GE Logiq P5 Service Manual
Have a look at the manual GE Logiq P5 Service Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 45 GE manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.
GE HEALTHCARE DIRECTION 5394141, REVISION 1LOGIQ™ P5 SERVICE MANUAL Section 8-3 - Software Loading Procedure 8 - 155 8-4-4-8 Print Key Assignment and Checkout (if necessary) 1.) Select Utility-> Connectivity-> Button tap. 2.) Choose the desired print button (for example, Print1) under Physical Print Button. 3.) Select Standard Print, and press > >Standard Print is added under printflow View. 4.) Press the print key just configured. The screenshot prints to the destination printer. Figure 8-219 Ph ysical Print Button NOTICEPress
GE HEALTHCARE DIRECTION 5394141, REVISION 1 LOGIQ™ P5 SERVICE MANUAL 8 - 156 Section 8-3 - Software Loading Procedure 8-4-4-9 Regional Setup Procedure for Japanese You can set up the keyboard for Japanese. If you select Japanese, the following items display or may be entered in Japanese. • Patient Name • Exam Comment (on Patient screen and Worksheet) • Annotation (Comments) • Error/Warning Messages • DICOM/Worklist 1.) In Utility--> System--> General, set the Language as JPN. Save this setting, but do not reboot the system yet. 2.) Press Regional Options, under Standards and Formats select Japanese, under Location select Japan. Press Apply. Figure 8-221 Changing the System Language to JPN Figure 8-222 Regional Options
GE HEALTHCARE DIRECTION 5394141, REVISION 1LOGIQ™ P5 SERVICE MANUAL Section 8-3 - Software Loading Procedure 8 - 157 8-4-4-9 Regional Setup Procedure for Japanese (cont’d) 3.) Select the Language tab, press Deta ils, under Installed Services add the Japanese-Microsoft IME Standard 2002 ver. 8.1 keyboard, under Default input language select Japanese, press Apply, Press OK. 4.) Select the Advanced tab, then select Japanese in the Language for non-Unicode programs pull- down menu. Press Apply. Answer Yes to use files already loaded on the hard disk, then answer No to not reboot the system yet, press OK. Press Save and Exit the Utility screen. 5.) Reboot the system. When your system restarts , the system appears in the selected language. NOTE: To have the settings take effect, you MUST turn off the system and turn it back on. 6.) In Utility --> System --> General, press Regional Options. Select Language Tab and press Details. Remove English under Installed Services. Press Apply and OK. 7.) To type in Japanese, press Alt + tilde/accent key (located between the Esc and F1 keys) in order to start the Input Method Editor (IME). Figure 8-223 Regional and Language Options—Language Tab
GE HEALTHCARE DIRECTION 5394141, REVISION 1 LOGIQ™ P5 SERVICE MANUAL 8 - 158 Section 8-3 - Software Loading Procedure 8-4-4-10 Product Type Check of the System To verify that the correct version of Ap plication software was installed, check the Product Type of the Application software. Verifica tion steps are listed below. 1.) Turn on the system. Wait until the screen comes up. 2.) Press the Utility key and click Admin tab. 3.) Check the value of Product item. 4.) The following table is the matching table. Figure 8-224 Checking Product Type Installed ApplicationValue of Product item P5 Radiology.Arirang A5 Radiology.Arirang.BW A5Pro (A5 w/o PW) Radiology.Arirang.BW2 Table 8-59 Product Type Matching Table
GE HEALTHCARE DIRECTION 5394141, REVISION 1LOGIQ™ P5 SERVICE MANUAL Section 8-3 - Software Loading Procedure 8 - 159 Section 8-5Full Back up/Restore Procedure 8-5-1 General This describes a Full Backup (Database, Image, User preset, Service Data) procedure. Use this instruction when you need to save the data : • before changing a HDD with a new one • before reinstalling Base Application • when you just want to save all of the current data. 8-5-2 Parts Required • USB HDD 8-5-3 Full Backup Procedure 1.) While the Echoloader is running, press ‘Utility’ button and click on the ‘Admin’. 2.) When Title Login window pops up, select an operator with admin authorization. 3.) Type in the password. 4.) press “OK”. 5.) Select “System Admin” page. 6.) press “Execute” button under Full Backup box and the window below pops up. Figure 8-225 Backup and Restore Window
GE HEALTHCARE DIRECTION 5394141, REVISION 1 LOGIQ™ P5 SERVICE MANUAL 8 - 160 Section 8-3 - Software Loading Procedure 8-5-3 Full Backup Procedure (cont’d) 7.) Press “Backup”. Then the below window pops up. 8.) Insert a USB HDD. NOTE: It might take about 30 seconds fo r the system to recognize the USB HDD. 9.) Press “Next”. 10.) Select USB HDD for backup when Select Drive window is displayed. 11.) Verify that USB HDD is in the list. Figure 8-226 Emergency Disk Making Wizard Figure 8-227 Drive select
GE HEALTHCARE DIRECTION 5394141, REVISION 1LOGIQ™ P5 SERVICE MANUAL Section 8-3 - Software Loading Procedure 8 - 161 8-5-3 Full Backup Procedure (cont’d) 12.) If USB HDD with enough space is not already plugged in, plug in one.Then press Next 13.) Press next to continue. Then the below windows appear. 14.) Verify that “Backup was completed!” message is displayed. 15.) Press Finish to complete. Figure 8-228 Storage Information Figure 8-229 Emergency Disk Making Preparation Figure 8-230 Emergency Disk Making in Progress
GE HEALTHCARE DIRECTION 5394141, REVISION 1 LOGIQ™ P5 SERVICE MANUAL 8 - 162 Section 8-3 - Software Loading Procedure 8-5-4 Restore procedure 1.) From Figure 8-225, press “Restore” button. 2.) Rest of the procedure is the same with “Backup” procedure. 3.) After reboot, Press “Patient”. Verify that Patient data are restored Press “Utility”. Verify that Userdefined data are restored. NOTICEThe system should be rebooted after finishing of Restore procedures.
GE HEALTHCARE DIRECTION 5394141, REVISION 1LOGIQ™ P5 SERVICE MANUAL Section 8-3 - Software Loading Procedure 8 - 163 Section 8-6Software Reloading 8-6-1 General This describes general Software Reload ing of C: partition functionality. 8-6-2 Software Reloading Procedure 8-6-2-1 Perform Software Reloading in the Service Platform No media (CD/DVD) is needed to perform this function. This can be done in two ways. A) By logging on to the Service Platform B) To access the system remotely. In case of performing So ftware Reloading remotely, you will need the assistance of the customer to switch the system back on and put it in disruptive mode. The following procedure applies to both Locally and Remotely. 1.) Go to Utility->System->General 2.) Press “Date/Time” Figure 8-231 Date/Time
GE HEALTHCARE DIRECTION 5394141, REVISION 1 LOGIQ™ P5 SERVICE MANUAL 8 - 164 Section 8-3 - Software Loading Procedure 8-6-2-1 Perform Software Reloading in the Service Platform (cont’d) 3.) Press “Time Zone” 4.) Register the current Time Zone 5.) Press “Cancel”. 6.) Log onto the Service Platform. 7.) Go to “Utilities”->”Common Utilities”. 8.) Go to “Utility”->”System”->”About” Verify that Software version and software build version are same with the ones before the Software Reloading. Figure 8-232 Time Zone Current Time Zone Table 8-1 Current Time Zone