refer to the  8-2-16 Side Right Cover on page 8-52.
    2.) Remove the EMI Cover R. Refer to the  8-2-27 EMI Cover R on page 8-69.
    3.) Unscrew 2 screws (1-2) and eject the PCB.
    4.) Perform the following functional tests. If all are successful, include the debrief script provided below.
    8-2-35-4 Mounting Procedure Install the new parts in the reverse order of removal. Figure 8-122   Eject the ASIG
    Table 8-36    Functional Tests
    Service Manual Section
    Functional Test / Diagnostic TestDebrief Script
    Section 4-3-1 Power On/Boot Up
    “Service Manual, Direction
    5394141, Rev 1+, Section 8-2-35. Equipment 
    passed all required tests and is ready for use. “
    Section 4-3-2
    Power Off / Shutdown
    Section 4-9-16 ASIG ASSY Function Validation Procedure
    Section 4-3-4 System B/M-Mode Checks
    Section 4-3-5 System CFM and PWD Checks
    Section 10-5-2 Functional Checks (See Also Chapter 4)
    (2)
    (1) 
    						
    							GE HEALTHCARE
    DIRECTION 5394141, REVISION  1LOGIQ™ P5 SERVICE MANUAL 
    Section 8-2 - DISASSEMBLY/RE-ASSEMBLY 8 - 87
    8-2-36 Battery on SYSCONPM/CM Assy
    NOTE: If the battery on SYSCONPM/CM Assy runs  out, the system date will be reset. Then can not 
    exit to maintenance mode.
    NOTE: The Battery is UL  critical component. So must use  the battery approved. The recommended 
    one is CR2450 manufactured by TOSHIBA.
    8-2-36-1 Tools • Common pilIips screwdrivers
    • Option strings
    8-2-36-2 Preparations • Shut down the system and switch off the main breaker.
    8-2-36-3 Removal procedure 1.) Remove the Side Right Cover. Refer to the  8-2-16 Side Right Cover on page 8-52.
    2.) Remove the EMI Cover R. Refer to the  8-2-27 EMI Cover R on page 8-69.
    3.) Unplug the J13 connector. Refer to the Figure 8-123.
    4.) Remove the SYSCONPM(SYSCONCM) assy  in slot #3 in the nest box.
    Figure 8-123   Pull out  the SYSCONPM(SYSCONCM) Assy
    Unplug the J13 Connector 
    						
    							GE HEALTHCARE
    DIRECTION 5394141, REVISION  1 LOGIQ™ P5 SERVICE MANUAL  
    8 - 88 Section 8-2 - DISASSEMBLY/RE-ASSEMBLY
    8-2-36-3              Removal procedure  (cont’d)
    5.) Remove the battery.
    6.) Perform the following functional tests. If all are successful, include the debrief script provided below.
    8-2-36-4 Mounting Procedure Install the new parts in the reverse order of removal. Figure 8-124   Pull out the battery from SYSCON PWA
    Table 8-37    Functional Tests
    Service Manual Section
    Functional Test / Diagnostic TestDebrief Script
    Section 4-3-1 Power On/Boot Up
    “Service Manual, Direction
    5394141, Rev 1+, Section 8-2-36. Equipment 
    passed all required tests and is ready for use. “
    Section 4-3-2
    Power Off / Shutdown
    Section 4-9-4 SYSCONML Assy Function Validation 
    Procedure
    Section 4-3-4 System B/M-Mode Checks
    Section 4-3-5 System CFM and PWD Checks
    Section 4-5 Peripheral Checks
    Section 10-5-2 Functional Checks (See Also Chapter 4)
    Section 10-5-2-2 Peripheral/Option Checks
    Section 10-5-5 Physical Inspection 
    						
    							GE HEALTHCARE
    DIRECTION 5394141, REVISION  1LOGIQ™ P5 SERVICE MANUAL 
    Section 8-2 - DISASSEMBLY/RE-ASSEMBLY 8 - 89
    8-2-37 Front Caster  / Rear Caster
    NOTE: Both Front Casters and Rear Casters are swivel  type in LOGIQ™ P5 but in LOGIQ™ A5, only 
    Front Casters are swivel type (Rear Casters are “Fixed” type). 
    8-2-37-1 Tools • Common pilIips screwdrivers
    • Allen/Unbraco wrench
    8-2-37-2 Preparations • Shut down the system and switch off the main breaker.
    8-2-37-3 Removal procedure 1.) Unscrew 8 screws (1A-8A) to remove the front caster.
    2.) Unscrew 8 screws (1-8) to remove the rear caster.
    Figure 8-125   Casters 
    						
    							GE HEALTHCARE
    DIRECTION 5394141, REVISION  1 LOGIQ™ P5 SERVICE MANUAL  
    8 - 90 Section 8-2 - DISASSEMBLY/RE-ASSEMBLY
    8-2-37-3              Removal procedure  (cont’d)
    3.) Perform the following functional tests. If all are successful, include the debrief script provided below.
    8-2-37-4 Mounting Procedure Install the new parts in the reverse order of removal. Table 8-38    Functional Tests
    Service ManualSection
    Functional Test / Diagnostic TestDebrief Script
    Section 4-3-1 Power On/Boot Up
    “Service Manual, Direction
    5394141, Rev 1+, Section 8-2-37. Equipment 
    passed all required tests and is ready for use. “
    Section 4-3-2
    Power Off / Shutdown
    Section 4-8-6 Front caster/Rear caster Function Validation 
    Procedure
    Section 10-5-5Physical Inspection 
    						
    							GE HEALTHCARE
    DIRECTION 5394141, REVISION  1LOGIQ™ P5 SERVICE MANUAL 
    Section 8-2 - DISASSEMBLY/RE-ASSEMBLY 8 - 91
    8-2-38 Rear Handle 
    8-2-38-1 Tools • Common pilIips screwdrivers
    • Allen/Unbraco wrench
    8-2-38-2 Preparations • Shut down the system and switch off the main breaker.
    8-2-38-3 Removal procedure 1.) Unscrew 1 screw. Remove the Handle Dummy brkt.
    2.) Unscrew 2 screws (1-2) from the back of the rear handle.
    3.) Perform the following functional tests. If all ar e successful, include the debrief script provided below.
    8-2-38-4 Mounting Procedure Install the new parts in the reverse order of removal. Figure 8-126   Handle Dummy Bracket
    Figure 8-127   Rear Handle
    Table 8-39    Functional Tests
    Service Manual Section
    Functional Test / Diagnostic TestDebrief Script
    Section 4-3-1 Power On/Boot Up
    “Service Manual, Direction
    5394141, Rev 1+, Section 8-2-38. Equipment 
    passed all required tests and is ready for use. “
    Section 4-3-2
    Power Off / Shutdown
    Section 4-8-1 Cover Parts Function Validation
    Section 10-5-5Physical Inspection
    (1)
    (2) 
    						
    							GE HEALTHCARE
    DIRECTION 5394141, REVISION  1 LOGIQ™ P5 SERVICE MANUAL  
    8 - 92 Section 8-2 - DISASSEMBLY/RE-ASSEMBLY
    8-2-39 Rear Hook
    8-2-39-1 Tools • Common pilIips screwdrivers
    8-2-39-2 Preparations • Shut down the system and switch off the main breaker.
    8-2-39-3 Removal procedure 1.) Unscrew 2 screws (1-2) and remove Rear hook.
    2.) Unscrew 2 screws (1-2) and remove. Figure 8-128   Screws on rear hook
    Figure 8-129   Screws on the rear hook fix brkt 
    						
    							GE HEALTHCARE
    DIRECTION 5394141, REVISION  1LOGIQ™ P5 SERVICE MANUAL 
    Section 8-2 - DISASSEMBLY/RE-ASSEMBLY 8 - 93
    8-2-39-3              Removal procedure  (cont’d)
    3.) Perform the following functional tests. If all ar e successful, include the debrief script provided below.
    8-2-39-4 Mounting Procedure Install the new parts in the reverse order of removal. Table 8-40    Functional Tests
    Service ManualSection
    Functional Test / Diagnostic TestDebrief Script
    Section 4-3-1 Power On/Boot Up
    “Service Manual, Direction
    5394141, Rev 1+, Section 8-2-39. Equipment 
    passed all required tests and is ready for use. “
    Section 4-3-2
    Power Off / Shutdown
    Section 4-8-1 Cover Parts Function Validation
    Section 10-5-5Physical Inspection 
    						
    							GE HEALTHCARE
    DIRECTION 5394141, REVISION  1 LOGIQ™ P5 SERVICE MANUAL  
    8 - 94 Section 8-2 - DISASSEMBLY/RE-ASSEMBLY
    8-2-40 Probe Holder
    8-2-40-1 Tools • No need tool
    8-2-40-2 Removal procedure 1.) Remove the probe holders from the Keyboard.
    2.) Perform the following functional tests. If all are successful, include the debrief script provided below.
    8-2-40-3 Mounting Procedure Install the new parts in the reverse order of removal. Figure 8-130   Probe Holders
    Table 8-41    Functional Tests
    Service Manual Section
    Functional Test / Diagnostic TestDebrief Script
    Section 4-3-1 Power On/Boot Up
    “Service Manual, Direction
    5394141, Rev 1+, Section 8-2-40. Equipment 
    passed all required tests and is ready for use. “
    Section 4-3-2
    Power Off / Shutdown
    Section 4-8-7 Probe holder Function Validation Procedure
    Section 10-5-5Physical Inspection 
    						
    All GE manuals Comments (0)

    Related Manuals for GE Logiq P5 Service Manual