Home > NEC > Communications System > NEC Neax 2000 Ivs2 Installation Procedure Manual

NEC Neax 2000 Ivs2 Installation Procedure Manual

    Download as PDF Print this page Share this page

    Have a look at the manual NEC Neax 2000 Ivs2 Installation Procedure Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 1168 NEC manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.

    Page
    of 416
    							CHAPTER 3 LAMP INDICATIONS AND SWITCH SETTINGS
    PN-DAIF (DAI)
    NEAX2000 IVS2 Installation Procedure Manual
    ND-70928 (E), Issue 1.0Page 275
    Switch Settings
    SWITCH NAME SWITCH
    NUMBER SETTING
    POSITION FUNCTION CHECK
    MB (Toggle SW) 
    N
    OTE UP
    For make-busy 
    For normal operation
    SW1 
    (Piano Key SW) 1
    Always set to OFF
    2 ON
    Line impedance: 75 ohms
    (For coaxial cable) 
    Line impedance: 120 ohms 
    (For twisted-pair cable)
    3 Always set to OFF
    4 Always set to OFF
    (Continued)
    ON
    DOWN
    4 
    3
    2
    1
    OFF
    ON
    OFF
    OFF
    OFF
    OFF 
    						
    							CHAPTER 3 LAMP INDICATIONS AND SWITCH SETTINGS
    PN-DAIF (DAI)
    NEAX2000 IVS2 Installation Procedure ManualPage 276ND-70928 (E), Issue 1.0
    SW2 (DIP SW)
    1ONControl channel signaling data 
    transmission speed: 48kbps
    Control channel signaling data 
    transmission speed: 64kbps
    2ONCRC Synchronization Detection 
    Timer is provided.
    CRC Synchronization Detection 
    Timer is not provided.
    3ON
    CRC4 Check is provided.
    CRC4 Check is not provided.
    4
    Not used
    5
    Not used
    6
    Not used
    7
    Not used
    8
    Not used
    (Continued)
    SWITCH
    NAMESWITCH
    NUMBERSETTING
    POSITIONFUNCTION CHECK
    1
    23
    45
    67
    8ON
    OFF
    OFF
    OFF
    OFF
    OFF
    OFF
    OFF
    OFF 
    						
    							CHAPTER 3 LAMP INDICATIONS AND SWITCH SETTINGS
    PN-DAIF (DAI)
    NEAX2000 IVS2 Installation Procedure Manual
    ND-70928 (E), Issue 1.0Page 277
    The figure in the SWITCH NAME column and the position in   in the SETTING POSITION
    column indicate the standard setting of the switch. When the switch is not set as shown by the
    figure and  , the setting of the switch varies with the system concerned.
    NOTE:
    When the power is on, flip the MB switch to ON (UP position) before plugging/unplug-
    ging the circuit card.  SW3 (DIP SW) 1
    Always set to ON
    2
    Always set to ON
    3
    Always set to ON
    4ONWhen mounting this card on remote 
    site.
    OFFWhen mounting this card on main 
    site.
    JPS (Jumper pin)
    RightTA is grounded on the transmission 
    line: 75 ohms (For coaxial cable)
    Balanced transmission: 120 ohms 
    (For twisted-pair cable)
    JPR (Jumper pin)
    RightRA is grounded on the transmission 
    line: 75 ohms (For coaxial cable)
    Balanced transmission: 120 ohms 
    (For twisted-pair cable)
    JP (Jumper pin)
    UPLine impedance: 
    75 ohms (For coaxial cable)
    Line impedance: 
    120 ohms (For twisted-pair cable)
    SWITCH
    NAMESWITCH
    NUMBERSETTING
    POSITIONFUNCTION CHECK
    1
    23
    4ON
    ON
    ON
    ON
    Left
    Left
    DOWN 
    						
    							CHAPTER 3 LAMP INDICATIONS AND SWITCH SETTINGS
    PN-24DTA-C (DTI)
    NEAX2000 IVS2 Installation Procedure ManualPage 278ND-70928 (E), Issue 1.0
    PN-24DTA-C (DTI)
    Locations of Lamps, Switches, and Connectors
    SENSE
    RUN
    MB
     
     
    CRC 
    PCM 
    FRM 
    RMT 
    AIS 
    BL 
       
     
     
     
     
     
      SW1
    SW0
    JRR1
    AISS MAS
    JPR0
    JPS 
    						
    							CHAPTER 3 LAMP INDICATIONS AND SWITCH SETTINGS
    PN-24DTA-C (DTI)
    NEAX2000 IVS2 Installation Procedure Manual
    ND-70928 (E), Issue 1.0Page 279
    Lamp Indications
    LAMP 
    NAMECOLOR FUNCTION
    RUN Green Flashes at 120 IPM while this card is operating normally.
    CRC Red Remains lit when detecting Cyclic Redundancy Checking (CRC) 
    errors.
    PCM Red Remains lit when detecting PCM signal loss.
    FRM Red Remains lit when detecting Frame Alignment signal loss.
    RMT Red Remains lit when receiving Frame Alignment signal loss alarm 
    from a distant office.
    AIS Red Remains lit when a pattern of consecutive “1” is received. The 
    distant office transmits this signal for a loop-back test.
    BL Red B channel status
    ON : More than 10 channels are busy
    OFF : All channels are idle
    Flash (60 IPM) : Only one channel is busy
    Flash (120 IPM) : 2 through 10 channels are busy 
    						
    							CHAPTER 3 LAMP INDICATIONS AND SWITCH SETTINGS
    PN-24DTA-C (DTI)
    NEAX2000 IVS2 Installation Procedure ManualPage 280ND-70928 (E), Issue 1.0
    Switch Settings
    SWITCH NAMESWITCH 
    NUMBERSETTING 
    POSITIONFUNCTION CHECK
    SENSE
    (Rotary SW)
    NOTE 10-3 Not used
    4-F Set the switch to match the AP Number (04-31) to
    be set by CM05.
    MB (Toggle SW)
    NOTE 2UP For make-busy
    For normal operation
    (Continued)
    F
    4
    AP No.SW1-4: ON
    04 05 06 07 08 09 10 11 12 13 14 15
    SW1-4: OFF
    20 21 22 23 24 25 26 27 28 29 30 31
    SW No.
    456789ABCDEF
    ON
    DOWN 
    						
    							CHAPTER 3 LAMP INDICATIONS AND SWITCH SETTINGS
    PN-24DTA-C (DTI)
    NEAX2000 IVS2 Installation Procedure Manual
    ND-70928 (E), Issue 1.0Page 281
    SW0
    (Piano Key SW)
    1
    NOTE 3
    NOTE 4ONSource clock signal from network is 
    sent to the PLO 0 input on MP card.
    OFFSource clock signal from network is 
    not sent to the PLO 0 input on MP 
    card. 
    2 
    NOTE 3
    NOTE 4ONSource clock signal from network is 
    sent to the PLO 1 input on MP card.
    OFFSource clock signal from network is 
    not sent to the PLO 1 input on MP 
    card. 
    3ONRemote loop-back
    For normal operation
    4ONLocal loop-back (AIS send)
    For normal operation
    5Set equalizer according to the cable 
    length between the PBX and the 
    MDF. OFF
    6
    OFF
    7
    OFF
    8 Not used
    (Continued)
    SWITCH NAMESWITCH 
    NUMBERSETTING 
    POSITIONFUNCTION CHECK
    OFF
    ON
    5 6 7 8
    1 2
    3 4
    OFF
    OFF
    ON
    OFF
    80-120m (262.5-394ft.)
    SW0-5 SW0-6 SW0-7CABLE LENGTH
    ON ON0-40m (0-131.2ft.)
    40-80m (131.2-262.5ft.)
    120-160m (394-525ft.)
    160-200m (525-656ft.)
    Signal is not sent ON ON ON
    ON ON OFF
    OFF ON OFF
    ON OFF ON
    OFF OFF OFF
    ON
    ON
    OFF 
    						
    							CHAPTER 3 LAMP INDICATIONS AND SWITCH SETTINGS
    PN-24DTA-C (DTI)
    NEAX2000 IVS2 Installation Procedure ManualPage 282ND-70928 (E), Issue 1.0
    The figure in the SWITCH NAME column and the position in    in the SETTING POSITION-
    column indicate the standard setting of the switch. When the switch is not set as shown by the
    figure and   , the setting of the switch varies with the system concerned.SW1
    (Piano Key SW)
    NOTE 41 Not used
    2 Not used
    3 Not used
    4ON AP No. 04-15
    OFF AP No. 20-31
    JPR0 (Jumper pin)
    UPNeutral grounding on the receiving
    line is provided.
    Neutral grounding on the receiving
    line is not provided.
    JPR1 (Jumper pin)
    Line impedance: 100 ohms
    Left Line impedance: 110 ohms
    JPS (Jumper pin)
    UPNeutral grounding on the transmit-
    ting line is provided.
    Neutral grounding on the transmit-
    ting line is not provided.
    MAS (Jumper pin)
    UP Clock Source
    Clock Receiver
    AISS (Jumper pin) AIS signal is sent out when make-
    busy or power on.
    DOWNAIS signal is not sent out when 
    make-busy or power on.
    (Continued)
    SWITCH NAMESWITCH 
    NUMBERSETTING 
    POSITIONFUNCTION CHECK
    4 
    3 
    2 
    1 OFF
    ON
    OFF
    OFF
    OFF
    DOWN
    Right
    DOWN
    DOWN
    UP 
    						
    							CHAPTER 3 LAMP INDICATIONS AND SWITCH SETTINGS
    PN-24DTA-C (DTI)
    NEAX2000 IVS2 Installation Procedure Manual
    ND-70928 (E), Issue 1.0Page 283
    NOTE 1:
    Set the groove on the switch to the desired position.
    NOTE 2:
    When the power is on, flip the MB switch to ON (UP position) before plugging/unplug-
    ging the circuit card.
    NOTE 3:
    Set SW0-1 and SW0-2 as follows:
    NOTE 4:
    When the PBX is a clock source office, set the SW0-1 and SW0-2 on all the DTI cards
    mounted in PIM0 to “OFF”.
    NOTE 5:
    Mount the DTI card which receives a source clock signal into PIM0.
    CONDITIONSDTI0 DTI1 DTI2 DTI3 DTI4
    REMARKS
    SW
    0-1SW
    0-2SW
    0-1SW
    0-2SW
    0-1SW
    0-2SW
    0-1SW
    0-2SW
    0-1SW
    0-2
    When one DTI is 
    provided.ON OFF––––––––MP card will receive the 
    clock signal from DTI0 at its 
    PLO0 input.
    When more than 
    one DTI is pro-
    vided.ON OFF OFF ON OFF OFF OFF OFF OFF OFFMP card will receive the 
    clock signal from DTI0 at its 
    PLO0 input, under normal 
    conditions.
    Should a clock failure occur 
    with DTI0, MP card will auto-
    matically switch to the PLO1 
    input which gets clock from 
    DTI1. 
    						
    							CHAPTER 3 LAMP INDICATIONS AND SWITCH SETTINGS
    PN-30DTC-A (DTI)
    NEAX2000 IVS2 Installation Procedure ManualPage 284ND-70928 (E), Issue 1.0
    PN-30DTC-A (DTI)
    Locations of Lamps, Switches, and Connectors
    SENSE
    RUN
    MB
    SW
    PCM 
    FRM 
    MFRM 
    RMT 
    MRMT 
    AIS 
    BL  
     
     
     
     
    JP JPSJPR 
    						
    All NEC manuals Comments (0)

    Related Manuals for NEC Neax 2000 Ivs2 Installation Procedure Manual