GTE Omni Scbs Installation And Maintenance Manual
Have a look at the manual GTE Omni Scbs Installation And Maintenance Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 3 GTE manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.
inal Instlation (Continued) GE al!avn SLBCS1 PROCEDURE 1 4.PLUG THE AC POWER SUPPLY ADAPTER INTO THE POWER OUTLET.AC ADAPTER AC ADAPTER 5.PLUG THE ROUND END OF THE AC POWER SUPPLY ADAPTER INTO THE CSD TELEPHONE. NOTE:REFER TO OPERATIONS MANUAL SUPPLIED WITH CUSTOMER- SUPPLIED DATA TERINAL FOR OPERATING INSTRUCTIONS. 4.40
Message Waiting on SLT Instruments1 DESCRIPTION 1 eMESSAGES CAN BE LEFT AT SLT INSTRUMENTS (DIAL PULSE OR DTMF) EQUIPPED WITH MESSAGE WAITING LAMPS. lMESSAGE WAITING FEATURE FOR SLT INSTRUMENTS IS ACTIVATED THROUGH A STRAPPING OPTION ON THE RGEN CARD AND TWO DATA BASE COMMANDS.[PROCEDURE 1 1.CUT STRAPPING JUMPER ON RGEN CARD (SEE DIAGRAM) OR IF EQUIPPED, SLIDE MESSAGE WAITING SWITCH (LOCATED IN SAME PLACE) TO ON. 2.ACTIVATE MESSAGE WAITING ON SLT INSTRUMENTS FOR SYSTEM WITH CMC-102. (REFER TO PACKAGE B, DATA BASE ADMINISTRATION SECTION). 3.IDENTIFY DIRECTORY NUMBERS OF SLT INSTRUMENTS TO BE ASSIGNED MESSAGE WAITING FEATURE WITH CMC-204. (REFER TO PACKAGE B, DATA BASE ADMINISTRATION SECTION). MESSAGE WAITING OPTION CUT STRAP TO ACTIVATE 4.41
Optional External Paging Installation GUE OMNU SBCS. DIAGRAM REPRESENTS A TYPICAL EXAMPLE OF25 PAIR CDF BLOCK7TIPCROSS CONNECTIONS FOR A CUSTOMER- SUPPLIED EXTERNAL PAGING AMPLIFIER.. EXTERNAL PAGING REQUIRES ONE PAIR OF WIRES FOR ITS INTERFACE TO A 4BWC CARD (SAME AS CO TRUNK INSTALLATION). EACH 4BWC CARD HAS FOUR CIRCUITS AND ONLY EVERY OTHER PAIR OF PINS IS USED ON THE CONNECTING BLOCK.. OPERATION MAY REQUIRE 24 VOLT POWER SUPPLY (DEPENDENT ON CUSTOMER- SUPPLIED EQUIPMENT) 25 PAIR CABLE REFER TO CDF CROSS CONNECT REFERENCE CHART IN STUDENT WORKBOOK FOR CROSS CONNECTION INSTRUCTIONS FOR OTHER CARD AND EQUIPMENT CONFIGURATIONS. 4.42
Laboratory Installation1.POWER SYSTEM OFF. 2.ENSURE THAT PROPER ELECTROSTATIC GROUNDING PROCEDURES ARE FOLLOWED PRIOR TO HANDLING PCB CARDS. 3.BEGIN REPLACING AND INSTALLING THE DESIGNATED PRINTED CIRCUIT BOARDS IN CARD SLOTS IDENTIFIED BELOW (IF NOT PREVIOUSLY INSTALLED IN MODULE I). ENSURE THAT CARD COMPONENTS ARE ON LEFT SIDE OF THE BOARDS. (A)INSERT AND SEAT AN INTERFACE CARD FOR CSD/DTA INSTRUMENTS (8DTC) IN CARD SLOT 00. (B)REPLACE THE CPMA CARD IN SLOT 20 WITH THE ENHANCED CONTROL PROCESSOR MEMORY CARD (CPMB). (C)REPLACE THE MEMA CARD IN SLOT 21 WITH THE ENHANCED MEMORY CARD (MEMB). 4.REMOVE THE RING GENERATOR (RGEN). CUT STRAP OR SLIDE SWITCH ON CARD TO ACTIVATE MESSAGE WAITING FOR SLT INSTRUMENTS. INSERT AND SEAT RGEN WITH CARD COMPONENTS ON RIGHT SIDE OF THE BOARD. 5.INSTALL DATA TERMINAL ADAPTERS IN TWO CSD TELEPHONES. 6.WIRE CROSS CONNECTIONS AND INSTALL CSD TELEPHONES USING THESE DESIGNATED CONFIGURATIONS (IF NOT PREVIOUSLY INSTALLED IN MODULE I). (A)CSD TELEPHONE USING 8DTC CARD IN SLOT 00, CIRCUIT 0. DEFAULT DIRECTORY NUMBER WILL BE 200 (VOICE). (B)CSD TELEPHONE USING 8DTC CARD IN SLOT 00, CIRCUIT 1. DEFAULT DIRECTORY NUMBER WILL BE 201 (VOICE). 7.LABEL EACH INSTRUMENT WITH THE APPROPRIATE STATION DIRECTORY NUMBER AND EQUIPMENT NUMBER (CARD SLOT AND CIRCUIT NUMBER). 6.INSTALL DATA TERMINAL STATIONS TO BOTH CSD TELEPHONES. 4.43
/’Laboratory InstallationActivity - Package B (4.2) (Continued) 9.WIRE CROSS CONNECTION AND INSTALL EXTERNAL SPEAKER TO 4BWC CARD IN SLOT 18, CIRCUIT 3. 10.POWER SYSTEM ON AND RESET SYSTEM BY PRESSING RESTART BUTTON ON CPMB CARD WITH TOGGLE SWITCH IN CENTER POSITION.11. REPROGRAM THE ODDB. 4.44
Review Exercise- Package B Installlation (4.2)INSTRUCTIONS:THE FOLLOWING EXERCISE CONSISTS OF MULTIPLE CHOICE, TRUE/FALSE, FILL IN THE BLANK, OR MATCHING TYPE QUESTIONS. ALL AVAILABLE RESOURCES (I.E. STUDENT WORKBOOK, NOTES AND GTEP MANUAL) MAY BE USED AS REFERENCES. SUBMIT EXERCISE TO INSTRUCTOR FOR GRADING WHEN LAST QUESTION HAS BEEN COMPLETED. 1. (TRUE OR FALSE) CPMB CAN BE INSTALLED AS A COMMON CONTROL CARD WITH SWC AND MEMA CARDS. 2. (TRUE OR FALSE) ‘REPLACING CPMB OR MEMB AUTOMATICALLY DELETES THE ODDB. 3.INSTALLATION OF THE DTA REQUIRES GROUNDING WIRES. 4. (TRUE OR FALSE) THE DTA OBTAINS ITS POWER DIRECTLY FROM THE CSD INSTRUMENT. 5.A CSD TELEPHONE CROSS CONNECTED TO THE SECOND CIRCUIT OF AN 8DTC INSTALLED IN SLOT 03 WOULD USE PINS-AND___ ON THE CDF TERMINAL BLOCK. 6.INDICATE WHICH OF THE FOLLOWING PIECES OF EQUIPMENT ARE REQUIRED FOR INTERNAL DATA TERMINAL INSTALLATION: a.CSD TO DATA TERMINAL CABLE, MODEM, DATA TERMINAL, AND CSD TELEPHONE. b.CSD TELEPHONE WITH DTA, AC POWER SUPPLY ADAPTER, DATA TERMINAL, AND CSD TO DATA TERMINAL CABLE. c.AC POWER SUPPLY, MASTER CONTROL TELEPHONE, DATA TERMINAL, AND CODEC. d.CSD TO DATA TERMINAL CABLE, DATA TERMINAL, CSD TELEPHONE, AND AC POWER SUPPLY. 7.THE MESSAGE WAITING OPTION ON THE RING GENERATOR IS INSTALLED BY:(1) CUTTING A STRAPPING JUMPER OR, (2) 8.AN EXTERNAL PAGING AMPLIFIER CROSS CONNECTED TO THE THIRD CIRCUIT OF A 4BWC CARD INSTALLED IN SLOT 15 WOULD USE PINS-AND ON THE CDF TERMINAL BLOCK. 4.45
_,-,Review Exercise -Package B Installation (4.2) (Continued) 9.What card slots may be used for 8DTC cards when CSD telephones are installed without Data Terminal Adapters? 10.Identify the correct descriptions for the RS-232-C pin configuration required for the RS-232-C port on a CSD equipped with a DTA: PINSIGNALDESCRIPTION 1FGPROTECTIVE GROUND 2TD 3RDRECEIVED DATA 4RTS 5CTS 6 DSRDATA SET READY 7SCSIGNAL GROUND 8RLSD 9_____________________________________ 14_______--_-_______________-__________ 15ST2TRANSMISSION SIGNAL 17--mm-w-______________________________ 18________--___---_____________________ 19_____________________________________ 20DTR 21_______----_--_-_____________________ 22RI 23_____________________________________ 24_________----_--_____________________ 25-------4.46______________________________
GIVEN:00 0 0 0 ACTION:0 0 0 CRITERIA:0 0 GTE OMNI SBCSGTE OMNI SBCS PACKAGE B EQUIPMENT AND PERIPHERALSPORTABLE MAINTENANCE PANEL OMNI SBCS COURSE AND SITE DOCUMENTATION PACKAGE REVIEW EXERCISEIDENTIFY FUNCTIONS AND APPLICATIONS OF PACKAGE B CMC COMMANDS. MODIFY PARAMETER VALUES FOR PACKAGE B CMCCOMMANDS. COMPLETE REVIEW EXERCISE.DEMONSTRATION OF ABOVE TASKS IN ACCORDANCE WITH PROCEDURES OUTLINED IN OMNI SBCS GTEP MANUAL AND OMNI SBCS STUDENT WORKBOOK. REVIEW EXERCISE WILL BE COMPLETED CORRECTLYIN ACCORDANCE WITH PASS/FAIL CRITERIA OF THIS TRAINING ORGANIZATION. 4.49