Home > GE > Medical Equipment > GE Logiq P5 Service Manual

GE Logiq P5 Service Manual

    Download as PDF Print this page Share this page

    Have a look at the manual GE Logiq P5 Service Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 45 GE manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.

    Page
    of 520
    							GE HEALTHCARE
    DIRECTION 5394141, REVISION  1LOGIQ™ P5 SERVICE MANUAL 
    Section 8-2 - DISASSEMBLY/RE-ASSEMBLY 8 - 95
    8-2-41 Cup Holder
    8-2-41-1 Tools • No need tool
    8-2-41-2 Removal procedure 1.) Remove the cup holder.
    2.) Perform the following functional tests. If all ar e successful, include the debrief script provided below.
    8-2-41-3 Mounting Procedure Install the new parts in the reverse order of removal. Figure 8-131   Cup holder
    Table 8-42    Functional Tests
    Service Manual Section
    Functional Test / Diagnostic TestDebrief Script
    Section 4-3-1 Power On/Boot Up
    “Service Manual, Direction
    5394141, Rev 1+, Section 8-2-41. Equipment 
    passed all required tests and is ready for use. “
    Section 4-3-2
    Power Off / Shutdown
    Section 4-8-1 Cover Parts Function Validation
    Section 10-5-5Physical Inspection 
    						
    							GE HEALTHCARE
    DIRECTION 5394141, REVISION  1 LOGIQ™ P5 SERVICE MANUAL  
    8 - 96 Section 8-2 - DISASSEMBLY/RE-ASSEMBLY
    8-2-42 ECG Cable Hook
    8-2-42-1 Tools • Common pilIips screwdrivers
    8-2-42-2 Removal procedure 1.) Unscrew 2 screws (1-2) to remove the ECG Cable Hook.
    2.) Perform the following functional tests. If all are successful, include the debrief script provided below.
    8-2-42-3 Mounting Procedure Install the new parts in the reverse order of removal. Figure 8-132   Screws of cable hook
    Table 8-43    Functional Tests
    Service Manual Section
    Functional Test / Diagnostic TestDebrief Script
    Section 4-3-1 Power On/Boot Up
    “Service Manual, Direction
    5394141, Rev 1+, Section 8-2-42. Equipment 
    passed all required tests and is ready for use. “
    Section 4-3-2
    Power Off / Shutdown
    Section 4-8-1 Cover Parts Function Validation
    Section 10-5-5Physical Inspection
    (1) (2) 
    						
    							GE HEALTHCARE
    DIRECTION 5394141, REVISION  1LOGIQ™ P5 SERVICE MANUAL 
    Section 8-2 - DISASSEMBLY/RE-ASSEMBLY 8 - 97
    8-2-43 Air Filter Set
    8-2-43-1 Tools • No need tool
    8-2-43-2 Preparations • Shut down the system and switch off the main breaker.
    8-2-43-3 Removal procedure 1.) Pull out the 2 Air filters from the bottom  left and right side of the system (1-2).
    2.) Perform the following functional tests. If all ar e successful, include the debrief script provided below.
    8-2-43-4 Mounting Procedure Install the new parts in the reverse order of removal. Figure 8-133   Air filters
    Table 8-44    Functional Tests
    Service Manual Section
    Functional Test / Diagnostic TestDebrief Script
    Section 4-3-1 Power On/Boot Up
    “Service Manual, Direction
    5394141, Rev 1+, Section 8-2-43. Equipment 
    passed all required tests and is ready for use. “
    Section 4-3-2
    Power Off / Shutdown
    Section 4-8-3 Air filter set Function Validation Procedure
    Section 10-5-5Physical Inspection
    (1) (2) 
    						
    							GE HEALTHCARE
    DIRECTION 5394141, REVISION  1 LOGIQ™ P5 SERVICE MANUAL  
    8 - 98 Section 8-2 - DISASSEMBLY/RE-ASSEMBLY
    8-2-44 DVD R/W Drive
    8-2-44-1 Tools • Common pilIips screwdrivers
    8-2-44-2 Preparations • Shut down the system and switch off the main breaker.
    8-2-44-3 Removal procedure 1.) Remove the side left cover. Refer to the  8-2-15 Side Left Cover on page 8-51.
    2.) Remove EMI L Cover. Refer to the  8-2-26 EMI Cover L on page 8-68.
    3.) .) Remove the HDD assy. Refer to the  8-2-47 SATA HDD Assy on page 8-104.
    4.) Disconnect the HDD power cable and unsc rew 4 screws of the HDD fixture bracket.
    5.) Remove the Front Cover. Refer to the  8-2-17 Front Cover on page 8-53.
    Figure 8-134   ODD SATA Power Cable and SATA cable of DVD Drive
    SATA Cable
    ODD SATA Power CAble 
    						
    							GE HEALTHCARE
    DIRECTION 5394141, REVISION  1LOGIQ™ P5 SERVICE MANUAL 
    Section 8-2 - DISASSEMBLY/RE-ASSEMBLY 8 - 99
    8-2-44-3              Removal procedure  (cont’d)
    6.) Unscrew the 4 screws on the front of the DVD drive and remove the DVD Assy.
    7.) Unscrew 8 screws to remove the bracket from the DVD Assy.
    8.) Perform the following functional tests. If all ar e successful, include the debrief script provided below.
    8-2-44-4 Mounting Procedure Install the new parts in the reverse order of removal.Figure 8-135   Unscrew 4screws and remove the DVD Assy 
    Figure 8-136   Unscrew 8screws and remove the DVD Drive from the bracket
    Table 8-45    Functional Tests
    Service Manual Section
    Functional Test / Diagnostic TestDebrief Script
    Section 4-3-1 Power On/Boot Up
    “Service Manual, Direction
    5394141, Rev 1+, Section 8-2-44. Equipment 
    passed all required tests and is ready for use. “
    Section 4-3-2
    Power Off / Shutdown 
    						
    							GE HEALTHCARE
    DIRECTION 5394141, REVISION  1 LOGIQ™ P5 SERVICE MANUAL  
    8 - 100 Section 8-2 -  DISASSEMBLY/RE-ASSEMBLY
    8-2-45 Nest Fan Assy
    8-2-45-1 Tools
    • Common pilIips screwdrivers
    8-2-45-2 Preparations • Shut down the system and switch off the main breaker.
    8-2-45-3 Removal procedure 1.) Remove the Left Cover. Refer to the  8-2-15 Side Left Cover on page 8-51.
    2.) Remove the EMI Cover Left. Refer to the  8-2-26 EMI Cover L on page 8-68.
    3.) Unplug the Connection.
    4.) Remove the Right Cover. Refer to the  8-2-16 Side Right Cover on page 8-52.
    5.) Remove the EMI Cover Right. Refer to the 8-2-27 EMI Cover R on page 8-69 .
    6.) Unscrews 2 screws. Figure 8-137   Power connector of Nest fan
    Figure 8-138   2 screws on the Nest Fan 
    						
    							GE HEALTHCARE
    DIRECTION 5394141, REVISION  1LOGIQ™ P5 SERVICE MANUAL 
    Section 8-2 - DISASSEMBLY/RE-ASSEMBLY 8 - 101
    8-2-45-3              Removal procedure  (cont’d)
    7.) Remove the Nest fan assy.
    8.) Perform the following functional tests. If all ar e successful, include the debrief script provided below.
    8-2-45-4 Mounting Procedure Install the new parts in the reverse order of removal. Figure 8-139   Pull out the nest fan
    Table 8-46    Functional Tests
    Service Manual Section
    Functional Test / Diagnostic TestDebrief Script
    Section 4-3-1 Power On/Boot Up
    “Service Manual, Direction
    5394141, Rev 1+, Section 8-2-45. Equipment 
    passed all required tests and is ready for use. “
    Section 4-3-2
    Power Off / Shutdown
    Section 4-9-10 Nest fan Function Validation Procedure
    Section 10-5-5Physical Inspection 
    						
    							GE HEALTHCARE
    DIRECTION 5394141, REVISION  1 LOGIQ™ P5 SERVICE MANUAL  
    8 - 102 Section 8-2 -  DISASSEMBLY/RE-ASSEMBLY
    8-2-46 ARP Assy 110V/220V
    8-2-46-1 Tools
    • Common pilIips screwdrivers
    8-2-46-2 Preparations • Shut down the system and switch off the main breaker.
    8-2-46-3 Removal procedure 1.) Remove side right cover and EMI cover. Refer to the  8-2-16 Side Right Cover on page 8-52 and 
    8-2-27 EMI Cover R on page 8-69 .
    2.) Remove the Rear Cover. Refer to the  8-2-18 Rear Cover on page 8-55.
    3.) Unscrew 4 screws (1-4). 
    4.) Disconnect J15 connector. Figure 8-140   Screws of the rear panel
    Figure 8-141   AEXP Ca ble of rear panel
    (1)
    (3) (4)(2) 
    						
    							GE HEALTHCARE
    DIRECTION 5394141, REVISION  1LOGIQ™ P5 SERVICE MANUAL 
    Section 8-2 - DISASSEMBLY/RE-ASSEMBLY 8 - 103
    8-2-46-3              Removal procedure  (cont’d)
    5.) Disconnect three (3) USB connectors or 5 USB  connectors from the rear panel and 2 AC power 
    connector. The 4D controller USB and ECG USB co nnector also connect to this rear panel PWA.
    6.) Perform the following functional tests. If all ar e successful, include the debrief script provided below.
    8-2-46-4 Mounting Procedure Install the new parts in the reverse order of removal. Figure 8-142   Open Rear Panel
    Table 8-47    Functional Tests
    Service Manual Section
    Functional Test / Diagnostic TestDebrief Script
    Section 4-3-1 Power On/Boot Up
    “Service Manual, Direction
    5394141, Rev 1+, Section 8-2-46. Equipment 
    passed all required tests and is ready for use. “
    Section 4-3-2
    Power Off / Shutdown
    Section 4-9-15 ARP Assy Function Validation Procedure
    Section 4-5 Peripheral Checks
    Section 10-5-2-2 Peripheral/Option Checks
    Section 10-5-5 Physical Inspection
    Section 10-6-3 Outlet Test - Wiring Arrangement - USA & 
    Canada 
    						
    							GE HEALTHCARE
    DIRECTION 5394141, REVISION  1 LOGIQ™ P5 SERVICE MANUAL  
    8 - 104 Section 8-2 -  DISASSEMBLY/RE-ASSEMBLY
    8-2-47 SATA HDD Assy
    8-2-47-1 Tools
    • Common pilIips screwdrivers
    8-2-47-2 Preparations • Shut down the system and switch off the main breaker.
    8-2-47-3 Removal procedure 1.) Remove the side left cover. Refer to the  8-2-15 Side Left Cover on page 8-51.
    2.) Remove EMI L Cover. Refer to the  8-2-26 EMI Cover L on page 8-68.
    3.) Disconnect the HDD power cable and unsc rew 4 screws of the HDD fixture bracket.
    Figure 8-143   HDD in System
    HDD Power Cable 
    						
    All GE manuals Comments (0)

    Related Manuals for GE Logiq P5 Service Manual