GE Logiq P5 Service Manual
Have a look at the manual GE Logiq P5 Service Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 45 GE manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.
GE HEALTHCARE DIRECTION 5394141, REVISION 1LOGIQ™ P5 SERVICE MANUAL Section 8-2 - DISASSEMBLY/RE-ASSEMBLY 8 - 65 8-2-24-3 Removal procedure (cont’d) 3.) Perform the following functional tests. If all ar e successful, include the debrief script provided below. 8-2-24-4 Mounting Procedure Install the new parts in the reverse order of removal. Table 8-25 Functional Tests Service ManualSection Functional Test / Diagnostic TestDebrief Script Section 4-3-1 Power On/Boot Up “Service Manual, Direction 5394141, Rev 1+, Section 8-2-24. Equipment passed all required tests and is ready for use. “ Section 4-3-2 Power Off / Shutdown Section 4-8-1 Cover Parts Function Validation Section 10-5-5 Physical Inspection
GE HEALTHCARE DIRECTION 5394141, REVISION 1 LOGIQ™ P5 SERVICE MANUAL 8 - 66 Section 8-2 - DISASSEMBLY/RE-ASSEMBLY 8-2-25 Dummy Cover L / R 8-2-25-1 Tools • Common pilIips screwdrivers 8-2-25-2 Preparations • Shut down the system and switch off the main breaker. 8-2-25-3 Removal procedure 1.) Remove 2 rubber caps (1-2). 2.) Unscrew 2 screws and remove the dummy cover L. 3.) Same process is applied for dummy cover R. Figure 8-102 rubber cap of dummy cover Figure 8-103 screws of dummy cover
GE HEALTHCARE DIRECTION 5394141, REVISION 1LOGIQ™ P5 SERVICE MANUAL Section 8-2 - DISASSEMBLY/RE-ASSEMBLY 8 - 67 8-2-25-3 Removal procedure (cont’d) 4.) Perform the following functional tests. If all ar e successful, include the debrief script provided below. 8-2-25-4 Mounting Procedure Install the new parts in the reverse order of removal. Table 8-26 Functional Tests Service ManualSection Functional Test / Diagnostic TestDebrief Script Section 4-3-1 Power On/Boot Up “Service Manual, Direction 5394141, Rev 1+, Section 8-2-25. Equipment passed all required tests and is ready for use. “ Section 4-3-2 Power Off / Shutdown Section 4-8-1 Cover Parts Function Validation Section 10-5-5 Physical Inspection
GE HEALTHCARE DIRECTION 5394141, REVISION 1 LOGIQ™ P5 SERVICE MANUAL 8 - 68 Section 8-2 - DISASSEMBLY/RE-ASSEMBLY 8-2-26 EMI Cover L 8-2-26-1 Tools • Common pilIips screwdrivers 8-2-26-2 Preparations • Shut down the system and switch off the main breaker. 8-2-26-3 Removal procedure 1.) Remove the Side Left Cover. Refer to the 8-2-15 Side Left Cover on page 8-51 . 2.) Unscrew 6 screws (1-6). 3.) Perform the following functional tests. If all are successful, include the debrief script provided below. 8-2-26-4 Mounting Procedure Install the new parts in the reverse order of removal. Figure 8-104 EMI Cover L Table 8-27 Functional Tests Service Manual Section Functional Test / Diagnostic TestDebrief Script Section 4-3-1 Power On/Boot Up “Service Manual, Direction 5394141, Rev 1+, Section 8-2-26. Equipment passed all required tests and is ready for use. “ Section 4-3-2 Power Off / Shutdown Section 4-8-1 Cover Parts Function Validation Section 10-5-5 Physical Inspection
GE HEALTHCARE DIRECTION 5394141, REVISION 1LOGIQ™ P5 SERVICE MANUAL Section 8-2 - DISASSEMBLY/RE-ASSEMBLY 8 - 69 8-2-27 EMI Cover R 8-2-27-1 Tools • Common pilIips screwdrivers 8-2-27-2 Preparations • Shut down the system and switch off the main breaker. 8-2-27-3 Removal procedure 1.) Remove the Side Right Cover. Refer to the 8-2-16 Side Right Cover on page 8-52. 2.) Unscrew 9 screws (1-9). 3.) Perform the following functional tests. If all ar e successful, include the debrief script provided below. 8-2-27-4 Mounting Procedure Install the new parts in the reverse order of removal. Figure 8-105 EMI Cover R Table 8-28 Functional Tests Service Manual Section Functional Test / Diagnostic TestDebrief Script Section 4-3-1 Power On/Boot Up “Service Manual, Direction 5394141, Rev 1+, Section 8-2-27. Equipment passed all required tests and is ready for use. “ Section 4-3-2 Power Off / Shutdown Section 4-8-1 Cover Parts Function Validation Section 10-5-5 Physical Inspection
GE HEALTHCARE DIRECTION 5394141, REVISION 1 LOGIQ™ P5 SERVICE MANUAL 8 - 70 Section 8-2 - DISASSEMBLY/RE-ASSEMBLY 8-2-28 APS/APS Pro Assy NOTE: APS Power Supply can not be adjusted. 8-2-28-1 Tools • Common pilIips screwdrivers • Nipper 8-2-28-2 Preparations • Shut down the system and switch off the main breaker. 8-2-28-3 Removal procedure 1.) Remove the Side Left Cover. Refer to the 8-2-15 Side Left Cover on page 8-51 . 2.) Remove the EMI Cover L. Refer to the 8-2-26 EMI Cover L on page 8-68. 3.) Remove Hard Disk assy to unplug the APS/APS Pro connectors on backplane easily. - Unplug the HDD power connector on the HDD and the SATA connector from the bottom side of the backplane. Pull out the connector. 4.) Unscrew 4 screws of the HDD bracket. 5.) Unplug the DC power connector from DVD RW drive. 6.) The APS/APS Pro assy have 5 co nnectors, 3 connectors are pluged on backplane and 1 connector is connected to nest cooling fan power and 1 connector is AC power connector. Figure 8-106 Remove HDD HDD Connector SATA Connector
GE HEALTHCARE DIRECTION 5394141, REVISION 1LOGIQ™ P5 SERVICE MANUAL Section 8-2 - DISASSEMBLY/RE-ASSEMBLY 8 - 71 8-2-28-3 Removal procedure (cont’d) 7.) Unplug 3 connectors from the backplane and disconn ect the 3P AC connector near bottom of the backplane and disconnect the 2P connector near the nest cooling fan. 8.) Remove the Side Right Cover. Refer to the 8-2-16 Side Right Cover on page 8-52. 9.) Remove the EMI Cover R. Refer to the 8-2-27 EMI Cover R on page 8-69. 10.) Unplug the J14 connector and unscrew 2 screws (1-2). Pull out the APS/APS Pro assy carefully. During take out the APS/APS Pro assy, the power connector on the backplane side should be passed through the square hole on the backplane. Figure 8-107 APS/APS Pro Connectors of backplane Figure 8-108 Pull out the APS/APS Pro Assy Cut the tie wrap ODD Power Connector ODD SATA Connector
GE HEALTHCARE DIRECTION 5394141, REVISION 1 LOGIQ™ P5 SERVICE MANUAL 8 - 72 Section 8-2 - DISASSEMBLY/RE-ASSEMBLY 8-2-28-3 Removal procedure (cont’d) 11.) Perform the following functional tests. If all ar e successful, include the debrief script provided below. 8-2-28-4 Mounting Procedure Install the new parts in the reverse order of removal. Table 8-29 Functional Tests Service ManualSection Functional Test / Diagnostic TestDebrief Script Section 4-3-1 Power On/Boot Up “Service Manual, Direction 5394141, Rev 1+, Section 8-2-28. Equipment passed all required tests and is ready for use. “ Section 4-3-2 Power Off / Shutdown Section 4-9-5 APS/APS Pro Assy PCB Function Validation Procedure Section 10-5-2 Functional Checks (See Also Chapter 4) Section 10-5-5 Physical Inspection
GE HEALTHCARE DIRECTION 5394141, REVISION 1LOGIQ™ P5 SERVICE MANUAL Section 8-2 - DISASSEMBLY/RE-ASSEMBLY 8 - 73 8-2-29 CL1TRX Assy / BL1TRX Assy 8-2-29-1 Tools • Common pilIips screwdrivers 8-2-29-2 Preparations • Shut down the system and switch off the main breaker. 8-2-29-3 Removal procedure 1.) Remove the Side Right Cover. Refer to the 8-2-16 Side Right Cover on page 8-52. 2.) Remove the EMI Cover R. Refer to the 8-2-27 EMI Cover R on page 8-69. 3.) Unscrew 2 screws (1-2) and eject the PCB. 4.) The CL1TRX(BL1TRX) board is located on the most left slot in the nest box. Figure 8-109 Eject ASIG Assy
GE HEALTHCARE DIRECTION 5394141, REVISION 1 LOGIQ™ P5 SERVICE MANUAL 8 - 74 Section 8-2 - DISASSEMBLY/RE-ASSEMBLY 8-2-29-3 Removal procedure (cont’d) 5.) Pull the CL1TRX Assy out. 6.) Perform the following functional tests. If all are successful, include the debrief script provided below. 8-2-29-4 Mounting Procedure Install the new parts in the reverse order of removal. Figure 8-110 Eject the CL1TRX(BL1TRX) Board Table 8-30 Functional Tests Service Manual Section Functional Test / Diagnostic TestDebrief Script Section 4-3-1 Power On/Boot Up “Service Manual, Direction 5394141, Rev 1+, Section 8-2-29. Equipment passed all required tests and is ready for use. “ Section 4-3-2 Power Off / Shutdown Section 4-9-1 CL1TRX Assy / BL1TRX Assy Function Validation Procedure Section 4-3-4 System B/M-Mode Checks Section 4-3-5 System CFM and PWD Checks Section 10-5-2 Functional Checks (See Also Chapter 4)