    							CHAPTER 2 INSTALLATION
    Floor Standing Installation
    NEAX2000 IVS2 Installation Procedure Manual
    ND-70928 (E), Issue 1.0Page 65
    Placing PIM on BASE TRAY for Stationary Equipment
    Place the PIM and the BASE on the BASE TRAY.
    Figure 2-14  Placing PIM on BASE TRAY
    BASE TRAY 
    						
    							CHAPTER 2 INSTALLATION
    Floor Standing Installation
    NEAX2000 IVS2 Installation Procedure ManualPage 66ND-70928 (E), Issue 1.0
    Connection of PIMs
    NOTE:
    The FRONT STOPPER, BUILD PLATES, and screws are attached to the PIM.
    (1) Insert the BUILD PLATES (R)/(L) into the slits of the SIDE FRAME, then slide them 
    backward and lock them.
    (2) Place the FRONT STOPPER on the PIM, then secure it with three screws.
    Figure 2-15  Connection of BUILD PLATE
    BUILD PLATE (L) BUILD PLATE (R)
    SIDE FRAME 
    						
    							CHAPTER 2 INSTALLATION
    Floor Standing Installation
    NEAX2000 IVS2 Installation Procedure Manual
    ND-70928 (E), Issue 1.0Page 67
    Figure 2-16  Connection of FRONT STOPPER
    SCREWPIM SIDE FRAME
    SCREWSCREWPZ-PW121PIM TOP FRAME
    FRONT 
    STOPPER
    SCREWS
    FRONT STOPPER 
    						
    							CHAPTER 2 INSTALLATION
    Floor Standing Installation
    NEAX2000 IVS2 Installation Procedure ManualPage 68ND-70928 (E), Issue 1.0
    (3) Hook the PIM onto the BUILD PLATE’s hooks.
    (4) Slide the PIM backward until it comes to the back end.
    (5) Secure the PIM with three screws.
    Figure 2-17  Connection of Modules
    SCREWS 
    						
    							CHAPTER 2 INSTALLATION
    Floor Standing Installation
    NEAX2000 IVS2 Installation Procedure Manual
    ND-70928 (E), Issue 1.0Page 69
    Installation of I/F BRACKET
    Install the I/F BRACKET to the top-stack PIMs if the equipment is stacked with four or more 
    PIMs.
    Secure the I/F BRACKET to rear side of top-stack PIMs with two screws from inside of PIMs.
    NOTE:
    Screws are attached to the I/F BRACKET.
    SCREW FRONT SIDE
    SCREW
    I/F BRACKET 
    						
    							CHAPTER 2 INSTALLATION
    Floor Standing Installation
    NEAX2000 IVS2 Installation Procedure ManualPage 70ND-70928 (E), Issue 1.0
    Installation of TOP COVER
    (1) Hang four hooks of the TOP COVER on the back board of PIM as shown below.
    (2) Secure the TOP COVER to the front side of the PIM with two screws.
    NOTE:
    Screws are attached to BASE/TOP ASSEM.
    HOOK 
    						
    							CHAPTER 2 INSTALLATION
    Floor Standing Installation
    NEAX2000 IVS2 Installation Procedure Manual
    ND-70928 (E), Issue 1.0Page 71
    Installation of MOUNTING BRACKET
    Install the MOUNTING BRACKET to the top-stack PIM if the equipment is stacked with four 
    or more PIMs.
    (1) Remove four screws located on the rear side of the top-stack PIM.
    (2) Secure the MOUNTING BRACKET to the PIM with the removed screws.
    (3) Secure the PIM to the wall or ceiling by using wires, chains and eyebolts (locally 
    provided).
    Figure 2-18  Installation of MOUNTING BRACKET
    SCREWSFRONT
    PIM
    MOUNTING BRACKET 
    						
    							CHAPTER 2 INSTALLATION
    Wall Mounting Installation
    NEAX2000 IVS2 Installation Procedure ManualPage 72ND-70928 (E), Issue 1.0
    Wall Mounting Installation
    Check the site for installing the PBX with the work drawing to verify that 
    the required floor space is ensured and that service entrances and ducts 
    for trunk/extension cables, power cables and grounding conductors 
    have been properly worked at correct positions.
    See Figure 2-7 and Figure 2-8.
    Detach the front cover of each PIM. See “Detaching FRONT COVER” 
    on Page 60
    .
    Mark hole positions for installation of the PBX main equipment. See   
    Figure 2-19.
    Secure the HANGER ASSEM to the wall. 
    Hang the PIM to the HANGER ASSEM. See Figure 2-20.
    NOTE:The BATTM cannot be installed on the wall.
    After hanging each PIM to the respective HANGER ASSEMs, connect 
    PIMs using screws. See “Connection of PIMs” on Page 66
    .
    Carefully review every step above to ensure that all necessary screws 
    are properly placed and tightened.
    Start 
    Checkup
    before installation
    Marking
    Installation of PIM
    Multiple-PIM
    Checking
    Detaching
    Front Cover
    End  Configuration 
    						
    							CHAPTER 2 INSTALLATION
    Wall Mounting Installation
    NEAX2000 IVS2 Installation Procedure Manual
    ND-70928 (E), Issue 1.0Page 73
    Figure 2-19  Wall Marking for HANGER ASSEM
    352
    (13.9) 356.5
    (14.0)210.8
    (8.3)
    HANGER ASSEM
    ANCHOR/ 
    SCREW
    (x 3/PIM)
    BASE167.5
    (7.0)167.5 UNIT : mm (inch)
    (7.0)
    352
    (13.9)
    352
    (13.9)
    352
    (13.9)
    210.8
    (8.3)
    210.8
    (8.3)
    210.8
    (8.3)
    210.8
    (8.3) 
    						
    							CHAPTER 2 INSTALLATION
    Wall Mounting Installation
    NEAX2000 IVS2 Installation Procedure ManualPage 74ND-70928 (E), Issue 1.0
    Hanging PIM to HANGER ASSEM
    (1) Secure the HANGER ASSEM to the surface of a wall with three screws.
    Select screws to match with the wall type as follows.
    A concrete wall is recommended because it is the most firm to mount the PBX of the 
    three. The plaster board is the least firm wall of the three.
    (2) Hang the slits of the rear of a PIM to the hooks of the HANGER ASSEM.
    (3) Secure the PIM to the HANGER ASSEM with two screws.
    NOTE:
    Screws are attached to the HANGER ASSEM.
    Figure 2-20  Hanging PIM to HANGER ASSEM WALL TYPE RECOMMENDED SCREW
    CONCRETE ANCHOR BOLT TYPE Recommended 4 mm (0.16 inch) by 
    25 mm (0.98 inch)
    WOOD WOOD TYPE SCREWS Min. 3.5 mm (0.14 inch) DIA 
    Max. 4.5 mm (0.17 inch) DIA
    PLASTER BOARD
    [THICKNESS Min. 9.6 mm (0.38 inch)]MOLLY ANCHOR TYPE Min. 3.5 mm (0.14 inch) DIA
    Max. 4.5 mm (0.17 inch) DIA
    HOOK
    HOOK
    HANGER ASSEM
    PIM
    BASE