Home > GTE > Communications System > GTE Omni Scbs Installation And Maintenance Manual

GTE Omni Scbs Installation And Maintenance Manual

    Download as PDF Print this page Share this page

    Have a look at the manual GTE Omni Scbs Installation And Maintenance Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 3 GTE manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.

    Page
    of 656
    							Character Trunk (CHT) Loop Test(
    CMC-810 ERROR MESSAGESNOT RGTR
    DISAGREE
    DENlED 20
    NOT EXEC
    =
    =
    -
    =SPECIFIED EQUIPMENT NUMBER HAS NOT BEEN
    INSTALLED: CHECK PARAMETERS.
    (I) DISAGREEMENT OF TERMINAL TYPES; CHECK
    PARAMETERS.
    (2) SYNCHRONOUS MODE IS SET ON 
    DIU/DTA; CHECK
    PARAMETERS.HOTEL/MOTEL PRINTER IS BEING CONNECTED; RELEASE
    PRINTER.4CHT CARD OR 
    DIU/DTA IS FAULTY OR HAS BEEN M
    BUSY. CHT LOOP TEST IS DISABLED DURING A FAU
    PRINTER IS BUSY, PLACE IN SERVICE WITH
    CMC-70i.
    5.117 
    						
    							Expanded System Maintenance -Controls and Indicators
    UP-COLD RESTART
    CAUTION
    REESTABLISHES DEFAULTDATA BASE 
    ODDS IS LOST
    CENTER.RESET MOMENTARY _INTERRUPT
    DOWN-HOT RESTART
    - RUN (GREEN)
    __ ALM (RED)
    - TD(RED)
    -RESTART BUTTON
    SYATUS FORCAWNETS %S II
    LACPM CARDSIC CABINET.
    5.118 
    						
    							MAJOR ALARMS -.
    POWER FAILURE TRANSFER MODE IN BASlC CABINET:
    - ENTIRE SYSTEM IS INOPERABLE
    - RUN LAMP IS OUT
    @POWER FAILURE TRANSFER MODE IN EXPANDED CABINET:
    -ONLY EXPANSION CABINET IS INOPERABLE
    - ALARM LAMP IS LIT
    eDEFECTIVE SWB CARD IN BASIC CABINET:
    - ENTIRE SYSTEM IS INOPERABLE
    - RUN LAMP IS OUT
    @DEFECTIVE SWE CARD IN EXPANDED CABINET:
    -ONLY EXPANSION CABINET IS INOPERABLE
    - ALARM LAMP IS LIT
    MINOR ALARM -
    @ALL SELF DIAGNOSTIC TESTS ARE PERFORMED FOR ENTIRE SYSTEM
    - ALARM LAMP IS LIT
    -FAULT IS LOGGED INTO MEMORY (REFER TO CMC-800)
    5.119 
    						
    							Expanded System Maintenance -Power Failure Transfer Activation
    GE aww SBCS.SIX POWER FAILURE TRANSFER CIRCUITS ARE PROVIDED THROUGH
    6PFT CARD IN BASIC CABINET. ADDITIONAL CIRCUITS ARE AVAILABLE
    THROUGH 
    6PFE CARD IN EXPANSION CABINET (REQUIRING WIRING OF
    SIGNAL LINE BETWEEN CARDS THROUGH CDF BLOCK).EXPANDED SYSTEM POWER FAILURE TRANSFER OPERATIONAL STATUS
    (BASIC AND EXPANDED CABINETS)
    INCIDENTS
    6PFT6PFEIN BASIC CABINETIN EXPANSION CABINET
    5.120
    ,.,.l.POWERBASIC
    CABINET
    ACTIVEACTIVE
    FAILURE
    EXPANSIONCABINET
    INACTIVEACTIVE
    SYSTEMFAILUREACTIVEACTIVEACTIVE
    MANUAL
    BASICSWITCHCABINETACTIVE
    INACTIVE
    ACTI-EXPANDEDVATIONCABINET
    INACTIVEACTIVE
    NOTE:ACTIVE = POWER FAILURE TRANSFER CONDITION 
    						
    							I; ” :‘\,‘\,.‘.‘, “‘:\
    GTE OMNn sms
    @FAULTY DEVICES AND LOCATIONS ARE DISPLAYED USING CMC-800.
    @CMC-800’s SCREEN THREE, DISPLAYING EKT STATUS, HAS BEEN ENHANCED TO DISPLAY THE
    FOLLOWING INFORMATION:
    -SYSTEM PROMPT (Pl) - FAULT TERMINAL
    -EQUIPMENT NUMBER OF FAULTY TERMINAL (P2) -
    xx i
    (MAXIMUM OF 4 EQUIPMENT NUMBERS)
    CIRCUIT NUMBER (0 
    - 7)
    CARD SLOT (00 
    - 18)
    CABINET NUMBER 
    (0,l OR BLANK)
    -EQUIPMENT NUMBER OF FAULTY TERMINAL (P3) -
    xx i
    i
    (MAXIMUM OF 4 EQUIPMENT NUMBERS)
    CIRCUIT NUMBER (0 
    - 7)
    CARD SLOT (00 
    - 18)
    CABINET NUMBER 
    (0,l OR BLANK)
    Q OPERATATlON OF SYSTEM FAULTS REMAIHE SAME, OTHER THAN
    IDENTllFi
    CABINETS CONTAiNlNG FAULTY TINALS.
    5.121 
    						
    							Laboratory ACtenant.
    GE aJ!mfn aE-s
    1.USING THE INSTRUCTIONS PROVIDED IN THE STUDENT WORKBOOK,
    PERFORM THE ATTENDANT CONSOLE DIAGNOSTIC TEST. BE SURE TO
    USE ALL TEST EXECUTION KEYS AND MONITOR THE RESULTS. RETURN
    INSTRUMENT TO NORMAL CALL PROCESSING MODE AFTER TESTS
    HAVE BEEN PERFORMED.
    2.USING THE INSTRUCTIONS PROVIDED l&l THE STUDENT WORKBOOK,
    PERFORM THE DATA INTERFACE UNIT 
    ,DlAGNOSTIC TEST. BE SURE TO
    USE ALL TEST EXECUTION KEYS AND MONITOR THE RESULTS. RETURN
    THE DIU TO NORMAL CALL PROCESSING MODE AFTER TESTS HAVE
    BEEN PERFORMED.
    3.ASSIGN Tf?E ATTENDANT CONSOLE AS A MASTER CONTROL
    TELEPHONE WITH CMC-702.
    4.REMOVE THE HOTEL/MOTEL PRINTER FROM SERVICE FOR ROUTINE
    MAINTENANCE WITH CMC-706.
    5.USING THE ATTENDANT CONSOLE AS A MASTER CONTROL TELEPHO
    PERFORM THE LOOP TEST BETWEEN THE 4CHT CARD AND THE DIUWITH CMC-810. WHAT ERROR MESSAGE IS RECEIVED?
    5.122 
    						
    All GTE manuals Comments (0)

    Related Manuals for GTE Omni Scbs Installation And Maintenance Manual