Home > GE > Medical Equipment > GE Logiq P5 Service Manual

GE Logiq P5 Service Manual

    Download as PDF Print this page Share this page

    Have a look at the manual GE Logiq P5 Service Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 45 GE manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.

    Page
    of 520
    							GE HEALTHCARE
    DIRECTION 5394141, REVISION  1LOGIQ™ P5 SERVICE MANUAL 
    Section 8-3 - Software Loading Procedure 8 - 185
    8-7-8 Color Printer Fixture Midd le installation - UP23MD Printer
    1.) Install color printer on the top of the base br acket by screw 4 screws(2306562, FH M3x6 YEL). 
    2.) Unscrew 2 existing screws from the middle cover.
    3.) Screw 1 screw (5176744, BH M4x20 WHT) on each  side of the system to fix the Color printer with 
    base bracket to the system.
     
    Figure 8-269   Color Printer Fixture Middle installation
     
    Figure 8-270   Color Printer Fixture Middle installation 
    						
    							GE HEALTHCARE
    DIRECTION 5394141, REVISION  1 LOGIQ™ P5 SERVICE MANUAL  
    8 - 186 Section 8-3 - Software Loading Procedure
    8-7-8               Color Printer Fixture Middle installation - UP23MD Printer (cont’d)
    4.) Connect the USB cable and Power cable from the colo r printer to the system as shown in the figure 
    below. 
    5.) Install Color printer hide bracket and scre w 4 screws(2159633, BH M4x8 WHT) to fix it. 
    6.) Tie the cables using the tie wrap  as illustrated in the figure below. 
     
    Figure 8-271   Color Printer Fixture Middle installation
     
    Figure 8-272   Color Printer Fixture Middle installation
     
    Figure 8-273   Color Printer Fixture Middle installation 
    						
    							GE HEALTHCARE
    DIRECTION 5394141, REVISION  1LOGIQ™ P5 SERVICE MANUAL 
    Section 8-3 - Software Loading Procedure 8 - 187
    8-7-9 Color Printer Fixture Middle  installation - UP-D25MD Printer
    1.) Install color printer on the top of the base br acket by screw 4 screws(2306562, FH M3x6 YEL). 
    2.) Unscrew 2 existing screws from the middle cover.
    3.) Screw 2 screws (5176744, BH M4x20 WHT) on each  side of the system to fix the Color printer with 
    base bracket to the system.
     
    Figure 8-274   Color Printer Fixture Middle installation
     
    Figure 8-275   Color Printer Fixture Middle installation 
    						
    							GE HEALTHCARE
    DIRECTION 5394141, REVISION  1 LOGIQ™ P5 SERVICE MANUAL  
    8 - 188 Section 8-3 - Software Loading Procedure
    8-7-9               Color Printer Fixture Middle  installation - UP-D25MD Printer (cont’d)
    4.) Connect the USB cable and Power cable from the colo r printer to the system as shown in the figure 
    below. 
    5.) Install Mid Color Cable Bracket and screw 4 screws(2159633, BH M4X8) to fix it. 
    6.) Tie the cables using the tie wrap  as illustrated in the figure below.
     
    Figure 8-276   Color Printer Fixture Middle installation
     
    Figure 8-277   Color Printer Fixture Middle installation
     
    Figure 8-278   Color Printer Fixture Middle installation 
    						
    							GE HEALTHCARE
    DIRECTION 5394141, REVISION  1LOGIQ™ P5 SERVICE MANUAL 
    Section 8-3 - Software Loading Procedure 8 - 189
    8-7-10 Printer VCR DVD Fixture  Top installation - UP23MD Printer
    1.) Unscrew 2 existing screws from the top cover.
    2.) Install Fixture DVD bot bracket on the top cover by screwing 2 screws(2327592, FH M4x14 YEL). 
    3.) Install color printer to the DVD top bracket by screwing 4 screws(2306562, FH M3x6 YEL).
     
    Figure 8-279   Printer VCR DVD Fixture installation top
    Figure 8-280   Printer VCR DVD Fixture installation top
     
    Figure 8-281   Printer VCR DVD Fixture installation top 
    						
    							GE HEALTHCARE
    DIRECTION 5394141, REVISION  1 LOGIQ™ P5 SERVICE MANUAL  
    8 - 190 Section 8-3 - Software Loading Procedure
    8-7-10               Printer VCR DVD Fixture Top  installation - UP23MD Printer (cont’d)
    4.) Screw 4 screws(2159633, BH M4x8 WHT) on both  sides to fix the color printer and DVD with top 
    bracket to the color printer top bracket.
    5.) Connect the USB cable and Power cable from the color printer and DVD to the system. For more  wiring information, refer to  the Basic Service Manual.
    6.)  Install hide bracket by screwing 2 screws(2159633, BH M4x8 WHT). 
    7.) Tie the cable properly using the tie wrap.
     
    Figure 8-282   Printer VCR DVD Fixture installation top
    Figure 8-283   Printer VCR DVD Fixture installation top 
    						
    							GE HEALTHCARE
    DIRECTION 5394141, REVISION  1LOGIQ™ P5 SERVICE MANUAL 
    Section 8-3 - Software Loading Procedure 8 - 191
    8-7-11 Color Printer Fixture Top Installation - UP-D25MD Printer
    1.) Unscrew 2 existing screws from the top cover.
    2.) Connect the USB cable and Power cable to the Color Printer.
    3.) Install Fixture DVD bot bracket on the top cover by screwing 2 screws (2327592, FH M4x14).
     
    Figure 8-284   Color Printer Fixture Top Installation
    Figure 8-285   Color Printer Fixture Top Installation
    Figure 8-286   Color Printer Fixture Top Installation 
    						
    							GE HEALTHCARE
    DIRECTION 5394141, REVISION  1 LOGIQ™ P5 SERVICE MANUAL  
    8 - 192 Section 8-3 - Software Loading Procedure
    8-7-11      Color Prin ter Fixture Top Installa tion - UP-D25MD Printer (cont’d)
    4.) Install Top Cable BRKT_UPD25MD by  screwing 2 screws(2159633, BH M4X8).
    5.) Install Color Printer to th e DVD top Bracket by screwing 4 screws (2306562, FH M3X6).
    6.) Screw 4 screws(2159633, BH M4X8) on both side s to fix the color printer with TOP Bracket to the 
    color printer bottom bracket.
     
    Figure 8-287   Color Printer Fixture Top Installation
    Figure 8-288   Color Printer Fixture Top Installation
     
    Figure 8-289   Color Printer Fixture Top Installation 
    						
    							GE HEALTHCARE
    DIRECTION 5394141, REVISION  1LOGIQ™ P5 SERVICE MANUAL 
    Section 8-3 - Software Loading Procedure 8 - 193
    8-7-11      Color Pr inter Fixture Top Installa tion - UP-D25MD Printer (cont’d)
    7.) Connect the USB cable and Power Cable to the system.
    8.) Tie the cables using the tie wrap.
    Figure 8-290   Color Printer Fixture Top Installation 
    						
    							GE HEALTHCARE
    DIRECTION 5394141, REVISION  1 LOGIQ™ P5 SERVICE MANUAL  
    8 - 194 Section 8-3 - Software Loading Procedure
    8-7-12 Printer VCR DVD fixture T op installation - CP900 Printer
    1.) Unscrew 2 existing screws from the top cover.
    2.) Install Fixture VCR bot bracket on the top cover by screwing 2 screws(2306565, BH M4x16 WHT). 
    3.) Install color printer to the VCR top bracket by screwing 4 screws(5161586, M3x8 WHT).
     
    Figure 8-291   Printer VCR DVD Fixture Top installation
    Figure 8-292   Printer VCR DVD Fixture Top installation
     
    Figure 8-293   Printer VCR DVD Fixture Top installation 
    						
    All GE manuals Comments (0)

    Related Manuals for GE Logiq P5 Service Manual