Home > NEC > Communications System > NEC Neax 2000 Ivs2 Installation Procedure Manual

NEC Neax 2000 Ivs2 Installation Procedure Manual

    Download as PDF Print this page Share this page

    Have a look at the manual NEC Neax 2000 Ivs2 Installation Procedure Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 1168 NEC manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.

    Page
    of 416
    							CHAPTER 2 INSTALLATION
    19-inch Rack Mounting Installation
    NEAX2000 IVS2 Installation Procedure Manual
    ND-70928 (E), Issue 1.0Page 75
    19-inch Rack Mounting Installation
    Check the site for installing the PBX with the work drawing to verify that 
    the required floor space is ensured and that service entrances and ducts 
    for trunk/extension cables, power cables and grounding conductors 
    have been properly worked at correct positions.
    See Figure 2-7 and Figure 2-8.
    Detach the SIDE COVER and SIDE PANEL of the Module for 19” RACK 
    BRACKET (A) mounting. For 19” RACK BRACKET (B), this procedure 
    is not required. See “Detaching SIDE COVER/SIDE PANEL” on
    Page 76
    .
    Mount the 19” RACK BRACKET (A) to the PIM. See “Connection of 19” 
    RACK BRACKET (A)” on Page 78
    .
    Mount the PIM with the 19” RACK BRACKET (A) to the 19-inch RACK. 
    See “Mounting PIM to 19-inch RACK” on Page 79
    .
    Mount the 19” RACK BRACKET (B) to the bottom-stack PIM. See “Con-
    nection of 19” RACK BRACKET (B)” on Page 80
    .
    Mount the 19” RACK BRACKET (A) to the top-stack PIM. See “Connec-
    tion of 19” RACK BRACKET (A)” on Page 78
    .
    Mount the PIMs with the 19” RACK BRACKET (A) and (B) to the 19-inch 
    RACK. See Figure 2-25.
    Carefully review every step above to ensure that all necessary screws 
    are properly placed and tightened.
    Start 
    Checkup
    before installation
    One PIM
    Multiple-PIM
    Checking
    Detaching
    Side Cover/Side Panel
    End  Configuration
    Configuration 
    						
    							CHAPTER 2 INSTALLATION
    19-inch Rack Mounting Installation
    NEAX2000 IVS2 Installation Procedure ManualPage 76ND-70928 (E), Issue 1.0
    Detaching SIDE COVER/SIDE PANEL
    (1) Remove the two screws fixing the SIDE COVER.
    (2) Pivot the SIDE COVER on its bottom to remove it.
    (3) Remove the SIDE PANEL fixed by three screws, from the left side flame of the PIM.
    Figure 2-21  Detaching SIDE COVER (1 of 2)
    SCREW
    SIDE COVER 
    						
    							CHAPTER 2 INSTALLATION
    19-inch Rack Mounting Installation
    NEAX2000 IVS2 Installation Procedure Manual
    ND-70928 (E), Issue 1.0Page 77
    Figure 2-21  Detaching SIDE PANEL (2 of 2)
    SCREWS
    SIDE PANEL 
    						
    							CHAPTER 2 INSTALLATION
    19-inch Rack Mounting Installation
    NEAX2000 IVS2 Installation Procedure ManualPage 78ND-70928 (E), Issue 1.0
    Connection of 19” RACK BRACKET (A)
    (1) Insert the nails of the 19” RACK BRACKET (A) into the side frame of the PIM.
    (2) Secure them with four screws each.
    NOTE:
    Screws are attached to the 19” RACK BRACKET (A).
    Figure 2-22  Connection of 19” RACK BRACKET (A)
    19” RACK BRACKET (A)
    SCREWS
    NAILS 
    						
    							CHAPTER 2 INSTALLATION
    19-inch Rack Mounting Installation
    NEAX2000 IVS2 Installation Procedure Manual
    ND-70928 (E), Issue 1.0Page 79
    Mounting PIM to 19-inch RACK
    (1) Mount the PIM with 19” RACK BRACKET (A) into the 19-inch RACK.
    (2) Secure them with four screws (locally provided).
    Figure 2-23  Mounting PIM to 19-inch Rack
    19” RACK BRACKET (A) SCREWS 
    						
    							CHAPTER 2 INSTALLATION
    19-inch Rack Mounting Installation
    NEAX2000 IVS2 Installation Procedure ManualPage 80ND-70928 (E), Issue 1.0
    Connection of 19” RACK BRACKET (B) 
    (1) Place the BASE PLATE on the 19” RACK BRACKET (B).
    (2) Secure the BASE PLATE with four washers and nuts.
    (3) Mount the BASE to the BASE PLATE.  (See Figure 2-12.)
    (4) Mount the PIM to the BASE.  (See Figure 2-13.)
    NOTE:
    Nuts and washers are attached to the 19” RACK BRACKET (B).
    Figure 2-24  Connection of 19” RACK BRACKET (B)
    NUT
    WASHER
    19” RACK BRACKET (B)
    BASE PLATE 
    						
    							CHAPTER 2 INSTALLATION
    19-inch Rack Mounting Installation
    NEAX2000 IVS2 Installation Procedure Manual
    ND-70928 (E), Issue 1.0Page 81
    Figure 2-25  Mounting Multiple-PIM to 19-inch RACK 
    						
    							CHAPTER 2 INSTALLATION
    BUS Cable Connection
    NEAX2000 IVS2 Installation Procedure ManualPage 82ND-70928 (E), Issue 1.0
    BUS Cable Connection
    When the system is a multiple-PIM configuration, connect all the BUS Connector to each other
    using BUS cables, as shown below.
    Be sure to secure the BUS cables using tie wraps to avoid obstructing a PFT card.
    Figure 2-26  BUS Cable
    Connection of BUS Cables
    700 mm (27.6 inch)
    48-TW-0.7 CONN CA
    P 
    W 
    R
    P 
    W 
    R
    P 
    W 
    R
    P 
    W 
    R
    P 
    W 
    R
    P 
    W 
    R
    P 
    W 
    R
    P 
    W 
    R PIM3
    PIM2
    PIM1
    PIM0PIM7
    PIM6
    PIM5
    PIM4
    48-TW-0.7 CONN CA
    FRONT
    BUS CABLE TIE WRAP 
    						
    							CHAPTER 2 INSTALLATION
    Power Cable Connection
    NEAX2000 IVS2 Installation Procedure Manual
    ND-70928 (E), Issue 1.0Page 83
    POWER CABLE CONNECTION
    The cable connections on the PZ-PW121 card are shown below.
    Figure 2-27  Cable Connection on PZ-PW121
    NOTE 1:
    Follow the Label on Front Plate of PZ-PW121.
    NOTE 2:
    If GND (Signal GND) has to be separated from FG (Frame GND), remove the link be-
    tween GND and FG terminals.
    MJ
    MN
    TO AUXILIARY 
    EQUIPMENT  
    1:  OFF:  NO CONNECTION 
    2:  ON:    SEAL/FLOAT2 
         OFF:  OPEN/FLOAT1ON
    ON
    SW101 OFF
    -27V
    FG
    GND
    I O
    TO         FRAME GROUND TERMINAL 
    IN PIM
    TO  T E R M IN A L  
    BLOCK ON BASE NOMINAL 
    AC INPUT
    CN104 CN103
    TO PWR0A CONNECTOR ON BWB TO PWR1 CONNECTOR ON BWB
    TO PWR0B CONNECTOR ON BWB
    1 2
    SW2 240V 100V /120V
    CN1TO OTHER PZ-PW121
    TO BATTERY OR OTHER PZ-PW121
    PWR CA-A/BATT CA PWR CA-A
    PWR CNT CA-D (for PIM1 to PIM 7) 
    PWR CNT CA-E (for PIM0)
    AC CORD-BNOTE 2
    POWER OUTPUT CABLE (+5V, -27V, E)
    POWER OUTPUT CABLE (+90V, CR, E)
    CAUTION
    Set the appropriate voltage 
    before turning on the SW1 
    switch.
    SW1
    L
    N
    FG
    NOTE 1
    SW101 
    						
    							CHAPTER 2 INSTALLATION
    Connection of AC CORD-B
    NEAX2000 IVS2 Installation Procedure ManualPage 84ND-70928 (E), Issue 1.0
    Connection of AC CORD-B
    (1) Connect the AC CORD-B to the CN1 connector on the PZ-PW121 card.
    (2) Screw the ground cable of the AC CORD-B to the frame ground terminal on the PIM.
    Figure 2-28  Connection of AC CORD-B
    CORD BUSH
    BASE
    TERMINAL BLOCKS FRONT
    PZ-PW121
    CN1
    AC CORD-BAC CORD-D TO 120V/240V AC POWER SOURCE 
    						
    All NEC manuals Comments (0)

    Related Manuals for NEC Neax 2000 Ivs2 Installation Procedure Manual