CHAPTER 2 INSTALLATION Connection of DC Power Cable NEAX2000 IVS2 Installation Procedure Manual ND-70928 (E), Issue 1.0Page 85 Connection of DC Power Cable (1) Confirm the connection of power output cables, as shown below (These cables are pre- installed). (2) For PIM0, connect the PWR CNT CA-E to the CN103 connector on the PZ-PW121 card and the PWR1 connector on the BWB. For PIM1 to PIM7, connect the PWR CNT CA-D to the CN103 connector on the PZ-PW121 card and the PWR1 connector on the BWB. Figure 2-29 PWR CNT CA-D/PWR CNT CA-E Figure 2-30 Cable Connection between PZ-PW121 and BWB 550 mm (21.7 inch)300 mm (11.8 inch) 250 mm (9.8 inch) PWR CNT CA-E (FOR PIM0) PWR CNT CA-D (FOR PIM1 TO PIM7)PWR0B PWR1 PZ-PW121 BWB (BACK WIRING BOARD)PIM PWR0CPWR0A POWER OUTPUT CABLE (+90V, CR, E)POWER OUTPUT CABLE (+5V, -27V, E)CARD SLOT AREA LTC CONNECTOR AREA CN103
CHAPTER 2 INSTALLATION Connection of DC Power Cable NEAX2000 IVS2 Installation Procedure ManualPage 86ND-70928 (E), Issue 1.0 (3) When you need a –48V DC power supply installed for a Cell Station (Zone Transceiver) in WCS system, do the following procedure. If not, skip this procedure and go to item (4) on Page 88 . STEP 1: Attach four screws preliminary to the PZ-PW122 card. STEP 2: Mount the PZ-PW122 card into the PIM which accommodates the CSI cards, and fas- ten the screws. NOTE: Screws are attached to the PZ-PW122 card. Figure 2-31 Mounting PZ-PW122 into PIM PIM PZ-PW122
CHAPTER 2 INSTALLATION Connection of DC Power Cable NEAX2000 IVS2 Installation Procedure Manual ND-70928 (E), Issue 1.0Page 87 STEP 3: Connect the PWR CNT CA-E or PWR CNT CA-D, and POWER OUTPUT CABLE (–48V, E) as shown below. Figure 2-32 Cable Connection between PZ-PW121/PZ-PW122 and BWB PWR CNT CA-E (FOR PIM0) PWR CNT CA-D (FOR PIM1 TO PIM7)PWR0B PWR1 PZ-PW121 BWB (BACK WIRING BOARD)PIM PWR0CPWR0A POWER OUTPUT CABLE (+90V, CR, E) PZ-PW122 POWER OUTPUT CABLE (+5V, -27V, E) POWER OUTPUT CABLE (-48V, E)CARD SLOT AREA LTC CONNECTOR AREA CN103
CHAPTER 2 INSTALLATION Connection of DC Power Cable NEAX2000 IVS2 Installation Procedure ManualPage 88ND-70928 (E), Issue 1.0 (4) When the system is configured with two or more PIMs, connect the PZ-PW121 cards to each other using the PWR CA-A for power multi-connection. Figure 2-33 PWR CA-A Figure 2-34 Connection of PWR CA-A Cables (a) When using an Internal Battery 550 mm (21. 7inch) PWR CA-A PIM3 TO INTERNAL BATTERY PWR PWR CA-A PIM2 PIM1PIM7 PIM6 PIM5 PIM4 PIM0 TO INTERNAL BATTERY PWR TO INTERNAL BATTERY PWR PWR CA-A TO INTERNAL BATTERY PWR TO INTERNAL BATTERY PWR PWR CA-A TO INTERNAL BATTERY PWR TO INTERNAL BATTERY PWR PWR CA-A TO INTERNAL BATTERY PWR
CHAPTER 2 INSTALLATION Connection of DC Power Cable NEAX2000 IVS2 Installation Procedure Manual ND-70928 (E), Issue 1.0Page 89 Figure 2-35 Connection of PWR CA-A Cables (b) When using an External Battery PIM 3PWR PIM 2 PIM 1PIM 7 PIM 6 PIM 5 PIM 4 PIM 0 PWR PWRPWR CA-A PWR PWR PWR PWR PWR PWR CA-A TO EXTERNAL BATTERY
CHAPTER 2 INSTALLATION Supply Voltage Check And Heat Run Test NEAX2000 IVS2 Installation Procedure ManualPage 90ND-70928 (E), Issue 1.0 SUPPLY VOLTAGE CHECK AND HEAT RUN TEST Precautions (1) Check the switch position of each PZ-PW121 card before turning power on. Make sure that the AC120V/240V selector switch is positioned to appropriate voltage for each country (AC120V or AC240V). Make sure that the battery mode selector switch is positioned as shown below to meet the kind of battery: (2) When the operating power is being supplied to the PZ-PW121 card, do not plug/unplug this circuit card into/from its mounting slot. (3) Immediately follow the instructions below if the MJ lamp on the PZ-PW121 lights up or smoke or an unpleasant odor is produced during the test: a) Turn power off of all PZ-PW121 cards. b) Unplug the AC code from the wall outlet. c) Carefully check for cause(s) of the failure occurring. NOTE: Do not turn power on again until the cause is detected. (4) When the system is configured with two or more PIMs, the BUS cable is providing gang control for the PZ-PW121 card of PIM0 and other PIMs. Therefore, if the power of PIM0 is off, no power is supplied to the whole system even when the power switch(es) of other PIMs are left on. Note, however, that the battery charging is continuing even under these circumstances. SW 240V 100V/120V ON OFF 12 SW101 1 : Not used 2 : ON (SEAL/FLOAT2) OFF (OPEN/FLOAT1)
CHAPTER 2 INSTALLATION Power Routing NEAX2000 IVS2 Installation Procedure Manual ND-70928 (E), Issue 1.0Page 91 Power Routing NOTE 1:PN-4LCD/4LCF/4LCL/4LCW card provides +80V on-board power supply (+80VOBP). NOTE 2:PN-AUCA, PN-2DLCB/PN-2DLCN, PN-2DLCC, PN-2LDTA, PN-2ODTA/2ODTB card provides –48V on-board power supply (–48VOBP). +5V -27V Ð27V CR +90V +90V AC AC PZ-PW121 +5V -5V -5V +5V +80V -27V-27V -27V CR CR PZ-PW121 NOTE 1 +80VOBP +5V -48V -27V CR-48VOBP NOTE 2 BATTERY PWR CA-A AC CORD-B TERMINAL BLOCKSBASE PIM0 PIM1 TO P I M 2 +5V -27V -5V CR PN-8LCAA +90V TO AC MAINS INPUTAC CORD-D
CHAPTER 2 INSTALLATION Checking for Supply Voltage NEAX2000 IVS2 Installation Procedure ManualPage 92ND-70928 (E), Issue 1.0 Checking for Supply Voltage Heat Run Test Turn the SW1 switch ON. Keep it on for 5 minutes to check for no abnormal voltage. After com- pleting the test, turn OFF the SW1 switch of the PZ-PW121 card on PIM0. Then, turn OFF the SW1 switches of all the PZ-PW121 cards. Before connecting AC Cord, verify: - that the SW1 switch of the PZ-PW121 card is positioned to OFF; - that the AC Cord is unplugged from the wall outlet. Use a tester to verify that the input power is AC120±10V or AC240±10V. Plug the AC cord into a wall outlet. Turn the SW1 switches of all the PZ-PW121 cards on PIM1 to PIM7 to ON. Then, turn the SW1 switch of the PZ-PW121 card on PIM0 to ON last of all. Verify that the ON lamp on the PZ-PW121 card lights up. Measure the output voltage: -20V should be observed at GND and -27V terminals of the PZ-PW121 card. See Figure 2-36. Start Checking power cable Connecting AC power Turning power ON Verifying power Testing for Testing for input power End and grounding conductor pilot lamp ON output voltage
CHAPTER 2 INSTALLATION Heat Run Test NEAX2000 IVS2 Installation Procedure Manual ND-70928 (E), Issue 1.0Page 93 Figure 2-36 Confirming Output Voltage TESTER DC100V MJ MN ON -27V FG GND I O SW1 TO FRAME GROUND TERMINAL IN PIM TO TERMINAL BLOCK ON BASE
CHAPTER 2 INSTALLATION Battery Connection NEAX2000 IVS2 Installation Procedure ManualPage 94ND-70928 (E), Issue 1.0 BATTERY CONNECTION WAR NIN G TURN OFF AC POWER BEFORE CONNECTING BATTERIES. CAU TIO N 1. 24V batteries must be used in this system. 2. If battery terminals (+, –) come in contact with the module while connecting the battery cable to the PZ-PW121 card, the PZ-PW121 card or the BWB may be broken. Therefore, you must perform work in accordance with the following steps when mounting or removing the batter- ies. (1) When mounting batteries: (a) Connect the battery cable to the batteries. (b) Mount the batteries into the appointed position of the PIM or the BATTM. (c) Connect the battery cable to the PZ-PW121 card. (2) When removing batteries: (a) Disconnect the battery cable from the PZ-PW121 card. (b) Remove the batteries from the PIM or the BATTM. Recommended Battery Internal Battery: YUASA MATSUSHITAtype NPH-3.2-12 type LCR-12V3.4NE External Battery: (BATTM) YUASA MATSUSHITAtype NP-24-12B type LCL-12V-24