GE Logiq P5 Service Manual
Have a look at the manual GE Logiq P5 Service Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 45 GE manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.
GE HEALTHCARE DIRECTION 5394141, REVISION 1LOGIQ™ P5 SERVICE MANUAL Section 8-3 - Software Loading Procedure 8 - 195 8-7-12 Printer VCR DVD fixture Top installation - CP900 Printer (cont’d) 4.) Screw 2 screws(2159633, BH M4x8 WHT) on each sides to fix the color printer with base bracket to the color prin ter top bracket. 5.) Connect the USB from the color printer as shown in the figure below. 6.) Connect the cable from the color printer to the system. Figure 8-294 Printer VCR DVD Fixture Top installation Figure 8-295 Printer VCR DVD Fixture Top installation Figure 8-296 Printer VCR DVD Fixture Top installation (1) (2) (3) (4)
GE HEALTHCARE DIRECTION 5394141, REVISION 1 LOGIQ™ P5 SERVICE MANUAL 8 - 196 Section 8-3 - Software Loading Procedure 8-7-12 Printer VCR DVD fixture Top installation - CP900 Printer (cont’d) 7.) Install hide bracket by screwing 3 screws(2159633, BH M4x8 WHT). 8.) Tie the cable properly using the tie wrap. Figure 8-297 Printer VCR DVD Fixture Top installation
GE HEALTHCARE DIRECTION 5394141, REVISION 1LOGIQ™ P5 SERVICE MANUAL Section 8-3 - Software Loading Procedure 8 - 197 8-7-13 Printer VCR DVD Fixture Top Installation (MD-3000) 8-7-13-1 VCR Remote Port Configuration 1.) LOGIQ™ P5 control the Mitsubishi MD-3000 VCR through USB. Hence the VCR remote control port must be configured as USB 2.) Open the remote control module in the VCR. 3.) Unscrew 2 screws on the VCR remote control po rt panel and out the remote control module from VCR. Unscrew 1 screw on the module. Figure 8-298 VCR Remote Control Panel Figure 8-299 VCR Remote Control Panel 2
GE HEALTHCARE DIRECTION 5394141, REVISION 1 LOGIQ™ P5 SERVICE MANUAL 8 - 198 Section 8-3 - Software Loading Procedure 8-7-13-1 VCR Remote Port Configuration (cont’d) 4.) Set the DIP switch on the VCR remote control pane l. The SW 7 in DIP switch should be set to “ON” position for the USB remote control. 5.) Insert the remote control module into the VC R and connect the USB cable between the “Remote” USB on the console rear panel and USB port of VCR. 6.) Plug the service dongle and turn on the VCR and System. 7.) Login to maintenance mode and open the device manager. 8.) Check if the VCR remote device is identified by OS. Figure 8-300 DIP Switch on the Panel Figure 8-301 Remote device in the device manager
GE HEALTHCARE DIRECTION 5394141, REVISION 1LOGIQ™ P5 SERVICE MANUAL Section 8-3 - Software Loading Procedure 8 - 199 8-7-13-2 Bracket Installation 1.) Unscrew 2 existing screws from the top cover. 2.) Install Fixture Top bracket on the top cover by screwing 2 screws(2306565, BH M4x16 WHT). 3.) Install VCR recorder to the base bracket by screwing 4 screws(2159634, BH M4x10 WHT). Figure 8-302 Printer VCR DVD Fixture Top installation Figure 8-303 Printer VCR DVD Fixture Top installation Figure 8-304 Printer VCR DVD Fixture Top installation
GE HEALTHCARE DIRECTION 5394141, REVISION 1 LOGIQ™ P5 SERVICE MANUAL 8 - 200 Section 8-3 - Software Loading Procedure 8-7-13-2 Bracket Installation (cont’d) 4.) Screw 2 screws(2159633, BH M4x8 WHT) on each side of the system to fix the VCR recorder with base bracket to the VCR top bracket. 5.) Connect the cables (Power Cable, USB cable, S-VHS Cable, and Sound cables) from the VCR to the system. 6.) Connect the cables to the system on the rear panel. Figure 8-305 Printer VCR DVD Fixture Top installation Figure 8-306 Printer VCR DVD Fixture Top installation Figure 8-307 Printer VCR DVD Fixture Top installation
GE HEALTHCARE DIRECTION 5394141, REVISION 1LOGIQ™ P5 SERVICE MANUAL Section 8-3 - Software Loading Procedure 8 - 201 8-7-13-2 Bracket Installation (cont’d) 7.) Connect the cables (Power Cable, USB cable, S-VHS Cable, and Sound cables) from the VCR to the system. 8.) Connect the cables to the system on the rear panel. 9.) Install VCR hide bracket by screwing 3 screws(2159633, BH M4x8 WHT). Figure 8-308 Printer VCR DVD Fixture Top installation Figure 8-309 Printer VCR DVD Fixture Top installation Figure 8-310 Printer VCR DVD Fixture Top installation
GE HEALTHCARE DIRECTION 5394141, REVISION 1 LOGIQ™ P5 SERVICE MANUAL 8 - 202 Section 8-3 - Software Loading Procedure 8-7-14 Printer VCR DVD Fixture Top Installation (MD-800) 1.) Unscrew 2 existing screws from the top cover. 2.) Install Fixture DVD bot bracket on the top cover by screwing 2 screws(2327592, FH M4x14 YEL). 3.) Install Fixture Top bracket on the top cover by screwing 4 screws(2373565, FH M4x20). Figure 8-311 Printer VCR DVD Fixture Top installation (LQ MD800) Figure 8-312 Printer VCR DVD Fixture installation top Figure 8-313 Printer VCR DVD Fi xture Top installation (LQ MD800)
GE HEALTHCARE DIRECTION 5394141, REVISION 1LOGIQ™ P5 SERVICE MANUAL Section 8-3 - Software Loading Procedure 8 - 203 8-7-14 Printer VCR DVD Fixt ure Top Installation (MD-800) (cont’d) 4.) Install DVD recorder to the base bracket by screwing 2 screws(2159633, BH M4x8 WHT) on each side. 5.) Connect the USB cable and power cable from the DVD to the system. 6.) Connect the cables to the system on the rear panel. Figure 8-314 Printer VCR DVD Fixture Top installation (LQ MD800) Figure 8-315 Printer VCR DVD Fixture Top installation (LQ MD800) Figure 8-316 Printer VCR DVD Fixture Top installation (LQ MD800)
GE HEALTHCARE DIRECTION 5394141, REVISION 1 LOGIQ™ P5 SERVICE MANUAL 8 - 204 Section 8-3 - Software Loading Procedure 8-7-14 Printer VCR DVD Fixt ure Top Installation (MD-800) (cont’d) 7.) Install DVD hide bracket by screwing 2 screws(2159633, BH M4x8). Figure 8-317 Printer VCR DVD Fi xture Top installation (LQ MD800)