CHAPTER 2 INSTALLATION Procedure NEAX2000 IVS2 Installation Procedure Manual ND-70928 (E), Issue 1.0Page 45 PROCEDURE This flowchart explains the procedures for installing the PBX system. Follow the procedures in Figure 2-2. Figure 2-2 Procedure Flowchart (1 of 2) START UNPACKING INSTALLATION OF MAIN EQUIPMENT BATTERY CONNECTION TERMINATION OF CABLES ON MDF SUPPLY VOLTAGE CHECK AND HEAT RUN TEST CABLE RUNNING TO MDF INSTALLATION OF PERIPHERAL EQUIPMENT A POWER CABLE CONNECTION SWITCH SETTINGS OF CIRCUIT CARDSREFER TO CHAPTER 3. Page 49 Page 54 Page 83 Page 90 Page 94 Page 102 Page 109 Page 128 WIRING AC CABLE TO TERMINALS Page 50
CHAPTER 2 INSTALLATION Procedure NEAX2000 IVS2 Installation Procedure ManualPage 46ND-70928 (E), Issue 1.0 Figure 2-2 Procedure Flowchart (2 of 2) For Floor Standing Installation, there are three methods to install the equipment. It depends on the country according to the UL/cUL/ACA. NOTE: UL = Underwriters Laboratories (U.S.A.) cUL = Canadian Underwriters Laboratories (Canada) ACA = Australian Communication Authority (Australia) “Stationary Equipment (For North America/ Australia)” “Fixed Equipment (For Nor th America/ Australia)” “Fixed Equipment (For Other Countries)” A END MOUNTING MOUNTING FRONT COVERCIRCUIT CARDS SYSTEM SYSTEM DATA ENTRY CLEANING AND VISUAL CHECK INITIALIZATION OPERATION TEST SYSTEM DATA SAVE Page 199 Page 201 Page 202 Page 204 Page 205 Page 205
CHAPTER 2 INSTALLATION Stationary Equipment (For North America/Australia) NEAX2000 IVS2 Installation Procedure Manual ND-70928 (E), Issue 1.0Page 47 Stationary Equipment (For North America/Australia) The equipment is placed on the BASE TRAY which is fixed on the floor, and is connected to 120V/ 240V AC Power Source using AC CORD-D cable. For installation of Stationary Equipment, see the following pages. WIRING AC CABLE TO TERMINALS - Using AC CORD-D Page 50 INSTALLATION OF MAIN EQUIPMENT - Floor Marking for BASE TRAY Page 58 - Installation of PIM, For Stationary Equipment Page 55 Fixed Equipment (For North America/Australia) The equipment is fixed on the floor by BASE PLATE and anchor bolts, and is connected to AC Power Distribution Board using installation cable. For installation of this equipment, see the following pages. WIRING AC CABLE TO TERMINALS - Using installation Cable Page 52 INSTALLATION OF MAIN EQUIPMENT - Floor Marking for BASE PLATE Page 58 - Installation of PIM, For Fixed Equipment Page 55 Fixed Equipment (For Other Countries) The equipment is fixed on the floor by BASE PLATE and anchor bolts, and is connected to 120V/ 240V AC Power Source using AC CORD-D cable. For installation of this equipment, see the following pages. WIRING AC CABLE TO TERMINALS - Using AC CORD-D Page 50 INSTALLATION OF MAIN EQUIPMENT - Floor Marking for BASE PLATE Page 58 - Installation of PIM, For Fixed Equipment Page 55
CHAPTER 2 INSTALLATION Fixed Equipment (For Other Countries) NEAX2000 IVS2 Installation Procedure ManualPage 48ND-70928 (E), Issue 1.0 The mark shown below is attached to each procedure in which circuit cards are handled. When doing such a procedure, the installer must perform the procedure with caution, to prevent dam- age caused by static electricity (See “Static Electricity Guard”on Page 39 ). ATTENTION Contents Static Sensitive Handling Precautions Required
CHAPTER 2 INSTALLATION Unpacking NEAX2000 IVS2 Installation Procedure Manual ND-70928 (E), Issue 1.0Page 49 UNPACKING (1) Check the received quantity of packages containing the PBX system with the description on the shipping document. (2) Check the packaging for external damage done by transportation and record it as necessary. (3) Unpack the packaging. For unpacking the packages containing circuit cards, a grounded wrist strap should be worn. (4) Check the quantity of equipment and materials unpacked with the shipping document. (5) Perform visual inspection, checking for the following items. PIMs Overall distor tion. Scratches and dents on the surface. Scratches and cracks on the PIM Backplane. Broken or bent pins on the PIM Backplane. Covers Scratches and dents. Circuit Cards Overall distor tion Scratches and cracks Loss, or damage of par ts on the circuit cards. Attendant Console Scratches and cracks on the keyboard Overall distor tion Damage to Keys and lamps. ATTENTIONContents Static Sensitive Handling Precautions Required
CHAPTER 2 INSTALLATION Wiring AC Cable to Terminals NEAX2000 IVS2 Installation Procedure ManualPage 50ND-70928 (E), Issue 1.0 WIRING AC CABLE TO TERMINALS There are two kinds of AC cable : AC CORD-D For Stationary Equipment/Fixed Equipment (For Other Countries) : Installation Cable For Fixed Equipment (For North America/ Australia) Using AC CORD-D (1) Take the AC CORD-D out of the hole on the left side of the BASE, then secure the code to the BASE with the cord bush. NOTE: Cord bush is attached to the AC CORD-D. (2) Wire the AC CORD-D and the FG cable to the FG, NEUTRAL, LINE and Ground terminals on the BASE. (3) Wire the AC CORD-B to the FG, NEUTRAL and LINE terminals on the BASE. Figure 2-3 Wiring AC CORD to Terminals NOTE: Cable colors in the parentheses are for Australia. FG CABLE (GREEN) HOW TO SECURE CABLES TO TERMINAL BLOCK INSERT A SCREW DRIVER INTO THE INSIDE HOLE OF TERMINAL BLOCK. PULL DOWN THE SCREW DRIVER TOWARD INSIDE AND OPEN THE METAL PLATE. INSERT A POWER CABLE INTO THE OUTSIDE HOLE OF TERMINAL BLOCK. REMOVE THE SCREW DRIVER. 1 12 2 33 4 4 AC CORD-B AC CORD-D TO 120V/240V AC POWER SOURCETO CN1 on PZ-PW121 in PIM FG NEUTRALLINETERMINAL BLOCKS GREEN (GREEN/YELLOW)BLACK (BROWN) BLACK (BROWN) WHITE (BLUE) GREEN (GREEN/YELLOW)WHITE (BLUE) BASE FRONT
CHAPTER 2 INSTALLATION Using AC CORD-D NEAX2000 IVS2 Installation Procedure Manual ND-70928 (E), Issue 1.0Page 51 (4) When the system is two-frame configuration, the AC CORD-D of the right side frame can go through the BASE of the left side frame. Figure 2-4 AC CORD Wiring for Two-Frame Configuration BASE FGLINENEUTRALFGLINENEUTRAL TERMINAL BLOCKS TO 120V/240V AC POWER SOURCE AC CORD-D CORD BUSH
CHAPTER 2 INSTALLATION Using Installation Cable NEAX2000 IVS2 Installation Procedure ManualPage 52ND-70928 (E), Issue 1.0 Using Installation Cable (1) Take the Installation cable out of the hole on the left side of the BASE, then secure the cable to the BASE with the cord bush. NOTE:The installer is to use minimum 16 AWG (1.3 φ) size wire, maximum 9 mm size cable. (2) Wire the Installation cable and the FG cable to the FG, NEUTRAL, LINE and Ground terminals on the BASE. (3) Wire the AC CORD-B to the FG, NEUTRAL and LINE terminals on the BASE. Figure 2-5 Wiring Installation Cable to Terminals NOTE:Cable colors in the parentheses are for Australia. FG CABLE (GREEN) HOW TO SECURE CABLES TO TERMINAL BLOCK INSERT A SCREW DRIVER INTO THE INSIDE HOLE OF TERMINAL BLOCK. PULL DOWN THE SCREW DRIVER TOWARD INSIDE AND OPEN THE METAL PLATE. INSERT A POWER CABLE INTO THE OUTSIDE HOLE OF TERMINAL BLOCK. REMOVE THE SCREW DRIVER. 112 23 3 4 4 AC CORD-B INSTALLATION CABLE TO AC POWER DISTRIBUTION BOARDTO CN1 on PZ-PW121 in PIM FG NEUTRAL LINETERMINAL BLOCKS GREEN (GREEN/YELLOW)BLACK (BROWN) BLACK (BROWN) WHITE (BLUE) GREEN (GREEN/YELLOW)WHITE (BLUE) BASE FRONT
CHAPTER 2 INSTALLATION Using Installation Cable NEAX2000 IVS2 Installation Procedure Manual ND-70928 (E), Issue 1.0Page 53 (4) When the system is two-frame configuration, the Installation cable of the right side frame can go through the BASE of the left side frame. Figure 2-6 Installation Cable Wiring for Two-Frame Configuration BASE FGLINENEUTRALFGLINENEUTRAL TERMINAL BLOCKS TO AC POWER DISTRIBUTION BOARD INSTALLATION CABLE CORD BUSH
CHAPTER 2 INSTALLATION Installation of Main Equipment NEAX2000 IVS2 Installation Procedure ManualPage 54ND-70928 (E), Issue 1.0 INSTALLATION OF MAIN EQUIPMENT Floor Standing Installation Check the site for installing the PBX with the work drawing to verify that the required floor space is ensured and that service entrances and ducts for trunk/extension cables, power cables and bus cables have been properly worked at correct positions. See Figure 2-7 and Figure 2-8. Mark positions for installation of the PBX main equipment. For Fixed Equipment, detach the BASE PLATE from the BASE. See Figure 2-9. For Stationary Equipment, see Figure 2-10. NOTE: Measure the level of the floor surface before installing the PBX main equipment. Check the level of the floor. If necessary, adjust the level by inserting spacers beneath the equipment. First open necessary number of preliminary prepared holes using the drill bit for small-diameter holes, then use the finishing drill bit for fin- ishing drill holes. See “Drilling” on Page 59. Detach the front cover of each PIM. See “Detaching FRONT COVER” on Page 60 . Start Checkup before installation Marking Leveling Detaching Front Cover Drilling A