GE Logiq P5 Service Manual
Have a look at the manual GE Logiq P5 Service Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 45 GE manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.
GE HEALTHCARE DIRECTION 5394141, REVISION 1LOGIQ™ P5 SERVICE MANUAL Section 8-2 - DISASSEMBLY/RE-ASSEMBLY 8 - 105 8-2-47-3 Removal procedure (cont’d) 4.) Unplug the SATA cable from the back plane on the bottom of backplane. 5.) Disconnect the SATA Power Cable and SATA Cable from HDD Assy after removing 2ea cable ties. And unscrew 4screws to remove the HDD Fixture bracket. Figure 8-144 Unplug the SATA Cable Figure 8-145 Separate HDD and HDD Fixture Bracket Cable Tie
GE HEALTHCARE DIRECTION 5394141, REVISION 1 LOGIQ™ P5 SERVICE MANUAL 8 - 106 Section 8-2 - DISASSEMBLY/RE-ASSEMBLY 8-2-47-3 Removal procedure (cont’d) 6.) Perform the following functional tests. If all are successful, include the debrief script provided below. 8-2-47-4 Mounting Procedure Install the new parts in the reverse order of removal. Table 8-48 Functional Tests Service ManualSection Functional Test / Diagnostic TestDebrief Script Section 4-3-1 Power On/Boot Up “Service Manual, Direction 5394141, Rev 1+, Section 8-2-47. Equipment passed all required tests and is ready for use. “ Section 4-3-2 Power Off / Shutdown
GE HEALTHCARE DIRECTION 5394141, REVISION 1LOGIQ™ P5 SERVICE MANUAL Section 8-2 - DISASSEMBLY/RE-ASSEMBLY 8 - 107 8-2-48 ACPC Assy 8-2-48-1 Tools • Common pilIips screwdrivers • Allen/Unbraco wrench • Stubby screwdriver (Flat tip and Cross tip) 8-2-48-2 Preparations • Shut down the system and switch off the main breaker. 8-2-48-3 Removal procedure 1.) Remove the AC Input Box Assy. Refer to the 8-2-49 Transbox Assy 110V/220V on page 8-109 . 2.) Disconnect 5 connectors. 3.) Unscrew 5 screws to remove the ACPC Assy. Figure 8-146 ACPC in Transbox Figure 8-147 Screws of ACPC assy
GE HEALTHCARE DIRECTION 5394141, REVISION 1 LOGIQ™ P5 SERVICE MANUAL 8 - 108 Section 8-2 - DISASSEMBLY/RE-ASSEMBLY 8-2-48-3 Removal procedure (cont’d) 4.) Perform the following functional tests. If all are successful, include the debrief script provided below. 8-2-48-4 Mounting Procedure Install the new parts in the reverse order of removal. Table 8-49 Functional Tests Service ManualSection Functional Test / Diagnostic TestDebrief Script Section 4-3-1 Power On/Boot Up “Service Manual, Direction 5394141, Rev 1+, Section 8-2-48. Equipment passed all required tests and is ready for use. “ Section 4-3-2 Power Off / Shutdown Section 4-9-12 ACPC Assy set Functi on Validation Procedure Section 10-5-2-2 Peripheral/Option Checks Section 10-5-5 Physical Inspection Section 10-6-2 GEMS Leakage Current Limits Section 10-6-3 Outlet Test - Wiring Arrangement - USA & Canada Section 10-6-4 Grounding Continuity Section 10-6-5 Chassis Leakage Current Test Section 10-6-6 Isolated Patient Lead (Source) Leakage–Lead to Ground Section 10-6-7 Isolated Patient Lead (Source) Leakage–Lead to Lead Section 10-6-9 Probe Leakage Current Test
GE HEALTHCARE DIRECTION 5394141, REVISION 1LOGIQ™ P5 SERVICE MANUAL Section 8-2 - DISASSEMBLY/RE-ASSEMBLY 8 - 109 8-2-49 Transbox Assy 110V/220V 8-2-49-1 Tools • Common pilIips screwdrivers • Allen/Unbraco wrench 8-2-49-2 Preparations • Shut down the system and switch off the main breaker. 8-2-49-3 Removal procedure • To detached the AC Power assy, All open 4 pcs c onsole cover that are left, right, front, rear cover 1.) Remove side left cover and right side cover. Refer to the 8-2-15 Side Left Cover on page 8-51 and 8-2-16 Side Right Cover on page 8-52 . 2.) Remove rear side cover and front cover. Refer to the 8-2-17 Front Cover on page 8-53 and 8-2- 18 Rear Cover on page 8-55 . 3.) Unscrew 2 pcs M4 screw and 2 pcs hexa screw on the front of AC trans box. And unscrew 4 pcs screw and 2pcs hexa screw on the rear side of Transbox assy and open inlet panel. 4.) Unplug 4 connectors inside of AC transbox and pull out the transbox assy. 5.) Pull out the transbox assy. Figure 8-148 4 screw on the front of the AC transbox assy 2 hexa Screws
GE HEALTHCARE DIRECTION 5394141, REVISION 1 LOGIQ™ P5 SERVICE MANUAL 8 - 110 Section 8-2 - DISASSEMBLY/RE-ASSEMBLY 8-2-49-3 Removal procedure (cont’d) 6.) Unplug 4 connectors inside of AC tr ansbox and pull out the transbox assy. 7.) Perform the following functional tests. If all are successful, include the debrief script provided below. Figure 8-149 Pull out the Transbox assy Table 8-50 Functional Tests Service Manual Section Functional Test / Diagnostic TestDebrief Script Section 4-3-1 Power On/Boot Up “Service Manual, Direction 5394141, Rev 1+, Section 8-2-49. Equipment passed all required tests and is ready for use. “ Section 4-3-2 Power Off / Shutdown Section 4-9-11 Transbox Function Validation Procedure Section 10-5-2-2 Peripheral/Option Checks Section 10-5-3 Input Power Section 10-5-5 Physical Inspection Section 10-6-2 GEMS Leakage Current Limits Section 10-6-3 Outlet Test - Wiring Arrangement - USA & Canada Section 10-6-4 Grounding Continuity Section 10-6-5 Chassis Leakage Current Test Section 10-6-6 Isolated Patient Lead (Source) Leakage–Lead to Ground Section 10-6-7 Isolated Patient Lead (Source) Leakage–Lead to Lead Section 10-6-9 Probe Leakage Current Test
GE HEALTHCARE DIRECTION 5394141, REVISION 1LOGIQ™ P5 SERVICE MANUAL Section 8-2 - DISASSEMBLY/RE-ASSEMBLY 8 - 111 8-2-49-4 Mounting Procedure Install the new parts in the reverse order of removal. When installing the Transbox assy, the transbox chassis should be inserted into the guide rail which is under the frame chassis. Figure 8-150 Insert the Transbox assy
GE HEALTHCARE DIRECTION 5394141, REVISION 1 LOGIQ™ P5 SERVICE MANUAL 8 - 112 Section 8-2 - DISASSEMBLY/RE-ASSEMBLY 8-2-50 Fuse Set 8-2-50-1 Tools • Common pilIips screwdrivers • Allen/Unbraco wrench • Stubby screwdriver (Flat tip and Cross tip) 8-2-50-2 Preparations • Shut down the system and switch off the main breaker. 8-2-50-3 Removal procedure 1.) Remove the AC Transbox assy. Refer to the 8-2-49 Transbox Assy 110V/220V on page 8-109 . 2.) Replace the 2 fuses located on th e ACPC assy in the transbox assy. 3.) Perform the following functional tests. If all are successful, include the debrief script provided below. 8-2-50-4 Mounting Procedure Install the new parts in the reverse order of removal. Figure 8-151 FUSE in Transbox assy Table 8-51 Functional Tests Service Manual Section Functional Test / Diagnostic TestDebrief Script Section 4-3-1 Power On/Boot Up “Service Manual, Direction 5394141, Rev 2+, Section 8-2-50. Equipment passed all required tests and is ready for use. “ Section 4-3-2 Power Off / Shutdown Section 4-9-14 Fuse set Function Validation Procedure Section 10-5-2-2 Peripheral/Option Checks
GE HEALTHCARE DIRECTION 5394141, REVISION 1LOGIQ™ P5 SERVICE MANUAL Section 8-2 - DISASSEMBLY/RE-ASSEMBLY 8 - 113 8-2-51 Read and Write Serial Info 8-2-51-1 How to start serial no read/write program 1.) Plug the service dongle on the usb port on rear panel. 2.) Turn on the system. 3.) When the Start Application dialog box appears , press [F2] before it automatically starts Echoloader.) 4.) When the Maintenance Access dialog box pops up, type in the service password. Figure 8-152 Start Application Dialog Box Figure 8-153 Maintenance Access Dialog Box
GE HEALTHCARE DIRECTION 5394141, REVISION 1 LOGIQ™ P5 SERVICE MANUAL 8 - 114 Section 8-2 - DISASSEMBLY/RE-ASSEMBLY 8-2-51-1 How to start serial no read/write program (cont’d) 5.) If the win XP screen appears, run the window explor er. Move the cursor to bottom of the screen. If the task bas appear, click the explorer icon. 6.) Run the “asn.exe” by double click. This execut ion file is in “C:\Arirang arget\bin” directory Figure 8-154 Windows Explorer Figure 8-155 “asn.exe”