GTE Omni Scbs Installation And Maintenance Manual
Have a look at the manual GTE Omni Scbs Installation And Maintenance Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 3 GTE manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.
round Wire T (1) (2) (3) / --EQUIPMENT CABINET SIGNAL GROUND TERMINAL FRAME GROUND TERMINAL POWER SUPPiY UNIT BT ---------- ,FRAME GROUND TERMINAL GROUND BOTH FRAME GROUND TERMINALS (FOR EQUIPMENT CABINET AND POWER SUPPLY UNIT) TO AN APPROVED EARTH GROUND. RUN SEPARATE GROUND WIRE FOR THE SIGNAL GROUND. USE #6 AWG STANDARD CABLE. 1.44
Laboratory Activity (1.2) - PERFORM THE INSTALLATION TASKS IN THE SEQUENCE OUTLINED BELOW, IN ACCORDANCE WITH THE GTE OMNI SBCS GTEP MANUAL. COMPLETE THE REVIEW EXERCISE QUESTIONS PERTAINING TO CABINET INSTALLATION UPON COMPLETION OF THIS LABORATORY ACTIVITY. (1) MOUNT CABINET AND POWER SUPPLY TO MOUNTING BRACKET. (A) REFER TO GTEP MANUAL OR STUDENT WORKBOOK FOR MOUNTING BRACKET REQUIREMENTS. (B) MOUNT THE BRACKET TO A SOLID SURFACE OR TO A STUD IN THE WALL. USE 24” CENTERS. (C) ENSURE THAT MOUNTING BRACKET IS LEVEL. (D) MOUNT THE POWER SUPPLY MOUNTING BRACKET TO LEFT OF SYSTEM CABINET. (2) WIRE SYSTEM GROUNDING. (A) REFER TO GTEP MANUAL OR STUDENT WORKBOOK FOR CORRECT GROUNDING PROCEDURES. (B) GROUND THE SYSTEM USING #6 AWG WIRING. (C) ENSURE THAT THE FRAME GROUND IS CONNECTED TO THE POWER SUPPLY AND TO AN APPROVED GROUND POINT. (D) ENSURE THAT THE SYSTEM GROUND IS CONNECTED TO THE CORRECT POINT ON THE CABINET AND FROM THERE TO AN APPROVED EARTH GROUND. (3) CO-NNECT POWER SUPPLY CABLE TO THE POWER SUPPLY ONLY. DO NOT CONNECT CABLE TO SYSTEM CABINET UNTIL INSTRUCTED TO POWER ON THE SYSTEM AT A LATER TIME. LAB MILESTONE: VERIFY THAT MOUNTING BRACKET, CABINET, AND POWER SUPPLY ARE INSTALLED CORRECTLY. THE SYSTEM SHOULD BE GROUNDED AND THE POWER SUPPLY CABLE SHOULD BE HANGING FROM THE POWER SUPPLY. ASK INSTRUCTOR TO INSPECT INSTALLATION. TURN TO REVIEW EXERCISE 1.2 AND ANSWER QUESTIONS 1-i 1.46
(4) ENSURE THAT SYSTEM IS GROUNDED AND THAT YOU ARE WEARING A GROUNDED ANTI-STATIC WRIST STRAP DEVICE. (5) REMOVE HINGED CABINET DOOR AND TEMPORARILY STORE IT OUT OF THE WAY. (6) BEGIN INSTALLING THE DESIGNATED PRINTED CIRCUIT BOARDS (IN THE SEQUENCE OUTLINED BELOW), FROM LEFT TO RIGHT IN THE SYSTEM CABINET: (A) INSTALL THE RING GENERATOR IN THE MARKED SLOT TO THE FAR LEFT. ENSURE THAT COMPONENTS FOR THIS CARD ARE ON THE RIGHT SIDE OF THE BOARD. NOTE: FOR INSTALLATION OF ALL OTHER PCB CARDS, THE CARD COMPONENTS WILL BE ON LEFT SIDE OF THE BOARDS. (B) INSERT AND SEAT AN ELECTRONIC KEY TELEPHONE (8EKC) CARD IN SLOT 01. (C) INSERT AND SEAT A SINGLE LINE TELEPHONE (8SLC) CARD IN SLOT 02. (D) ‘INSERT AND SEAT A DIGITAL TELEPHONE (8DTC) CARD IN SLOT 00.’ (E) INSERT AND SEAT A DTMF RECEIVER (4DMR) CARD IN SLOT 06. (F) INSERT AND SEAT A BOTHWAY CO TRUNK (4BWC) CARD IN SLOT 18. (G) INSERT AND SEAT A TIE LINE LOOP TRUNK (2TTL) CARD IN SLOT 16. (H) INSERT AND SEAT A TIE LINE E&M TRUNK (2TTE) CARD IN SLOT 17. (I) INSERT AND SEAT THE SWITCH (SWC) CARD IN SLOT 19. (J) INSERT AND SEAT THE CONTROL PROCESSOR MEMORY (CPM) CARD IN SLOT 20. (K) INSERT AND SEAT THE MEMORY (MEM) CARD IN SLOT 21. (L) INSERT AND SEAT THE POWER FAIL TRANSFER (GPFT) CARD IN SLOT 22. LAB MILESTONE: . VERIFY THAT PCB CARDS ARE INSTALLED AND SEATED CORRECTLY. @ ASK INSTRUCTOR TO INSPECT INSTALLATION OF CARDS. Q TURN TO REVIEW EXERCISE 1.2 AND ANSWER QUESTIONS 6-14. SUBMIT YOUR COMPLETED REVIEW EXERCISE TO THE INSTRUCTOR FOR GRADING. @ YOU HAVE NOW COMPLETED THE CABINET INSTALLATION LABORATORY ACTIVITY. 1.47
INSTRUCTIONS: THE FOLLOWNG EXERClSE CONSlSTS OF WlULTlPLE CHOICE. FILL 1. 2. 3. 4. 5. 6. IN THE BLANK OR MATCHING TYPE QUESTIONS. ALL AVAILMiLE RESOURCES (I.E. STUDENT WORKBOOK, NOTES, AND GTEP MANUAL) MAY BE USED AS REFERENCES. SUBMIT EXERCISE TO INSTRUCTOR FOR GRADING WHEN LAST QUESTION HAS BEEN COMPLETED. THE MOUNTING BRACKET IS DESIGNED TO PERMIT MOUNTING ON OR INCH CENTERS. (TRUE OR FALSE) THE POWER SUPPLY IS MOUNTED TO THE RIGHT OF THE SYSTEM CABINET. THREE GROUND WIRES ARE REQUIRED FOR SYSTEM OPERATION , , AND . WHERE DOES THE GROUND ORIGINATE FOR GROUND START TRUNKS? WHAT PREVENTS INCORRECT INSTALLATION OF THE POWER SUPPLY CABLE? TO PROTECT AGAINST ELECTROSTATIC DISCHARGE, A GROUNDED SHOULD ALWAYS BE WORN WHEN INSERTING OR REMOVING PC@ CARDS. 1.48
Review Exer (1.2) - Cabinet 7. COMPLETE THE OMNI SBCS FRAME IMAGE BELOW, BY IDENTIFYING WHAT TYPE OF CARDS WERE INSTALLED IN EACH CARD SLOT DURING THE LAB ACTIVITY. 8. 9. 10. 11. 12. 13. 14. POWER SUPPLY 11 RGEN RGEN t WHICH CARD IS INSERTED WITH COMPONENTS FACING THE RIGHT SIDE OF THE CABINET WHEN INSTALLED CORRECTLY? OTHER THAN LINE OR TRUNK CARDS, WHICH THREE TYPES OF CARDS ARE CONSIDERED TO BE OPTIONAL? 9 , AND HOW MANY CIRCUITS CAN BE ASSIGNED AS POWER FAIL TRANSFER CIRCUITS? HOW MANY OMNI SBCS SLOTS CAN BE DEDICATED TO LINE CARDS? HOW MANY OMNI SBCS SLOTS CAN BE DEDICATED TO TRUNK CARDS? HOW MANY OMNI SBCS SLOTS CAN CONTAIN EITHER LINE OR TRUNK CARDS? WHAT THREE CARDS ARE REFERRED TO AS COMMON CONTROL CARDS? , , AND 1.49
FEATUPF ACCESS CODE ASSIGNMENTS PACKAGE C (Continued) SBCSISTARLOG Feature Default Enter New Number Access Access Code Pl Code P2 48 *0 2 NONE 160 67 49 #!fJ 151 *7 91 P7 130 6 I. * 70 NONE 78 NONE 79 NONE Feature Name !??xon speed calling Station Prefix Subordinate data call setup (2.0) System speed calling Trunk camp-on (activate) Trunk camp-on (cancel) Trunk access - direct trunk access Wake-up other (activate) (2.0) Wake-up self (activate) (2.0) Wake-up self (cancel) (2.0)
1.3 Enabling Objective/ Peripheral Installation GIVEN: 0 0 e 0 0 0 ACTION: 0 0 0 0 0 0 0 CRITERIA: 8 0 GTE OMNI SBCS GTE OMNI SBCS PERIPHERALS ASSORTED GAUGE WIRE, AMP CONNECTOR CABLES, CDF BLOCKS, MODULAR TELEPHONE JACKS, AND HARDWARE GTE OMNI SBCS COURSE AND SITE DOCUMENTATION PACKAGE STANDARD INSTALLATION TOOLS REVIEW EXERCISE CONNECT AND FASTEN AMP CONNECTOR CABLES FROM OMNI SBCS TO CDF BLOCKS. INSTALL PERIPHERAL DEVICES BY MAKING CORRECT CROSS CONNECTIONS FROM MODULAR TELEPHONE JACKS TO CDF BLOCKS. WIRE POWER FAIL TRANSFER CROSS CONNECTIONS. INSTALL CO AND TIE LINE TRUNKS BY MAKING CORRECT CROSS CONNECTIONS. WIRE NIGHT BELL AND MUSIC-ON-HOLD CROSS CONNECTIONS, CONNECT AND INSTALL SMDR PRINTER, PORTABLE MAINTENANCE PANEL, AND FLOPPY DISKETTE DRIVE UNIT. COMPLETE REVIEW EXERCISE. PERIPHERALS WILL BE INSTALLED IN ACCORDANCE WITH GTE OMNI SBCS GTEP MANUAL. REVIEW EXERCISE QUESTIONS WILL BE COMPLETED CORRECTLY IN ACCORDANCE WITH PASS/FAIL CRITERIA OF THIS TRAINING ORGANIZATION. 1.51