    							round Wire T 
    (1) 
    (2) 
    (3) 
    / 
    --EQUIPMENT CABINET 
     
    SIGNAL GROUND TERMINAL 
    FRAME GROUND 
    TERMINAL POWER 
    SUPPiY 
    UNIT 
    BT 
    ---------- 
    ,FRAME GROUND TERMINAL 
    GROUND BOTH FRAME GROUND TERMINALS (FOR EQUIPMENT 
    CABINET AND POWER SUPPLY UNIT) TO AN APPROVED EARTH 
    GROUND. 
    RUN SEPARATE GROUND WIRE FOR THE SIGNAL GROUND. 
    USE #6 AWG STANDARD CABLE. 
    1.44  
    						
    							Laboratory Activity (1.2) - 
    PERFORM THE INSTALLATION TASKS IN THE SEQUENCE OUTLINED BELOW, IN ACCORDANCE WITH THE 
    GTE OMNI SBCS GTEP MANUAL. COMPLETE THE REVIEW EXERCISE QUESTIONS PERTAINING TO CABINET 
    INSTALLATION UPON COMPLETION OF THIS LABORATORY ACTIVITY. 
    (1) MOUNT CABINET AND POWER SUPPLY TO MOUNTING BRACKET. 
    (A) REFER TO GTEP MANUAL OR STUDENT WORKBOOK FOR MOUNTING BRACKET REQUIREMENTS. 
    (B) MOUNT THE BRACKET TO A SOLID SURFACE OR TO A STUD IN THE WALL. USE 24” CENTERS. 
    (C) ENSURE THAT MOUNTING BRACKET IS LEVEL. 
    (D) MOUNT THE POWER SUPPLY MOUNTING BRACKET TO LEFT OF SYSTEM CABINET. 
    (2) WIRE SYSTEM GROUNDING. 
    (A) REFER TO GTEP MANUAL OR STUDENT WORKBOOK FOR CORRECT GROUNDING PROCEDURES. 
    (B) GROUND THE SYSTEM USING #6 AWG WIRING. 
    (C) ENSURE THAT THE FRAME GROUND IS CONNECTED TO THE POWER SUPPLY AND TO AN 
    APPROVED GROUND POINT. 
    (D) ENSURE THAT THE SYSTEM GROUND IS CONNECTED TO THE CORRECT POINT ON THE CABINET 
    AND FROM THERE TO AN APPROVED EARTH GROUND. 
    (3) CO-NNECT POWER SUPPLY CABLE TO THE POWER SUPPLY ONLY. DO NOT CONNECT CABLE TO 
    SYSTEM CABINET UNTIL INSTRUCTED TO POWER ON THE SYSTEM AT A LATER TIME. 
    LAB MILESTONE: 
    VERIFY THAT MOUNTING BRACKET, CABINET, AND POWER SUPPLY ARE INSTALLED 
    CORRECTLY. THE SYSTEM SHOULD BE GROUNDED AND THE POWER SUPPLY CABLE 
    SHOULD BE HANGING FROM THE POWER SUPPLY. 
    ASK INSTRUCTOR TO INSPECT INSTALLATION. 
    TURN TO REVIEW EXERCISE 1.2 AND ANSWER QUESTIONS 1-i 
    1.46  
    						
    							(4) ENSURE THAT SYSTEM IS GROUNDED AND THAT YOU ARE WEARING A GROUNDED ANTI-STATIC 
    WRIST STRAP DEVICE. 
    (5) REMOVE HINGED CABINET DOOR AND TEMPORARILY STORE IT OUT OF THE WAY. 
    (6) BEGIN INSTALLING THE DESIGNATED PRINTED CIRCUIT BOARDS (IN THE SEQUENCE OUTLINED 
    BELOW), FROM LEFT TO RIGHT IN THE SYSTEM CABINET: 
    (A) INSTALL THE RING GENERATOR IN THE MARKED SLOT TO THE FAR LEFT. ENSURE THAT 
    COMPONENTS FOR THIS CARD ARE ON THE RIGHT SIDE OF THE BOARD. 
    NOTE: FOR INSTALLATION OF ALL OTHER PCB CARDS, THE CARD COMPONENTS WILL 
    BE ON LEFT SIDE OF THE BOARDS. 
    (B) INSERT AND SEAT AN ELECTRONIC KEY TELEPHONE (8EKC) CARD IN SLOT 01. 
    (C) INSERT AND SEAT A SINGLE LINE TELEPHONE (8SLC) CARD IN SLOT 02. 
    (D) ‘INSERT AND SEAT A DIGITAL TELEPHONE (8DTC) CARD IN SLOT 00.’ 
    (E) INSERT AND SEAT A DTMF RECEIVER (4DMR) CARD IN SLOT 06. 
    (F) INSERT AND SEAT A BOTHWAY CO TRUNK (4BWC) CARD IN SLOT 18. 
    (G) INSERT AND SEAT A TIE LINE LOOP TRUNK (2TTL) CARD IN SLOT 16. 
    (H) INSERT AND SEAT A TIE LINE E&M TRUNK (2TTE) CARD IN SLOT 17. 
    (I) INSERT AND SEAT THE SWITCH (SWC) CARD IN SLOT 19. 
    (J) INSERT AND SEAT THE CONTROL PROCESSOR MEMORY (CPM) CARD IN SLOT 20. 
    (K) INSERT AND SEAT THE MEMORY (MEM) CARD IN SLOT 21. 
    (L) INSERT AND SEAT THE POWER FAIL TRANSFER (GPFT) CARD IN SLOT 22. 
    LAB MILESTONE: 
    . VERIFY THAT PCB CARDS ARE INSTALLED AND SEATED CORRECTLY. 
    @ ASK INSTRUCTOR TO INSPECT INSTALLATION OF CARDS. 
    Q TURN TO REVIEW EXERCISE 1.2 AND ANSWER QUESTIONS 6-14. SUBMIT YOUR 
    COMPLETED REVIEW EXERCISE TO THE INSTRUCTOR FOR GRADING. 
    @ YOU HAVE NOW COMPLETED THE CABINET INSTALLATION LABORATORY ACTIVITY. 
    1.47  
    						
    							INSTRUCTIONS: THE FOLLOWNG EXERClSE CONSlSTS OF WlULTlPLE CHOICE. FILL 
    1. 
    2. 
    3. 
    4. 
    5. 
    6. 
    IN THE BLANK OR MATCHING TYPE QUESTIONS. ALL AVAILMiLE 
    RESOURCES (I.E. STUDENT WORKBOOK, NOTES, AND GTEP 
    MANUAL) MAY BE USED AS REFERENCES. SUBMIT EXERCISE TO 
    INSTRUCTOR FOR GRADING WHEN LAST QUESTION HAS BEEN 
    COMPLETED. 
    THE MOUNTING BRACKET IS DESIGNED TO PERMIT MOUNTING ON 
    OR INCH CENTERS. 
    (TRUE OR FALSE) THE POWER SUPPLY IS MOUNTED TO THE RIGHT OF THE 
    SYSTEM CABINET. 
    THREE GROUND WIRES ARE REQUIRED FOR SYSTEM OPERATION 
    , 
    , AND . 
    WHERE DOES THE GROUND ORIGINATE FOR GROUND START TRUNKS? 
    WHAT PREVENTS INCORRECT INSTALLATION OF THE POWER SUPPLY CABLE? 
    TO PROTECT AGAINST ELECTROSTATIC DISCHARGE, A GROUNDED 
    SHOULD ALWAYS BE WORN WHEN INSERTING OR REMOVING PC@ CARDS. 
    1.48  
    						
    							Review Exer (1.2) - Cabinet 
    7. COMPLETE THE OMNI SBCS FRAME IMAGE BELOW, BY IDENTIFYING WHAT TYPE 
    OF CARDS WERE INSTALLED IN EACH CARD SLOT DURING THE LAB ACTIVITY. 
    8. 
    9. 
    10. 
    11. 
    12. 
    13. 
    14. 
    POWER 
    SUPPLY 
    11 RGEN RGEN t 
    WHICH CARD IS INSERTED WITH COMPONENTS FACING THE RIGHT SIDE OF THE 
    CABINET WHEN INSTALLED CORRECTLY? 
    OTHER THAN LINE OR TRUNK CARDS, WHICH THREE TYPES OF CARDS ARE 
    CONSIDERED TO BE OPTIONAL? 
    9 , AND 
    HOW MANY CIRCUITS CAN BE ASSIGNED AS POWER FAIL TRANSFER CIRCUITS? 
    HOW MANY OMNI SBCS SLOTS CAN BE DEDICATED TO LINE CARDS? 
    HOW MANY OMNI SBCS SLOTS CAN BE DEDICATED TO TRUNK CARDS? 
    HOW MANY OMNI SBCS SLOTS CAN CONTAIN EITHER LINE OR TRUNK CARDS? 
    WHAT THREE CARDS ARE REFERRED TO AS COMMON CONTROL CARDS? 
    , , AND 
    1.49  
    						
    							FEATUPF ACCESS CODE ASSIGNMENTS 
    PACKAGE C 
    (Continued) 
    SBCSISTARLOG 
    Feature Default Enter New 
    Number Access Access Code 
    Pl 
    Code P2 
    48 *0 
    2 NONE 
    160 67 
    49 #!fJ 
    151 *7 
    91 P7 
    130 6 I. * 
    70 NONE 
    78 NONE 
    79 NONE  Feature Name 
    !??xon speed calling 
    Station Prefix 
    Subordinate data call setup (2.0) 
    System speed calling 
    Trunk camp-on (activate) 
    Trunk camp-on (cancel) 
    Trunk access - direct trunk access 
    Wake-up other (activate) (2.0) 
    Wake-up self (activate) (2.0) 
    Wake-up self (cancel) (2.0)  
    						
    							1.3 Enabling Objective/ 
    Peripheral Installation 
    GIVEN: 0 
    0 
    e 
    0 
    0 
    0 
    ACTION: 0 
    0 
    0 
    0 
    0 
    0 
    0 
    CRITERIA: 8 
    0 
    GTE OMNI SBCS 
    GTE OMNI SBCS PERIPHERALS 
    ASSORTED GAUGE WIRE, AMP CONNECTOR CABLES, CDF BLOCKS, MODULAR 
    TELEPHONE JACKS, AND HARDWARE 
    GTE OMNI SBCS COURSE AND SITE DOCUMENTATION PACKAGE 
    STANDARD INSTALLATION TOOLS 
    REVIEW EXERCISE 
    CONNECT AND FASTEN AMP CONNECTOR CABLES FROM OMNI SBCS TO CDF 
    BLOCKS. 
    INSTALL PERIPHERAL DEVICES BY MAKING CORRECT CROSS CONNECTIONS 
    FROM MODULAR TELEPHONE JACKS TO CDF BLOCKS. 
    WIRE POWER FAIL TRANSFER CROSS CONNECTIONS. 
    INSTALL CO AND TIE LINE TRUNKS BY MAKING CORRECT CROSS 
    CONNECTIONS. 
    WIRE NIGHT BELL AND MUSIC-ON-HOLD CROSS CONNECTIONS, 
    CONNECT AND INSTALL SMDR PRINTER, PORTABLE MAINTENANCE PANEL, 
    AND FLOPPY DISKETTE DRIVE UNIT. 
    COMPLETE REVIEW EXERCISE. 
    PERIPHERALS WILL BE INSTALLED IN ACCORDANCE WITH GTE OMNI SBCS 
    GTEP MANUAL. 
    REVIEW EXERCISE QUESTIONS WILL BE COMPLETED CORRECTLY IN 
    ACCORDANCE WITH PASS/FAIL CRITERIA OF THIS TRAINING ORGANIZATION. 
    1.51  
    						
    All GTE manuals Comments (0)