NEC Neax 2000 Ivs2 Installation Procedure Manual
Have a look at the manual NEC Neax 2000 Ivs2 Installation Procedure Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 1168 NEC manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.
CHAPTER 2 INSTALLATION Floor Standing Installation NEAX2000 IVS2 Installation Procedure Manual ND-70928 (E), Issue 1.0Page 55 For Fixed Equipment (1) Fix the BASE PLATE to the floor with anchor bolts. (2) Fix the BASE to the BASE PLATE with screws. See Figure 2-12. (3) Fix the PIM onto the BASE with screws. See Figure 2-13. For Stationary Equipment (1) Fix the BASE TRAY to the floor with anchor bolts. (2) Fix the PIM onto the BASE with screws. See Figure 2-13. (3) Place the Module and the BASE on the BASE TRAY. See Figure 2- 14. Connect PIMs with screws. See Figure 2-17. Install the I/F BRACKET to the top-stack PIMs if the equipment is stacked with five or more PIMs. See “Installation of I/F BRACKET” on Page 69 . Install the TOP COVER to the top-stack PIM. See “Installation of TOP COVER” on Page 70 . Install the MOUNTING BRACKET to the top-stack PIM if the equipment is stacked with four or more PIMs. See “Installation of MOUNTING BRACKET” on Page 71 . Carefully review every step above to ensure that all necessary screws are properly placed and tightened. Installation of Checking End A Installation of PIM Multiple-Module Installation of To p C o v e r Installation of Mounting Bracket
CHAPTER 2 INSTALLATION Floor Standing Installation NEAX2000 IVS2 Installation Procedure ManualPage 56ND-70928 (E), Issue 1.0 Figure 2-7 Floor Space PIM/BATTM FRONT BASE 1000 (39.4)223 (8.8) 200 (7.9) 430 (16.9) 200 (7.9)UNIT : mm (inch) MAINTENANCE AREA
CHAPTER 2 INSTALLATION Floor Standing Installation NEAX2000 IVS2 Installation Procedure Manual ND-70928 (E), Issue 1.0Page 57 Figure 2-8 Cable Hole Location BASE PIM : CABLE HOLE FRONT
CHAPTER 2 INSTALLATION Floor Standing Installation NEAX2000 IVS2 Installation Procedure ManualPage 58ND-70928 (E), Issue 1.0 Figure 2-9 Floor Marking for BASE PLATE (for Fixed Equipment) Figure 2-10 Floor Marking for BASE TRAY (for Stationary Equipment) (WALL)UNIT : mm (inch) 202.6 (7.9)ANCHOR BOLT x 4 347.2 (13.7) 412.4 (16.2) 30 (1.2)30 (1.2) 34 (1.3)128 (5.0)40.6 (1.6) Using MOUNTING BRACKET: 10 (0.4) Not Using MOUNTING BRACKET : 1.7 (0.1) ANCHOR BOLT x 4 45 128 (1.8) (5.0) 43.9 (1.7)347.2 (13.7) UNIT : mm (inch)
CHAPTER 2 INSTALLATION Floor Standing Installation NEAX2000 IVS2 Installation Procedure Manual ND-70928 (E), Issue 1.0Page 59 Drilling (1) Make a preliminary hole in the concrete, using a drill bit for small-diameter holes. (2) Drill a hole in the concrete with a drill suitable for a plug bolt a little deeper than the plug bolt length. Anchor Bolt Size : 10mm (0.39 inch) DIA for Fixed Equipment 6mm (0.24 inch) DIA for Stationary Equipment (3) Insert the anchor bolt into the hole. (4) Push anchor bolt until the bolt stays permanently in place. (5) Turn bolt counterclockwise and remove. (6) Insert bolts correctly into the holes for equipment installation, then tighten them properly. Figure 2-11 Drilling Instructions for Anchor Bolt (3) (4) (5) (6) (1) (2)
CHAPTER 2 INSTALLATION Floor Standing Installation NEAX2000 IVS2 Installation Procedure ManualPage 60ND-70928 (E), Issue 1.0 Detaching FRONT COVER (1) Push portion A of the COVER PARTS to release the LATCH. (2) Pivot the COVER PARTS on its left side to remove it. (3) Loosen its one screw. (4) Lift up the STOPPER to unlock. (5) Pivot the FRONT COVER on its bottom to remove it. Detaching FRONT COVER (1) PUSH COVER PARTS. (2) REMOVE COVER PARTS. COVER PARTSPUSH PORTION A
CHAPTER 2 INSTALLATION Floor Standing Installation NEAX2000 IVS2 Installation Procedure Manual ND-70928 (E), Issue 1.0Page 61 (3) LOOSEN A SCREW. (4) LIFT UP STOPPER (UNLOCK).
CHAPTER 2 INSTALLATION Floor Standing Installation NEAX2000 IVS2 Installation Procedure ManualPage 62ND-70928 (E), Issue 1.0 (5) REMOVE FRONT COVER.
CHAPTER 2 INSTALLATION Floor Standing Installation NEAX2000 IVS2 Installation Procedure Manual ND-70928 (E), Issue 1.0Page 63 Connection of BASE and BASE PLATE for Fixed Equipment (1) Mount the BASE on the BASE PLATE by placing it over the hooks. (2) Slide the BASE into the inner end. (3) Secure the BASE to the BASE PLATE with two screws. NOTE: Screws are attached to the BASE PLATE. Figure 2-12 Connection of BASE and BASE PLATE FRONT BASE PLATEBASE HOOKS BASE BASE PLATESLIDE BASE INTO INNER END.
CHAPTER 2 INSTALLATION Floor Standing Installation NEAX2000 IVS2 Installation Procedure ManualPage 64ND-70928 (E), Issue 1.0 Connection of PIM and BASE for Fixed/Stationary Equipment (1) Mount the PIM on the BASE by placing it over the hooks. (2) Slide the PIM into the inner end. (3) Fix the PIM to the BASE with three screws. NOTE: Screws are attached to the Module. Figure 2-13 Connection of PIM and BASE SCREWS BASE PIMBASE HOOKS SLIDE PIM INTO INNER END.