CHAPTER 3 LAMP INDICATIONS AND SWITCH SETTINGS PN-30DTC-A (DTI) NEAX2000 IVS2 Installation Procedure Manual ND-70928 (E), Issue 1.0Page 285 Lamp Indications LAMP NAMECOLOR FUNCTION RUN Green Flashes at 120 IPM when this card is normally operating. PCM Red Remains lit when detecting PCM signal loss. FRM Red Remains lit when detecting Frame Alignment signal loss. MFRM Red Remains lit when detecting Multi-Frame Alignment signal loss on time Slot 16. RMT Red Remains lit when receiving the alarm from a distant office because Frame Alignment signal loss has been detected at the distant office. MRMT Red Remains lit when receiving the alarm from a distant office because Multi-Frame Alignment signal loss has been detected at the distant office. AIS Red Remains lit when indicating that the pattern of consecutive “1” is being received. The distant office transmits this signal for a loop- back test distant. BL Red B channel status ON : More than10 channels are busy OFF : All channels are idle Flash (60 IPM) : Only one channel is busy Flash (120 IPM) : 2 to 10 channels are busy
CHAPTER 3 LAMP INDICATIONS AND SWITCH SETTINGS PN-30DTC-A (DTI) NEAX2000 IVS2 Installation Procedure ManualPage 286ND-70928 (E), Issue 1.0 Switch Settings SWITCH NAMESWITCH NUMBERSETTING POSITIONFUNCTION CHECK SENS (Rotary SW) NOTE 14-F Set the switch to match the AP Number (04-31) to be set by CM05. 0-3 Not used MB (Toggle SW) NOTE 2UP For make-busy For normal operation (Continued) F 4 AP No.SW-8: ON 04 05 06 07 08 09 10 11 12 13 14 15 SW-8: OFF 20 21 22 23 24 25 26 27 28 29 30 31 SW No. 456789ABCDEF ON DOWN
CHAPTER 3 LAMP INDICATIONS AND SWITCH SETTINGS PN-30DTC-A (DTI) NEAX2000 IVS2 Installation Procedure Manual ND-70928 (E), Issue 1.0Page 287 SW (Piano Key SW) 1 NOTE 3 NOTE 4ONSource clock signal from network is sent to the PLO 0 input on MP card. OFFSource clock signal from network is not sent to the PLO 0 input on MP card 2 NOTE 3 NOTE 4ONSource clock signal from network is sent to the PLO 1 input on MP card. OFFSource clock signal from network is not sent to the PLO 1 input on MP card. 3ON Remote loop-back For normal operation 4ON Local loop-back (AIS send) For normal operation 5ONTransmission line cable: Coaxial cable (75 ohms) Transmission line cable: Twisted-pair cable (120 ohms) 6 Always set to OFF 7 8ON AP No. 04-15 OFF AP No. 20-31 (Continued) SWITCH NAMESWITCH NUMBERSETTING POSITIONFUNCTION CHECK OFF ON 5 6 7 8 1 2 3 4 OFF OFF OFF OFF OFF
CHAPTER 3 LAMP INDICATIONS AND SWITCH SETTINGS PN-30DTC-A (DTI) NEAX2000 IVS2 Installation Procedure ManualPage 288ND-70928 (E), Issue 1.0 The figure in the SWITCH NAME column and the position in in the SETTING POSITION column indicate the standard setting of the switch. When the switch is not set as shown by the figure and , the setting of the switch varies with the system concerned. NOTE 1: Set the groove on the switch to the desired position. NOTE 2: When the power is on, flip the MB switch to ON (UP position) before plugging/unplug- ging the circuit card. JPS (Jumper pin)Balanced transmission (For twisted-pair cable) DOWNTA is grounded on the transmission line (For coaxial cable) JPR (Jumper pin)Balanced transmission (For twisted-pair cable) DOWNRA is grounded on the transmission line (For coaxial cable) JP (Jumper pin)RIGHTLine impedance: 75 ohms (For coaxial cable) Line impedance: 120 ohms (For twisted-pair cable) (Continued) SWITCH NAMESWITCH NUMBERSETTING POSITIONFUNCTION CHECK UP UP LEFT
CHAPTER 3 LAMP INDICATIONS AND SWITCH SETTINGS PN-30DTC-A (DTI) NEAX2000 IVS2 Installation Procedure Manual ND-70928 (E), Issue 1.0Page 289 NOTE 3: Set the SW-1 and SW-2 as follows: NOTE 4: When the PBX is a clock source office, set the SW-1 and SW-2 on all the DTI cards mounted in PIM0 to “OFF”. NOTE 5: Mount the DTI card which receives a source clock signal into PIM0. CONDITIONSDTI0 DTI1 DTI2 DTI3 REMARKS SW -1SW -2SW -1SW -2SW -1SW -2SW -1SW -2 When one DTI is provided.ON OFF––––––MP card will receive the clock signal from DTI0 at its PLO0 input. When more than one DTI is provided.ON OFF OFF ON OFF OFF OFF OFFMP card will receive the clock signal from DTI0 at its PLO0 input, under normal condi- tions. Should a clock failure occur with DTI0, MP card will auto- matically switch to the PLO1 input which gets from DTI1.
CHAPTER 3 LAMP INDICATIONS AND SWITCH SETTINGS PN-IPTA (IPT) NEAX2000 IVS2 Installation Procedure ManualPage 290ND-70928 (E), Issue 1.0 PN-IPTA (IPT) Locations of Lamps, Switches, and Connectors SW1 MODE SW2VCT IP CONN VCT : IP CONN : TO EXTERNAL LAN INTERFACE SENSE RUN MB BUSY SUBOPE3 SUBOPE2 SUBOPE1 SUBOPE0 L3 L2 L1 IP-TX IP-RX IP-100M IP-LINK IP-COL IP-LYR PZ-M539 PN-IPTA TO PN-4VCTH
CHAPTER 3 LAMP INDICATIONS AND SWITCH SETTINGS PN-IPTA (IPT) NEAX2000 IVS2 Installation Procedure Manual ND-70928 (E), Issue 1.0Page 291 Lamp Indications LAMP NAMECOLOR FUNCTION RUN Green Flashes at 120 IPM while this card is operating normally. BUSY Red When even 1-line ON: Even one line is busy When even 1-line OFF: All lines are idle SUBOPE3 Green Remains lit when Card No.3 of PN-4VCTH is operating. SUBOPE2 Green Remains lit when Card No.2 of PN-4VCTH is operating. SUBOPE1 Green Remains lit when Card No.1 of PN-4VCTH is operating. SUBOPE0 Green Remains lit when Card No.0 of PN-4VCTH is operating. L3–Not used L2–Not used L1 Green Remains lit when a loop-back test is in progress. IP-TX Green Remains lit when sending IP data. IP-RX Green Remains lit when receiving IP data. IP-100M Green ON: Ethernet is operating with 100 Mbps. OFF: Ethernet is operating with 10 Mbps. IP-LINK Green ON: Being connected to IP network (Link established). OFF: Disconnected to IP network (No link established). IP-COL Green Remains lit when detecting IP data collision. IP-LYR Green Remains lit when IP network is ready to use.
CHAPTER 3 LAMP INDICATIONS AND SWITCH SETTINGS PN-IPTA (IPT) NEAX2000 IVS2 Installation Procedure ManualPage 292ND-70928 (E), Issue 1.0 Switch Settings SWITCH NAMESWITCH NUMBERSETTING POSITIONFUNCTION CHECK SENSE (Rotary SW) NOTE 10-3 Not used 4-F Set the switch to match the AP Number (04-31) to be set by CM05. MB (Toggle SW) NOTE 2UP For make-busy For normal operation MODE (Rotary SW) 0For setting of the operating mode For normal operation 1-F Not used (Continued) F 4 AP No.SW1-4: ON 04 05 06 07 08 09 10 11 12 13 14 15 SW1-4: OFF 20 21 22 23 24 25 26 27 28 29 30 31 SW No. 456789ABCDEF ON DOWN DOWN
CHAPTER 3 LAMP INDICATIONS AND SWITCH SETTINGS PN-IPTA (IPT) NEAX2000 IVS2 Installation Procedure Manual ND-70928 (E), Issue 1.0Page 293 The figure in the SWITCH NAME column and the position in the SETTING POSITION column indicate the standard setting of the switch. When the switch is not set as shown by the figure and , the setting of the switch varies with the system concerned. NOTE 1: Set the groove on the switch to the desired position. NOTE 2: When the power is on, flip the MB switch to ON (UP position) before plugging/unplug- ging the circuit card. SW1 (DIP SW) 1For normal operation OFF Not used 2For normal operation OFF Not used 3For normal operation OFF Not used 4ON AP Number: 04-15 OFF AP Number: 20-31 SW2 (DIP SW) 1-8 Not used SWITCH NAMESWITCH NUMBERSETTING POSITIONFUNCTION CHECK 1 23 4ON ON ON ON 1 23 45 67 8ONOFF
CHAPTER 3 LAMP INDICATIONS AND SWITCH SETTINGS PN-24PRTA (PRT) NEAX2000 IVS2 Installation Procedure ManualPage 294ND-70928 (E), Issue 1.0 PN-24PRTA (PRT) Locations of Lamps, Switches, and Connectors SENSE RUN MB SW2 LC LPB CRC PCM FRM RMT AIS BL SW1 SW0 JRR1 AISS MAS JPR0 JPS