Home > GE > Medical Equipment > GE Logiq P5 Service Manual

GE Logiq P5 Service Manual

    Download as PDF Print this page Share this page

    Have a look at the manual GE Logiq P5 Service Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 45 GE manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.

    Page
    of 520
    							GE HEALTHCARE
    DIRECTION 5394141, REVISION  1LOGIQ™ P5 SERVICE MANUAL 
    Section 8-2 - DISASSEMBLY/RE-ASSEMBLY 8 - 65
    8-2-24-3              Removal procedure  (cont’d)
    3.) Perform the following functional tests. If all ar e successful, include the debrief script provided below.
    8-2-24-4 Mounting Procedure Install the new parts in the reverse order of removal. Table 8-25    Functional Tests
    Service ManualSection
    Functional Test / Diagnostic TestDebrief Script
    Section 4-3-1 Power On/Boot Up
    “Service Manual, Direction
    5394141, Rev 1+, Section 8-2-24. Equipment 
    passed all required tests and is ready for use. “
    Section 4-3-2
    Power Off / Shutdown
    Section 4-8-1 Cover Parts Function Validation
    Section 10-5-5 Physical Inspection 
    						
    							GE HEALTHCARE
    DIRECTION 5394141, REVISION  1 LOGIQ™ P5 SERVICE MANUAL  
    8 - 66 Section 8-2 - DISASSEMBLY/RE-ASSEMBLY
    8-2-25 Dummy Cover L / R 
    8-2-25-1 Tools • Common pilIips screwdrivers
    8-2-25-2 Preparations • Shut down the system and switch off the main breaker.
    8-2-25-3 Removal procedure 1.) Remove 2 rubber caps (1-2).
    2.) Unscrew 2 screws and remove the dummy cover L.
    3.) Same process is applied for dummy cover R. Figure 8-102   rubber cap of dummy cover
    Figure 8-103   screws of dummy cover 
    						
    							GE HEALTHCARE
    DIRECTION 5394141, REVISION  1LOGIQ™ P5 SERVICE MANUAL 
    Section 8-2 - DISASSEMBLY/RE-ASSEMBLY 8 - 67
    8-2-25-3              Removal procedure  (cont’d)
    4.) Perform the following functional tests. If all ar e successful, include the debrief script provided below.
    8-2-25-4 Mounting Procedure Install the new parts in the reverse order of removal. Table 8-26    Functional Tests
    Service ManualSection
    Functional Test / Diagnostic TestDebrief Script
    Section 4-3-1 Power On/Boot Up
    “Service Manual, Direction
    5394141, Rev 1+, Section 8-2-25. Equipment 
    passed all required tests and is ready for use. “
    Section 4-3-2
    Power Off / Shutdown
    Section 4-8-1 Cover Parts Function Validation
    Section 10-5-5 Physical Inspection 
    						
    							GE HEALTHCARE
    DIRECTION 5394141, REVISION  1 LOGIQ™ P5 SERVICE MANUAL  
    8 - 68 Section 8-2 - DISASSEMBLY/RE-ASSEMBLY
    8-2-26 EMI Cover L
    8-2-26-1 Tools • Common pilIips screwdrivers
    8-2-26-2 Preparations • Shut down the system and switch off the main breaker.
    8-2-26-3 Removal procedure 1.) Remove the Side Left Cover. Refer to the 8-2-15 Side Left Cover on page 8-51 .
    2.) Unscrew 6 screws (1-6).
    3.) Perform the following functional tests. If all are successful, include the debrief script provided below.
    8-2-26-4 Mounting Procedure Install the new parts in the reverse order of removal. Figure 8-104   EMI Cover L
    Table 8-27    Functional Tests
    Service Manual Section
    Functional Test / Diagnostic TestDebrief Script
    Section 4-3-1 Power On/Boot Up
    “Service Manual, Direction
    5394141, Rev 1+, Section 8-2-26. Equipment 
    passed all required tests and is ready for use. “
    Section 4-3-2
    Power Off / Shutdown
    Section 4-8-1 Cover Parts Function Validation
    Section 10-5-5 Physical Inspection 
    						
    							GE HEALTHCARE
    DIRECTION 5394141, REVISION  1LOGIQ™ P5 SERVICE MANUAL 
    Section 8-2 - DISASSEMBLY/RE-ASSEMBLY 8 - 69
    8-2-27 EMI Cover R
    8-2-27-1 Tools • Common pilIips screwdrivers
    8-2-27-2 Preparations • Shut down the system and switch off the main breaker.
    8-2-27-3 Removal procedure 1.) Remove the Side Right Cover. Refer to the  8-2-16 Side Right Cover on page 8-52.
    2.) Unscrew 9 screws (1-9).
    3.) Perform the following functional tests. If all ar e successful, include the debrief script provided below.
    8-2-27-4 Mounting Procedure Install the new parts in the reverse order of removal. Figure 8-105   EMI Cover R
    Table 8-28    Functional Tests
    Service Manual Section
    Functional Test / Diagnostic TestDebrief Script
    Section 4-3-1 Power On/Boot Up
    “Service Manual, Direction
    5394141, Rev 1+, Section 8-2-27. Equipment 
    passed all required tests and is ready for use. “
    Section 4-3-2
    Power Off / Shutdown
    Section 4-8-1 Cover Parts Function Validation
    Section 10-5-5 Physical Inspection 
    						
    							GE HEALTHCARE
    DIRECTION 5394141, REVISION  1 LOGIQ™ P5 SERVICE MANUAL  
    8 - 70 Section 8-2 - DISASSEMBLY/RE-ASSEMBLY
    8-2-28 APS/APS Pro Assy
    NOTE: APS Power Supply  can not be adjusted.
    8-2-28-1 Tools • Common pilIips screwdrivers
    • Nipper
    8-2-28-2 Preparations • Shut down the system and switch off the main breaker.
    8-2-28-3 Removal procedure 1.) Remove the Side Left Cover. Refer to the 8-2-15 Side Left Cover on page 8-51 .
    2.) Remove the EMI Cover L. Refer to the  8-2-26 EMI Cover L on page 8-68.
    3.) Remove Hard Disk assy to unplug the APS/APS Pro connectors on backplane easily. - Unplug the HDD power connector on the HDD and the SATA connector from the bottom side  of the backplane. Pull out the connector.
    4.) Unscrew 4 screws  of the HDD bracket.
    5.) Unplug the DC power connector from DVD RW drive.
    6.) The APS/APS Pro assy have 5 co nnectors, 3 connectors are pluged on backplane and 1 connector 
    is connected to nest cooling fan power  and 1 connector is AC power connector.
    Figure 8-106   Remove HDD
    HDD Connector
    SATA Connector 
    						
    							GE HEALTHCARE
    DIRECTION 5394141, REVISION  1LOGIQ™ P5 SERVICE MANUAL 
    Section 8-2 - DISASSEMBLY/RE-ASSEMBLY 8 - 71
    8-2-28-3              Removal procedure  (cont’d)
    7.) Unplug 3 connectors from the backplane and disconn ect the 3P AC connector near bottom of the 
    backplane and disconnect the 2P connector near the nest cooling fan.
    8.) Remove the Side Right Cover. Refer to the  8-2-16 Side Right Cover on page 8-52.
    9.) Remove the EMI Cover R. Refer to the  8-2-27 EMI Cover R on page 8-69.
    10.) Unplug the J14 connector and  unscrew 2 screws (1-2). Pull out the APS/APS  Pro assy carefully. 
    During take out the APS/APS Pro  assy, the power connector on the backplane side should be 
    passed through the square hole on the backplane. Figure 8-107   APS/APS Pro Connectors of backplane
    Figure 8-108   Pull out the APS/APS Pro Assy Cut the tie wrap
    ODD Power Connector
    ODD SATA Connector 
    						
    							GE HEALTHCARE
    DIRECTION 5394141, REVISION  1 LOGIQ™ P5 SERVICE MANUAL  
    8 - 72 Section 8-2 - DISASSEMBLY/RE-ASSEMBLY
    8-2-28-3              Removal procedure  (cont’d)
    11.) Perform the following functional tests. If all ar e successful, include the debrief script provided below.
    8-2-28-4 Mounting Procedure Install the new parts in the reverse order of removal. Table 8-29    Functional Tests
    Service ManualSection
    Functional Test / Diagnostic TestDebrief Script
    Section 4-3-1 Power On/Boot Up
    “Service Manual, Direction
    5394141, Rev 1+, Section 8-2-28. Equipment 
    passed all required tests and is ready for use. “
    Section 4-3-2
    Power Off / Shutdown
    Section 4-9-5 APS/APS Pro Assy PCB Function Validation 
    Procedure
    Section 10-5-2 Functional Checks (See Also Chapter 4)
    Section 10-5-5 Physical Inspection 
    						
    							GE HEALTHCARE
    DIRECTION 5394141, REVISION  1LOGIQ™ P5 SERVICE MANUAL 
    Section 8-2 - DISASSEMBLY/RE-ASSEMBLY 8 - 73
    8-2-29 CL1TRX Assy / BL1TRX Assy
    8-2-29-1 Tools • Common pilIips screwdrivers
    8-2-29-2 Preparations • Shut down the system and switch off the main breaker.
    8-2-29-3 Removal procedure 1.) Remove the Side Right Cover. Refer to the  8-2-16 Side Right Cover on page 8-52.
    2.) Remove the EMI Cover R. Refer to the  8-2-27 EMI Cover R on page 8-69.
    3.) Unscrew 2 screws (1-2) and eject the PCB.
    4.) The CL1TRX(BL1TRX) board is located  on the most left slot in the nest box.
    Figure 8-109   Eject ASIG Assy 
    						
    							GE HEALTHCARE
    DIRECTION 5394141, REVISION  1 LOGIQ™ P5 SERVICE MANUAL  
    8 - 74 Section 8-2 - DISASSEMBLY/RE-ASSEMBLY
    8-2-29-3              Removal procedure  (cont’d)
    5.) Pull the CL1TRX Assy out.
    6.) Perform the following functional tests. If all are successful, include the debrief script provided below.
    8-2-29-4 Mounting Procedure Install the new parts in the reverse order of removal. Figure 8-110   Eject the CL1TRX(BL1TRX) Board
    Table 8-30    Functional Tests
    Service Manual Section
    Functional Test / Diagnostic TestDebrief Script
    Section 4-3-1 Power On/Boot Up
    “Service Manual, Direction
    5394141, Rev 1+, Section 8-2-29. Equipment 
    passed all required tests and is ready for use. “
    Section 4-3-2
    Power Off / Shutdown
    Section 4-9-1 CL1TRX Assy / BL1TRX Assy Function 
    Validation Procedure
    Section 4-3-4 System B/M-Mode Checks
    Section 4-3-5 System CFM and PWD Checks
    Section 10-5-2 Functional Checks (See Also Chapter 4) 
    						
    All GE manuals Comments (0)

    Related Manuals for GE Logiq P5 Service Manual