Have a look at the manual Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Installation And Test For Single-Carrier Cabinets Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 413 Lucent Technologies manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.
DEFINITY Enterprise Communication Server Release 8.2 Installation and Test for Single-Carrier Cabinets 555-233-120 Issue 1 April 2000 Install and Connect the Cabinets 1-33 Connect System Cables 1 Recommended Cable Routing 1. Route the fib er optic c ab le up toward the top of the c ab inet. The exc ess c ab le should b e loop ed and d rap ed from the B25A c able c lamp on the top g round p late in the stac k. See Figure 1-18 . 2. Dress the c ab le b y tie wrap p ing it to the outsid e of the B25A c able c lamp . !CAUTION: Do not route fib er op tic c ab les and the B25A c ab les tog ether. Figure 1-18. Single-Carrier Cabinet Fiber Routing Figure Notes 1. Supplied B25A Cables 2. Loop and Drap e Exc ess Fib er Op tic Cab le3. Fib er Op tic Cab le Sheath 4. Port Cabinet 5. Control Cab inet 3 44 44 44 55 1 2
DEFINITY Enterprise Communication Server Release 8.2 Installation and Test for Single-Carrier Cabinets 555-233-120 Issue 1 April 2000 Install and Connect the Cabinets 1-34 Connect System Cables 1 Standard Reliability Fiber Connections Connec t and route the fib er op tic c able as shown in the c ab le running list. See Fi g u re 1 - 1 9 for a samp le c ab le routing. Figure 1-19. Connections to Standard Reliability SystemsFigure Notes 1. Control Cab inet 2. Port Cab inet 3. Exp ansion Control Cab inet4. Cab inet Stac k 1 5. Cab inet Stac k 2 6. Cab inet Stac k 3 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 118 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 3 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 118 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 118 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 118 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 118 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 2 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1Terminal stndard LJK 032896
DEFINITY Enterprise Communication Server Release 8.2 Installation and Test for Single-Carrier Cabinets 555-233-120 Issue 1 April 2000 Install and Connect the Cabinets 1-35 Connect System Cables 1 High Reliability Fiber Connections Connec t and route the fib er op tic c able as shown in the c ab le running list. See Fi g u re 1 - 2 0 for a samp le c ab le routing. Figure 1-20. Connections to High Reliability SystemsFigure Notes 1. Control Cab inet 2. Duplic ate Control Cab inet 3. Port Cab inet 4. Exp ansion Control Cab inet5. Cab inet Stac k 1 6. Cab inet Stac k 2 7. Cab inet Stac k 3 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 118 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 118 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 118 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 118 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 118 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 118 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 116 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1Te r m i n a l 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1Te r m i n a l high LJK 032896
DEFINITY Enterprise Communication Server Release 8.2 Installation and Test for Single-Carrier Cabinets 555-233-120 Issue 1 April 2000 Install and Connect the Cabinets 1-36 Connect System Cables 1 Critical Reliability Fiber Connections Connec t and route the fib er op tic c able as shown in the c ab le running list. See Fi g u re 1 - 2 1 for a samp le c ab le routing. Figure 1-21. Connections to Critical Reliability SystemsFigure Notes 1. Control Cab inet 2. Duplic ate Control Cab inet 3. Port Cab inet 4. Exp ansion Control Cab inet5. Cab inet Stac k 1 6. Cab inet Stac k 2 7. Cab inet Stac k 3 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 118 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 118 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 118 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 118 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 118 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 118 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 116 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1Te r m i n a l 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1Te r m i n a l critical LJK 032896
DEFINITY Enterprise Communication Server Release 8.2 Installation and Test for Single-Carrier Cabinets 555-233-120 Issue 1 April 2000 Install and Connect the Cabinets 1-37 Install Earthquake Protection 1 Install Earthquake Protection Earthq uake p rotec tion only installs on Sing le-Carrier Cab inets. Figure 1-22. Front Mounting Angle Location 1. Position the Control Cab inet (J58890L) in the p osition it is to oc c up y when the installation is c omp lete. Be sure the c ab inet is level. 2. Using a p enc il or marker and using the Front Mounting Ang le as a temp late, mark the loc ations of the two floor mounting holes. 3. Move the c ab inet out of the way and d rill a hole 0.5-inc h (1.3 c m) in d iameter and 1.5 inc hes (3.8 c m) d eep at the loc ations marked in Step 2. 4. Insert a c onc rete floor anc hor (STARR p art numb er 3425) into eac h hole. Figure Notes 1. #12-24x1/2-inc h Thread Forming Sc re w 2. Control Cab inet 3. Front Mounting Ang le4. Hex Head Bolt 5. Nylon Insulating Washer 6. Conc rete Floor 7. Conc rete Floor Anc hor 4 1 3 2 5 6 7 r781854a CJL 030896
DEFINITY Enterprise Communication Server Release 8.2 Installation and Test for Single-Carrier Cabinets 555-233-120 Issue 1 April 2000 Install and Connect the Cabinets 1-38 Install Earthquake Protection 1 5. Sec ure the Front Mounting Ang le to the floor using the short hex head bolts provided. 6. Move the c ab inet b ac k into p lac e. 7. At the rear of the c ab inet, remove the two hole plug s from the b ottom of the c ab inet. See Fig ure 1-2 3 . 8. Insert a p enc il or marker throug h the holes in the b ottom of the c ab inet and mark the floor d irec tly b eneath eac h hole. 9. Move the c ab inet out of the way and d rill a hole 0.5-inc h (1.27 c m) in d iameter and 1.5 inc hes (3.8 c m) d eep at the loc ations marked in Step 8. 10. Insert a c onc rete floor anc hor (STARR p art numb er 3425) into eac h hole. 11. Move the c ab inet b ac k into p lac e and alig n with the Front Mounting Ang le. 12. Attac h the c ab inet to the Front Mounting Ang le using the four sup p lied #12-24 x 1/2-inc h (1.27 c m) thread -forming sc rews. See Fi g u re 1 - 2 2 .
DEFINITY Enterprise Communication Server Release 8.2 Installation and Test for Single-Carrier Cabinets 555-233-120 Issue 1 April 2000 Install and Connect the Cabinets 1-39 Install Earthquake Protection 1 Figure 1-23. Cabinet Earthquake Mounting — Rear View 13. Lay the sup p lied Stiffener on the bottom rear of the c ab inet and alig n with the holes in the b ottom of the c ab inet. See Fig ure 1-2 3 . 14. Slid e a nylon washer onto eac h of the two sup p lied long hex head b olts. 15. Insert the b olts throug h the Stiffener and thread into the c onc rete floor anc hor. Tig hten sec urely. NOTE: If c ritic al reliab ility is installed, the Exp ansion Control Cab inet sets on the floor, next to Control Cab inet A. Rep eat the ab ove proc edures. Figure Notes 1. Cabinet 2. Nylon Insulating Washer (2 Req uired ) 3. Long Hex Head Bolt (2 Req uired ) 4. Stiffener5. Cabinet Foot 6. Floor Plugs (Remove) 7. Conc rete Floor Anc hor 8. Conc rete Floor 34 5 1 8 2 7 On OffOn Off 6 r781851a CJL 030796
DEFINITY Enterprise Communication Server Release 8.2 Installation and Test for Single-Carrier Cabinets 555-233-120 Issue 1 April 2000 Install and Connect the Cabinets 1-40 Install Earthquake Protection 1
Install Telecommunications Cabling 2-1 Equipment Room Hardware 2 DEFINITY Enterprise Communication Server Release 8.2 Installation and Test for Single-Carrier Cabinets 555-233-120 Issue 1 April 2000 2 Install Telecommunications Cabling Equipment Room Hardware SYSTIMAX 110-typ e hardware is used for the Main Distrib ution Frame (MDF). 110-typ e hard ware is availab le in two b asic types: the 110A and 110P. The 110A req uires less wall sp ac e than the 110P. The 110P inc lud es horizontal and vertic al c ab le troug hs for manag ing c ross-c onnec t c ab les. The system is c onnec ted to the MDF with the sup p lied B25A male to female 25-pair c ab les. The c ab les are p rovid ed in 10-foot (3 m) and 15-foot (4.5 m) lengths. Refer to DEFINITY Communic ations System Generic 1 and Generic 3 Main Distribution Field Design for more information. Fi g u re 2 - 1 shows a d etailed examp le of Sing le-Carrier Cab inet c ab les c onnec ting system c ab inets and satellite c losets to the MDF. The fig ure shows the c ross-c onnec tions for one example station c irc uit.
DEFINITY Enterprise Communication Server Release 8.2 Installation and Test for Single-Carrier Cabinets 555-233-120 Issue 1 April 2000 Install Telecommunications Cabling 2-2 Equipment Room Hardware 2 Figure 2-1. Example MDF ConnectionsFigure Notes 1. Rear of Port Cab inet 2. Main Distrib ution Frame (MDF) 3. Port Distribution Field (Purp le Field ) 4. Station Distribution Field (White Field) 5. Trunk/Auxiliary Field 6. Purp le Field 7. Yellow Field 8. Green Field9. Satellite Closet 10. Auxiliary Cab inet (Yellow Field ) 11. White Field 12. Blue Field 13. Cross-Connec t Jumpers 14. 103A or Mod ular Wall Jac k 15. 4-Pair Line Cord 16. To Line Circ uit Pac k 0016_0 RBP 052396 16 17 18 19 15 14 13 12 11 10 09 08 07 06 05 04 03 02 01AUX 25-Pair Cable25-Pair Cable 25-Pair Cable 25-Pair Cable Trunk Circuit Pack Line Circuit Pack 25-Pair Cable To Network Intrface Yellow Field