    Have a look at the manual Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Installation And Test For Single-Carrier Cabinets Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 413 Lucent Technologies manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.

    							DEFINITY Enterprise Communication Server Release 8.2
    Installation and Test for Single-Carrier Cabinets  555-233-120  Issue 1
    April 2000
    Install and Wire Telephones and Other Equipment 
    5-63 Install Multi-point Adapters 
    5
    367A Adapter
    The 367A is an 8-c onduc tor ad ap ter used  at the work loc ation to b ridg e 3 to 7 
    terminals. See Fig ure 5-25
    .
    Figure 5-25. Wiring Diagram of 367A Adapter Figure Notes
    1. Jac k 1
    2. Jac k 23. Jac k 8
    4. 367A Adap ter
    312 88 877 766 655 544 433 322 211 1
    4 
    						
    							DEFINITY Enterprise Communication Server Release 8.2
    Installation and Test for Single-Carrier Cabinets  555-233-120  Issue 1
    April 2000
    Install and Wire Telephones and Other Equipment 
    5-64 Install Multi-point Adapters 
    5
    Basic Multi-point Installation Distances
    Fi g u re  5 - 2 6 p rovid es c ab ling  information for fan-out of ISDN-BRI multi-p oint 
    installations. In Fig ure 5-26
    , the terminating resistor is loc ated  in the satellite 
    c loset. All d istanc es assume 24 AWG (#5) (0.5 mm2) D-Insid e Wire (DIW).
    Figure 5-26. Basic Multi-point with One Work Location Figure Notes
    1. S-Interfac e Sourc e (TN556)
    2. Terminating  Resistor
    3. Satellite Closet
    4. Maximum Distanc e from S-Interfac e 
    Sourc e to Work Loc ation (1600 
    Feet) (488 m) 
    5. Maximum Distanc e From 
    Terminating  Resistor to Work 
    Loc ation (250 Feet) (76 m)6. System Cab inet 
    7. Terminating  End point 1 
    8. Terminating  End point 2 
    9. Work Loc ation
    10. Maximum Distanc e from 
    Information Outlet to Terminating  
    Endp oint (33 Feet) (10 m)
    11. Information Outlet
    2
    38
    9
    7
    110
    11
    11
    5
    4
    6
    inst_dis CJL 030796 
    						
    							DEFINITY Enterprise Communication Server Release 8.2
    Installation and Test for Single-Carrier Cabinets  555-233-120  Issue 1
    April 2000
    Install and Wire Telephones and Other Equipment 
    5-65 Connect Stratum 3 Clock 
    5
    Connect Stratum 3 Clock
    Set Clock Options
    1. There are four sets of op tion switc hes on the c loc k. Set the op tions on the 
    Cloc k Inp ut (CI) c irc uit p ac k p er Tab le 5-15
    .
    2. Set the options on the Stratum 3 Clock (ST3) circuit pack per Tab le 5-16.
    NOTE:
    Only SW 1 and  SW2 are used . SW1 c ontrols the outp ut of alarm sig nals 
    from the Stratum 3 Clock circuit pack.
    3. Set the options on the Comp osite Cloc k Timing  Outp ut (TOCA) c irc uit 
    pack per Table 5-17
    .
    4. Set the Stratum 2/Stratum 3 switc h to the STRATUM 3 p osition.
    Table 5-15. CI Option Switch Settings
    Switch Function Position
    1 T1 Selec t OFF =  enab le (d efault)
    ON = disable
    2 CC Selec t OFF =  enab le
    ON = disable (default)
    3 Fra m i n g  Se l e c t O FF =  ESF
    ON =  D4 (d efault)
    4 BX.25 OFF =  enab le
    ON = disable (default)
    Table 5-16. ST3 Clock Circuit Pack Option Switch Settings
    Switch Status/Results
    SW1  
    Minor Alarm 
    ControlOFF =  minor alarm never outp ut
    ON =  minor alarm is outp ut if hold over oc c urs
    SW2  
    Major Alarm 
    ControlOFF =  major alarm is outp ut and  fail lamp  lig hts if 5 VDC 
    p ower is lost and  4 kHz outp ut is lost
    ON =  major alarm is outp ut and  fail lamp  lig hts if 5 VDC 
    p ower is lost and  4 kHz outp ut is lost and  hold over oc c urs 
    						
    							DEFINITY Enterprise Communication Server Release 8.2
    Installation and Test for Single-Carrier Cabinets  555-233-120  Issue 1
    April 2000
    Install and Wire Telephones and Other Equipment 
    5-66 Connect Stratum 3 Clock 
    5
    NOTE:
    Set switc hes 1 and  2 ac cording to the d istanc e from the Stratum 3 c loc k to the DEFINITY 
    System. Set switch 3 to ON. Set switc h 4 to OFF.
    Cabling the Stratum 3 Clock
    Figure 5-27 shows typ ic al c onnec tions to a Stratum 3 Cloc k c ab inet. Connec tions 
    are mad e throug h the yellow field  c ross-c onnec t. A c ustom Y c ab le (H600-274) 
    c onnec ts the CSU to the DS1 c irc uit p ac k and  tap s off the inp ut for the Stratum 3 
    Cloc k. A resistor b uilt into the c ab le to p rovid es the nec essary isolation b etween 
    the system and  the c loc k. The Y c ab le p lug s d irec tly into the CSU and  c onnec ts 
    to stand ard  c ab les for interfac e to the system and the yellow field on the MDF.
    The H600-307 c ab le c onnec ts the system end of the Y c ab le to a DS1 c irc uit 
    p ac k (shown as TN464/2464, TN722, or TN767). The B25A c ab le c onnec ts the 
    c loc k end of the Y c ab le to the yellow field on the MDF.
    Table 5-17. Composite Clock Timing Output (TOCA) Circuit Pack
     Switch  Range
    500 10001 Foot
    (0.3 m)500 Feet
    (152 m)1000 Feet
    (305 m)1500 Feet
    (457 m)2000 Feet
    (610 m)2500 Feet
    (762 m)3000 Feet
    (914 m)
    OFF OFF < ------------------------------------------------------->
    ON OFF < --------------------------------------------------------->
    OFF ON < --------------------------------------------------------->
    ON ON < ---------------------------------------------------------> 
    						
    							DEFINITY Enterprise Communication Server Release 8.2
    Installation and Test for Single-Carrier Cabinets  555-233-120  Issue 1
    April 2000
    Install and Wire Telephones and Other Equipment 
    5-67 Connect Stratum 3 Clock 
    5
    Figure 5-27. Typical Connections to Stratum 3 Clock Figure Notes:
    1 . SC C  C a b in e t  ( PPN )
    2.“A” Position
    3. “ B”  Position
    4. H600-307 Cab le
    5. H600-247 G2 Cab le
    6. 1300 Feet (396 m)
    7. B25A (Male-to-Female) Cable
    8. Channel Servic e Unit (Sec ond ary)9. Channel Servic e Unit (Primary)
    10. Stratum 3 Cloc k
    11. Main Distrib ution Frame (MDF)
    12. DS1/E1 Interfac e Circ uit Pac k
    13. DS1 Tie Trunk Circ uit Pac k
    14. DS1 Interfac e Circ uit Pac k
    15. Tone-Cloc k Circ uit Pac k 
    						
    							DEFINITY Enterprise Communication Server Release 8.2
    Installation and Test for Single-Carrier Cabinets  555-233-120  Issue 1
    April 2000
    Install and Wire Telephones and Other Equipment 
    5-68 Connect Stratum 3 Clock 
    5
    Stratum 3 Clock Wiring Installation Procedure
    1. Connec t the B25A c ab les from the TN780 c onnec tor panel slot on the 
    system c ab inet and  the Stratum 3 Cloc k to the c ross-c onnec t mod ule in 
    the yellow field .
    2. Connec t the CSU p lug end  of the H-600-274 (Y) c ab le to the p rimary CSU. 
    Route an H600-307 c ab le from the DS1 c onnec tor panel slot on the 
    system c ab inet to the c onnec tor on the SYSTEM  e n d  o f  t h e  Y c a b le .
    3. Route a B25A c able from the CLOCK end of the Y c ab le to the 
    c ross-c onnec t module in the yellow field.
    4. Rep eat steps 2 and  3 for the sec ond ary CSU. The maximum allowab le 
    c ab ling d istanc e b etween the Stratum 3 c loc k and  the CSU is shown in 
    Tab le 5-18
    .
    5. For stand ard  reliab ility systems, refer to Tab le 5-19 to c ross-c onnec t the 
    TN780 and  CLOCK end  c onnec tions to the Stratum 3 Cloc k c onnec tions 
    on the c ross-c onnec t mod ule.
    6. For hig h or c ritic al reliab ility systems, refer to Tab le 5-20
     to cross-connect 
    the TN780 and  CLOCK end  c onnec tions to the Stratum 3 Cloc k 
    c onnec tions on the c ross-c onnec t mod ule.
    Table 5-18. Maximum Cabling Distance
    Channel Service 
    Unit (CSU)Maximum Cabling 
    Distance
    551A 85 Feet (26 m)
    551V 85 Feet (26 m)
    5 5 1 V EFS/ R 6 5 5  Fe e t  ( 1 9 9 . 6  m )
    EFS T1 655 Feet (199.6 m) 
    						
    							DEFINITY Enterprise Communication Server Release 8.2
    Installation and Test for Single-Carrier Cabinets  555-233-120  Issue 1
    April 2000
    Install and Wire Telephones and Other Equipment 
    5-69 Connect Stratum 3 Clock 
    5
    Table 5-19. Cross-Connects for Standard Reliability
    From: Stratum 3 Clock To: Y Cable Clock End (Primary)
    Lead 
    DesignationLead 
    ColorConnecting 
    Block 
    Te r m i n a lLead 
    DesignationLead 
    ColorConnecting 
    Block 
    Te r m i n a l
    RREF1 W- BL 1 V- O 4 3
    TREF1 B L - W 2 O - V 4 4
    To: Y Cable Clock End (Secondary)
     RREF2 W- O 3 V- O 4 3
     TREF2 O - W 4 O - V 4 4
    To: Tone-Clock Carrier A
     BCLKRTN R-O 13  ALRM5B V-G 45
     BCLKLST O-R 14  ALRM5A G-V 46
     BPWRRTN R-BR 17  ALRM4B BK-BL 21
     B PWRL ST B R- R 1 8  A L RM 4 A B L - B K 2 2
     REF2 RTN W- B R 7  A L RM 3 B R- B R 1 7
     REF2 L ST B R- W 8  A L RM 3 A B R- R 1 8
     SC L K RTN R- B L 1 1  A L RM 2 B R- B L 1 1
     SCLKLST BL-R 12  ALRM2A BL-R 12
     SPWRRTN R-G 1 5  A L RM 1 B Y- BL 3 1
     SPWRLST G-R 16  ALRM1A BL-Y 32
     REF1 RTN W- G 5  A L RM 0 B W- B R 7
     REF1LST G-W 6  ALRM0A BR-W 8
     C C A 0 1 R R-S 1 9  EXTSYN 0 T V- BL 4 1
     C C A 0 1 T S- R 2 0  EXTSYN 0 R B L - V 4 2
     C C B 0 1 R B K- B L 2 1  EXTSYN 1 T Y- G 3 5
     C C B 0 1 T B L - BK 2 2  EXTSYN 1 R G - Y 3 6 
    						
    							DEFINITY Enterprise Communication Server Release 8.2
    Installation and Test for Single-Carrier Cabinets  555-233-120  Issue 1
    April 2000
    Install and Wire Telephones and Other Equipment 
    5-70 Connect Stratum 3 Clock 
    5
    7. The c ommon c ross-c onnec tion from the TN780 in A and  B c arriers to the 
    Stratum 3 Cloc k should  b e d one b y brid ging  the jump er wires.
    8. Dress the c ab les d own sid es of the c ab inet and  run throug h the Cable 
    Slack Manager, if provided.
    9. Ad minister p er 
    DEFINITY Enterprise Communic ations Server Release 8 
    Ad ministration and  Feature Desc ription
    .
    Table 5-20. Cross-Connects for High or Critical Reliability
    From: Stratum 3 Clock To: Y Cable Clock End (Primary)
    Lead 
    Designation Lead 
    ColorConnectin
    g Block 
    Terminal Lead 
    Designation Lead 
    ColorConnectin
    g Block 
    Te r m i n a l
    RREF1  W-B L 1 V- O 4 3
    TREF1  B L - W 2 O - V 4 4
    To: Y Cable Clock End (Secondary)
    RREF2  W-O 3  V-O 4 3
    Lead 
    Designation Lead 
    ColorConnecting 
    Block 
    Te r m i n a l TREF2  O-W 4  O-V 44
    To: Tone-Clock Carrier A To: Tone-Clock Carrier B
    BCLKRTN  R-O 13  ALRM5B  V-G 45  ALRM5B  V-G 45
    BCLKLST  O-R 14  ALRM5A  G-V 46  ALRM5A  G-V 46
    BPWRRTN  R-BR 17  ALRM4B  BK-BL  21  ALRM4B  BK-BL  21
    BPWRLST  BR-R 18  ALRM4A  BL-BK  22  ALRM4A  BL-BK  22
    REF2RTN  W-BR 7  ALRM3B  R-BR 17  ALRM3B  R-BR 17
    REF2LST  BR-W 8  ALRM3A  BR-R 18  ALRM3A  BR-R 18
    SCLKRTN  R-BL 11  ALRM2B  R-BL 11  ALRM2B  R-BL 11
    SCLKLST  BL-R 12  ALRM2A  BL-R 12  ALRM2A  BL-R 12
    SPWRRTN  R-G 15  ALRM1B  Y-BL 31  ALRM1B  Y-BL 31
    SPWRLST  G-R 16  ALRM1A  BL-Y 32  ALRM1A  BL-Y 32
    REF1RTN  W-G 5  ALRM0B  W-BR 7  ALRM0B  W-BR 7
    REF1LST  G-W 6  ALRM0A  BR-W 8  ALRM0A  BR-W 8
    CCA 01R  R- S 19  EXTSYN0T  V-B L 4 1
    CCA 01T  S-R 20  EXTSYN0R  B L- V 4 2
    CCB01R  BK-BL 21  EXTSYN1T  Y-G 35
    CCB01T  BL-BK 22  EXTSYN1R  G-Y 36
    CCA 02R  B K -O 23  EXTSYN0 T  V- B L 41
    CCA02T  O-BK 24  EXTSYN0R  BL-V 42
    CCB 02R  B K -G 25  EXTSYN1 T  Y- G 35
    CCB02T  G-BK 26  EXTSYN1R  G-Y 36 
    						
    							DEFINITY Enterprise Communication Server Release 8.2
    Installation and Test for Single-Carrier Cabinets  555-233-120  Issue 1
    April 2000
    Install and Wire Telephones and Other Equipment 
    5-71 DEFINITY Wireless Business System 
    5
    DEFINITY Wireless Business System
    To install and  test the hard ware, refer to DEFINITY Wireless Business System 
    Installation and  Tests Guid e
    .
    To interfac e the Wireless Business System to the system c ab inet, refer to 
    DEFINITY Wireless Business System Interfac e.
    To operate the wireless hand sets, refer to 
    DEFINITY Wireless Business System 
    User’s Guid e
    .
    Cellular Business System
    The DEFINITY Cellular Business System allows use of the same full-feature 
    c ellular telep hone insid e and  outsid e of the b uild ing. The system sup p orts up  to 
    600 users. Total system c overag e is up  to 4 million sq uare feet.
    Refer to the installation and  usag e d oc umentation that c omes with the system 
    c omp onents.
    Forum PCM
    The Forum Personal Communic ations Manager uses a Forum switc h, serving  as 
    an ad junc t to DEFINITY ECS, to manag e mob ility. The system uses Cord less 
    Telep hone Generation 2 (CT2) tec hnology, whic h is a g lob al standard  for wireless 
    telep hone servic e. This stand ard  d efines the rad io interfac e b etween the Forum 
    p oc ket telep hones and  the b ase stations in the system.
    Refer to the installation and  usag e d oc umentation that c omes with the Forum 
    Personal Communic ations Manag er c omp onents. 
    						
    							DEFINITY Enterprise Communication Server Release 8.2
    Installation and Test for Single-Carrier Cabinets  555-233-120  Issue 1
    April 2000
    Install and Wire Telephones and Other Equipment 
    5-72 Connect Modem to Telephone Network 
    5
    Connect Modem to Telephone 
    Network
    1. Cross-c onnec t the network jac k on the mod em to the network interfac e 
    (via a 103A or mod ular wall jac k). See Table 5-21
     for the p inout.  
    Figure 5-28. Network Jack on U.S. Robotics Modem
    Table 5-21. Pinout of Network Jack
    Pin Number Signal
    1 Unused
    2Tip 
    3Ring 
    4 Unused
    Figure Notes
    1. Pin 1 of network jac k 2. Mod em 
    modmcabl KLC 110397
    OFF ON
    AA CD RD SD C S AR Q/ FAXTR
    Sportster33.6
    Faxmodem
    1
    2 
    						
    All Lucent Technologies manuals Comments (0)

    Related Manuals for Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Installation And Test For Single-Carrier Cabinets Manual