Home > NEC > Communications System > NEC Neax 2000 Ivs2 Installation Procedure Manual

NEC Neax 2000 Ivs2 Installation Procedure Manual

    Download as PDF Print this page Share this page

    Have a look at the manual NEC Neax 2000 Ivs2 Installation Procedure Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 1168 NEC manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.

    Page
    of 416
    							CHAPTER 3 LAMP INDICATIONS AND SWITCH SETTINGS
    PN-30DTC-A (DTI)
    NEAX2000 IVS2 Installation Procedure Manual
    ND-70928 (E), Issue 1.0Page 285
    Lamp Indications
    LAMP 
    NAMECOLOR FUNCTION
    RUN Green Flashes at 120 IPM when this card is normally operating.
    PCM Red Remains lit when detecting PCM signal loss.
    FRM Red Remains lit when detecting Frame Alignment signal loss.
    MFRM Red Remains lit when detecting Multi-Frame Alignment signal loss on 
    time Slot 16.
    RMT Red Remains lit when receiving the alarm from a distant office 
    because Frame Alignment signal loss has been detected at the 
    distant office.
    MRMT Red Remains lit when receiving the alarm from a distant office 
    because Multi-Frame Alignment signal loss has been detected at 
    the distant office.
    AIS Red Remains lit when indicating that the pattern of consecutive “1” is 
    being received. The distant office transmits this signal for a loop-
    back test distant.
    BL Red B channel status
    ON  : More than10 channels are busy
    OFF  : All channels are idle
    Flash (60 IPM) : Only one channel is busy
    Flash (120 IPM) : 2 to 10 channels are busy 
    						
    							CHAPTER 3 LAMP INDICATIONS AND SWITCH SETTINGS
    PN-30DTC-A (DTI)
    NEAX2000 IVS2 Installation Procedure ManualPage 286ND-70928 (E), Issue 1.0
    Switch Settings
    SWITCH
    NAMESWITCH
    NUMBERSETTING
    POSITIONFUNCTION CHECK
    SENS 
    (Rotary SW)
    NOTE 14-F Set the switch to match the AP Number (04-31) to
    be set by CM05.
    0-3 Not used
    MB (Toggle SW)
    NOTE 2UP
    For make-busy
    For normal operation
    (Continued)
    F
    4
    AP No.SW-8: ON
    04 05 06 07 08 09 10 11 12 13 14 15
    SW-8: OFF
    20 21 22 23 24 25 26 27 28 29 30 31
    SW No.
    456789ABCDEF
    ON
    DOWN 
    						
    							CHAPTER 3 LAMP INDICATIONS AND SWITCH SETTINGS
    PN-30DTC-A (DTI)
    NEAX2000 IVS2 Installation Procedure Manual
    ND-70928 (E), Issue 1.0Page 287
    SW
    (Piano Key SW)
    1
    NOTE 3
    NOTE 4ONSource clock signal from network is 
    sent to the PLO 0 input on MP card.
    OFFSource clock signal from network is 
    not sent to the PLO 0 input on MP 
    card 
    2
    NOTE 3
    NOTE 4ONSource clock signal from network is 
    sent to the PLO 1 input on MP card.
    OFFSource clock signal from network is 
    not sent to the PLO 1 input on MP 
    card. 
    3ON Remote loop-back
    For normal operation
    4ON
    Local loop-back (AIS send)
    For normal operation
    5ONTransmission line cable: 
    Coaxial cable (75 ohms)
    Transmission line cable: 
    Twisted-pair cable (120 ohms)
    6
    Always set to OFF
    7
    8ON AP No. 04-15
    OFF AP No. 20-31
    (Continued)
    SWITCH
    NAMESWITCH
    NUMBERSETTING
    POSITIONFUNCTION CHECK
    OFF
    ON
    5 6 7 8
    1 2 3
    4
    OFF
    OFF
    OFF
    OFF
    OFF 
    						
    							CHAPTER 3 LAMP INDICATIONS AND SWITCH SETTINGS
    PN-30DTC-A (DTI)
    NEAX2000 IVS2 Installation Procedure ManualPage 288ND-70928 (E), Issue 1.0
    The figure in the SWITCH NAME column and the position in   in the SETTING POSITION
    column indicate the standard setting of the switch. When the switch is not set as shown by the
    figure and  , the setting of the switch varies with the system concerned.
    NOTE 1:
    Set the groove on the switch to the desired position.
    NOTE 2:
    When the power is on, flip the MB switch to ON (UP position) before plugging/unplug-
    ging the circuit card. JPS
    (Jumper pin)Balanced transmission
    (For twisted-pair cable)
    DOWNTA is grounded on the transmission 
    line (For coaxial cable)
    JPR
    (Jumper pin)Balanced transmission
    (For twisted-pair cable)
    DOWNRA is grounded on the transmission
    line (For coaxial cable)
    JP
    (Jumper pin)RIGHTLine impedance: 75 ohms
    (For coaxial cable)
    Line impedance: 120 ohms 
    (For twisted-pair cable)
    (Continued)
    SWITCH
    NAMESWITCH
    NUMBERSETTING
    POSITIONFUNCTION CHECK
    UP
    UP
    LEFT 
    						
    							CHAPTER 3 LAMP INDICATIONS AND SWITCH SETTINGS
    PN-30DTC-A (DTI)
    NEAX2000 IVS2 Installation Procedure Manual
    ND-70928 (E), Issue 1.0Page 289
    NOTE 3:
    Set the SW-1 and SW-2 as follows:
    NOTE 4:
    When the PBX is a clock source office, set the SW-1 and SW-2 on all the DTI cards
    mounted in PIM0 to “OFF”.
    NOTE 5:
    Mount the DTI card which receives a source clock signal into PIM0. CONDITIONSDTI0 DTI1 DTI2 DTI3
    REMARKS
    SW
    -1SW
    -2SW
    -1SW
    -2SW
    -1SW
    -2SW
    -1SW
    -2
    When one DTI is 
    provided.ON OFF––––––MP card will receive the clock 
    signal from DTI0 at its PLO0 
    input.
    When more than 
    one DTI is 
    provided.ON OFF OFF ON OFF OFF OFF OFFMP card will receive the clock
    signal from DTI0 at its PLO0
    input, under normal condi-
    tions.
    Should a clock failure occur
    with DTI0, MP card will auto-
    matically switch to the PLO1
    input which gets from DTI1. 
    						
    							CHAPTER 3 LAMP INDICATIONS AND SWITCH SETTINGS
    PN-IPTA (IPT)
    NEAX2000 IVS2 Installation Procedure ManualPage 290ND-70928 (E), Issue 1.0
    PN-IPTA (IPT)
    Locations of Lamps, Switches, and Connectors
    SW1
    MODE
    SW2VCT
    IP 
    CONN
    VCT :
    IP CONN :
    TO EXTERNAL 
    LAN INTERFACE SENSE
    RUN
    MB
    BUSY 
    SUBOPE3 
    SUBOPE2 
    SUBOPE1 
    SUBOPE0 
    L3 
    L2 
    L1 
    IP-TX 
    IP-RX 
    IP-100M 
    IP-LINK 
    IP-COL 
    IP-LYR 
     
    PZ-M539
    PN-IPTA
    TO PN-4VCTH 
    						
    							CHAPTER 3 LAMP INDICATIONS AND SWITCH SETTINGS
    PN-IPTA (IPT)
    NEAX2000 IVS2 Installation Procedure Manual
    ND-70928 (E), Issue 1.0Page 291
    Lamp Indications
    LAMP 
    NAMECOLOR FUNCTION
    RUN Green Flashes at 120 IPM while this card is operating normally.
    BUSY Red When even 1-line ON: Even one line is busy
    When even 1-line OFF: All lines are idle
    SUBOPE3 Green Remains lit when Card No.3 of PN-4VCTH is operating.
    SUBOPE2 Green Remains lit when Card No.2 of PN-4VCTH is operating.
    SUBOPE1 Green Remains lit when Card No.1 of PN-4VCTH is operating.
    SUBOPE0 Green Remains lit when Card No.0 of PN-4VCTH is operating.
    L3–Not used
    L2–Not used
    L1 Green Remains lit when a loop-back test is in progress.
    IP-TX Green Remains lit when sending IP data.
    IP-RX Green Remains lit when receiving IP data.
    IP-100M Green ON: Ethernet is operating with 100 Mbps.
    OFF: Ethernet is operating with 10 Mbps.
    IP-LINK Green ON: Being connected to IP network (Link established).
    OFF: Disconnected to IP network (No link established).
    IP-COL Green Remains lit when detecting IP data collision.
    IP-LYR Green Remains lit when IP network is ready to use. 
    						
    							CHAPTER 3 LAMP INDICATIONS AND SWITCH SETTINGS
    PN-IPTA (IPT)
    NEAX2000 IVS2 Installation Procedure ManualPage 292ND-70928 (E), Issue 1.0
    Switch Settings
    SWITCH NAMESWITCH
    NUMBERSETTING
    POSITIONFUNCTION CHECK
    SENSE
    (Rotary SW)
    NOTE 10-3 Not used
    4-F Set the switch to match the AP Number (04-31) to
    be set by CM05.
    MB (Toggle SW)
    NOTE 2UP For make-busy
    For normal operation
    MODE 
    (Rotary SW)
    0For setting of the operating mode
    For normal operation
    1-F Not used
    (Continued)
    F
    4
    AP No.SW1-4: ON
    04 05 06 07 08 09 10 11 12 13 14 15
    SW1-4: OFF
    20 21 22 23 24 25 26 27 28 29 30 31
    SW No.
    456789ABCDEF
    ON
    DOWN
    DOWN 
    						
    							CHAPTER 3 LAMP INDICATIONS AND SWITCH SETTINGS
    PN-IPTA (IPT)
    NEAX2000 IVS2 Installation Procedure Manual
    ND-70928 (E), Issue 1.0Page 293
    The figure in the SWITCH NAME column and the position in   the SETTING POSITION
    column indicate the standard setting of the switch. When the switch is not set as shown by the
    figure and  , the setting of the switch varies with the system concerned.
    NOTE 1:
    Set the groove on the switch to the desired position.
    NOTE 2:
    When the power is on, flip the MB switch to ON (UP position) before plugging/unplug-
    ging the circuit card. SW1 (DIP SW)
    1For normal operation
    OFF Not used
    2For normal operation
    OFF Not used
    3For normal operation
    OFF Not used
    4ON AP Number: 04-15
    OFF AP Number: 20-31
    SW2 (DIP SW)
    1-8 Not used
    SWITCH NAMESWITCH
    NUMBERSETTING
    POSITIONFUNCTION CHECK
    1
    23
    4ON
    ON
    ON
    ON
    1
    23
    45
    67
    8ONOFF 
    						
    							CHAPTER 3 LAMP INDICATIONS AND SWITCH SETTINGS
    PN-24PRTA (PRT)
    NEAX2000 IVS2 Installation Procedure ManualPage 294ND-70928 (E), Issue 1.0
    PN-24PRTA (PRT)
    Locations of Lamps, Switches, and Connectors
    SENSE
    RUN
    MB
    SW2
    LC 
    LPB 
    CRC 
    PCM 
    FRM 
    RMT 
    AIS 
    BL 
       
     
     
     
     
     
      SW1
    SW0
    JRR1
    AISS MAS
    JPR0
    JPS 
    						
    All NEC manuals Comments (0)

    Related Manuals for NEC Neax 2000 Ivs2 Installation Procedure Manual