Home > GE > Medical Equipment > GE Logiq P5 Service Manual

GE Logiq P5 Service Manual

    Download as PDF Print this page Share this page

    Have a look at the manual GE Logiq P5 Service Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 45 GE manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.

    Page
    of 520
    							GE HEALTHCARE
    DIRECTION 5394141, REVISION  1LOGIQ™ P5 SERVICE MANUAL 
    Section 8-2 - DISASSEMBLY/RE-ASSEMBLY 8 - 55
    8-2-18 Rear Cover 
    8-2-18-1 Tools • Common pilIips screwdrivers
    8-2-18-2 Preparations • Shut down the system and switch off the main breaker.
    8-2-18-3 Removal procedure 1.) Remove the Left, and Right side covers. Refer to the  8-2-15 Side Left Cover on page 8-51 and 8-
    2-16 Side Right Cover on page 8-52 .
    2.) Remove 4 rubber caps from the rear cover of the system.
    3.) Unscrew 4 screws (1-4) from the rear cover.
    4.) Remove the Rear Cover. Figure 8-91   4 rubber caps on Rear Cover
    Figure 8-92   4 screws on rear cover
    (2)
    (3) (4)
    (1) 
    						
    							GE HEALTHCARE
    DIRECTION 5394141, REVISION  1 LOGIQ™ P5 SERVICE MANUAL  
    8 - 56 Section 8-2 - DISASSEMBLY/RE-ASSEMBLY
    8-2-18-3              Removal procedure  (cont’d)
    5.) Perform the following functional tests. If all are successful, include the debrief script provided below.
    8-2-18-4 Mounting Procedure Install the new parts in the reverse order of removal. Table 8-19    Functional Tests
    Service ManualSection
    Functional Test / Diagnostic TestDebrief Script
    Section 4-3-1 Power On/Boot Up
    “Service Manual, Direction
    5394141, Rev 1+, Section 8-2-18. Equipment 
    passed all required tests and is ready for use. “
    Section 4-3-2
    Power Off / Shutdown
    Section 4-8-1 Cover Parts Function Validation
    Section 10-5-5 Physical Inspection 
    						
    							GE HEALTHCARE
    DIRECTION 5394141, REVISION  1LOGIQ™ P5 SERVICE MANUAL 
    Section 8-2 - DISASSEMBLY/RE-ASSEMBLY 8 - 57
    8-2-19 Middle Cover
    8-2-19-1 Tools • Common pilIips screwdrivers
    • Stubby screwdriver (Flat tip and Cross tip)
    8-2-19-2 Preparations • Shut down the system and switch off the main breaker.
    8-2-19-3 Removal procedure 1.) Remove the Left, and Right side covers. Refer to the  8-2-15 Side Left Cover on page 8-51 and 8-
    2-16 Side Right Cover on page 8-52 . And Remove the Rear Cover. Refer to the  8-2-18 Rear 
    Cover on page 8-55 .
    2.) Remove 2 rubber caps (1-2) from  the middle cover of the system.
    3.) Unscrew 2 screws (1-2) from the middle cover. Figure 8-93   2 rubber cap of middle cover
    Figure 8-94   2 screws of middle cover
    1 2
    12 
    						
    							GE HEALTHCARE
    DIRECTION 5394141, REVISION  1 LOGIQ™ P5 SERVICE MANUAL  
    8 - 58 Section 8-2 - DISASSEMBLY/RE-ASSEMBLY
    8-2-19-3              Removal procedure  (cont’d)
    4.) Perform the following functional tests. If all are successful, include the debrief script provided below.
    8-2-19-4 Mounting Procedure Install the new parts in the reverse order of removal. Table 8-20    Functional Tests
    Service ManualSection
    Functional Test / Diagnostic TestDebrief Script
    Section 4-3-1 Power On/Boot Up
    “Service Manual, Direction
    5394141, Rev 1+, Section 8-2-19. Equipment 
    passed all required tests and is ready for use. “
    Section 4-3-2
    Power Off / Shutdown
    Section 4-8-1 Cover Parts Function Validation
    Section 10-5-5 Physical Inspection 
    						
    							GE HEALTHCARE
    DIRECTION 5394141, REVISION  1LOGIQ™ P5 SERVICE MANUAL 
    Section 8-2 - DISASSEMBLY/RE-ASSEMBLY 8 - 59
    8-2-20 Top Cover
    8-2-20-1 Tools • Common pilIips screwdrivers
    8-2-20-2 Preparations • Shut down the system and switch off the main breaker.
    8-2-20-3 Removal procedure 1.) Remove the Dummy Cover L/R. Refer to the  8-2-25 Dummy Cover L / R on page 8-66.
    2.) Remove the Top Bottom Cover. Refer to the  8-2-21 Top Bottom Cover on page 8-60.
    3.) Remove 2 rubber caps (1-2) from the top cover of the system and unscrew 2 screws (1-2).
    4.) Unscrew 5 screws (1-5) from the bottom of the top cover.
    5.) Remove the Top Cover.
    6.) Perform the following functional tests. If all ar e successful, include the debrief script provided below.
    8-2-20-4 Mounting Procedure Install the new parts in the reverse order of removal. Figure 8-95   2 rubber caps of top cover
    Table 8-21    Functional Tests
    Service Manual Section
    Functional Test / Diagnostic TestDebrief Script
    Section 4-3-1 Power On/Boot Up
    “Service Manual, Direction
    5394141, Rev 1+, Section 8-2-20. Equipment 
    passed all required tests and is ready for use. “
    Section 4-3-2
    Power Off / Shutdown
    Section 4-8-1 Cover Parts Function Validation
    Section 10-5-5 Physical Inspection
    (1)(2) 
    						
    							GE HEALTHCARE
    DIRECTION 5394141, REVISION  1 LOGIQ™ P5 SERVICE MANUAL  
    8 - 60 Section 8-2 - DISASSEMBLY/RE-ASSEMBLY
    8-2-21 Top Bottom Cover
    8-2-21-1 Tools • Common pilIips screwdrivers
    • Stubby screwdriver (Flat tip and Cross tip)
    8-2-21-2 Preparations • Shut down the system and switch off the main breaker.
    8-2-21-3 Removal procedure 1.) Remove the Dummy Cover L/R. Refer to the  8-2-25 Dummy Cover L / R on page 8-66.
    2.) Unscrew 7 screws (1-7) from the bottom of the top cover.
    3.) Remove the Top Bottom Cover.
    4.) Perform the following functional tests. If all are successful, include the debrief script provided below.
    8-2-21-4 Mounting Procedure Install the new parts in the reverse order of removal. Figure 8-96   Top bottom cover
    Table 8-22    Functional Tests
    Service Manual Section
    Functional Test / Diagnostic TestDebrief Script
    Section 4-3-1 Power On/Boot Up
    “Service Manual, Direction
    5394141, Rev 1+, Section 8-2-21. Equipment 
    passed all required tests and is ready for use. “
    Section 4-3-2
    Power Off / Shutdown
    Section 4-8-1 Cover Parts Function Validation
    Section 10-5-5 Physical Inspection 
    						
    							GE HEALTHCARE
    DIRECTION 5394141, REVISION  1LOGIQ™ P5 SERVICE MANUAL 
    Section 8-2 - DISASSEMBLY/RE-ASSEMBLY 8 - 61
    8-2-22 Pole Cover 
    8-2-22-1 Tools • Common pilIips screwdrivers
    8-2-22-2 Preparations • Shut down the system and switch off the main breaker.
    8-2-22-3 Removal procedure 1.) Remove the Dummy Cover L/R. Refer to the  8-2-25 Dummy Cover L / R on page 8-66.
    2.) Remove the Top Bottom Cover. Refer to the  8-2-21 Top Bottom Cover on page 8-60.
    3.) Remove the Top Cover. Refer to the  8-2-20 Top Cover on page 8-59.
    4.) Unscrew 2 screws (1-2).
    5.) Perform the following functional tests. If all ar e successful, include the debrief script provided below.
    8-2-22-4 Mounting Procedure Install the new parts in the reverse order of removal. Figure 8-97   Pole Cover
    Table 8-23    Functional Tests
    Service Manual Section
    Functional Test / Diagnostic TestDebrief Script
    Section 4-3-1 Power On/Boot Up
    “Service Manual, Direction
    5394141, Rev 1+, Section 8-2-22. Equipment 
    passed all required tests and is ready for use. “
    Section 4-3-2
    Power Off / Shutdown
    Section 4-8-1 Cover Parts Function Validation
    Section 10-5-5 Physical Inspection
    (1)
    (2) 
    						
    							GE HEALTHCARE
    DIRECTION 5394141, REVISION  1 LOGIQ™ P5 SERVICE MANUAL  
    8 - 62 Section 8-2 - DISASSEMBLY/RE-ASSEMBLY
    8-2-23 Neck Front 
    8-2-23-1 Tools • Common pilIips screwdrivers
    8-2-23-2 Preparations • Shut down the system and switch off the main breaker.
    8-2-23-3 Removal procedure 1.) Remove 1 rubber cap.
    2.) Unscrew 1 screw and remove the Neck Front. Figure 8-98   rubber cap of neck front cover
    Figure 8-99   Open neck front cover 
    						
    							GE HEALTHCARE
    DIRECTION 5394141, REVISION  1LOGIQ™ P5 SERVICE MANUAL 
    Section 8-2 - DISASSEMBLY/RE-ASSEMBLY 8 - 63
    8-2-23-3              Removal procedure  (cont’d)
    3.) Perform the following functional tests. If all ar e successful, include the debrief script provided below.
    8-2-23-4 Mounting Procedure Install the new parts in the reverse order of removal. Table 8-24    Functional Tests
    Service ManualSection
    Functional Test / Diagnostic TestDebrief Script
    Section 4-3-1 Power On/Boot Up
    “Service Manual, Direction
    5394141, Rev 1+, Section 8-2-23. Equipment 
    passed all required tests and is ready for use. “
    Section 4-3-2
    Power Off / Shutdown
    Section 4-8-1 Cover Parts Function Validation
    Section 10-5-5 Physical Inspection 
    						
    							GE HEALTHCARE
    DIRECTION 5394141, REVISION  1 LOGIQ™ P5 SERVICE MANUAL  
    8 - 64 Section 8-2 - DISASSEMBLY/RE-ASSEMBLY
    8-2-24 Neck Rear
    8-2-24-1 Tools • Common pilIips screwdrivers
    8-2-24-2 Preparations • Shut down the system and switch off the main breaker.
    8-2-24-3 Removal procedure 1.) Remove 2 rubber caps (1-2).
    2.) Unscrew 2 screws and remove the Neck Rear. Figure 8-100   rubber cap of neck rear cover
    Figure 8-101   Open neck rear cover
    (2)
    (1) 
    						
    All GE manuals Comments (0)

    Related Manuals for GE Logiq P5 Service Manual