    							CHAPTER 3 LAMP INDICATIONS AND SWITCH SETTINGS
    PN-AP01 (AP01)
    NEAX2000 IVS2 Installation Procedure Manual
    ND-70928 (E), Issue 1.0Page 235
    PN-AP01 (AP01)
    Locations of Lamps, Switches, and Connectors
    Lamp Indications
    LAMP NAME COLOR FUNCTION
    RUN Green Flashes at 120 IPM while this card is operating normally.
    L0-L3 L3 Green Indication of CTS signal status on RS-232C port.
    L2 Indication of DCD signal status on RS-232C port.
    L1 Indication of TXD signal status on RS-232C port.
    L0 Indication of RXD signal status on RS-232C port.
    RS0
    SENSE
    RUN
    MB
    SW1
    L3 
    L2 
    L1 
    L0
    SW0
    IP
    J19 
    						
    							CHAPTER 3 LAMP INDICATIONS AND SWITCH SETTINGS
    PN-AP01 (AP01)
    NEAX2000 IVS2 Installation Procedure ManualPage 236ND-70928 (E), Issue 1.0
    Switch Settings
    SWITCH NAMESWITCH 
    NUMBERSETTING 
    POSITIONFUNCTION CHECK
    SENSE
    (Rotary SW)
    NOTE 14-F Set the switch to match the AP Number (04-15) to
    be set by CM05.
    0-3 Not used
    MB (Toggle SW)
    NOTE 2UP For make-busy
    For normal operation
    SW1
    (Piano Key SW)
    1For normal operation
    OFF Not used
    2For normal operation
    OFF Not used
    3For normal operation
    OFF Not used
    4For normal operation
    OFF Not used
    (Continued)
    F
    4AP No.04 05 06 07 08 09 10 11 12 13 14 15
    SW No.456789ABCDEF
    ON
    DOWN
    4 
    3 
    2 
    1 OFF
    ON
    ON
    ON
    ON
    ON 
    						
    							CHAPTER 3 LAMP INDICATIONS AND SWITCH SETTINGS
    PN-AP01 (AP01)
    NEAX2000 IVS2 Installation Procedure Manual
    ND-70928 (E), Issue 1.0Page 237
    The figure in the SWITCH NAME column and the position in    in the SETTING POSITION
    column indicate the standard setting of the switch. When the switch is not set as shown by the
    figure and   , the setting of the switch varies with the system concerned.
    NOTE 1:
    Set the groove on the switch to the desired position.
    NOTE 2:
    When the power is on, flip the MB switch to ON (UP position) before plugging/unplug-
    ging the circuit card. SW0 (DIP SW)
    1ON Receives RT clock
    Uses internal clock
    2ON Receives ST2 clock
    Uses internal clock
    3ON Sends ST1 clock
    Not send ST1 clock
    4 Not used 
    J19
    For normal operation
    (Memory backup ON)
    LEFTNot used 
    (Memory backup OFF)
    SWITCH NAMESWITCH 
    NUMBERSETTING 
    POSITIONFUNCTION CHECK
    1
    23
    4ONOFF
    OFF
    OFF
    OFF
    Front (Jumper pin)
    RIGHT 
    						
    							CHAPTER 3 LAMP INDICATIONS AND SWITCH SETTINGS
    PN-BRTA (BRT)
    NEAX2000 IVS2 Installation Procedure ManualPage 238ND-70928 (E), Issue 1.0
    PN-BRTA (BRT)
    Locations of Lamps, Switches, and Connectors
    SENSE
    RUN
    MB
    SW1
    SW0B1
    B2
    D
    ALM 
    						
    							CHAPTER 3 LAMP INDICATIONS AND SWITCH SETTINGS
    PN-BRTA (BRT)
    NEAX2000 IVS2 Installation Procedure Manual
    ND-70928 (E), Issue 1.0Page 239
    Lamp Indications
    LAMP 
    NAMECOLOR FUNCTION
    RUN Green Flashes at 120 IPM while this card is operating normally.
    B1 Green B1 channel status
    ON: Busy
    OFF: Idle
    Flash (60 IPM):  Make Busy
    B2 Green B2 channel status
    ON: Busy
    OFF: Idle
    Flash (60 IPM):  Make Busy
    D Green D channel status
    ON: Busy
    OFF: Idle
    ALM Red Transmission line fault status
    ON: Line fault
    OFF: Normal operation 
    						
    							CHAPTER 3 LAMP INDICATIONS AND SWITCH SETTINGS
    PN-BRTA (BRT)
    NEAX2000 IVS2 Installation Procedure ManualPage 240ND-70928 (E), Issue 1.0
    Switch Settings
    SWITCH NAMESWITCH 
    NUMBERSETTING 
    POSITIONFUNCTION CHECK
    SENSE
    (Rotary SW)
    NOTE 14-F Set the switch to match the AP Number (04-15) to
    be set by CM05.
    0-3 Not used
    MB (Toggle SW)
    NOTE 2UP For make-busy
    For normal operation
    SW0 (DIP SW)
    1For normal operation 
    OFF Not used
    2
    NOTE 3
    NOTE 4ONSource clock signal from network is 
    sent to the PLO of MP according to 
    the switch setting of SW0-3.
    OFFSource clock signal from network is 
    not sent to the PLO of MP card.
    3
    NOTE 3
    NOTE 4ONClock signal is sent to the PLO 0 of 
    MP.
    OFFClock signal is sent to the PLO 1 of 
    MP.
    4For normal operation
    OFF Not used
    (Continued)
    AP No.04 05 06 07 08 09 10 11 12 13 14 15
    SW No.456789ABCDEF
    ON
    DOWN
    1
    23
    4ON
    ON
    ON 
    						
    							CHAPTER 3 LAMP INDICATIONS AND SWITCH SETTINGS
    PN-BRTA (BRT)
    NEAX2000 IVS2 Installation Procedure Manual
    ND-70928 (E), Issue 1.0Page 241
    The figure in the SWITCH NAME column and the position in   in the SETTING POSITION
    column indicate the standard setting of the switch. When the switch is not set as shown by the
    figure and  , the setting of the switch varies with the system concerned.
    NOTE 1:
    Set the groove on the switch to the desired position.
    NOTE 2:
    When the power is on, flip the MB switch to ON (UP position) before plugging/unplug-
    ging the circuit card. SW1 (DIP SW)
    1For terminating the transmitting side 
    of channels B1 and B2 with 100 
    ohms.
    OFFTo remove the terminating resistor 
    on the transmitting side of channels 
    B1 and B2.
    2For terminating the receiving side of 
    channels B1 and B2 with 100 ohms.
    OFFTo remove the terminating resistor 
    on the receiving side of channels B1 
    and B2.
    (Continued)
    SWITCH NAMESWITCH 
    NUMBERSETTING 
    POSITIONFUNCTION CHECK
    1
    2ONON
    ON 
    						
    							CHAPTER 3 LAMP INDICATIONS AND SWITCH SETTINGS
    PN-BRTA (BRT)
    NEAX2000 IVS2 Installation Procedure ManualPage 242ND-70928 (E), Issue 1.0
    NOTE 3:
    Set the SW0-2 and SW0-3 as follows:
    NOTE 4:
    When the system is a clock source office, set the SW0-2 and SW0-3 on all the BRT
    cards mounted in PIM0 to “OFF”.
    NOTE 5:
    Mount the BRT card which receives a source clock signals into PIM0. CONDITIONSBRT0 BRT1 BRT2 ---- BRT11
    REMARKS
    SW
    0-2SW
    0-3SW
    0-2SW
    0-3SW
    0-2SW
    0-3----SW
    0-2SW
    0-3
    When one 
    BRT is 
    provided.ON ONMP card will receive the 
    clock signal from BRT0 at 
    its PLO0 input.
    When more 
    than one BRT 
    is provided.ON ON ON OFF OFF ON ---- OFF ONMP card will receive the 
    clock signal from BRT0 at 
    its PLO0 input, under nor-
    mal conditions.
    Should a clock failure occur 
    with BRT0, MP card will 
    switch to the PLO1 input 
    which gets clock from 
    BRT1. 
    						
    							CHAPTER 3 LAMP INDICATIONS AND SWITCH SETTINGS
    PN-2BRTC (BRT)
    NEAX2000 IVS2 Installation Procedure Manual
    ND-70928 (E), Issue 1.0Page 243
    PN-2BRTC (BRT)
    Locations of Lamps, Switches, and Connectors
    SENSE
    RUN
    MB
    B21 
    B11 
    D1 
    ALM1 
    B20 
    B10 
    D0 
    ALM0
    SW0 SW11
    SW10 
    						
    							CHAPTER 3 LAMP INDICATIONS AND SWITCH SETTINGS
    PN-2BRTC (BRT)
    NEAX2000 IVS2 Installation Procedure ManualPage 244ND-70928 (E), Issue 1.0
    Lamp Indications
    LAMP 
    NAMECOLOR FUNCTION
    RUN Green Flashes at 120 IPM while this card is operating normally.
    B21 Red No.1 Circuit B2 channel status
    ON: Busy
    OFF: Idle
    Flash (60 IPM):  Make Busy
    B11 Red B1 channel status
    ON: Busy
    OFF: Idle
    Flash (60 IPM):  Make Busy
    D1 Green D channel status
    ON: Busy
    OFF: Idle
    ALM1 Red Transmission line fault status
    ON: Line fault
    OFF: Normal operation
    B20 Red No.0 Circuit B2 channel status
    ON: Busy
    OFF: Idle
    Flash (60 IPM):  Make Busy
    B10 Red B1 channel status
    ON: Busy
    OFF: Idle
    Flash (60 IPM):  Make Busy
    D0 Green D channel status
    ON: Busy
    OFF: Idle
    ALM0 Red Transmission line fault status
    ON: Line fault
    OFF: Normal operation 
    						
    All NEC manuals Comments (0)