Home > GE > Medical Equipment > GE Logiq P5 Service Manual

GE Logiq P5 Service Manual

    Download as PDF Print this page Share this page

    Have a look at the manual GE Logiq P5 Service Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 45 GE manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.

    Page
    of 520
    							GE HEALTHCARE
    DIRECTION 5394141, REVISION  1LOGIQ™ P5 SERVICE MANUAL 
    Section 8-2 - DISASSEMBLY/RE-ASSEMBLY 8 - 105
    8-2-47-3              Removal procedure  (cont’d)
    4.) Unplug the SATA cable from the back plane on the bottom of backplane.
    5.) Disconnect the SATA Power Cable and SATA Cable  from HDD Assy after removing 2ea cable ties. 
    And unscrew 4screws to remove the HDD Fixture bracket. Figure 8-144   Unplug the SATA Cable
    Figure 8-145   Separate  HDD and HDD Fixture Bracket
    Cable Tie 
    						
    							GE HEALTHCARE
    DIRECTION 5394141, REVISION  1 LOGIQ™ P5 SERVICE MANUAL  
    8 - 106 Section 8-2 -  DISASSEMBLY/RE-ASSEMBLY
    8-2-47-3              Removal procedure (cont’d)
    6.) Perform the following functional tests. If all are successful, include the debrief script provided below.
    8-2-47-4 Mounting Procedure Install the new parts in the reverse order of removal. Table 8-48    Functional Tests
    Service ManualSection
    Functional Test / Diagnostic TestDebrief Script
    Section 4-3-1 Power On/Boot Up
    “Service Manual, Direction
    5394141, Rev 1+, Section 8-2-47. Equipment 
    passed all required tests and is ready for use. “
    Section 4-3-2
    Power Off / Shutdown 
    						
    							GE HEALTHCARE
    DIRECTION 5394141, REVISION  1LOGIQ™ P5 SERVICE MANUAL 
    Section 8-2 - DISASSEMBLY/RE-ASSEMBLY 8 - 107
    8-2-48 ACPC Assy
    8-2-48-1 Tools • Common pilIips screwdrivers
    • Allen/Unbraco wrench
    • Stubby screwdriver (Flat tip and Cross tip)
    8-2-48-2 Preparations • Shut down the system and switch off the main breaker.
    8-2-48-3 Removal procedure 1.) Remove the AC Input Box Assy. Refer to the  8-2-49 Transbox Assy 110V/220V on page 8-109 .
    2.) Disconnect 5 connectors.
    3.) Unscrew 5 screws to remove the ACPC Assy. Figure 8-146   ACPC in Transbox
    Figure 8-147   Screws of ACPC assy 
    						
    							GE HEALTHCARE
    DIRECTION 5394141, REVISION  1 LOGIQ™ P5 SERVICE MANUAL  
    8 - 108 Section 8-2 -  DISASSEMBLY/RE-ASSEMBLY
    8-2-48-3              Removal procedure (cont’d)
    4.) Perform the following functional tests. If all are successful, include the debrief script provided below.
    8-2-48-4 Mounting Procedure Install the new parts in the reverse order of removal. Table 8-49    Functional Tests
    Service ManualSection
    Functional Test / Diagnostic TestDebrief Script
    Section 4-3-1 Power On/Boot Up
    “Service Manual, Direction
    5394141, Rev 1+, Section 8-2-48. Equipment 
    passed all required tests and is ready for use. “
    Section 4-3-2
    Power Off / Shutdown
    Section 4-9-12 ACPC Assy set Functi
    on Validation Procedure
    Section 10-5-2-2 Peripheral/Option Checks
    Section 10-5-5 Physical Inspection
    Section 10-6-2 GEMS Leakage Current Limits
    Section 10-6-3 Outlet Test - Wiring Arrangement - USA & 
    Canada
    Section 10-6-4 Grounding Continuity
    Section 10-6-5 Chassis Leakage Current Test
    Section 10-6-6 Isolated Patient Lead (Source) Leakage–Lead 
    to Ground
    Section 10-6-7 Isolated Patient Lead (Source) Leakage–Lead 
    to Lead
    Section 10-6-9 Probe Leakage Current Test 
    						
    							GE HEALTHCARE
    DIRECTION 5394141, REVISION  1LOGIQ™ P5 SERVICE MANUAL 
    Section 8-2 - DISASSEMBLY/RE-ASSEMBLY 8 - 109
    8-2-49 Transbox Assy 110V/220V
    8-2-49-1 Tools • Common pilIips screwdrivers
    • Allen/Unbraco wrench
    8-2-49-2 Preparations • Shut down the system and switch off the main breaker.
    8-2-49-3 Removal procedure • To detached the AC Power assy, All open 4 pcs c onsole cover that are left, right, front, rear cover
    1.) Remove side left cover and right side cover. Refer to the  8-2-15 Side Left Cover on page 8-51 and 
    8-2-16 Side Right Cover on page 8-52 .
    2.) Remove rear side cover and front cover. Refer to the  8-2-17 Front Cover on page 8-53 and 8-2-
    18 Rear Cover on page 8-55 .
    3.) Unscrew 2 pcs M4 screw and 2 pcs hexa screw on the front of AC trans box. And unscrew 4 pcs  screw and 2pcs hexa screw on the rear side of Transbox assy and open inlet panel.
    4.) Unplug 4 connectors inside of AC transbox and pull out the transbox assy.
    5.) Pull out the transbox assy.  Figure 8-148   4 screw on the front of the AC transbox assy
    2 hexa Screws 
    						
    							GE HEALTHCARE
    DIRECTION 5394141, REVISION  1 LOGIQ™ P5 SERVICE MANUAL  
    8 - 110 Section 8-2 -  DISASSEMBLY/RE-ASSEMBLY
    8-2-49-3              Removal procedure (cont’d)
    6.) Unplug 4 connectors inside of AC tr ansbox and pull out the transbox assy.
    7.) Perform the following functional tests. If all are successful, include the debrief script provided below. Figure 8-149   Pull out the Transbox assy
    Table 8-50    Functional Tests
    Service Manual Section
    Functional Test / Diagnostic TestDebrief Script
    Section 4-3-1 Power On/Boot Up
    “Service Manual, Direction
    5394141, Rev 1+, Section 8-2-49. Equipment 
    passed all required tests and is ready for use. “
    Section 4-3-2
    Power Off / Shutdown
    Section 4-9-11 Transbox Function Validation Procedure
    Section 10-5-2-2 Peripheral/Option Checks
    Section 10-5-3 Input Power
    Section 10-5-5 Physical Inspection
    Section 10-6-2 GEMS Leakage Current Limits
    Section 10-6-3 Outlet Test - Wiring Arrangement - USA & 
    Canada
    Section 10-6-4 Grounding Continuity
    Section 10-6-5 Chassis Leakage Current Test
    Section 10-6-6 Isolated Patient Lead (Source) Leakage–Lead 
    to Ground
    Section 10-6-7 Isolated Patient Lead (Source) Leakage–Lead 
    to Lead
    Section 10-6-9 Probe Leakage Current Test 
    						
    							GE HEALTHCARE
    DIRECTION 5394141, REVISION  1LOGIQ™ P5 SERVICE MANUAL 
    Section 8-2 - DISASSEMBLY/RE-ASSEMBLY 8 - 111
    8-2-49-4 Mounting Procedure Install the new parts in the reverse order of removal.
    When installing the Transbox assy,  the transbox chassis should be inserted into the guide rail which is 
    under the frame chassis.
    Figure 8-150   Insert the Transbox assy 
    						
    							GE HEALTHCARE
    DIRECTION 5394141, REVISION  1 LOGIQ™ P5 SERVICE MANUAL  
    8 - 112 Section 8-2 -  DISASSEMBLY/RE-ASSEMBLY
    8-2-50 Fuse Set 
    8-2-50-1 Tools
    • Common pilIips screwdrivers
    • Allen/Unbraco wrench
    • Stubby screwdriver (Flat tip and Cross tip)
    8-2-50-2 Preparations • Shut down the system and switch off the main breaker.
    8-2-50-3 Removal procedure 1.) Remove the AC Transbox assy. Refer to the 8-2-49 Transbox Assy 110V/220V on page 8-109 .
    2.) Replace the 2 fuses located on th e ACPC assy in the transbox assy.
    3.) Perform the following functional tests. If all are successful, include the debrief script provided below.
    8-2-50-4 Mounting Procedure Install the new parts in the reverse order of removal. Figure 8-151   FUSE in Transbox assy
    Table 8-51    Functional Tests
    Service Manual Section
    Functional Test / Diagnostic TestDebrief Script
    Section 4-3-1 Power On/Boot Up
    “Service Manual, Direction
    5394141, Rev 2+, Section 8-2-50. Equipment 
    passed all required tests and is ready for use. “
    Section 4-3-2
    Power Off / Shutdown
    Section 4-9-14 Fuse set Function Validation Procedure
    Section 10-5-2-2 Peripheral/Option Checks 
    						
    							GE HEALTHCARE
    DIRECTION 5394141, REVISION  1LOGIQ™ P5 SERVICE MANUAL 
    Section 8-2 - DISASSEMBLY/RE-ASSEMBLY 8 - 113
    8-2-51 Read and Write Serial Info
    8-2-51-1 How to start serial no read/write program 1.) Plug the service dongle on  the usb port on rear panel.
    2.) Turn on the system. 
    3.) When the Start Application dialog box appears , press [F2] before it automatically starts 
    Echoloader.)
    4.) When the Maintenance Access dialog box  pops up, type in the service password.
    Figure 8-152   Start Application Dialog Box
    Figure 8-153   Maintenance Access Dialog Box 
    						
    							GE HEALTHCARE
    DIRECTION 5394141, REVISION  1 LOGIQ™ P5 SERVICE MANUAL  
    8 - 114 Section 8-2 -  DISASSEMBLY/RE-ASSEMBLY
    8-2-51-1              How to start serial no read/write program  (cont’d)
    5.) If the win XP screen appears, run the window explor er. Move the cursor to bottom of the screen. If 
    the task bas appear, click the explorer icon.
    6.) Run the “asn.exe” by double click. This execut ion file is in “C:\Arirang	arget\bin” directory
    Figure 8-154   Windows Explorer
    Figure 8-155   “asn.exe” 
    						
    All GE manuals Comments (0)

    Related Manuals for GE Logiq P5 Service Manual