NEC Neax 2000 Ivs2 Installation Procedure Manual
Have a look at the manual NEC Neax 2000 Ivs2 Installation Procedure Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 1168 NEC manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.
CHAPTER 3 LAMP INDICATIONS AND SWITCH SETTINGS Application Processor Card NEAX2000 IVS2 Installation Procedure Manual ND-70928 (E), Issue 1.0Page 225 PN-4RSTB (MFR) X X XPage 300 PN-4RSTC (CIR) X XPage 302 PN-SC00 (CCH) X XPage 304 PN-SC01 (DCH) X XPage 307 PN-SC03 (ICH) X XPage 310 PN-SC03-A (CSH) X XPage 312 PZ-M537 (EXPMEM)–X–Page 314 PZ-M542 (CONN)–XXPage 317 PZ-M557 (CONN)–XXPage 319 Table 3-2 List of Application Processor Cards (Continued) NAME (FUNCTIONAL NAME)LAMP X: PROVIDED –:NOT PROVIDEDSWITCH X: PROVIDED –:NOT PROVIDEDEXTRACTION/ INSERTION WITH POWER ON X: ALLOWED : ALLOWED AFTER MB* –: NOT ALLOWEDREFERENCE PA G E *MB = Make Busy
CHAPTER 3 LAMP INDICATIONS AND SWITCH SETTINGS PN-AP00-A (DBM) NEAX2000 IVS2 Installation Procedure ManualPage 226ND-70928 (E), Issue 1.0 PN-AP00-A (DBM) Locations of Lamps, Switches, and Connectors RS3 RS2 RS1 RS0 SENSE RUN MB SW0 WE L3 L2 L1 L0 SW1 J16
CHAPTER 3 LAMP INDICATIONS AND SWITCH SETTINGS PN-AP00-A (DBM) NEAX2000 IVS2 Installation Procedure Manual ND-70928 (E), Issue 1.0Page 227 Lamp Indications Switch Settings LAMP NAMECOLOR FUNCTION RUN Green Flashes at 120 IPM while this card is operating normally. WE Red Not used L0-L3 Green Second data setting value for CMD001 > 250 0 1 (Port 0)-3 (Port 2) L3 Indication of transmitting status of Por t 0Indication of CTS signal status on Po r t 0 - 2 L2 Indication of transmitting status of Por t 1Indication of DCD signal status on Po r t 0 - 2 L1 Indication of transmitting status of Por t 2Indication of TXD signal status on Po r t 0 - 2 L0 Indication of transmitting status of Por t 3Indication of RXD signal status on Po r t 0 - 2 SWITCH NAMESWITCH NUMBERSETTING POSITIONFUNCTION CHECK SENSE (Rotary SW) NOTE 14-F Set the switch to match the AP Number (04-15) to be set by CM05. 0-3 Not used MB (Toggle SW) NOTE 2UP For make-busy For normal operation (Continued) F 4AP No.04 05 06 07 08 09 10 11 12 13 14 15 SW No.456789ABCDEF ON DOWN
CHAPTER 3 LAMP INDICATIONS AND SWITCH SETTINGS PN-AP00-A (DBM) NEAX2000 IVS2 Installation Procedure ManualPage 228ND-70928 (E), Issue 1.0 The figure in the SWITCH NAME column and the position in in the SETTING POSITION column indicate the standard setting of the switch. When the switch is not set as shown by the figure and , the setting of the switch varies with the system concerned. NOTE 1: Set the groove on the switch to the desired position. NOTE 2: When the power is on, flip the MB switch to ON (UP position) before plugging/unplug- ging the circuit card. SW1 (Piano Key SW) 1For normal operation OFF Not used 2For normal operation OFF Not used 3For normal operation OFF Not used 4 Not used SW0 (DIP SW) 1 - 8 Not used J16 For normal operation (Memory backup ON) LEFTNot used (Memory backup OFF) SWITCH NAMESWITCH NUMBERSETTING POSITIONFUNCTION CHECK 4 3 2 1 OFF ON ON ON ON OFF 1 23 45 67 8ONOFF Front (Jumper pin) RIGHT
CHAPTER 3 LAMP INDICATIONS AND SWITCH SETTINGS PN-AP00-B (AP00) NEAX2000 IVS2 Installation Procedure Manual ND-70928 (E), Issue 1.0Page 229 PN-AP00-B (AP00) Locations of Lamps, Switches, and Connectors CONN: To CONNR connector on PZ-M537 (EXPMEM) RS3 RS2 RS1 RS0 SENSE RUN MB SW0 SW2 L3 L2 L1 L0 SW1 CONN JP0 JP1
CHAPTER 3 LAMP INDICATIONS AND SWITCH SETTINGS PN-AP00-B (AP00) NEAX2000 IVS2 Installation Procedure ManualPage 230ND-70928 (E), Issue 1.0 Lamp Indications Switch Settings LAMP NAMECOLOR FUNCTION RUN Green Flashes at 120 IPM while this card is operating normally. L0-L3 Green Second data setting value for CMD001 > 250 0 1 (Por t 0)-3 (Por t 2) L3 Indication of transmitting status of Por t 0Indication of CTS signal status on Po r t 0 - 2 L2 Indication of transmitting status of Por t 1Indication of DCD signal status on Po r t 0 - 2 L1 Indication of transmitting status of Por t 2Indication of TXD signal status on Po r t 0 - 2 L0 Indication of transmitting status of Por t 3Indication of RXD signal status on Po r t 0 - 2 SWITCH NAMESWITCH NUMBERSETTING POSITIONFUNCTION CHECK SENSE (Rotary SW) NOTE 10-3 Not used 4-F Set the switch to match the AP Number (04-31) to be set by CM05. MB (Toggle SW) NOTE 2UP For make-busy For normal operation (Continued) F 4 AP No.SW1-4: ON 04 05 06 07 08 09 10 11 12 13 14 15 SW1-4: OFF 20 21 22 23 24 25 26 27 28 29 30 31 SW No. 456789ABCDEF ON DOWN
CHAPTER 3 LAMP INDICATIONS AND SWITCH SETTINGS PN-AP00-B (AP00) NEAX2000 IVS2 Installation Procedure Manual ND-70928 (E), Issue 1.0Page 231 SW0 (DIP SW) 1-3ON Not used For normal operation 4, 5For normal operation OFF Not used 6 NOTE 3ONSets No. 0 Port forcibly in a state which DSR signal is always pro- vided. OFFReceives DSR signal from the DCE on No. 0 Port. 7 NOTE 3ONSets No. 1 Port forcibly in a state which DSR signal is always provided. OFFReceives DSR signal from the DCE on No. 1 Port. 8 NOTE 3ONSets No. 2 Port forcibly in a state which DSR signal is always provided. OFFReceives DSR signal from the DCE on No. 2 Port. SW1 (Piano Key SW) 1For normal operation OFF Not used 2For normal operation OFFFor AP data clearing by CMD100/ CMD101 3For normal operation OFFFor AP data clearing by CMD100/ CMD101 4ON AP No. 4-15 OFF AP No. 20-31 (Continued) SWITCH NAMESWITCH NUMBERSETTING POSITIONFUNCTION CHECK 1 23 45 67 8ONOFF ON 4 3 2 1 OFF ON ON ON ON
CHAPTER 3 LAMP INDICATIONS AND SWITCH SETTINGS PN-AP00-B (AP00) NEAX2000 IVS2 Installation Procedure ManualPage 232ND-70928 (E), Issue 1.0 SW2 (DIP SW) 1 NOTE 3ONSets No. 3 Port forcibly in a state which DSR signal is always pro- vided. OFFReceives DSR signal from the DCE on No. 3 Port. 2ONEnables the receive clock from the DCE (Modem) when No. 1 Port is synchronous. (Clock is received at the RXC terminal) OFFUses internal clock as the receive clock when No. 1 Port is synchro- nous. When No. 1 Port is asynchronous. 3ONEnables transmit clock from the DCE (Modem) when No. 1 Port is synchronous. (Clock is received at the TXC (2) terminal.) OFFUses internal clock as the send clock when No. 1 Port is synchro- nous. When No. 1 Port is asynchronous. 4ONTransmit the send clock from the DTE (this card) when No. 1 Port is synchronous. (Clock is transmitted from the TXC (1) terminal) OFFNot transmit the send clock from the DTE (this card) when No. 1 Port is synchronous. When No. 1 Port is asynchronous. 5ON When No. 1 Port is asynchronous. OFF When No. 1 Port is synchronous. (Continued) SWITCH NAMESWITCH NUMBERSETTING POSITIONFUNCTION CHECK 1 23 45 67 8ON
CHAPTER 3 LAMP INDICATIONS AND SWITCH SETTINGS PN-AP00-B (AP00) NEAX2000 IVS2 Installation Procedure Manual ND-70928 (E), Issue 1.0Page 233 The figure in the SWITCH NAME column and the position in in the SETTING POSITION column indicate the standard setting of the switch. When the switch is not set as shown by the figure and , the setting of the switch varies with the system concerned. NOTE 1: Set the groove on the switch to the desired position. NOTE 2: When the power is on, flip the MB switch to ON (UP position) before plugging/unplug- ging the circuit card. NOTE 3: When the DCE connected to the port does not provide a function to send the DSR sig- nals, set the switch to ON. In this case, the AP00 card cannot recognize the actual state of the DCE, so that the call records or system messages will not be stored in the mem- SW2 (DIP SW) 6 NOTE 4ONUses internal clock as the receive clock when No. 1 Port is synchro- nous. When No. 1 Port is asynchronous. OFFEnables receive clock from the DCE (Modem) when No. 1 Port is syn- chronous. (Clock is received at the RXC terminal) 7Not used 8Not used JP0 (Jumper SW) For normal operation (Memory backup ON) DOWNNot used (Memory backup OFF) JP1 (Jumper SW) UP Not used For normal operation SWITCH NAMESWITCH NUMBERSETTING POSITIONFUNCTION CHECK 1 23 45 67 8ON OFF OFF UP DOWN
CHAPTER 3 LAMP INDICATIONS AND SWITCH SETTINGS PN-AP00-B (AP00) NEAX2000 IVS2 Installation Procedure ManualPage 234ND-70928 (E), Issue 1.0 ory buffer on the AP00 card even if the cable is disconnected from the DCE. When the switch is set to OFF, the call records or system messages will be stored when the cable is disconnected, and will be sent when the cable is re-connected. NOTE 4: The use of the external clock (from the distant end) or the internal clock is determined by the following table: CLOCKSW2 26 External ON OFF Internal OFF ON