    							CHAPTER 2 INSTALLATION
    Battery Connection
    NEAX2000 IVS2 Installation Procedure Manual
    ND-70928 (E), Issue 1.0Page 95
    C AU TIO N
    3. Battery Replacement Table and Battery Warnings
    The label which shows battery replacement table and battery warnings is attached to the 
    reverse side of Front Cover for PIM and BATTM.
    During the battery installation process, the warning statements must be observed. When re- 
    placing batteries, the battery replacement table should be observed in order to increase bat- 
    tery life and insure a safe operation.
    0 ~ 50 °C
    2 YEARS(AVERAGE 25 °C)
    LABEL
    PIM/BATTM
    FRONT COVER
    BATTERY REPLACEMENT TABLE
    INSTALLATION DATE:
    AMBIENT  
    TEMPERATURE5 ~ 35
    °C(AVERAGE 25 °C)
    REPLACEMENT 
    INTERVAL 3 YEARS 1 YEAR
    CAUTIONTO PREVENT INJURY AND SKIN BURN, 
    PAY ATTENTION TO THE FOLLOWING.
    o DO NOT STRIKE A MATCH OR CAUSE A SPARK IN
    VICINITY OF BATTERY.
    o PLACE THE EQUIPMENT WELL VENTILATED  AREA.
    o DO NOT SHORT. 
    o REPLACE BATTERY ONLY AFTER BATTERY  GASES HAVE BEEN DISPERSED.
    o ELECTROLYTE LEAKAGE OR OTHER HAZARDS
    MAY RESULT IF THE BATTERY IS NOT REPLACED 
    IN ACCORDANCE WITH THE SPECIFIED INTER-
    VALS.
    (AVERAGE 40 °C)0 ~ 50 °C 
    						
    							CHAPTER 2 INSTALLATION
    Internal Battery Connection
    NEAX2000 IVS2 Installation Procedure ManualPage 96ND-70928 (E), Issue 1.0
    Internal Battery Connection
    (1) Connect the BATT CA INT cable to the batteries as shown below.
    (2) Mount the battery unit (24V DC, 3.2-3.4AH) into the PIM.
    (3) Plug the BATT CA INT connector into the BATT1 connector on the PZ-PW121 card.
    (4) Secure the batteries and battery cable using tie wraps.
    Figure 2-37  Internal Battery Mounting (1 of 2)
    67 mmDIMENSION OF BATTERY(2.6 inch)
    134 mm
    (5.3 inch) 60 mm
    (2.4 inch)
    Recommended Batteries
    Yuasa NPH-3.2-12
    Matsushita LCR-12V 3.4NE
    BLUE/BLACK
    INTERNAL BATTERY UNIT 
    (24V DC, 3.2 TO 3.4AH) PIM
    +
    +
    –
    RED BATT CA INT
    BLACK
    TO BATT1 
    CONNECTOR 
    ON PZ-PW121
    – 
    						
    							CHAPTER 2 INSTALLATION
    Internal Battery Connection
    NEAX2000 IVS2 Installation Procedure Manual
    ND-70928 (E), Issue 1.0Page 97
    Figure 2-37  Internal Battery Mounting (2 of 2)
    TIE WRAP
    +
    +
    –
    – 
    						
    							CHAPTER 2 INSTALLATION
    Internal Battery Connection
    NEAX2000 IVS2 Installation Procedure ManualPage 98ND-70928 (E), Issue 1.0
    (5) When the system is configured with two or more PIMs, connect the BATT CA INT and the 
    PWR CA-A as shown below.
    Figure 2-38  Internal Battery Connection for Multiple-PIM Configuration
    NOTE 1:
    One Internal Battery unit (24V DC, 3.2-3.4AH) can be mounted in each PIM.
    NOTE 2:
    Internal Batteries are multi-connected for each two PIMs.
    PIM3PWR
    PIM2
    PIM1PIM7
    PIM6
    PIM5
    PIM4 PIM0
    PWR
    PWR
    PWR
    PWR
    PWR
    PWR
    PWR
    BATT CA INT
    BATT CA INT
    BATT CA INT
    BATT CA INTBATT CA INT
    BATT CA INT
    BATT CA INT
    BATT CA INT
    PWR CA-A
    PWR CA-APWR CA-A
    PWR CA-A 
    						
    							CHAPTER 2 INSTALLATION
    External / BATTM Battery Connection
    NEAX2000 IVS2 Installation Procedure Manual
    ND-70928 (E), Issue 1.0Page 99
    External / BATTM Battery Connection
    (1) Connect the BATT CA EXT cable to the batteries as shown below.
    (2) Mount the battery units (24V DC, 24AH per unit) into the Battery Module (BATTM), if the 
    BATTM required.
    (3) Plug the BATT CA EXT connector into the BATT1 connector on the PZ-PW121 card in PIM0 
    or PIM4.
    NOTE:Screws are attached to the BATTM.
    Figure 2-39  Battery Mounting into BATTM
    Recommended Batteries
    Yuasa NP-24-12B
    Matsushita LCL-12V-24 DIMENSION OF BATTERY
    175 mm
    (6.9 inch)
    125 mm
    (4.9 inch)
    165 mm
    (6.5 inch)
    BATTERY UNIT 
    (24V DC, 24AH)
    BATTERY UNIT 
    (24V DC, 24AH) BATT CA EXTTO BATT1 CONNECTOR 
    ON PZ-PW121 
    IN PIM0/PIM4 
    						
    							CHAPTER 2 INSTALLATION
    External / BATTM Battery Connection
    NEAX2000 IVS2 Installation Procedure ManualPage 100ND-70928 (E), Issue 1.0
    Figure 2-40  Battery Mounted into BATTM
    BATTM
    FRONT
    TO BATT1 CONNECTOR 
    ON PZ-PW121 
    IN PIM0/PIM4 
    						
    							CHAPTER 2 INSTALLATION
    External / BATTM Battery Connection
    NEAX2000 IVS2 Installation Procedure Manual
    ND-70928 (E), Issue 1.0Page 101
    (3) When the system is configured with two or more PIMs, connect the BATT CA EXT and the 
    PWR CA-A as shown below.
    Figure 2-41  External/BATTM Battery Connection for Multiple-PIM Configuration
    NOTE 1:
    One pair each of battery unit (24V DC, 24AH) can be housed in a BATTM, for each two
    PIMs.
    NOTE 2:
    External Batteries are multi-connected for each four PIMs.
    PWR
    BATT CA EXTPWR 
    CA-APWR 
    CA-A
    PWR PWR PWR PWR PWR PWR PWR
    PIM0
    BATT CA EXTPIM4
    BATTM/ 
    EXTERNAL BATTBATTM/ 
    EXTERNAL BATT PIM1PIM5 PIM2PIM6 PIM3PIM7 
    						
    							CHAPTER 2 INSTALLATION
    Cable Running to MDF
    NEAX2000 IVS2 Installation Procedure ManualPage 102ND-70928 (E), Issue 1.0
    CABLE RUNNING TO MDF
    Installation of External MDF
    Secure the external MDF onto the floor or the wall.
    Mount the required MDF components.
    If required, install the cable ducts for the cables to be laid between the MDF and the Main 
    Equipment.  In this case, confirm the locations of the cable holes for the Main Equipment.
    Figure 2-42  MDF Cable Hole Location
    BASE MODULE
     : CABLE HOLE FRONT 
    						
    							CHAPTER 2 INSTALLATION
    MDF Cable
    NEAX2000 IVS2 Installation Procedure Manual
    ND-70928 (E), Issue 1.0Page 103
    MDF Cable
    To facilitate the termination of the 25 pair cables (MDF cables) from the system to the MDF shown
    in Figure 2-43, the length of each cable to be used should be predetermined according to the
    distance between the MDF and the system. Each cable should be labeled at both ends using a
    cable number or cable designation as shown in Table 2-2.
    Figure 2-43  MDF Cable
    TO  P I MCHAMP CONNECTOR
    TWISTED 25 PAIR CABLES
    TO M DF 
    						
    							CHAPTER 2 INSTALLATION
    MDF Cable
    NEAX2000 IVS2 Installation Procedure ManualPage 104ND-70928 (E), Issue 1.0
    Table 2-2  MDF Cables for each PIM 
    FROM
    CABLE 
    NUMBERTOCABLE 
    DESIGNATION
    MODULE CONNECTION
    PIM 0 LTC0 1 MDF 0   LTC0
    LT C 1 2 0    LT C 1
    LT C 2 3 0    LT C 2
    LT C 3 4 0    LT C 3
    PIM 1 LTC0 5 MDF 1   LTC0
    LT C 1 6 1    LT C 1
    LT C 2 7 1    LT C 2
    LT C 3 8 1    LT C 3
    PIM 2 LTC0 9 MDF 2   LTC0
    LT C 1 1 0 2    LT C 1
    LT C 2 1 1 2    LT C 2
    LT C 3 1 2 2    LT C 3
    PIM 3 LTC0 13 MDF 3   LTC0
    LT C 1 1 4 3    LT C 1
    LT C 2 1 5 3    LT C 2
    LT C 3 1 6 3    LT C 3
    PIM 4 LTC0 17 MDF 4   LTC0
    LT C 1 1 8 4    LT C 1
    LT C 2 1 9 4    LT C 2
    LT C 3 2 0 4    LT C 3
    PIM 5 LTC0 21 MDF 5   LTC0
    LT C 1 2 2 5    LT C 1
    LT C 2 2 3 5    LT C 2
    LT C 3 2 4 5    LT C 3 
    						